CN103422436B - 用波形钢腹板承担施工荷载的施工方法 - Google Patents

用波形钢腹板承担施工荷载的施工方法 Download PDF

Info

Publication number
CN103422436B
CN103422436B CN201310306280.4A CN201310306280A CN103422436B CN 103422436 B CN103422436 B CN 103422436B CN 201310306280 A CN201310306280 A CN 201310306280A CN 103422436 B CN103422436 B CN 103422436B
Authority
CN
China
Prior art keywords
wavelike steel
steel webplate
construction method
construction
corrugated steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310306280.4A
Other languages
English (en)
Other versions
CN103422436A (zh
Inventor
孙天明
张建东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang CTB Corrugated Steel Web Co., Ltd.
Original Assignee
Zhejiang Ctb Corrugated Steel Web Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ctb Corrugated Steel Web Co Ltd filed Critical Zhejiang Ctb Corrugated Steel Web Co Ltd
Priority to CN201310306280.4A priority Critical patent/CN103422436B/zh
Publication of CN103422436A publication Critical patent/CN103422436A/zh
Application granted granted Critical
Publication of CN103422436B publication Critical patent/CN103422436B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及用波形钢腹板承担施工荷载的施工方法,包括以下步骤:a.波形钢腹板纵向连接,b.两侧波形钢腹板之间设有水平支撑装置或倾斜支撑装置c.将连接后的波形钢腹板顶推或吊装就位,d.将底板或底板模用连接杆或连接带与波形钢腹板连接e.将顶板或顶板模放置在波形钢腹板上部的托架上f.向顶板模和底板模内浇筑钢筋混凝土或将顶底板与波形钢腹板进行固定。用波形钢腹板承担施工荷载的施工方法利用波形钢腹板的刚度来承担部分施工荷载,减少了普通施工中挂篮或支架的荷载,不仅使整体的施工更加简单、方便,还使整个施工中的安全性大大的增加。本方比较适用于波形板在山谷、峡谷,或者桥梁下方为急流、通航的河道等无法搭设支架的地方。

Description

用波形钢腹板承担施工荷载的施工方法
技术领域
本发明涉及波形钢腹板施工的方法,尤其涉及用波形钢腹板承担施工荷载的施工方法。
背景技术
随着我国桥梁结构的不断发展,新的桥梁结构形式不断涌现,波形钢腹板桥梁逐步被应用。如果节段重量及施工荷载全部由挂篮或支架承担,势必增加上述挂篮和支架的重量,从而进一步加剧了施工荷载,也增加了施工挂篮和支架的成本。
发明内容
本发明是为解决现有波形钢腹板桥梁施工方法所具有的挂篮和支架的重量笨重,成本高等不足而提出的,旨在提供具有施工方便、利用波形钢腹板承担部分载荷的用波形钢腹板承担施工荷载的施工方法。
为了解决上述技术问题,本发明通过下述技术方案得以解决:
用波形钢腹板承担施工荷载的施工方法,包括以下步骤:a.波形钢腹板纵向连接,b.两侧波形钢腹板之间设有水平支撑装置或倾斜支撑装置c.将连接后的波形钢腹板顶推或吊装就位,d.将底板或底板模用连接杆或连接带与波形钢腹板连接e.将顶板或顶板模放置在波形钢腹板上部的托架上f.向顶板模和底板模内浇筑钢筋混凝土或将顶板、底板分别与波形钢腹板进行固定。
将上下底板或底板模板直接连接在波形钢腹板上,利用波形钢腹板的刚度来承担上下底板或底板模板的荷载,减少了普通施工中用挂篮或支架的承担荷载,使整体的施工更加方便、安全。
作为优选,步骤a中波形钢腹板纵向连接方式为螺栓或电焊连接。用螺栓或电焊的方式连接,比较牢固不容易使波形钢腹板相互之间分离。
作为优选,步骤b中,水平支撑装置位于波形钢腹板的上部或/和下部。水平支撑装置可以根据实际情况,设置于波形钢腹板的上部或下部,也可以上部和下部均设置。
作为优选,步骤b中,倾斜支撑装置与波形钢腹板的连接点位于波形钢腹板的上部或/和下部。倾斜支撑装置的一端连接在左侧波形钢腹板的上部,另一端连接在右侧波形钢腹板的下部。另一个倾斜支撑装置的一端则设置在左侧波形钢腹板的下部,另一端连接在右侧波形钢腹板的上部。两者形成交叉,增加左右两侧波形钢腹板的连接强度。
作为优选,步骤c中,用液压油缸进行顶推,顶推时波形钢腹板与墩柱之间设有减阻钢板。减阻钢板较小了整个波形钢腹板结构与桥墩的摩擦,使波形钢腹板被顶推的更加顺利。
作为优选,步骤c中,采用顶推施工时,波形钢腹板底边为直线形状。前后波形钢腹板的底边形成一条直线,保证了波形钢腹板连接的直线度。
作为优选,波形钢腹板上部或下部设有临时钢梁。临时钢梁增了波形钢腹板相互之间临时的连接强度。
作为优选,临时钢梁沿桥梁纵向设置且位于波形钢腹板的内侧或外侧。临时钢梁根据实际情况,选择设置在波形钢腹板的两侧。
按照本发明的技术方案,虽然波形板本身较轻,但是波形钢板拥有很高的刚度,本方法将波形钢板的刚度加以利用。用波形钢腹板承担施工荷载的施工方法,利用波形钢腹板的刚度来承担部分施工荷载,减少了普通施工中挂篮或支架的重量,不仅使整体的施工更加简单、方便、经济,还使整个施工中的安全性大大的增加。本方比较适用于波形板在山谷、峡谷,或者桥梁下方为急流、通航的河道等无法搭设支架的地方。另外,不用搭设支架,还降低了整个工程的施工成本。
附图说明
图1为本发明中底板或底板模、波形钢腹板、顶板或顶板模,三者之间的结构示意图。
1、顶板或顶板模  2、托架  3、波形钢腹板  4、连接杆或连接带  5、底板或底板模  6、挂篮桁架  7、挂篮吊杆或挂篮吊带  8、临时钢梁
具体实施方式
下面结合附图与具体实施方式对本发明作进一步详细描述:
实施例1
用波形钢腹板承担施工荷载的施工方法,包括以下步骤:
a.波形钢腹板纵向连接;波形钢腹板纵向连接方式为螺栓或电焊连接。
b.两侧波形钢腹板之间设有水平支撑装置或倾斜支撑装置;水平支撑装置位于波形钢腹板的上部或/和下部。倾斜支撑装置与波形钢腹板的连接点位于波形钢腹板的上部或/和下部。
c.将连接后的波形钢腹板顶推或吊装就位;用液压油缸进行顶推,顶推时波形钢腹板与墩柱之间设有减阻钢板。采用顶推施工时,波形钢腹板底边为直线形状。
d.将底板或底板模用连接杆或连接带与波形钢腹板连接;
e.将顶板或顶板模放置在波形钢腹板上部的托架上;
f.向顶板模和底板模内浇筑钢筋混凝土或将顶板、底板分别与波形钢腹板进行固定。
波形钢腹板上部或下部设有临时钢梁。
临时钢梁沿桥梁纵向设置且位于波形钢腹板的内侧或外侧。
总之,以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所作的均等变化与修饰,皆应属本发明专利的涵盖范围。

Claims (8)

1.用波形钢腹板承担施工荷载的施工方法,其特征在于包括以下步骤:a.波形钢腹板纵向连接,b.两侧波形钢腹板之间设有水平支撑装置或倾斜支撑装置c.将连接后的波形钢腹板顶推或吊装就位,d.将底板或底板模用连接杆或连接带与波形钢腹板连接e.将顶板或顶板模放置在波形钢腹板上部的托架上f.向顶板模和底板模内浇筑钢筋混凝土或将顶板、底板分别与波形钢腹板进行固定。
2.根据权利要求1所述的用波形钢腹板承担施工荷载的施工方法,其特征在于:步骤a中波形钢腹板纵向连接方式为螺栓或电焊连接。
3.根据权利要求1所述的用波形钢腹板承担施工荷载的施工方法,其特征在于:步骤b中,水平支撑装置位于波形钢腹板的上部或/和下部。
4.根据权利要求1所述的用波形钢腹板承担施工荷载的施工方法,其特征在于:步骤b中,倾斜支撑装置与波形钢腹板的连接点位于波形钢腹板的上部或/和下部。
5.根据权利要求1所述的用波形钢腹板承担施工荷载的施工方法,其特征在于:步骤c中,用液压油缸进行顶推,顶推时波形钢腹板与墩柱之间设有减阻钢板。
6.根据权利要求1所述的用波形钢腹板承担施工荷载的施工方法,其特征在于:步骤c中,采用顶推施工时,波形钢腹板底边为直线形状。
7.根据权利要求1所述的用波形钢腹板承担施工荷载的施工方法,其特征在于:波形钢腹板上部或下部设有临时钢梁。
8.根据权利要求7所述的用波形钢腹板承担施工荷载的施工方法,其特征在于:临时钢梁沿桥梁纵向设置且位于波形钢腹板的内侧或外侧。
CN201310306280.4A 2013-07-18 2013-07-18 用波形钢腹板承担施工荷载的施工方法 Active CN103422436B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310306280.4A CN103422436B (zh) 2013-07-18 2013-07-18 用波形钢腹板承担施工荷载的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310306280.4A CN103422436B (zh) 2013-07-18 2013-07-18 用波形钢腹板承担施工荷载的施工方法

Publications (2)

Publication Number Publication Date
CN103422436A CN103422436A (zh) 2013-12-04
CN103422436B true CN103422436B (zh) 2015-06-24

Family

ID=49647788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310306280.4A Active CN103422436B (zh) 2013-07-18 2013-07-18 用波形钢腹板承担施工荷载的施工方法

Country Status (1)

Country Link
CN (1) CN103422436B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507165B (zh) * 2016-01-20 2017-02-22 长沙理工大学 一种波形刚腹板施工挂篮与施工工艺
CN110184889A (zh) * 2019-06-19 2019-08-30 苏交科集团股份有限公司 波形腹板承受施工荷载的组合结构桥梁及其架设方法
CN110820566A (zh) * 2019-10-16 2020-02-21 广西翔路建设有限责任公司 波形钢腹板部分承重式挂篮悬浇施工方法
CN110820565A (zh) * 2019-10-16 2020-02-21 广西翔路建设有限责任公司 波形钢腹板挂篮悬浇方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001200510A (ja) * 2000-01-17 2001-07-27 Ps Corp 波形鋼板ウエブ張出架設桁橋の構築方法
JP2008031768A (ja) * 2006-07-31 2008-02-14 Ps Mitsubishi Construction Co Ltd 波形鋼板ウエブ箱桁橋の片持張出架設方法
JP2008088782A (ja) * 2006-10-05 2008-04-17 Zenitaka Corp 波形鋼板ウェブ橋の片持ち張り出し架設工法
CN101768916A (zh) * 2010-01-22 2010-07-07 清华大学 下翼缘改进型波形钢腹板组合箱梁及其施工方法
CN102154992B (zh) * 2011-04-28 2012-08-22 中交第二公路工程局有限公司 波形钢腹板错位安装方法
CN102418313B (zh) * 2011-09-30 2014-01-29 李勇 波形钢腹板组合pc桥梁及其施工方法
CN102691257A (zh) * 2012-06-25 2012-09-26 河南省交通规划勘察设计院有限责任公司 一种波形钢腹板先张法预应力混凝土连续箱梁及施工方法

Also Published As

Publication number Publication date
CN103422436A (zh) 2013-12-04

Similar Documents

Publication Publication Date Title
CN107044090B (zh) 一种双层桥梁的施工方法
CN103266573A (zh) 自锚式悬索桥钢箱梁三滑道同步顶推施工方法
CN103422436B (zh) 用波形钢腹板承担施工荷载的施工方法
CN104060542B (zh) 组合梁斜拉桥横桥向预应力施加装置及其施加方法
CN203174515U (zh) 自行式双走行轨道三角挂篮
CN204589822U (zh) 一种独柱双悬臂盖梁抱箍施工支撑系统
CN102979038A (zh) 宽幅变宽现浇箱梁移动支架
CN104532749A (zh) 一种用于悬索桥主塔上横梁施工的支架
CN102926504A (zh) 一种用于钢混叠合粱结合部的连接钢构件及施工方法
CN110700119A (zh) 一种组装式贝雷梁挂篮上走行系统及其设计工法
CN203393639U (zh) 一种用于路桥施工的菱形自锚式挂篮
CN103103925A (zh) 一种组合h型钢立柱式托架
CN102777050B (zh) 大跨度管桁架屋面梁的组拼胎架
CN205257790U (zh) 固定高低腿提梁龙门吊
CN205224288U (zh) 一种钢筋混凝土叠合梁与钢管柱连接节点
CN202176343U (zh) 一种自行式多功能模板台车组合装置
CN202170573U (zh) 一种钢柱与混凝土柱的连接结构
CN203795311U (zh) 多肢高墩同滑施工装置
CN203530961U (zh) 一种加强型钢管桩或钢立柱
CN202989781U (zh) 宽幅变宽现浇箱梁移动支架
CN102635070B (zh) 斜拉桥钢塔互拉式竖向转体施工方法
CN102926330B (zh) 一种适用于桥梁施工用挂蓝的安装方法
CN102041779A (zh) 一种桥面吊机及其施工方法
CN103835238A (zh) 一种高墩斜拉桥0号块无支架施工方法及施工中的结构
CN103046743A (zh) 一种超高层转换层型钢混凝土大梁吊挂式模板支撑体系及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HANGZHOU YANGLI STEEL STRUCTURE CO., LTD.

Free format text: FORMER OWNER: HANGZHOU BOSHU CIVIL ENGINEERING TECHNOLOGY CO., LTD.

Effective date: 20141128

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311215 HANGZHOU, ZHEJIANG PROVINCE TO: 311200 HANGZHOU, ZHEJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20141128

Address after: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou

Applicant after: Hangzhou Li Yang Steel Structure Co., Ltd.

Address before: Hangzhou City, Zhejiang province 311215 Xiaoshan economic and Technological Development Zone, North Building 2 room 1711 Ning'an

Applicant before: Hangzhou Boshu Civil Engineering Technology Co., Ltd.

ASS Succession or assignment of patent right

Owner name: ZHEJIANG CTB CORRUGATED STEEL WEB CO., LTD.

Free format text: FORMER OWNER: HANGZHOU YANGLI STEEL STRUCTURE CO., LTD.

Effective date: 20150302

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311200 HANGZHOU, ZHEJIANG PROVINCE TO: 314422 HANGZHOU, ZHEJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150302

Address after: 314422, No. 168-2, village, town, Hangzhou, Xiaoshan District, Zhejiang

Applicant after: Zhejiang CTB Corrugated Steel Web Co., Ltd.

Address before: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou

Applicant before: Hangzhou Li Yang Steel Structure Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant