CN103422674A - 装配式混凝土结构现浇段混凝土施工方法 - Google Patents

装配式混凝土结构现浇段混凝土施工方法 Download PDF

Info

Publication number
CN103422674A
CN103422674A CN2013103942293A CN201310394229A CN103422674A CN 103422674 A CN103422674 A CN 103422674A CN 2013103942293 A CN2013103942293 A CN 2013103942293A CN 201310394229 A CN201310394229 A CN 201310394229A CN 103422674 A CN103422674 A CN 103422674A
Authority
CN
China
Prior art keywords
cast
situ segment
concrete
place
mutual
Prior art date
Application number
CN2013103942293A
Other languages
English (en)
Other versions
CN103422674B (zh
Inventor
李哲龙
葛立杰
李晓亮
霍晓光
Original Assignee
二十二冶集团第一建设有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 二十二冶集团第一建设有限公司 filed Critical 二十二冶集团第一建设有限公司
Priority to CN201310394229.3A priority Critical patent/CN103422674B/zh
Publication of CN103422674A publication Critical patent/CN103422674A/zh
Application granted granted Critical
Publication of CN103422674B publication Critical patent/CN103422674B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及装配式混凝土结构的施工方法,具体是一种装配式混凝土结构现浇段混凝土施工方法。其步骤是:在预制外墙体时,对应现浇段的外墙保护层内埋设预埋件并加入钢筋网片;现浇段模板通过一端与套筒连接、另一端由现浇段模板上的预留孔穿出的对拉螺杆及扣件连接在墙体结构层内侧,对拉螺杆上套装有PVC套管;通过预留在墙体结构层内的灌浆孔浇筑现浇段混凝土;待现浇段混凝土达到设计强度,即可松开扣件,拆除现浇段模板,然后旋转对拉螺杆使之与套筒分离,再由PVC套管中抽出对拉螺杆。本发明解决了保温保护层因穿墙螺杆造成的保护层表面开裂及变形现象及外墙渗水问题,减少了外墙面修补作业量,提高了现浇段混凝土浇筑作业效率。

Description

装配式混凝土结构现浇段混凝土施工方法技术领域
[0001] 本发明涉及装配式混凝土结构的施工方法,具体是一种装配式混凝土结构现浇段混凝土施工方法。
背景技术
[0002]目前,在装配式混凝土结构施工中都会碰到外墙节点位置现浇的情况。现有方法一般是将现浇段外侧的保温保护层充当现浇部位的外侧模板,然后在外墙的保温保护层上打孔通过穿墙螺杆将保温保护层与内侧模板相连接,以此来实现现浇节点的浇筑。但该作业方法因为需要螺杆穿透现浇段外侧的保温保护层,而50mm厚的保护层强度不足以抵抗混凝土的侧压力,所以容易使现浇段外侧的保温、保护层发生开裂、变形现象,从而造成质量缺陷,导致从此位置向室内渗水,同时也给后续修复造成不必要的麻烦。
[0003] 发明内容:
本发明旨在解决上述混凝土浇筑过程中保护层开裂和变形问题,而提供一种能够避免外墙渗水情况发生,减·少保温保护层后期修补量,提高施工效率的装配式混凝土结构现浇段混凝土施工方法。
·[0004] 本发明解决所述问题采用的技术方案是:
一种装配式混凝土结构现浇段混凝土施工方法,按下述步骤进行:
⑴保护层内埋设预埋件并加入钢筋网片:在预制外墙体生产过程,对应现浇段的外墙保护层内埋设预埋件并加入钢筋网片,预埋件由埋板、与埋板焊接且内部有套丝的套筒构成,埋板置于钢筋网片外侧,套筒穿过钢筋网片及保护层内侧的保温层,且套筒端部探出保温层;
⑵安装现浇段模板:在现浇段模板上设置预留孔,现浇段模板通过一端与套筒连接、另一端由现浇段模板上的预留孔穿出的对拉螺杆及扣件连接在墙体结构层内侧,对拉螺杆上套装有PVC套管,PVC套管一端插入保温层内1cm,另一端从现浇段模板上的预留孔穿出,穿出长度1cm,之后做好现浇段模板与灌注墙体的封堵措施及拧紧扣件;
⑶浇筑现浇段混凝土:通过预留在墙体结构层内的灌浆孔进行现浇段混凝土浇筑作业,在浇筑混凝土过程中做好振捣工作,为防止对底部产生较大冲击力,开始要放慢浇筑速度,待浇筑量高度超过现浇段模板上边缘高度,适当加大浇筑速度,直至浇筑完成;
⑷拆除现浇段模板:待现浇段混凝土达到设计强度,松开扣件,即可拆除现浇段模板,然后旋转对拉螺杆使之与套筒分离,再由PVC套管中抽出对拉螺杆。
[0005] 采用上述技术方案的本发明,与现有技术相比,其突出的发明效果是:由于在保护层内布置了钢筋网片及增设了预埋件,并通过对拉螺杆将预埋件与现浇段模板进行对拉,加强了保护层的侧向抗压强度,避免了保护层表面出现开裂及变形的现象发生,也避免了在外墙保温保护层上打孔穿穿墙螺杆造成破坏保温保护层的问题,由此实现了较少外墙面修补作业量,解决了外墙渗水问题,提高了现浇段混凝土浇筑作业效率。附图说明
[0006] 图1是本发明实施例预埋件结构示意图。
[0007] 图2是本发明实施例现浇段模板安装结构示意图。
[0008] 图中:埋板1,套筒2,钢筋网片3,保护层4,保温层5,结构层6,灌浆孔7,现浇段模板8,PVC套管9,对拉螺杆10,扣件11,现浇段12。
具体实施方式
[0009] 以下结合实施例对本发明作进一步说明,目的仅在于更好地理解本发明内容。因此,所举之例并不限制本发明的保护范围。
[0010] 参见图1、图2,本实施例给出的装配式混凝土结构现浇段混凝土施工方法,按下述步骤进行:
⑴保护层4内埋设预埋件并加入钢筋网片3。
[0011] 在预制外墙体生产过程,对应现浇段12的外墙保护层4内埋设预埋件并加入钢筋网片3,预埋件由埋板1、与埋板I焊接且内部有套丝的套筒2构成,埋板I是一块150mm*150mm*6mm的钢板,预埋在距保护层4外表面25mm处并位于钢筋网片3外侧,以起到增大混凝土接触面积的作用;钢筋网片3可以增加保护层4的整体强度;套筒2内径为20mm、高度60mm,套筒2穿过钢筋网片3及钢筋网片3内侧的保温层5,且套筒2端部探出保温层5表面20mm。
[0012] ⑵安装现浇段模板8。
[0013] 在现浇段模板8上设置预留孔,现浇段模板8通过一端与套筒2连接、另一端由现浇段模板8上的预留孔穿出的对拉螺杆10及扣件11连接在墙体结构层6内侧;为防止混凝土浇筑时套筒2与对拉螺杆10粘结,拆模时对拉螺杆10不易取出,在对拉螺杆10上套装PVC套管9,PVC套管9 一端插入保温层5内1cm,另一端从现浇段模板8上的预留孔穿出,穿出长度1cm,之后做好现浇段模板8与灌注墙体的封堵措施及拧紧扣件11。
[0014] ⑶浇筑现浇段12混凝土。
[0015] 通过预留在墙体结构层6内的灌浆孔7进行现浇段12的混凝土浇筑作业,在浇筑混凝土过程中做好振捣工作,为防止对底部产生较大冲击力,开始要放慢浇筑速度,待浇筑量高度超过现浇段模板8上边缘高度,适当加大浇筑速度,直至浇筑完成成。
[0016] ⑷拆除现浇段模板8。
[0017] 待现浇段混凝土达到设计强度,即可松开扣件11,拆除现浇段模板8,然后旋转对拉螺杆10使之与套筒2分离,再由PVC套管9中抽出对拉螺杆10。拆模过程中,禁止使用锤硬砸及撬棍撬,以免破坏模板及混凝土面层。

Claims (1)

1.一种装配式混凝土结构现浇段混凝土施工方法,其特征在于,按下述步骤进行:⑴保护层内埋设预埋件并加入钢筋网片:在预制外墙体生产过程,对应现浇段的外墙保护层内埋设预埋件并加入钢筋网片,预埋件由埋板、与埋板焊接且内部有套丝的套筒构成,埋板置于钢筋网片外侧,套筒穿过钢筋网片及保护层内侧的保温层,且套筒端部探出保温层; ⑵安装现浇段模板:在现浇段模板上设置预留孔,现浇段模板通过一端与套筒连接、另一端由现浇段模板上的预留孔穿出的对拉螺杆及扣件连接在墙体结构层内侧,对拉螺杆上套装有PVC套管,PVC套管一端插入保温层内1cm,另一端从现浇段模板上的预留孔穿出,穿出长度1cm,之后做好现浇段模板与灌注墙体的封堵措施及拧紧扣件; ⑶浇筑现浇段混凝土:通过预留在墙体结构层内的灌浆孔进行现浇段混凝土浇筑作业,在浇筑混凝土过程中做好振捣工作,为防止对底部产生较大冲击力,开始要放慢浇筑速度,待浇筑量高度超过现浇段模板上边缘高度,适当加大浇筑速度,直至浇筑完成; ⑷拆除现浇段模板:待现浇段混凝土达到设计强度,松开扣件,即可拆除现浇段模板,然后旋转对拉螺杆使之与套筒分离,再由PVC套管中抽出对拉螺杆。
CN201310394229.3A 2013-09-03 2013-09-03 装配式混凝土结构现浇段混凝土施工方法 Active CN103422674B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310394229.3A CN103422674B (zh) 2013-09-03 2013-09-03 装配式混凝土结构现浇段混凝土施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310394229.3A CN103422674B (zh) 2013-09-03 2013-09-03 装配式混凝土结构现浇段混凝土施工方法

Publications (2)

Publication Number Publication Date
CN103422674A true CN103422674A (zh) 2013-12-04
CN103422674B CN103422674B (zh) 2016-03-30

Family

ID=49648016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310394229.3A Active CN103422674B (zh) 2013-09-03 2013-09-03 装配式混凝土结构现浇段混凝土施工方法

Country Status (1)

Country Link
CN (1) CN103422674B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790261A (zh) * 2013-12-31 2014-05-14 吴方伯 一种保温墙及施工方法
CN105839918A (zh) * 2016-04-20 2016-08-10 中国建筑第八工程局有限公司 用于装配式混凝土结构的现浇段模板加固结构及方法
CN108517788A (zh) * 2018-03-09 2018-09-11 武汉二航路桥特种工程有限责任公司 一种用于结构增大截面的压灌结合浇筑混凝土施工方法
CN108643403A (zh) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 预制混凝土剪力墙外叶加固方法
CN109853789A (zh) * 2018-12-25 2019-06-07 三一筑工科技有限公司 预制墙体、预制墙体现浇段连接结构及施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2750884A1 (en) * 2008-12-30 2010-07-22 Harbin Wushuhuan Construction Engineering Technology Research Co., Ltd. Composite thermal insulation wall body of a building
CN101761158B (zh) * 2010-01-05 2011-11-09 中国建筑第八工程局有限公司 剪力墙制造方法及结构
CN102182317A (zh) * 2011-03-18 2011-09-14 北京华美科博科技发展有限公司 混凝土喷涂钢网夹芯模板现浇剪力墙施工方法及剪力墙
CN102425310B (zh) * 2011-12-15 2014-02-19 中国二十二冶集团有限公司 装配式住宅剪力墙结构墙体竖向连接施工方法
CN103046669B (zh) * 2012-12-10 2015-04-29 北京工业大学 预制高强钢筋混凝土设低强消能条带剪力墙及作法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790261A (zh) * 2013-12-31 2014-05-14 吴方伯 一种保温墙及施工方法
CN103790261B (zh) * 2013-12-31 2016-04-06 吴方伯 一种保温墙及施工方法
CN105839918A (zh) * 2016-04-20 2016-08-10 中国建筑第八工程局有限公司 用于装配式混凝土结构的现浇段模板加固结构及方法
CN108517788A (zh) * 2018-03-09 2018-09-11 武汉二航路桥特种工程有限责任公司 一种用于结构增大截面的压灌结合浇筑混凝土施工方法
CN108643403A (zh) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 预制混凝土剪力墙外叶加固方法
CN109853789A (zh) * 2018-12-25 2019-06-07 三一筑工科技有限公司 预制墙体、预制墙体现浇段连接结构及施工方法

Also Published As

Publication number Publication date
CN103422674B (zh) 2016-03-30

Similar Documents

Publication Publication Date Title
CN106223360B (zh) 采用桩撑支护体系的明挖装配整体式结构地铁站施工方法
CN102561553B (zh) 预制钢管混凝土边框剪力墙及其施工方法
CN202000380U (zh) 地下室外墙后浇带回填保护板
CN103352581B (zh) 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法
CN102635118B (zh) 一种基坑支护用的方钢管混凝土支撑结构
CN203729424U (zh) 顶管施工改型骑马检查井
CN103556826B (zh) 后浇带区域及其两侧的楼盖区域支撑体系施工方法
CN103132690B (zh) 一种地下室外墙单侧模板及其支模方法
RU2382143C2 (ru) Блок опалубки для ограничения участка стены в грунте, элемент блока опалубки и способ возведения стены в грунте
CN201280725Y (zh) 一种用于建筑物地下室后浇带施工的预制板
CN103924793B (zh) 老旧住宅加固结构及其加固方法
CN104405065B (zh) 一种免拆模墙板结构及其施工方法
CN103206088B (zh) 剪力墙结构墙、板整体浇筑施工方法
CN104746639B (zh) 一种在叠合墙板上安装预制飘窗的安装方法
CN103510640B (zh) 一种装配式剪力墙及其装配方法
CN103422620A (zh) 一种预制中空型钢混凝土柱及其拼接结构和拼接方法
CN103410317A (zh) 采用墙体预制构件现场拼装并浇筑的整体墙体施工方法
CN204112525U (zh) 高强度混凝土预制框架内嵌带竖缝预制剪力墙结构
CN107130791A (zh) 组合铝合金模板用于装配式混凝土预制结构的施工方法
CN204326248U (zh) 一种带有螺旋形凹凸肋的钢筋对接连接灌浆套筒
CN106801517B (zh) 一种预制多孔板砖混合结构的校舍体外加固加强方法
CN102383443A (zh) 基坑支护桩与地下室外墙之间的连接结构及施工方法
CN102966121A (zh) 一种管廊现浇施工整体移动式模架
CN104295088A (zh) 一种变形缝两侧剪力墙的钢木组合模板结构及其施工方法
CN104060760B (zh) 高层建筑结构转换层混凝土超大梁分层施工方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model
TR01 Transfer of patent right

Effective date of registration: 20160708

Address after: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee after: China MCC 22 Group Corp., Ltd.

Address before: 064000, Fengrun District, Hebei, Tangshan City 9

Patentee before: The 1 st Construction Co., Ltd. of 22 MCC Group

C41 Transfer of patent application or patent right or utility model