CN103967036A - 用于海上风电的桩与套筒灌浆连接结构及其施工方法 - Google Patents

用于海上风电的桩与套筒灌浆连接结构及其施工方法 Download PDF

Info

Publication number
CN103967036A
CN103967036A CN201410189865.7A CN201410189865A CN103967036A CN 103967036 A CN103967036 A CN 103967036A CN 201410189865 A CN201410189865 A CN 201410189865A CN 103967036 A CN103967036 A CN 103967036A
Authority
CN
China
Prior art keywords
sleeve
steel pipe
pipe pile
grouting
offshore wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410189865.7A
Other languages
English (en)
Other versions
CN103967036B (zh
Inventor
赵生校
孙杏建
黄春林
俞华锋
贾献林
汤群益
冯卫江
吴芳和
吕国儿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina East China Engineering Corp
Original Assignee
Hydrochina East China Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina East China Engineering Corp filed Critical Hydrochina East China Engineering Corp
Priority to CN201410189865.7A priority Critical patent/CN103967036B/zh
Publication of CN103967036A publication Critical patent/CN103967036A/zh
Application granted granted Critical
Publication of CN103967036B publication Critical patent/CN103967036B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

本发明涉及一种用于海上风电的桩与套筒灌浆连接结构及其施工方法。本发明的目的是提供一种结构简单、施工方便、成本较低的用于海上风电的桩与套筒灌浆连接结构,以为桩和套筒提供可靠连接。本发明的技术方案是:一种用于海上风电的桩与套筒灌浆连接结构,具有打入海床的钢管桩和套于其上的套筒,其特征在于:所述钢管桩外围制有一圈环形牛腿,所述套筒套于钢管桩外并搁置于环形牛腿上,套筒与钢管桩之间留有间隙,间隙底部置有圆环形土工布袋,所述套筒下端设置有两个分别用于向土工布袋和间隙内灌浆的灌浆接口,套筒与钢管桩之间间隙内和土工布袋内填充高强灌浆材料。本发明适用于海上风力发电领域。

Description

用于海上风电的桩与套筒灌浆连接结构及其施工方法
技术领域
本发明涉及一种用于海上风电的桩与套筒灌浆连接结构及其施工方法。适用于海上风力发电领域。
背景技术
随着我国风力发电行业的迅速发展,海上风力发电开始快速起步,近几年涌现了大批在建、拟建的海上风电场。海上风电场的风电机组基础、海上升压站基础一般有高桩承台基础、导管架基础、单桩基础等,本发明主要用于导管架基础。
导管架基础分为钢管桩、导管架两部分。钢管桩的数量可以是3根或3根以上,钢管桩首先施工,由海上打桩设备将钢管桩打入海床中。导管架整体在钢结构加工厂制造,整体运输至现场,由起重船吊装后安装在已打好的桩上。导管架与桩连接的部件为套筒,套筒直径较桩稍大,套筒套在桩端外面,套筒与桩之间留有施工安装的间隙。因为桩与导管架最终需共同受力,套筒将上部结构传来的拉力、压力、水平力传递给桩,因此桩和套筒之间需要可靠的连接。本发明解决桩与套筒之间连接的问题。
发明内容
本发明要解决的技术问题是:针对上述存在的问题,提供一种结构简单、施工方便、成本较低的用于海上风电的桩与套筒灌浆连接结构及其施工方法,以为桩和套筒提供可靠连接。
本发明所采用的技术方案是:一种用于海上风电的桩与套筒灌浆连接结构,具有打入海床的钢管桩和套于其上的套筒,其特征在于:所述钢管桩外围制有一圈环形牛腿,所述套筒套于钢管桩外并搁置于环形牛腿上,套筒与钢管桩之间留有间隙,间隙底部置有圆环形土工布袋,所述套筒下端设置有两个分别用于向土工布袋和间隙内灌浆的灌浆接口,套筒与钢管桩之间间隙内和土工布袋内填充高强灌浆材料。
在钢管桩与套管重合段,钢管桩的外侧和套筒的内侧均设置若干圈剪力键;所述钢管桩与套筒上的剪力键在立面位置错开布置。
所述剪力键采用螺纹钢筋,水平焊接固定于钢管桩和套管上。
所述环形牛腿由固定于钢管桩外围的环形板和连接环形牛腿与钢管桩的锥形板组成。
土工布袋所对应的灌浆接口内设有与土工布袋连通的土工布管。
所述套筒上端设有观察孔,该观察孔距套筒下端面的距离略小于环形牛腿距钢管桩上端面的距离;所述观察孔共三个,互成120度均匀分布在套筒上。
所述套管内侧设置三个用于套管安装导向的导向限位板,导向限位板互成120度均匀布置。
用于海上风电的桩与套筒灌浆连接结构的施工方法,其特征在于步骤如下:
1、首先施打钢管桩,然后安装套筒,在导向限位板的作用下将套筒限定在设计的位置,套筒搁置于环形牛腿上;
2、将灌浆管与连通土工布袋的灌浆接口连接,向土工布袋灌注高强灌浆材料,土工布袋在压力作用下膨胀,在套筒的底部形成封堵,然后关闭灌浆管阀门;
3、将灌浆管与连通套筒与钢管桩之间间隙的灌浆接口连接,向套筒与钢管桩之间的间隙灌注高强灌浆材料,灌浆材料在压力作用下,由底部向上部灌注,逐步向上排水,最后浆液在观察孔处溢出,当3个观察孔都有稳定的浆液溢出时,关闭灌浆管的阀门;
4、将观察孔用环氧砂浆封堵,整个钢管桩与套筒的连接完成,待高强灌浆材料达到设计强度后,钢管桩与套筒的连接可承受上部结构传来的压力、拉力和水平力。
所述土工布袋先于套筒和钢管桩安装前折叠固定于套筒内侧,该土工布袋通过棉线与套筒内侧的剪力键相连。
所述高强灌浆材料为高强度、高流态的细石混凝土材料,由高强水泥、细骨料、粗骨料、减水剂、引气剂、早强剂和水组成,
其中水泥为高强水泥,标号≥52.5;
细骨料为砂;粗骨料为碎石或卵石,粗骨料最大粒径≤15mm;粗、细骨料的原料为硬岩,抗压强度应≥60MPa;
减水剂采用多环芳香族磺酸盐类、水溶性树脂磺酸盐类、脂肪族类、改性土质素磺酸盐类、改性丹宁类减水剂等高效减水剂中的一种或多种;
早强剂采用用硝酸盐、亚硝酸盐、三乙醇胺、甲酸胺、乙酸盐、丙酸盐中的一种或多种。
本发明的有益效果是:
1、在钢管桩外侧设置了环形牛腿,解决了套筒安装时搁置的问题,并用于承担上部结构传来的竖向荷载,由于环形牛腿的设置使应力路径更加流畅,减缓应力集中现象,减缓材料疲劳。
2、在套筒内侧设置有导向限位板,导向限位板用于套筒安装时,限定套筒的位置用,可以避免套筒在安装过程中与钢管桩碰撞,并避免套筒和钢管桩之间的间隙过大或过小。
3、在钢管桩外侧、套筒内侧设置水平剪力键,钢管桩和套筒之间的间隙灌注高强灌浆材料,设置剪力键之后的灌浆体能够很好的承担上部结构传来的各种荷载,包括动力荷载。
4、在套筒底部设置土工布袋,土工布袋在安装前折叠固定在套筒底部,折叠固定方式为采用棉线弱固定,仅保证安装时土工布袋的处于套筒内侧的位置,在向土工布袋内高压灌浆后,土工布袋受压力作用膨胀并拉断棉线,在套筒的底部形成封堵,防止漏浆;土工布袋在灌浆段底部形成了对灌浆材料的包裹,减缓灌浆材料的应力集中现象,减缓材料疲劳。
5、在套筒下端设置灌浆接口,浆液从底部向上灌注,逐步向上排水,保证灌浆的质量,也保证了此连接方法可用于水下施工。
6、连接部位的附属部件全部在工厂内制作,随套筒一起安装,现场仅需要灌注高强灌浆材料,现场作业工序少、时间短,既保证的连接的可靠性,也具有较好的经济性。
附图说明
图1是实施例中钢管桩和套筒连接的横剖面图。
图2是实施例中环形牛腿放大后的横剖面图。
图3是实施例中剪力键布置的平剖面图。
图4是实施例中灌浆接口的详图。
图5是实施例中土工布袋的详图。
图6是实施例中土工布管在灌浆接口内的安装图。
图7是实施例中土工布袋在未灌浆前的安装图(横剖面)。
图8是实施例中土工布袋在未灌浆前的安装图(平剖面)。
具体实施方式
如图1所示,本实施例为一个海上风电场的钢管桩1和套筒2之间的连接结构。钢管桩1外径1219mm壁厚28mm,钢管桩1首先施工,由海上打桩设备打至设计标高。钢管桩1上外围设置有环形牛腿4,环形牛腿4在钢管桩1制造时就已安装在钢管桩1上。导管架在钢管桩1施打完成后再安装,套筒2连接在导管架上,导管架安装时将套筒2套在钢管桩1的外侧,套筒2外径1524mm壁厚36mm。钢管桩1和套筒2之间留有116.5mm的间隙,此间隙用来适应安装误差,也用于充填高强灌浆材料3,间隙底部置有圆环形土工布袋7。本实施例中连接长度共2500mm,即钢管桩1的上端伸入套筒2内的长度共2500mm。在套筒2的上端设有观察孔9(观察孔9距套筒2下端面约2500mm),观察孔9为直径50mm的圆孔,共3个,互成120度均匀分布在套筒2上。
套筒2安装时搁置在钢管桩1外侧的环形牛腿4上。如图2所示,环形牛腿4由环形板41和锥形板42组成,固定于钢管桩1外围,锥形板42连接钢管桩1和环形板41外边缘,支撑环形板41,其中环形板41和锥形板42的尺寸由安装时套筒2传递给牛腿4的竖向力决定。本实施例环形板41外径1639mm、内径1219mm、厚30mm,锥形板42展开后外径3848mm、内径2970mm、厚28mm。
如图3所示,在钢管桩1与套筒2重合段,钢管桩1的外侧、套筒2的内侧均设置有若干圈剪力键5。剪力键5采用直径20mm的螺纹钢筋,用双侧焊缝水平焊接在钢管桩1、套筒2上。每段剪力键5长度200mm,在套筒2内侧间隔174mm设置,一周共12个;在钢管桩1外侧间隔123mm设置,一周共12个。如图2所示,钢管桩1和套筒2上的剪力键5在立面位置错开设置,钢管桩1上的剪力键5间距250mm,套筒2上的剪力键5最下端的位置分别为50mm、200mm、325mm,之上也是250mm。
本实施例中在套筒2内侧设置有导向限位板8,导向限位板8共3块,互成120度均匀布置在套筒2的内侧。导向限位板8由宽80mm、厚16mm的钢板弯折而成,弯折后距套筒2内壁最大距离80mm,上端留间隙40mm。导向限位板8用于套筒2安装时,限定套筒2的位置用,避免套筒2在安装过程中与钢管桩1碰撞,并避免套筒2和钢管桩1之间的间隙过大或过小。
本例中在套筒2的下端设置有两个灌浆接口6(见图1),分别距套筒2下端150mm、700mm。下方的灌浆接口6用于向土工布袋7灌浆,上方的灌浆接口6用于向套筒2和钢管桩1之间的间隙灌浆。如图4所示,灌浆接口6由钢管61和接于钢管外端的法兰62组成,钢管61长200mm、外径120mm、内径100mm、厚10mm;法兰62外径300mm、内径100mm、厚20mm,法兰上预钻8个20mm的螺栓孔。
如图5所示,本实施例中土工布袋7为圆环形,外径1452mm,在灌浆接口6的内设有土工布管71。其中土工布袋7宽500mm,用厚质土工布缝制而成;土工布管71直径100mm,长360mm,同样由厚质土工布缝制而成,土工布管71与土工布袋7之间同样采用缝制的方式连接。如图6所示,土工布管71安装在灌浆接口6的内侧,其长于灌浆接口的部分剪开成8份,弯折后用AB胶粘贴在法兰面62上,在法兰面62有螺栓孔的位置也相应的开孔。
本实施例的具体施工方法如下:
1、在现场操作中,首先施打钢管桩1,然后安装套筒2,套筒2在导向限位板8的作用下,将套筒2限定在设计的位置,套筒2搁置于环形牛腿4上;
2、将灌浆管与下部的灌浆接口6的法兰连接,向土工布袋7灌注高强灌浆材料,土工布袋7在压力作用下膨胀,在套筒2的底部形成封堵,防止漏浆,然后关闭下部灌浆接口6的灌浆管的阀门;
3、将灌浆管与上部的灌浆接口6的法兰连接,向套筒2与钢管桩1之间的间隙灌注高强灌浆材料,水泥浆在压力作用下,由底部向上部灌注,逐步向上排水,最后浆液在观察孔9处溢出,当3个观察孔9都有稳定的浆液溢出时,停止灌浆,关闭灌浆管的阀门;
4、将观察孔9用环氧砂浆封堵,整个钢管桩1与套筒2的连接完成,待高强灌浆材料达到设计强度后,钢管桩1与套筒2的连接就可以承受上部结构传来的压力、拉力和水平力。
如图7、图8所示,本实施例中土工布袋7先于套筒2和钢管桩1安装前就折叠固定在套筒2的内侧。套筒2的最下端两圈剪力键5为固定土工布袋7做了特别设计,此处剪力键5采用直径20mm的螺纹钢筋,螺纹钢筋按照套筒2的内径弯折,并与套筒内壁预留1~2mm的间隙,剪力键5与套筒2之间采用间断焊,每90mm焊缝52预留10mm间隙53。用棉线72穿过间隙53将土工布袋7固定在套筒2的内侧,每个间隙53位置绕3圈棉线72。土工布袋7在安装前的折叠固定方式为弱固定,仅保证安装时土工布袋7的处于套筒2内侧的位置,在向土工布袋7内高压灌浆后,土工布袋7受压力作用膨胀,拉断棉线72。
本实施例中高强灌浆材料3为高强度、高流态的细石混凝土材料,由高强水泥、细骨料、粗骨料、减水剂、引气剂、早强剂和水组成。其中水泥为高强水泥,标号52.5;细骨料为砂;粗骨料为碎石,粗骨料最大粒径≤15mm;粗、细骨料的原料应为硬岩;减水剂用多环芳香族磺酸盐类高效减水剂;早强剂用三乙醇胺。

Claims (10)

1.一种用于海上风电的桩与套筒灌浆连接结构,具有打入海床的钢管桩(1)和套于其上的套筒(2),其特征在于:所述钢管桩(1)外围制有一圈环形牛腿(4),所述套筒(2)套于钢管桩(1)外并搁置于环形牛腿(4)上,套筒(2)与钢管桩(1)之间留有间隙,间隙底部置有圆环形土工布袋(7),所述套筒(2)下端设置有两个分别用于向土工布袋(7)和间隙内灌浆的灌浆接口(6),套筒(2)与钢管桩(1)之间间隙内和土工布袋(7)内填充高强灌浆材料(3)。
2.根据权利要求1所述的用于海上风电的桩与套筒灌浆连接结构,其特征在于:在钢管桩(1)与套管(2)重合段,钢管桩(1)的外侧和套筒(2)的内侧均设置若干圈剪力键(5);所述钢管桩(1)与套筒(2)上的剪力键(5)在立面位置错开布置。
3.根据权利要求2所述的用于海上风电的桩与套筒灌浆连接结构,其特征在于:所述剪力键(5)采用螺纹钢筋,水平焊接固定于钢管桩(1)和套管(2)上。
4.根据权利要求3所述的用于海上风电的桩与套筒灌浆连接结构,其特征在于:所述环形牛腿(4)由固定于钢管桩(1)外围的环形板(41)和连接环形牛腿(4)与钢管桩(1)的锥形板(42)组成。
5.根据权利要求4所述的用于海上风电的桩与套筒灌浆连接结构,其特征在于:土工布袋(7)所对应的灌浆接口(6)内设有与土工布袋(7)连通的土工布管(71)。
6.根据权利要求5所述的用于海上风电的桩与套筒灌浆连接结构,其特征在于:所述套筒(2)上端设有观察孔(9),该观察孔距套筒(2)下端面的距离略小于环形牛腿(4)距钢管桩(1)上端面的距离;所述观察孔(9)共三个,互成120度均匀分布在套筒(2)上。
7.根据权利要求6所述的用于海上风电的桩与套筒灌浆连接结构,其特征在于:所述套管(2)内侧设置三个用于套管(2)安装导向的导向限位板(8),导向限位板(8)互成120度均匀布置。
8.根据权利要求7所述用于海上风电的桩与套筒灌浆连接结构的施工方法,其特征在于步骤如下:
8.1、首先施打钢管桩(1),然后安装套筒(2),在导向限位板(8)的作用下将套筒(2)限定在设计的位置,套筒搁置于环形牛腿(4)上;
8.2、将灌浆管与连通土工布袋(7)的灌浆接口(6)连接,向土工布袋(7)灌注高强灌浆材料(3),土工布袋(7)在压力作用下膨胀,在套筒(2)的底部形成封堵,然后关闭灌浆管阀门;
8.3、将灌浆管与连通套筒(2)与钢管桩(1)之间间隙的灌浆接口(6)连接,向套筒(2)与钢管桩(1)之间的间隙灌注高强灌浆材料(3),灌浆材料在压力作用下,由底部向上部灌注,逐步向上排水,最后浆液在观察孔(9)处溢出,当3个观察孔都有稳定的浆液溢出时,关闭灌浆管的阀门;
8.4、将观察孔(9)用环氧砂浆封堵,整个钢管桩(1)与套筒(2)的连接完成,待高强灌浆材料(3)达到设计强度后,钢管桩与套筒的连接可承受上部结构传来的压力、拉力和水平力。
9.根据权利要求8的施工方法,其特征在于:所述土工布袋(7)先于套筒(2)和钢管桩(1)安装前折叠固定于套筒(2)内侧,该土工布袋通过棉线(72)与套筒(2)内侧的剪力键(5)相连。
10.根据权利要求1或8所述的用于海上风电的桩与套筒灌浆连接结构,其特征在于:所述高强灌浆材料(3)为高强度、高流态的细石混凝土材料,由高强水泥、细骨料、粗骨料、减水剂、引气剂、早强剂和水组成,
其中水泥为高强水泥,标号≥52.5;
细骨料为砂;粗骨料为碎石或卵石,粗骨料最大粒径≤15mm;粗、细骨料的原料为硬岩,抗压强度应≥60MPa;
减水剂采用多环芳香族磺酸盐类、水溶性树脂磺酸盐类、脂肪族类、改性土质素磺酸盐类、改性丹宁类减水剂等高效减水剂中的一种或多种;
早强剂采用用硝酸盐、亚硝酸盐、三乙醇胺、甲酸胺、乙酸盐、丙酸盐中的一种或多种。
CN201410189865.7A 2014-05-07 2014-05-07 用于海上风电的桩与套筒灌浆连接结构及其施工方法 Active CN103967036B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410189865.7A CN103967036B (zh) 2014-05-07 2014-05-07 用于海上风电的桩与套筒灌浆连接结构及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410189865.7A CN103967036B (zh) 2014-05-07 2014-05-07 用于海上风电的桩与套筒灌浆连接结构及其施工方法

Publications (2)

Publication Number Publication Date
CN103967036A true CN103967036A (zh) 2014-08-06
CN103967036B CN103967036B (zh) 2016-12-07

Family

ID=51237005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410189865.7A Active CN103967036B (zh) 2014-05-07 2014-05-07 用于海上风电的桩与套筒灌浆连接结构及其施工方法

Country Status (1)

Country Link
CN (1) CN103967036B (zh)

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314098A (zh) * 2014-10-08 2015-01-28 国家电网公司 输电塔用微型桩基
CN104499500A (zh) * 2014-12-02 2015-04-08 瑞风能源(武汉)工程技术有限公司 一种风电基础后灌浆补强防水系统
CN104817306A (zh) * 2015-04-17 2015-08-05 中国二十二冶集团有限公司 利用人工砂石粉、矿物废料配制c40混凝土的方法
CN104947676A (zh) * 2015-06-29 2015-09-30 中国能源建设集团广东省电力设计研究院有限公司 海上灌浆防漏结构及海上灌浆防漏方法
CN105544549A (zh) * 2016-01-28 2016-05-04 上海建工二建集团有限公司 一种防止一柱一桩钢管柱反浆接头装置及其施工方法
CN105672321A (zh) * 2016-04-06 2016-06-15 福州大学 管口加强的海上风电机组基础灌浆套管连接结构及其方法
CN105672320A (zh) * 2016-04-06 2016-06-15 福州大学 设置环槽的海上风电机组基础灌浆套管连接结构及其方法
CN105672344A (zh) * 2016-04-06 2016-06-15 福州大学 配置钢筋的海上风电机组基础灌浆套管连接结构及其方法
CN105862906A (zh) * 2016-05-27 2016-08-17 上海勘测设计研究院有限公司 海上风电场风机单桩基础及施工方法
CN105862907A (zh) * 2016-06-04 2016-08-17 福建省新能海上风电研发中心有限公司 环形组合式超大直径海上风电单桩基础及其施工工艺
CN106284400A (zh) * 2016-09-18 2017-01-04 中国电建集团华东勘测设计研究院有限公司 一种预应力混凝土风电机组基础
CN106930313A (zh) * 2017-04-19 2017-07-07 合肥学院 一种近海风电工程桩桶组合基础及其施工方法
CN107938699A (zh) * 2017-11-13 2018-04-20 中交第三航务工程局有限公司宁波分公司 一种升压站基础的施工方法
CN108277817A (zh) * 2018-01-02 2018-07-13 中国建筑第八工程局有限公司 高桩承台塔吊基础加固结构及其施工方法
CN108625388A (zh) * 2018-05-28 2018-10-09 中国电建集团华东勘测设计研究院有限公司 一种适用于浅基岩地质条件的套筒组合式大直径单桩基础及其施工方法
CN108708686A (zh) * 2018-08-21 2018-10-26 天津熙盛科技发展有限公司 一种被动式具有缩小间隙功能的水下封隔器
CN108755738A (zh) * 2018-07-18 2018-11-06 中国电建集团中南勘测设计研究院有限公司 一种海上高桩承台风机基础及其施工方法
CN109137902A (zh) * 2018-07-26 2019-01-04 中船第九设计研究院工程有限公司 一种用于单节桩改成下节桩的钢桶及其加工方法
CN109235282A (zh) * 2018-11-12 2019-01-18 中铁六局集团有限公司 水上临时支墩的防滑柱体及其施工方法
CN109295980A (zh) * 2018-10-09 2019-02-01 中交上海港湾工程设计研究院有限公司 一种后桩法导管架水下灌浆管线系统及灌浆封堵方法
CN109423987A (zh) * 2017-08-29 2019-03-05 中交天津港湾工程设计院有限公司 一种海上可重复使用型多桩嵌岩平台
CN110241826A (zh) * 2019-07-01 2019-09-17 中交港湾(上海)科技有限公司 先桩法直桩外套式导管架水下灌浆施工系统及施工方法
CN111827274A (zh) * 2020-07-22 2020-10-27 浙江大学 一种海上风电弱风化基岩单桩嵌岩基础的高强灌浆方法
CN111877328A (zh) * 2020-07-17 2020-11-03 中交第二航务工程局有限公司 预应力混凝土管桩与钢管立柱灌浆连接构造及施工方法
CN113237612A (zh) * 2021-05-06 2021-08-10 郑州大学 一种模拟海上风机注浆加固的试验装置
CN113417282A (zh) * 2021-07-22 2021-09-21 中国电建集团华东勘测设计研究院有限公司 一种新型单桩过渡段及其安装方法
CN114045836A (zh) * 2021-10-15 2022-02-15 中国铁建港航局集团有限公司 海上灌浆辅助装置及施工方法
CN114890738A (zh) * 2022-05-09 2022-08-12 阳江海上风电实验室 海上风机吸力筒填充专用水下轻质灌浆料及其制备方法
CN115030230A (zh) * 2022-08-10 2022-09-09 衡橡科技股份有限公司 一种先桩式充浆封闭封隔器及封闭方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201506979U (zh) * 2009-09-14 2010-06-16 中国水利水电科学研究院 一种海上风机桩基础与导管架腿柱的灌浆连接结构
CN102108873A (zh) * 2009-12-29 2011-06-29 郑州优特基础工程维修有限公司 隧道渗漏水快速处治高聚物注浆方法
JP2011196053A (ja) * 2010-03-18 2011-10-06 Penta Ocean Construction Co Ltd グラウト注入施工方法、この施工方法を用いた桟橋施工方法及びこの施工方法に適用可能な基礎杭固定構造
CN102535534A (zh) * 2012-01-05 2012-07-04 江苏海上龙源风力发电有限公司 一种潮间带多角架风机基础调平灌浆施工工艺
CN102561354A (zh) * 2012-01-19 2012-07-11 中国水电顾问集团华东勘测设计研究院 一种海上风电基础灌浆连接的灌浆压舱结构
CN202745205U (zh) * 2012-03-31 2013-02-20 中国海洋石油总公司 用于深水浮式平台钢结构间的灌浆连接节点
CN103437372A (zh) * 2013-08-13 2013-12-11 广东明阳风电产业集团有限公司 一种海上风机导管架与海底桩基础的连接结构及灌浆方法
EP2672016A1 (en) * 2012-06-04 2013-12-11 RWE Innogy GmbH Grout seal and method to grout an annular space between two foundation members of an offshore structure
CN203475461U (zh) * 2013-08-13 2014-03-12 广东明阳风电产业集团有限公司 一种海上风机导管架与海底桩基础的连接结构
CN203866853U (zh) * 2014-05-07 2014-10-08 中国水电顾问集团华东勘测设计研究院有限公司 用于海上风电的桩与套筒灌浆连接结构

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201506979U (zh) * 2009-09-14 2010-06-16 中国水利水电科学研究院 一种海上风机桩基础与导管架腿柱的灌浆连接结构
CN102108873A (zh) * 2009-12-29 2011-06-29 郑州优特基础工程维修有限公司 隧道渗漏水快速处治高聚物注浆方法
JP2011196053A (ja) * 2010-03-18 2011-10-06 Penta Ocean Construction Co Ltd グラウト注入施工方法、この施工方法を用いた桟橋施工方法及びこの施工方法に適用可能な基礎杭固定構造
CN102535534A (zh) * 2012-01-05 2012-07-04 江苏海上龙源风力发电有限公司 一种潮间带多角架风机基础调平灌浆施工工艺
CN102561354A (zh) * 2012-01-19 2012-07-11 中国水电顾问集团华东勘测设计研究院 一种海上风电基础灌浆连接的灌浆压舱结构
CN202745205U (zh) * 2012-03-31 2013-02-20 中国海洋石油总公司 用于深水浮式平台钢结构间的灌浆连接节点
EP2672016A1 (en) * 2012-06-04 2013-12-11 RWE Innogy GmbH Grout seal and method to grout an annular space between two foundation members of an offshore structure
CN103437372A (zh) * 2013-08-13 2013-12-11 广东明阳风电产业集团有限公司 一种海上风机导管架与海底桩基础的连接结构及灌浆方法
CN203475461U (zh) * 2013-08-13 2014-03-12 广东明阳风电产业集团有限公司 一种海上风机导管架与海底桩基础的连接结构
CN203866853U (zh) * 2014-05-07 2014-10-08 中国水电顾问集团华东勘测设计研究院有限公司 用于海上风电的桩与套筒灌浆连接结构

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314098A (zh) * 2014-10-08 2015-01-28 国家电网公司 输电塔用微型桩基
CN104499500A (zh) * 2014-12-02 2015-04-08 瑞风能源(武汉)工程技术有限公司 一种风电基础后灌浆补强防水系统
CN104817306A (zh) * 2015-04-17 2015-08-05 中国二十二冶集团有限公司 利用人工砂石粉、矿物废料配制c40混凝土的方法
CN104947676A (zh) * 2015-06-29 2015-09-30 中国能源建设集团广东省电力设计研究院有限公司 海上灌浆防漏结构及海上灌浆防漏方法
CN105544549A (zh) * 2016-01-28 2016-05-04 上海建工二建集团有限公司 一种防止一柱一桩钢管柱反浆接头装置及其施工方法
CN105672321A (zh) * 2016-04-06 2016-06-15 福州大学 管口加强的海上风电机组基础灌浆套管连接结构及其方法
CN105672320A (zh) * 2016-04-06 2016-06-15 福州大学 设置环槽的海上风电机组基础灌浆套管连接结构及其方法
CN105672344A (zh) * 2016-04-06 2016-06-15 福州大学 配置钢筋的海上风电机组基础灌浆套管连接结构及其方法
CN105862906A (zh) * 2016-05-27 2016-08-17 上海勘测设计研究院有限公司 海上风电场风机单桩基础及施工方法
CN105862907A (zh) * 2016-06-04 2016-08-17 福建省新能海上风电研发中心有限公司 环形组合式超大直径海上风电单桩基础及其施工工艺
CN106284400A (zh) * 2016-09-18 2017-01-04 中国电建集团华东勘测设计研究院有限公司 一种预应力混凝土风电机组基础
CN106930313A (zh) * 2017-04-19 2017-07-07 合肥学院 一种近海风电工程桩桶组合基础及其施工方法
CN106930313B (zh) * 2017-04-19 2023-10-13 合肥学院 一种近海风电工程桩桶组合基础及其施工方法
CN109423987A (zh) * 2017-08-29 2019-03-05 中交天津港湾工程设计院有限公司 一种海上可重复使用型多桩嵌岩平台
CN107938699A (zh) * 2017-11-13 2018-04-20 中交第三航务工程局有限公司宁波分公司 一种升压站基础的施工方法
CN108277817A (zh) * 2018-01-02 2018-07-13 中国建筑第八工程局有限公司 高桩承台塔吊基础加固结构及其施工方法
CN108625388A (zh) * 2018-05-28 2018-10-09 中国电建集团华东勘测设计研究院有限公司 一种适用于浅基岩地质条件的套筒组合式大直径单桩基础及其施工方法
CN108755738A (zh) * 2018-07-18 2018-11-06 中国电建集团中南勘测设计研究院有限公司 一种海上高桩承台风机基础及其施工方法
CN109137902B (zh) * 2018-07-26 2020-11-17 中船第九设计研究院工程有限公司 一种用于单节桩改成下节桩的钢桶及其加工方法
CN109137902A (zh) * 2018-07-26 2019-01-04 中船第九设计研究院工程有限公司 一种用于单节桩改成下节桩的钢桶及其加工方法
CN108708686A (zh) * 2018-08-21 2018-10-26 天津熙盛科技发展有限公司 一种被动式具有缩小间隙功能的水下封隔器
CN109295980A (zh) * 2018-10-09 2019-02-01 中交上海港湾工程设计研究院有限公司 一种后桩法导管架水下灌浆管线系统及灌浆封堵方法
CN109235282A (zh) * 2018-11-12 2019-01-18 中铁六局集团有限公司 水上临时支墩的防滑柱体及其施工方法
CN110241826A (zh) * 2019-07-01 2019-09-17 中交港湾(上海)科技有限公司 先桩法直桩外套式导管架水下灌浆施工系统及施工方法
CN111877328A (zh) * 2020-07-17 2020-11-03 中交第二航务工程局有限公司 预应力混凝土管桩与钢管立柱灌浆连接构造及施工方法
CN111827274A (zh) * 2020-07-22 2020-10-27 浙江大学 一种海上风电弱风化基岩单桩嵌岩基础的高强灌浆方法
CN113237612A (zh) * 2021-05-06 2021-08-10 郑州大学 一种模拟海上风机注浆加固的试验装置
CN113237612B (zh) * 2021-05-06 2024-03-19 郑州大学 一种模拟海上风机注浆加固的试验装置
CN113417282A (zh) * 2021-07-22 2021-09-21 中国电建集团华东勘测设计研究院有限公司 一种新型单桩过渡段及其安装方法
CN114045836A (zh) * 2021-10-15 2022-02-15 中国铁建港航局集团有限公司 海上灌浆辅助装置及施工方法
CN114890738A (zh) * 2022-05-09 2022-08-12 阳江海上风电实验室 海上风机吸力筒填充专用水下轻质灌浆料及其制备方法
CN115030230A (zh) * 2022-08-10 2022-09-09 衡橡科技股份有限公司 一种先桩式充浆封闭封隔器及封闭方法

Also Published As

Publication number Publication date
CN103967036B (zh) 2016-12-07

Similar Documents

Publication Publication Date Title
CN103967036A (zh) 用于海上风电的桩与套筒灌浆连接结构及其施工方法
CN203866853U (zh) 用于海上风电的桩与套筒灌浆连接结构
CN201241344Y (zh) 可控囊式膨胀装置
CN106759325A (zh) 一种布袋式多扩大头旋喷锚杆杆体装置及其施工方法
CN104234047A (zh) 一种竹节桩与管桩共同嵌入水泥土搅拌土钉桩的复合桩
CN101324064B (zh) 岩土工程用可控膨胀挤压土体装置
CN101748742B (zh) 降压井混凝土与法兰盘双重封堵施工方法
CN108442386A (zh) 一种可拆芯扩体锚固结构装置及其组装施工方法
CN106930289A (zh) 一种无声破桩装置及破桩方法
CN204491645U (zh) 一种深基坑降水封井装置
CN202482860U (zh) 一种自钻式螺旋锚杆
CN207260138U (zh) 高压旋喷搅拌承载桩的钻杆及具有其的装置
CN111042142B (zh) 桩端后注浆施工及注浆失效处理装置
CN102518129A (zh) 后压浆预应力空心方桩及制作方法
CN109868813B (zh) 预应力管桩的封底方法
CN206956754U (zh) 一种用于基坑局部降水的简易装置
CN206942800U (zh) 一种控制隧道初期支护沉降收敛的锁脚桩支护结构
CN205776152U (zh) 预应力锚杆波形板桩支挡结构
CN109854281A (zh) 上土下岩复合断面地层顶管施工的支护方法
CN204491643U (zh) 一种筏板上降水井封闭的施工结构
CN209959261U (zh) 一种矫正地铁隧道水平变形的实时反馈注浆装置
CN212270943U (zh) 一种预制拼装式钢砼组合支撑桩
CN105442594A (zh) 内置压浆管预应力空心方桩扩孔压浆施工工艺
CN106836215A (zh) 内外水压自动平衡钢护筒
CN206545206U (zh) 一种土木工程组合桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant