CN102535534A - 一种潮间带多角架风机基础调平灌浆施工工艺 - Google Patents

一种潮间带多角架风机基础调平灌浆施工工艺 Download PDF

Info

Publication number
CN102535534A
CN102535534A CN2012100014734A CN201210001473A CN102535534A CN 102535534 A CN102535534 A CN 102535534A CN 2012100014734 A CN2012100014734 A CN 2012100014734A CN 201210001473 A CN201210001473 A CN 201210001473A CN 102535534 A CN102535534 A CN 102535534A
Authority
CN
China
Prior art keywords
pile body
jacket sleeve
foundation
basic
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100014734A
Other languages
English (en)
Other versions
CN102535534B (zh
Inventor
张钢
高宏飙
陈强
季晓强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Original Assignee
Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Marine Longyuan Wind Power Generation Co Ltd filed Critical Jiangsu Marine Longyuan Wind Power Generation Co Ltd
Priority to CN201210001473.4A priority Critical patent/CN102535534B/zh
Publication of CN102535534A publication Critical patent/CN102535534A/zh
Application granted granted Critical
Publication of CN102535534B publication Critical patent/CN102535534B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

本发明公开了一种潮间带多角架风机基础调平灌浆施工工艺,所述施工工艺包括以下步骤:将所述基础桩体沉入水中;测量多个所述基础桩牛腿顶面的高程;根据各个所述基础桩牛腿顶面高程偏差,在多个所述基础桩牛腿上放置垫片,进行预调平;将所述导管架套筒套设在所述基础桩体的外部;测量所述导管架套筒上法兰水平面的偏差,若偏差在2毫米以内,不需再调整,若超出2毫米,则用千斤顶置于所述基础桩体顶面,顶升所述导管架套筒,将法兰水平度调整至2毫米以内。本发明潮间带多角架风机基础调平灌浆施工工艺具有以下有益效果:解决了潮间带区域高精度调平灌浆的问题,大大的降低了施工成本,降低单台成本。

Description

一种潮间带多角架风机基础调平灌浆施工工艺
技术领域
本发明涉及海上风电行业的施工工艺,尤其涉及一种潮间带多角架风机基础调平灌浆施工工艺。
背景技术
潮间带是位于大潮的高、低潮位之间,随潮汐涨落而被淹没和露出的地带。根据初步估算,潮间带年平均风速可达6-7米/秒,因此潮间带中具备可以利用的风能。对于潮间带风电工程来说,其主要涉及到风电机组基础的施工。
由于海上风电机组的基础处于海上,增加了许多额外的载荷和不确定因素,因而设计较为复杂,结构形式也由于不同的海况而多样化。海上风电机组的固定式基础最常用的有3种,单桩式、重力式、多角架式。目前在潮间带区域实施的多角架基础施工工艺具体分为桩基施工、导管架安装、调平灌浆三个步骤,为能在潮间带有效实施多角架基础的调平工作,将基础法兰平面的最高点和最低点的差值控制在2毫米以内,并进行灌浆施工。但是,目前的施工工艺较难达到该差值以内。
因此,需要提供一种潮间带多角架风机基础调平灌浆施工工艺以解决上述问题。
发明内容
为了解决该问题,本发明公开了一种潮间带多角架风机基础调平灌浆施工工艺,所述施工工艺应用于多角架桩,所述多角架桩包括基础桩体,所述基础桩体的下部外侧设置有环形板,在所述环形板和所述基础桩体之间,设置有多个基础桩牛腿,所述环形板形成所述基础桩牛腿的顶面,在所述基础桩体的外部还套设有导管架套筒,所述导管架套筒支撑在所述环形板上,在所述导管架套筒和所述基础桩体之间灌注有灌浆料,在所述基础桩体的顶面和所述导管架套筒的顶面之间还设置有千斤顶,所述施工工艺包括以下步骤:
将所述基础桩体沉入水中;
测量多个所述基础桩牛腿顶面的高程;
根据各个所述基础桩牛腿顶面高程偏差,在多个所述基础桩牛腿上放置垫片,进行预调平;
将所述导管架套筒套设在所述基础桩体的外部;
测量所述导管架套筒上法兰水平面的偏差,若偏差在2毫米以内,不需再调整,若超出2毫米,则用千斤顶置于所述基础桩体顶面,顶升所述导管架套筒,将法兰水平度调整至2毫米以内。
较佳地,在所述环形板上环绕所述导管架套筒还设置有抱箍,所述抱箍从所述环形板向上延伸,设置在所述导管架套筒的外侧,用以对所述导管架套筒固定。
较佳地,在所述导管架套筒和所述基础桩体之间还设置有钢筋。
较佳地,在所述导管架套筒和所述基础桩体之间还设置有定位板,在所述导管架套筒的内壁上和所述基础桩体的外壁上还设置有剪力键。
本发明潮间带多角架风机基础调平灌浆施工工艺具有以下有益效果:解决了潮间带区域高精度调平灌浆的问题,大大的降低了施工成本,降低单台成本。
在发明内容部分中引入了一系列简化形式的概念,这将在具体实施方式部分中进一步详细说明。本发明内容部分并不意味着要试图限定出所要求保护的技术方案的关键特征和必要技术特征,更不意味着试图确定所要求保护的技术方案的保护范围。
以下结合附图,详细说明本发明的优点和特征。
附图说明
图1是根据本发明一个实施例的施工工艺中采用的多角架桩的示意图。
具体实施方式
在下文的描述中,给出了大量具体的细节以便提供对本发明更为彻底的理解。然而,对于本领域技术人员来说显而易见的是,本发明可以无需一个或多个这些细节而得以实施。在其他的例子中,为了避免与本发明发生混淆,对于本领域公知的一些技术特征未进行描述。
为了彻底了解本发明,将在下列的描述中提出详细的结构。显然,本发明的施行并不限定于本领域的技术人员所熟习的特殊细节。本发明的较佳实施例详细描述如下,然而除了这些详细描述外,本发明还可以具有其他实施方式。
以下结合附图对本发明的实施例做详细描述。
参考图1,示出了根据本发明的施工工艺中采用的多角架桩的示意图。该多角架桩包括基础桩体1,该基础桩体1的下部外侧设置有环形板2,在环形板2和基础桩体1之间,设置有多个基础桩牛腿3。环形板2形成基础桩牛腿3的顶面。在基础桩体1的外部还套设有导管架套筒4,其支撑在环形板2上。在导管架套筒4和基础桩体1之间灌注有灌浆料。在环形板2上环绕导管架套筒4还设置有抱箍5,抱箍5从环形板2向上延伸,设置在导管架套筒4的外侧,用以对导管架套筒4固定。在导管架套筒4和基础桩体1之间还设置有钢筋6,以提高灌浆料的强度。在基础桩体1的顶面和导管架套筒4的顶面之间还设置有千斤顶7。在导管架套筒4和基础桩体1之间还设置有定位板8。在导管架套筒4的内壁上和基础桩体1的外壁上还设置有剪力键9。
本发明的施工工艺包括以下步骤:首先,将基础桩体1沉入水中;然后,测量多个基础桩牛腿3顶面的高程。根据各个基础桩牛腿顶面高程偏差,在多个基础桩牛腿上放置垫片,进行预调平,这样可以使多角架安装后,法兰平面偏差较小。例如,如果某一基础桩牛腿的高度较低,那么在其顶面上设置垫片,以使得多个基础桩牛腿的顶面尽量在同一平面内。然后,将导管架套筒4套设在基础桩体1的外部。随后,测量导管架套筒4上法兰水平面的偏差,若偏差在2毫米以内,不需再调整,若超出2毫米,则用千斤顶置于基础桩体顶面,顶升导管架套筒4,将法兰水平度调整至2毫米以内。调整完成后,采用搅拌机、地泵等设备连接管道,将搅拌完成的灌浆料灌入导管架套筒4和基础桩体1之间的空腔内。
本发明潮间带多角架风机基础调平灌浆施工工艺具有以下有益效果:解决了潮间带区域高精度调平灌浆的问题,大大的降低了施工成本,降低单台成本。
本发明已经通过上述实施例进行了说明,但应当理解的是,上述实施例只是用于举例和说明的目的,而非意在将本发明限制于所描述的实施例范围内。此外本领域技术人员可以理解的是,本发明并不局限于上述实施例,根据本发明的教导还可以做出更多种的变型和修改,这些变型和修改均落在本发明所要求保护的范围以内。本发明的保护范围由附属的权利要求书及其等效范围所界定。

Claims (4)

1.一种潮间带多角架风机基础调平灌浆施工工艺,所述施工工艺应用于多角架桩,所述多角架桩包括基础桩体,所述基础桩体的下部外侧设置有环形板,在所述环形板和所述基础桩体之间,设置有多个基础桩牛腿,所述环形板形成所述基础桩牛腿的顶面,在所述基础桩体的外部还套设有导管架套筒,所述导管架套筒支撑在所述环形板上,在所述导管架套筒和所述基础桩体之间灌注有灌浆料,在所述基础桩体的顶面和所述导管架套筒的顶面之间还设置有千斤顶,所述施工工艺包括以下步骤:
将所述基础桩体沉入水中;
测量多个所述基础桩牛腿顶面的高程;
根据各个所述基础桩牛腿顶面高程偏差,在多个所述基础桩牛腿上放置垫片,进行预调平;
将所述导管架套筒套设在所述基础桩体的外部;
测量所述导管架套筒上法兰水平面的偏差,若偏差在2毫米以内,不需再调整,若超出2毫米,则用千斤顶置于所述基础桩体顶面,顶升所述导管架套筒,将法兰水平度调整至2毫米以内。
2.按照权利要求1所述的施工工艺,其特征在于,在所述环形板上环绕所述导管架套筒还设置有抱箍,所述抱箍从所述环形板向上延伸,设置在所述导管架套筒的外侧,用以对所述导管架套筒固定。
3.按照权利要求2所述的施工工艺,其特征在于,在所述导管架套筒和所述基础桩体之间还设置有钢筋。
4.按照权利要求3所述的施工工艺,其特征在于,在所述导管架套筒和所述基础桩体之间还设置有定位板,在所述导管架套筒的内壁上和所述基础桩体的外壁上还设置有剪力键。
CN201210001473.4A 2012-01-05 2012-01-05 一种潮间带多角架风机基础调平灌浆施工工艺 Active CN102535534B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210001473.4A CN102535534B (zh) 2012-01-05 2012-01-05 一种潮间带多角架风机基础调平灌浆施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210001473.4A CN102535534B (zh) 2012-01-05 2012-01-05 一种潮间带多角架风机基础调平灌浆施工工艺

Publications (2)

Publication Number Publication Date
CN102535534A true CN102535534A (zh) 2012-07-04
CN102535534B CN102535534B (zh) 2016-01-20

Family

ID=46343439

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210001473.4A Active CN102535534B (zh) 2012-01-05 2012-01-05 一种潮间带多角架风机基础调平灌浆施工工艺

Country Status (1)

Country Link
CN (1) CN102535534B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926387A (zh) * 2012-10-22 2013-02-13 中交第二航务工程局有限公司 钢板桩围堰水下围檩安装导向装置及定位方法
CN103225304A (zh) * 2013-04-28 2013-07-31 国电联合动力技术有限公司 一种海上基础支撑结构及其施工方法
CN103255778A (zh) * 2013-03-22 2013-08-21 广东明阳风电产业集团有限公司 用于海上风机导管架基础安装灌浆的定位、调平方法
CN103556649A (zh) * 2013-11-08 2014-02-05 广东明阳风电产业集团有限公司 海上风力发电机组的导管架调平机构
CN103967036A (zh) * 2014-05-07 2014-08-06 中国水电顾问集团华东勘测设计研究院有限公司 用于海上风电的桩与套筒灌浆连接结构及其施工方法
CN104563172A (zh) * 2015-01-13 2015-04-29 浙江湖州市建工集团有限公司 一种钢结构房下沉复位结构及其复位方法
CN106522294A (zh) * 2016-12-16 2017-03-22 四川省建筑科学研究院 一种地下空间预制构件二次精准调平装置及方法
CN109208607A (zh) * 2018-11-06 2019-01-15 江苏龙源振华海洋工程有限公司 一种海上升压站导管架灌浆封堵工艺
CN109763470A (zh) * 2017-11-09 2019-05-17 刘中平 用于水中基础导管架的调整装置、系统及方法
CN109914411A (zh) * 2019-03-15 2019-06-21 江苏龙源振华海洋工程有限公司 一种海上四桩导管架非嵌岩型施工工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240088A (ja) * 1999-02-19 2000-09-05 Taisei Corp フーチングの構築工法
CN201506979U (zh) * 2009-09-14 2010-06-16 中国水利水电科学研究院 一种海上风机桩基础与导管架腿柱的灌浆连接结构
CN201746849U (zh) * 2010-06-24 2011-02-16 上海勘测设计研究院 海上风电场风机基础结构
CN102286986A (zh) * 2011-06-30 2011-12-21 天津大学 一种五脚架基础结构及施工方法
CN102296623A (zh) * 2011-06-27 2011-12-28 天津大学 一种可调平的三脚架式海上基础结构及施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000240088A (ja) * 1999-02-19 2000-09-05 Taisei Corp フーチングの構築工法
CN201506979U (zh) * 2009-09-14 2010-06-16 中国水利水电科学研究院 一种海上风机桩基础与导管架腿柱的灌浆连接结构
CN201746849U (zh) * 2010-06-24 2011-02-16 上海勘测设计研究院 海上风电场风机基础结构
CN102296623A (zh) * 2011-06-27 2011-12-28 天津大学 一种可调平的三脚架式海上基础结构及施工方法
CN102286986A (zh) * 2011-06-30 2011-12-21 天津大学 一种五脚架基础结构及施工方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102926387B (zh) * 2012-10-22 2014-11-05 中交第二航务工程局有限公司 钢板桩围堰水下围檩安装导向装置及定位方法
CN102926387A (zh) * 2012-10-22 2013-02-13 中交第二航务工程局有限公司 钢板桩围堰水下围檩安装导向装置及定位方法
CN103255778A (zh) * 2013-03-22 2013-08-21 广东明阳风电产业集团有限公司 用于海上风机导管架基础安装灌浆的定位、调平方法
CN103225304B (zh) * 2013-04-28 2016-09-14 国电联合动力技术有限公司 一种海上基础支撑结构及其施工方法
CN103225304A (zh) * 2013-04-28 2013-07-31 国电联合动力技术有限公司 一种海上基础支撑结构及其施工方法
CN103556649A (zh) * 2013-11-08 2014-02-05 广东明阳风电产业集团有限公司 海上风力发电机组的导管架调平机构
CN103556649B (zh) * 2013-11-08 2015-08-12 广东明阳风电产业集团有限公司 海上风力发电机组的导管架调平机构
CN103967036A (zh) * 2014-05-07 2014-08-06 中国水电顾问集团华东勘测设计研究院有限公司 用于海上风电的桩与套筒灌浆连接结构及其施工方法
CN104563172A (zh) * 2015-01-13 2015-04-29 浙江湖州市建工集团有限公司 一种钢结构房下沉复位结构及其复位方法
CN106522294A (zh) * 2016-12-16 2017-03-22 四川省建筑科学研究院 一种地下空间预制构件二次精准调平装置及方法
CN109763470A (zh) * 2017-11-09 2019-05-17 刘中平 用于水中基础导管架的调整装置、系统及方法
CN109763470B (zh) * 2017-11-09 2020-12-22 刘中平 用于水中基础导管架的调整装置、系统及方法
CN109208607A (zh) * 2018-11-06 2019-01-15 江苏龙源振华海洋工程有限公司 一种海上升压站导管架灌浆封堵工艺
CN109914411A (zh) * 2019-03-15 2019-06-21 江苏龙源振华海洋工程有限公司 一种海上四桩导管架非嵌岩型施工工艺

Also Published As

Publication number Publication date
CN102535534B (zh) 2016-01-20

Similar Documents

Publication Publication Date Title
CN102535534A (zh) 一种潮间带多角架风机基础调平灌浆施工工艺
CN105971000A (zh) 一种海上风机嵌岩单桩基础临时施工平台
CN104110039B (zh) 具有压力分散型布置高强预应力锚杆(索)的风机基础
CN206706811U (zh) 一种海上风机单桩基础
KR101192659B1 (ko) 풍력발전장치용 부유식 기초
KR101044752B1 (ko) 해상 풍력 발전 시설물 설치시 기울기 보정 장치
CN103423093B (zh) 用于深海海面的带吸力式沉箱的平台浮式风电机
CN202672129U (zh) 一种近海风电自升式海上升压站
CN103541377B (zh) 全过程可控式位移调节装置
CN201746845U (zh) 一种适用于海洋工程的桩基式基础结构
CN105780806A (zh) 一种钻孔桩长腿导管架海上风机基础及其施工方法
CN102852156A (zh) 一种复合桩基础结构
CN102296629A (zh) 一种适用于海洋工程的塔筒式结构物及其安装方法
CN105970998A (zh) 一种带隔板的箱式重力式海上风机基础
CN103088801A (zh) 海上风力发电机及桩基一次整体安装平台
CN205917721U (zh) 一种海上风机嵌岩单桩基础临时施工平台
KR101383159B1 (ko) 암반 설치용 중력식 해상풍력 기초 슬래브
CN103410677B (zh) 带吸力式沉箱的单桩固定式垂直轴风电机
CN102852154A (zh) 一种复合桩基
CN206031706U (zh) 漂浮式动态调平组件及测风装置
CN204803907U (zh) 一种海上风电钢构重力式风机基础
CN202298644U (zh) 一种用于海上风电的沉井式重力基础
CN106638651A (zh) 一种海上风机浮式基础整体式安装工艺
CN102392446A (zh) 一种大型无过渡段单桩施工技术
CN206847612U (zh) 一种离岸微型验潮仪安装装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20120704

Assignee: Haian Longyuan Offshore Wind Power Generation Co., Ltd.

Assignor: Jiangsu Marine Longyuan Wind Power Generation Co.,Ltd.

Contract record no.: 2019320010023

Denomination of invention: Construction process for leveling and grouting intertidal zone polygonal bracket fan foundation

Granted publication date: 20160120

License type: Common License

Record date: 20190515

Application publication date: 20120704

Assignee: Longyuan Yancheng Dafeng Offshore Wind Power Generation Co., Ltd.

Assignor: Jiangsu Marine Longyuan Wind Power Generation Co.,Ltd.

Contract record no.: 2019320010024

Denomination of invention: Construction process for leveling and grouting intertidal zone polygonal bracket fan foundation

Granted publication date: 20160120

License type: Common License

Record date: 20190516

EE01 Entry into force of recordation of patent licensing contract