CN103469815A - 一种钢筋混凝土挡土墙护坡施工方法 - Google Patents
一种钢筋混凝土挡土墙护坡施工方法 Download PDFInfo
- Publication number
- CN103469815A CN103469815A CN2013104384519A CN201310438451A CN103469815A CN 103469815 A CN103469815 A CN 103469815A CN 2013104384519 A CN2013104384519 A CN 2013104384519A CN 201310438451 A CN201310438451 A CN 201310438451A CN 103469815 A CN103469815 A CN 103469815A
- Authority
- CN
- China
- Prior art keywords
- concrete
- wall
- retaining wall
- construction method
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Revetment (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开一种钢筋混凝土挡土墙护坡施工方法,包括如下步骤:(一)测量放线;(二)基坑开挖;(三)铺设混凝土垫层;(四)基础钢筋制作与安装;(五)支立基础模板;(六)浇筑基础混凝土;(七)支立墙体模板;(八)浇筑墙体混凝土;(九)墙体混凝土养护;(十)墙体模板拆除;上述的施工方法的优点:(1)严格按照规范要求科学设计、计划详细而周密,挡土墙质量好,避免返工浪费,克服了现有挡土墙存在的麻面、夹层和泄水孔堵塞等缺陷;(2)增强了整个挡土墙的整体性使其性能有一定的提高。
Description
技术领域
本发明涉及一种挡土墙,尤其涉及一种钢筋混凝土挡土墙护坡施工方法,属于土木工程施工技术领域。
背景技术
挡土墙是指支承路基填土或山坡土体、防止填土或土体变形失稳的构造物。在挡土墙横断面中,与被支承土体直接接触的部位称为墙背;与墙背相对的、临空的部位称为墙面;与地基直接接触的部位称为基底;与基底相对的、墙的顶面称为墙顶;基底的前端称为墙趾;基底的后端称为墙踵。根据其刚度及位移方式不同,可分为刚性挡土墙、柔性挡土墙和临时支撑三类。根据挡土墙的设置位置不同,分为路肩墙、路堤墙、路堑墙和山坡墙等。设置于路堤边坡的挡土墙称为路堤墙;墙顶位于路肩的挡土墙称为路肩墙;设置于路堑边坡的挡土墙称为路堑墙;设置于山坡上,支承山坡上可能坍塌的覆盖层土体或破碎岩层的挡土墙称为山坡墙。
其中,刚性挡土墙以钢筋混凝土挡土墙为主,根据不同的墙体高度有两种结构,通常墙高≤5m时采用钢筋砼悬臂式挡土墙,墙高>5m时采用钢筋砼扶壁式挡土墙。悬臂式挡土墙指由底板及固定在底板上的悬臂式直墙构成的主要靠底板上的填土重量维持稳定的挡土墙,其结构由立壁、趾板、踵板三个钢筋混凝土悬臂构件组成。钢筋砼扶壁式挡土墙,由底板及固定在底板上的直墙和扶壁构成的、主要靠底板上的填土重量维持自身稳定的挡土墙,其具体结构是沿悬臂式挡土墙的立臂,每隔一定距离加一道扶壁,将立壁与踵板连接起来。
现有的钢筋混凝土挡土墙经常存在着麻面、夹层、泄水孔堵塞及墙体与基底整体性差等缺陷,说明现有的施工步骤上还存有许多不足之处需进一步改善。
发明内容
发明目的:本发明的目的在于针对现有技术的不足,提供一种钢筋混凝土挡土墙护坡施工方法,该施工方法严格按照规范要求科学设计、计划详细而周密,严把质量关,避免返工浪费,克服了现有挡土墙存在的麻面、夹层、泄水孔堵塞及墙体与基底整体性差等缺陷。
技术方案:本发明所述的一种钢筋混凝土挡土墙护坡施工方法,包括如下步骤:
(一)测量放线,根据施工图纸及坐标点测放出挡土墙中心线、基础平面位置线和纵断高程线,做好平面、高程控制点;
(二)基坑开挖,开挖宽度根据挡土墙基础宽度按照1:1放坡确定,在开挖中,对不在同一高程的土石方开挖时,施工应按先深后浅的顺序进行,完成后,按基底纵轴线结合横断面放线复验,确认位置、标高无误;
(三)铺设混凝土垫层,先进行垫层定位放样,垫层支模,然后浇筑垫层混凝土,垫层施工完成后,复核设计高程并按设计图纸和挡墙中线桩定出墙体轴线、基础尺寸线和钢筋控制线;
(四)基础钢筋制作与安装,钢筋绑扎前应将垫层泥、水清理干净,按定好的间距,先摆放受力主筋、后放分布筋,且泄水孔应及时配合安装,同时预埋墙身钢筋和墙肋钢筋,增加基础与墙身的连接性使整个挡土墙成为一体;
(五)支立基础模板,模板支撑时,模板下口先做水平支撑,再加斜撑固定,模板接缝应严密,不得漏浆、错台,模板安装后,应检查预留洞口及预埋件位置;
(六)浇筑基础混凝土,混凝土配合比须符合设计强度要求,混凝土分层浇筑,分层厚度小于或等于250mm,各层混凝土浇筑不得间断,且应在前层混凝土振实尚未初凝前,将次层混凝土浇筑、捣实完毕,基础施工完成后应立即回填土,以小型压实机械进行分层夯实,并在表面预留3%的向外斜坡,防止积水渗入基底;
(七)支立墙体模板,首先按照模板设计方案拼装外侧的模板并按位置线就位,然后安装拉杆,装拉杆螺栓时螺杆要和原喷护锚杆须有效连接,同时按施工图纸要求安装泄水孔;
(八)浇筑墙体混凝土,墙体混凝土浇筑前,在底部接茬处先均匀浇筑15mm-18mm厚与墙体混凝土强度等级相同的砂浆结合层;浇筑时,混凝土应按规范规定分层浇筑,振捣密实,分层厚度小于或等于250mm,混凝土下料点应分散布置,墙体应连续进行浇筑,每层间隔时间不超过混凝土初凝时间,墙体混凝土施工缝设在设计伸缩缝处;混凝土浇筑振捣完毕,将上口露出的钢筋加以整理,用木抹子按设计标高控制线对墙体上口进行找平;
(九)墙体混凝土养护,混凝土浇筑完毕后,应在12小时以内加以覆盖和浇水,浇水次数应能保持混凝土有足够的湿润状态,养护期不少于7天;
(十)墙体模板拆除,待混凝土强度达到的合计强度75%以上,拆除侧面模板,首先逐段松开并拆除拉杆,然后逐块拆除模板,拆除时须保护墙体防止损坏。
进一步完善上述技术方案:
所述步骤(六)中基础混凝土浇筑时,采用混凝土泵,经过混凝土管道送入,同时采用三相振动棒振捣,振动时振动棒应快插慢拨,插入振捣的间距为30-50cm成“梅花形”进行,对每一振动部分必须振动到该部分混凝土密实为止,密实的标志是混凝土停止下沉,不再冒出气泡、表面呈现平坦、泛浆,同时应避免振动棒碰撞模板、钢筋及其他预埋件。
所述步骤(七)中的泄水孔间距2~3m,上下排交错布置,孔内预埋10cmPVC管,最下面一排泄水孔出口应高出地面25cm以上;墙内PVC管应在支模时安装好并进行定位;墙背进水口处管道应伸出墙体20~30cm,在进水口处管口底面设置粘土封层或采用砼将其夯振密实防止雨水下渗,管口四周用粗粒材料堆壤,防止泄水孔进水口堵塞。
所述步骤(四)中在钢筋与模板之间垫有垫块,垫块采用水泥砂浆制成,垫块厚度应与保护层厚度相同,垫块内预埋火烧丝或用塑料卡以保证保护层厚度。
所述步骤(六)中基础混凝土初凝前,距基础外边线向内100mm插入Φ20钢筋,埋深150mm,外漏50~80mm,间距1500mm,用于外脚手架的支座稳定,防止脚手架根部滑移。
所述步骤(四)中在绑扎基础双层钢筋网片时,须设置足够强度的撑脚,撑脚间距为400-600mm,以保证钢筋网片的定位准确、稳定牢固,在浇筑混凝土时不得松动变形。
所述步骤(八)中,施工缝应在已硬化的砼表面上继续灌筑砼前,清除其表面上的垃圾、水泥薄膜、表面上松动砂石和软弱砼层,采用风镐凿辅助以人工凿毛,高压力水冲洗,在浇筑上一层砼前,水平施工缝上先铺上10~15mm厚的水泥砂浆一层,其配合比与砼内的砂浆成分相同。
上述技术方案还包括步骤(十一)回填土,待墙身混凝土强度达到设计强度的70%后即可进行墙背回填,墙背回填时按设计及规范要求采用透水性较好的材料进行回填,靠墙处回填土后采用水夯及人工配合机械打夯;墙背以外的场平回填按要求分层回填压实。
所述步骤(五)和(七)中,在安装模板时要根据设计标高将所要支撑的模板高度先在两端头做好高程控制桩,同时拉线加密高程控制点以便控制模板顶面标高;模板安装完毕后按设计标高和所固定控制点进行加固模板和校正模板。
所述步骤(七)中基础混凝土达到设计强度的25%以上时方可搭设挡土墙墙体模板。
上述施工方法在整个过程中建立从上到下的质量管理体系,并在整个施工过程中开展,从始至终坚持质量管理活动,建立管理点、管理工具,采用相应立方图法、排列图法、因果分析法,使质量管理从静态管理进化为动态管理。
本发明与现有技术相比,其有益效果是:本发明所述的施工方法(1)严格按照规范要求科学设计、计划详细而周密,挡土墙质量好,避免返工浪费,克服了现有挡土墙存在的麻面、夹层和泄水孔堵塞等缺陷;(2)增强了整个挡土墙的整体性使其性能有一定的提高。
附图说明
图1为本发明的施工步骤框图。
具体实施方式
下面对本发明技术方案进行详细说明,但是本发明的保护范围不局限于所述实施例。
实施例1:如图1所示,一种钢筋混凝土挡土墙护坡施工方法,包括如下步骤:
(一)测量放线,根据施工图纸及坐标点测放出挡土墙中心线、基础平面位置线和纵断高程线,做好平面、高程控制点;
(二)基坑开挖,开挖宽度根据挡土墙基础宽度按照1:1放坡确定,在开挖中,对不在同一高程的土石方开挖时,施工应按先深后浅的顺序进行,完成后,按基底纵轴线结合横断面放线复验,确认位置、标高无误;
(三)铺设混凝土垫层,先进行垫层定位放样,垫层支模,然后浇筑垫层混凝土,垫层施工完成后,须复核设计高程并按设计图纸和挡墙中线桩定出墙体轴线、基础尺寸线和钢筋控制线;
(四)基础钢筋制作与安装,钢筋绑扎前应将垫层泥、水清理干净,按定好的间距,先摆放受力主筋、后放分布筋,且泄水孔应及时配合安装,绑扎基础双层钢筋网片时,须设置足够强度的撑脚,撑脚间距为400-600mm;
同时预埋墙身钢筋和墙肋钢筋,且在钢筋与模板之间垫有垫块,垫块采用水泥砂浆制成,垫块厚度应与保护层厚度相同,垫块内预埋火烧丝或用塑料卡以保证保护层厚度。
(五)支立基础模板,模板支撑时,模板下口先做水平支撑,再加斜撑固定,模板接缝应严密,不得漏浆、错台,模板安装后,应检查预留洞口及预埋件位置;
(六)浇筑基础混凝土,混凝土配合比须符合设计强度要求,混凝土分层浇筑,分层厚度小于或等于250mm,各层混凝土浇筑不得间断,且应在前层混凝土振实尚未初凝前,将次层混凝土浇筑、捣实完毕,
基础混凝土浇筑时,采用混凝土泵,经过混凝土管道送入,同时采用三相振动棒振捣,振动时振动棒应快插慢拨,插入振捣的间距为30-50cm成“梅花形”进行,对每一振动部分必须振动到该部分混凝土密实为止;
基础混凝土初凝前,距基础外边线向内100mm插入Φ20钢筋,埋深150mm,外漏50~80mm,间距1500mm,用于外脚手架的支座稳定,防止脚手架根部滑移;
基础施工完成后应立即回填土,以小型压实机械进行分层夯实,并在表面预留3%的向外斜坡,防止积水渗入基底;
(七)支立墙体模板,基础混凝土达到设计强度的25%以上时方可搭设挡土墙墙体模板;
首先按照模板设计方案拼装外侧的模板并按位置线就位,然后安装拉杆,装拉杆螺栓时螺杆要和原喷护锚杆须有效连接,同时按施工图纸要求安装泄水孔,泄水孔间距2~3m,上下排交错布置,孔内预埋10cmPVC管,最下面一排泄水孔出口应高出地面25cm以上;墙内PVC管应在支模时安装好并进行定位;墙背进水口处管道应伸出墙体20~30cm,在进水口处管口底面设置粘土封层或采用砼将其夯振密实防止雨水下渗,管口四周用粗粒材料堆壤。
(八)浇筑墙体混凝土,墙体混凝土浇筑前,在底部接茬处先均匀浇筑15mm-18mm厚与墙体混凝土强度等级相同的砂浆结合层;浇筑时,混凝土应按规范规定分层浇筑,振捣密实,分层厚度小于或等于250mm,混凝土下料点应分散布置,墙体应连续进行浇筑,每层间隔时间不超过混凝土初凝时间,墙体混凝土施工缝设在设计伸缩缝处;混凝土浇筑振捣完毕,将上口露出的钢筋加以整理,用木抹子按设计标高控制线对墙体上口进行找平;
其中:施工缝应在已硬化的砼表面上继续灌筑砼前,清除其表面上的垃圾、水泥薄膜、表面上松动砂石和软弱砼层,采用风镐凿辅助以人工凿毛,高压力水冲洗,在浇筑上一层砼前,水平施工缝上先铺上10~15mm厚的水泥砂浆一层,其配合比与砼内的砂浆成分相同。
(九)墙体混凝土养护,混凝土浇筑完毕后,应在12小时以内加以覆盖和浇水,浇水次数应能保持混凝土有足够的湿润状态,养护期不少于7天;
(十)墙体模板拆除,混凝土强度达到的合计强度75%以上时,拆除侧面模板,首先逐段松开并拆除拉杆,然后逐块拆除模板,拆除时须保护墙体防止损坏。
(十一)回填土,待墙身混凝土强度达到设计强度的70%后即可进行墙背回填,墙背回填时按设计及规范要求采用透水性较好的材料进行回填,靠墙处回填土后采用水夯及人工配合机械打夯;墙背以外的场平回填按要求分层回填压实。
所述步骤(五)和(七)中,在安装模板时要根据设计标高将所要支撑的模板高度先在两端头做好高程控制桩,同时拉线加密高程控制点以便控制模板顶面标高;模板安装完毕后按设计标高和所固定控制点进行加固模板和校正模板。
如上所述,尽管参照特定的优选实施例已经表示和表述了本发明,但其不得解释为对本发明自身的限制。在不脱离所附权利要求定义的本发明的精神和范围前提下,可对其在形式上和细节上作出各种变化。
Claims (10)
1.一种钢筋混凝土挡土墙护坡施工方法,其特征在于:包括如下步骤:
(一)测量放线,根据施工图纸及坐标点测放出挡土墙中心线、基础平面位置线和纵断高程线,做好平面、高程控制点;
(二)基坑开挖,开挖宽度根据挡土墙基础宽度按照1:1放坡确定,在开挖中,对不在同一高程的土石方开挖时,施工应按先深后浅的顺序进行,完成后,按基底纵轴线结合横断面放线复验,确认位置、标高无误;
(三)铺设混凝土垫层,先进行垫层定位放样,垫层支模,然后浇筑垫层混凝土,垫层施工完成后,须复核设计高程并按设计图纸和挡墙中线桩定出墙体轴线、基础尺寸线和钢筋控制线;
(四)基础钢筋制作与安装,钢筋绑扎前应将垫层泥、水清理干净,按定好的间距,先摆放受力主筋、后放分布筋,且泄水孔应及时配合安装,同时预埋墙身钢筋和墙肋钢筋;
(五)支立基础模板,模板支撑时,模板下口先做水平支撑,再加斜撑固定,模板接缝应严密,不得漏浆、错台,模板安装后,应检查预留洞口及预埋件位置;
(六)浇筑基础混凝土,混凝土配合比须符合设计强度要求,混凝土分层浇筑,分层厚度小于或等于250mm,各层混凝土浇筑不得间断,且应在前层混凝土振实尚未初凝前,将次层混凝土浇筑、捣实完毕,基础施工完成后应立即回填土,以小型压实机械进行分层夯实,并在表面预留3%的向外斜坡,防止积水渗入基底;
(七)支立墙体模板,首先按照模板设计方案拼装外侧的模板并按位置线就位,然后安装拉杆,装拉杆螺栓时螺杆要和原喷护锚杆须有效连接,同时按施工图纸要求安装泄水孔;
(八)浇筑墙体混凝土,墙体混凝土浇筑前,在底部接茬处先均匀浇筑15mm-18mm厚与墙体混凝土强度等级相同的砂浆结合层;浇筑时,混凝土应按规范规定分层浇筑,振捣密实,分层厚度小于或等于250mm,混凝土下料点应分散布置,墙体应连续进行浇筑,每层间隔时间不超过混凝土初凝时间,墙体混凝土施工缝设在设计伸缩缝处;混凝土浇筑振捣完毕,将上口露出的钢筋加以整理,用木抹子按设计标高控制线对墙体上口进行找平;
(九)墙体混凝土养护,混凝土浇筑完毕后,应在12小时以内加以覆盖和浇水,浇水次数应能保持混凝土有足够的湿润状态,养护期不少于7天;
(十)墙体模板拆除,混凝土强度达到的合计强度75%以上时,拆除侧面模板,首先逐段松开并拆除拉杆,然后逐块拆除模板,拆除时须保护墙体防止损坏。
2.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(六)中基础混凝土浇筑时,采用混凝土泵,经过混凝土管道送入,同时采用三相振动棒振捣,振动时振动棒应快插慢拨,插入振捣的间距为30-50cm成“梅花形”进行,对每一振动部分必须振动到该部分混凝土密实为止。
3.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(七)中的泄水孔间距2~3m,上下排交错布置,孔内预埋φ10cmPVC管,最下面一排泄水孔出口应高出地面25cm 以上;墙内PVC管应在支模时安装好并进行定位;墙背进水口处管道应伸出墙体20~30cm,在进水口处管口底面设置粘土封层或采用砼将其夯振密实防止雨水下渗,管口四周用粗粒材料堆壤。
4.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(四)中在钢筋与模板之间垫有垫块,垫块采用水泥砂浆制成,垫块厚度应与保护层厚度相同,垫块内预埋火烧丝或用塑料卡以保证保护层厚度。
5.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(六)中基础混凝土初凝前,距基础外边线向内100mm插入Φ20钢筋,埋深150mm,外漏50~80mm,间距1500mm,用于外脚手架的支座稳定,防止脚手架根部滑移。
6.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(四)中在绑扎基础双层钢筋网片时,须设置足够强度的撑脚,撑脚间距为400-600mm。
7.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(八)中,施工缝应在已硬化的砼表面上继续灌筑砼前,清除其表面上的垃圾、水泥薄膜、表面上松动砂石和软弱砼层,采用风镐凿辅助以人工凿毛,高压力水冲洗,在浇筑上一层砼前,水平施工缝上先铺上10~15mm厚的水泥砂浆一层,其配合比与砼内的砂浆成分相同。
8.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:还包括步骤(十一)回填土,待墙身混凝土强度达到设计强度的70%后即可进行墙背回填,墙背回填时按设计及规范要求采用透水性较好的材料进行回填,靠墙处回填土后采用水夯及人工配合机械打夯;墙背以外的场平回填按要求分层回填压实。
9.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(五)和(七)中,在安装模板时要根据设计标高将所要支撑的模板高度先在两端头做好高程控制桩,同时拉线加密高程控制点以便控制模板顶面标高;模板安装完毕后按设计标高和所固定控制点进行加固模板和校正模板。
10.根据权利要求1所述的一种钢筋混凝土挡土墙护坡施工方法,其特征在于:所述步骤(七)中基础混凝土达到设计强度的25%以上时方可搭设挡土墙墙体模板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310438451.9A CN103469815B (zh) | 2013-09-23 | 2013-09-23 | 一种钢筋混凝土挡土墙护坡施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310438451.9A CN103469815B (zh) | 2013-09-23 | 2013-09-23 | 一种钢筋混凝土挡土墙护坡施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103469815A true CN103469815A (zh) | 2013-12-25 |
CN103469815B CN103469815B (zh) | 2016-05-25 |
Family
ID=49794844
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310438451.9A Active CN103469815B (zh) | 2013-09-23 | 2013-09-23 | 一种钢筋混凝土挡土墙护坡施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103469815B (zh) |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099936A (zh) * | 2014-07-03 | 2014-10-15 | 上海市园林设计院有限公司 | 人工堆筑山体上叠水瀑布水景结构及其施工方法 |
CN104594378A (zh) * | 2015-02-11 | 2015-05-06 | 中国水利水电第四工程局有限公司 | 一种挡墙施工方法 |
CN104929150A (zh) * | 2015-04-23 | 2015-09-23 | 侨健新能源科技(苏州)有限公司 | 刚柔复合预位移挡土墙施工方法 |
CN105544561A (zh) * | 2016-02-25 | 2016-05-04 | 中铁十八局集团有限公司 | 抗滑桩护壁混凝土快速浇注的施工方法 |
CN105926815A (zh) * | 2016-05-10 | 2016-09-07 | 江苏东晟新诚建设集团有限公司 | 受限区域的板墙模板支护模板一体化施工工法 |
CN106958256A (zh) * | 2017-03-22 | 2017-07-18 | 中建四局第五建筑工程有限公司 | 一种分层浇筑、多次下沉的沉井施工工艺 |
CN107366302A (zh) * | 2017-06-27 | 2017-11-21 | 华恒建设集团有限公司 | 一种钢筋混凝土挡土墙的施工工艺 |
CN107938613A (zh) * | 2017-12-25 | 2018-04-20 | 浙江大学 | 一种新型带弹簧支撑泥石流防护挡墙及其施工方法 |
CN108277777A (zh) * | 2017-12-08 | 2018-07-13 | 中交烟台环保疏浚有限公司 | 挡浪墙分步浇筑施工工艺 |
CN108612233A (zh) * | 2018-04-03 | 2018-10-02 | 贵州建工集团第建筑工程有限责任公司 | 一种现浇饰面清水混凝土墙体施工方法 |
CN109339117A (zh) * | 2018-10-31 | 2019-02-15 | 长安大学 | 一种生物滞留设施中防渗膜与挡墙的搭接方法 |
CN109371910A (zh) * | 2018-12-10 | 2019-02-22 | 四川港航建设工程有限公司 | 垫地填高防护及施工方法 |
CN109736354A (zh) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | 隧道明挖段主体结构施工方法 |
CN109928701A (zh) * | 2019-04-23 | 2019-06-25 | 内江职业技术学院 | 一种建筑工程现浇柱的施工材料和施工方法 |
CN110185062A (zh) * | 2019-05-30 | 2019-08-30 | 陕西华山路桥集团有限公司 | 锁脚拉口式自稳定大模板墙身施工工法 |
CN111910679A (zh) * | 2020-08-12 | 2020-11-10 | 中建八局第二建设有限公司 | 复杂地形下超长超高衡重式挡土墙施工方法 |
CN112593749A (zh) * | 2020-12-08 | 2021-04-02 | 中铁八局集团有限公司 | 一种mbbr水处理工艺构筑物抗渗砼施工方法 |
CN113073679A (zh) * | 2021-01-07 | 2021-07-06 | 肖臣 | 一种重力式挡土墙分段式施工方法 |
CN113565128A (zh) * | 2021-08-05 | 2021-10-29 | 安徽金鹏建设集团股份有限公司 | 后浇带挡土墙施工方法 |
CN113585581A (zh) * | 2021-08-12 | 2021-11-02 | 中铁二十一局集团第二工程有限公司 | 一种仿茅草屋面施工工法 |
CN113897905A (zh) * | 2021-10-19 | 2022-01-07 | 长春工程学院 | 一种防冻害埋入式临水护墙结构及施工方法 |
CN114197704A (zh) * | 2021-12-23 | 2022-03-18 | 江苏精享裕建工有限公司 | 换流站防火墙施工工艺 |
CN114592577A (zh) * | 2022-03-21 | 2022-06-07 | 中交路桥建设有限公司 | 用于公路平交口排水的一体式排水沟结构及施工方法 |
CN114960698A (zh) * | 2022-06-10 | 2022-08-30 | 中铁十二局集团第三工程有限公司 | 一种消力式滑坡体防护结构施工方法 |
CN115142722A (zh) * | 2022-06-10 | 2022-10-04 | 河南沃克曼建设工程有限公司 | 一种大型污水处理厂圆形水池模板精准定位快速施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2219630Y (zh) * | 1995-02-10 | 1996-02-14 | 王丽钧 | 可装配成多种用途的组合家具 |
CN1219630A (zh) * | 1998-12-08 | 1999-06-16 | 李宪奎 | 挡土墙的成形方法 |
KR20050089576A (ko) * | 2004-03-05 | 2005-09-08 | 유근무 | 프리캐스트 콘크리트 옹벽블록 및 그 블록을 이용한조립식 옹벽의 시공방법 |
-
2013
- 2013-09-23 CN CN201310438451.9A patent/CN103469815B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2219630Y (zh) * | 1995-02-10 | 1996-02-14 | 王丽钧 | 可装配成多种用途的组合家具 |
CN1219630A (zh) * | 1998-12-08 | 1999-06-16 | 李宪奎 | 挡土墙的成形方法 |
KR20050089576A (ko) * | 2004-03-05 | 2005-09-08 | 유근무 | 프리캐스트 콘크리트 옹벽블록 및 그 블록을 이용한조립식 옹벽의 시공방법 |
Non-Patent Citations (4)
Title |
---|
BIN821027: "《zhidao.baidu.com/link?url=TfDXgMSLj..》", 4 July 2012 * |
XHF0239: "《xm.zhulong.com/info_wiki/read600275.html》", 18 October 2012 * |
中交第二公路勘测设计研究院有限公司: "《公路挡土墙设计与施工技术细则》", 31 March 2008, 人民交通出版社 * |
谢玉晶: "扶壁式钢筋混凝土挡土墙施工技术", 《广西质量监督导报》 * |
Cited By (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104099936A (zh) * | 2014-07-03 | 2014-10-15 | 上海市园林设计院有限公司 | 人工堆筑山体上叠水瀑布水景结构及其施工方法 |
CN104594378A (zh) * | 2015-02-11 | 2015-05-06 | 中国水利水电第四工程局有限公司 | 一种挡墙施工方法 |
CN104929150A (zh) * | 2015-04-23 | 2015-09-23 | 侨健新能源科技(苏州)有限公司 | 刚柔复合预位移挡土墙施工方法 |
CN105544561A (zh) * | 2016-02-25 | 2016-05-04 | 中铁十八局集团有限公司 | 抗滑桩护壁混凝土快速浇注的施工方法 |
CN105544561B (zh) * | 2016-02-25 | 2017-10-13 | 中铁十八局集团有限公司 | 抗滑桩护壁混凝土快速浇注的施工方法 |
CN105926815A (zh) * | 2016-05-10 | 2016-09-07 | 江苏东晟新诚建设集团有限公司 | 受限区域的板墙模板支护模板一体化施工工法 |
CN106958256A (zh) * | 2017-03-22 | 2017-07-18 | 中建四局第五建筑工程有限公司 | 一种分层浇筑、多次下沉的沉井施工工艺 |
CN107366302B (zh) * | 2017-06-27 | 2019-02-05 | 华恒建设集团有限公司 | 一种钢筋混凝土挡土墙的施工工艺 |
CN107366302A (zh) * | 2017-06-27 | 2017-11-21 | 华恒建设集团有限公司 | 一种钢筋混凝土挡土墙的施工工艺 |
CN108277777A (zh) * | 2017-12-08 | 2018-07-13 | 中交烟台环保疏浚有限公司 | 挡浪墙分步浇筑施工工艺 |
CN107938613A (zh) * | 2017-12-25 | 2018-04-20 | 浙江大学 | 一种新型带弹簧支撑泥石流防护挡墙及其施工方法 |
CN108612233A (zh) * | 2018-04-03 | 2018-10-02 | 贵州建工集团第建筑工程有限责任公司 | 一种现浇饰面清水混凝土墙体施工方法 |
CN108612233B (zh) * | 2018-04-03 | 2020-05-05 | 贵州建工集团第一建筑工程有限责任公司 | 一种现浇饰面清水混凝土墙体施工方法 |
CN109339117A (zh) * | 2018-10-31 | 2019-02-15 | 长安大学 | 一种生物滞留设施中防渗膜与挡墙的搭接方法 |
CN109371910A (zh) * | 2018-12-10 | 2019-02-22 | 四川港航建设工程有限公司 | 垫地填高防护及施工方法 |
CN109371910B (zh) * | 2018-12-10 | 2020-08-14 | 四川港航建设工程有限公司 | 垫地填高防护及施工方法 |
CN109736354A (zh) * | 2018-12-30 | 2019-05-10 | 中铁十四局集团有限公司 | 隧道明挖段主体结构施工方法 |
CN109928701A (zh) * | 2019-04-23 | 2019-06-25 | 内江职业技术学院 | 一种建筑工程现浇柱的施工材料和施工方法 |
CN110185062A (zh) * | 2019-05-30 | 2019-08-30 | 陕西华山路桥集团有限公司 | 锁脚拉口式自稳定大模板墙身施工工法 |
CN111910679B (zh) * | 2020-08-12 | 2022-02-18 | 中建八局第二建设有限公司 | 复杂地形下超长超高衡重式挡土墙施工方法 |
CN111910679A (zh) * | 2020-08-12 | 2020-11-10 | 中建八局第二建设有限公司 | 复杂地形下超长超高衡重式挡土墙施工方法 |
CN112593749A (zh) * | 2020-12-08 | 2021-04-02 | 中铁八局集团有限公司 | 一种mbbr水处理工艺构筑物抗渗砼施工方法 |
CN113073679A (zh) * | 2021-01-07 | 2021-07-06 | 肖臣 | 一种重力式挡土墙分段式施工方法 |
CN113565128A (zh) * | 2021-08-05 | 2021-10-29 | 安徽金鹏建设集团股份有限公司 | 后浇带挡土墙施工方法 |
CN113585581A (zh) * | 2021-08-12 | 2021-11-02 | 中铁二十一局集团第二工程有限公司 | 一种仿茅草屋面施工工法 |
CN113897905A (zh) * | 2021-10-19 | 2022-01-07 | 长春工程学院 | 一种防冻害埋入式临水护墙结构及施工方法 |
CN114197704A (zh) * | 2021-12-23 | 2022-03-18 | 江苏精享裕建工有限公司 | 换流站防火墙施工工艺 |
CN114592577A (zh) * | 2022-03-21 | 2022-06-07 | 中交路桥建设有限公司 | 用于公路平交口排水的一体式排水沟结构及施工方法 |
CN114960698A (zh) * | 2022-06-10 | 2022-08-30 | 中铁十二局集团第三工程有限公司 | 一种消力式滑坡体防护结构施工方法 |
CN115142722A (zh) * | 2022-06-10 | 2022-10-04 | 河南沃克曼建设工程有限公司 | 一种大型污水处理厂圆形水池模板精准定位快速施工方法 |
CN115142722B (zh) * | 2022-06-10 | 2024-04-05 | 河南沃克曼建设工程有限公司 | 一种大型污水处理厂圆形水池模板精准定位快速施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103469815B (zh) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103469815B (zh) | 一种钢筋混凝土挡土墙护坡施工方法 | |
CN101906768B (zh) | 混凝土面板堆石坝的面板施工方法 | |
CN101781896A (zh) | 混凝土垫上制作沉井的施工方法 | |
CN108505805B (zh) | 膨胀加强带控裂大型现浇水池及其施工方法 | |
CN104120736A (zh) | 一种钢筋混凝土挡土墙的施工方法 | |
CN106930319A (zh) | 一种高边坡框架式挡土墙及其施工方法 | |
CN114164764B (zh) | 一种高填方桥梁承台结构施工方法 | |
CN111577334B (zh) | 运营隧道仰拱修复方法 | |
CN107447778A (zh) | 一种在役钢筋混凝土挡土墙的加高加固结构及方法 | |
CN103469806A (zh) | 一种预制砼基础承台侧模替代砖胎模的施工方法 | |
CN108331000A (zh) | 沉井下沉施工方法 | |
CN110863498A (zh) | 一种紧邻地铁站的深基坑组合支护施工方法 | |
CN207331740U (zh) | 一种在役钢筋混凝土挡土墙的加高加固结构 | |
CN111119195A (zh) | 一种基坑土钉喷锚支护施工方法 | |
CN109706952A (zh) | 大型沉井施工方法 | |
CN103161176A (zh) | 主楼连体车库内塔吊基础施工方法 | |
CN110952586A (zh) | 一种高速公路下方承台施工工艺 | |
CN114837088A (zh) | 一种公路上承台的施工方法 | |
CN110106915A (zh) | 一种免支撑逆作地下工程施工方法及地下工程建筑结构 | |
CN108385612B (zh) | 一种稳定性好的混凝土护面板的施工方法 | |
CN212837843U (zh) | Ⅳ类、ⅴ类围岩隧洞混凝土衬砌抗裂结构 | |
CN211144503U (zh) | 一种高陡地形桥隧相接段明洞接长结构 | |
CN117166510A (zh) | 一种深大直径沉井施工方法 | |
CN110820756A (zh) | 一种盾构井及竖井深基坑开挖安全施工方法 | |
CN106758852A (zh) | 横跨基坑围护对撑梁的栈桥施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 210017 Jiangsu, Nanjing, West Gate Street, No. 223 Applicant after: JSTI GROUP Co.,Ltd. Address before: 211112 Jiangning City, Nanjing Province, the integrity of the road No. 2200, Applicant before: JIANGSU TRANSPORTATION RESEARCH INSTITUTE Co.,Ltd. |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |