CN103416129A - Rapid reclamation control method for coal gangue dumps in semiarid windy desert area - Google Patents

Rapid reclamation control method for coal gangue dumps in semiarid windy desert area Download PDF

Info

Publication number
CN103416129A
CN103416129A CN2013103647945A CN201310364794A CN103416129A CN 103416129 A CN103416129 A CN 103416129A CN 2013103647945 A CN2013103647945 A CN 2013103647945A CN 201310364794 A CN201310364794 A CN 201310364794A CN 103416129 A CN103416129 A CN 103416129A
Authority
CN
China
Prior art keywords
sand
coal gangue
semi
bed surface
area coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103647945A
Other languages
Chinese (zh)
Other versions
CN103416129B (en
Inventor
赵国平
李军保
张继平
赵晓彬
徐连秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI COUNTY DESERT CONTROL RESEARCH INSTITUTE
Original Assignee
SHAANXI COUNTY DESERT CONTROL RESEARCH INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI COUNTY DESERT CONTROL RESEARCH INSTITUTE filed Critical SHAANXI COUNTY DESERT CONTROL RESEARCH INSTITUTE
Priority to CN201310364794.5A priority Critical patent/CN103416129B/en
Publication of CN103416129A publication Critical patent/CN103416129A/en
Application granted granted Critical
Publication of CN103416129B publication Critical patent/CN103416129B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/40Afforestation or reforestation

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a rapid reclamation control method for coal gangue dumps in a semiarid windy desert area. The rapid reclamation control method comprises the following successive steps of performing land shaping and reclamation; filling soil and spreading sand; installing rainwater harvesting beds; building a sand barrier; promoting shrubbery by grass and cultivating or combining the shrubbery and the grass and cultivating; managing the reclamation to prevent coal gangue from reburning. The rapid reclamation control method for the coal gangue dumps in the semiarid windy desert area is rapid, simple and direct, economic and practical, is lasting in benefit, and is suitable for rapid reclamation control of the coal gangue dumps in the semiarid windy desert area.

Description

The quick Reclamation method of semi-arid wind-sand area coal gangue hill
Technical field
The present invention relates to a kind of coal gangue hill Reclamation technology, relate in particular to a kind of quick Reclamation method of semi-arid wind-sand area coal gangue hill.
Background technology
The Jin, Shaanxi and Inner Mongolia that Shenfu coalfield is located in the Mu Us Shadi edge border on district, are cross-centennial super-huge coal mining, development area that country determines.The Dan Gai district is located in ecological environment frailty district and the serious development zone of desertification of China, all show strong transition feature on the factors such as weather, soil, vegetation, particularly be accompanied by the strength increase of mankind's activity, ecotope is very responsive to the response of mining, especially mine and produce adjunct--the gangue discarded object is occupied a large amount of land resources, Proterozoic hypergene state system is destroyed.Show that according to the monitoring of Shaanxi Province sand control research institute the Shen Fu mining area has now formed 10hm 2Nearly more than 400 of above hillocks, coal gangue hill have have a very wide distribution, area is large, appropriation of land resource, contaminated environment and the large problem of difficulty of governance.
The coal gangue hill that semi-arid wind-sand area forms is the site type that a kind of land reclamation is very difficult, and conventional Reclamation is difficult to successfully, and in prior art, " cover+afforestation of soil moved in to improve the original " method of mostly using is administered.
At least there is following shortcoming in above-mentioned prior art:
Cost is high, speed is slow, range of application is narrow, can not effectively solve in a short time the environmental problem that coal gangue hill pollution, leaching etc. cause.At present, in the quick Reclamation of semi-arid wind-sand area coal gangue hill field, also there is no a set of successful simple supporting technology both at home and abroad.
Summary of the invention
The purpose of this invention is to provide a kind of quick, simple and direct, economical and practical, benefit is lasting, and the quick Reclamation method of the semi-arid wind-sand area coal gangue hill of the quick Reclamation of applicable semi-arid wind-sand area coal gangue hill.
The objective of the invention is to be achieved through the following technical solutions:
The quick Reclamation method of semi-arid wind-sand area coal gangue hill of the present invention comprises the following steps of carrying out successively: the shaping transformation; Pad soil covers sand; Collection rain bed surface is set; Set up sand-protecting barrier; With grass, urge to fill with and cultivation or the combination of filling grass and cultivation; Reclaim management, prevent the gangue resume combustion.
As seen from the above technical solution provided by the invention, the quick Reclamation method of the semi-arid wind-sand area coal gangue hill that the invention process provides, owing to comprising the following steps of carrying out successively: the shaping transformation; Pad soil covers sand; Collection rain bed surface is set; Set up sand-protecting barrier; With grass, urge to fill with and cultivation or the combination of filling grass and cultivation; Reclaim management, prevent the gangue resume combustion.Fast, simple and direct, economical and practical, benefit is lasting, and the quick Reclamation of applicable semi-arid wind-sand area coal gangue hill.
The accompanying drawing explanation
Fig. 1 is that in the embodiment of the present invention, coal gangue hill shaping and pad soil cover the cross-sectional view after sand;
The cross-sectional view that Fig. 2 is collection rain bed surface in the embodiment of the present invention;
Fig. 3 is the planar structure schematic diagram after the quick Reclamation of coal gangue hill in the embodiment of the present invention.
In figure: 1, husky 50cm is covered on the spoil top layer, 2, the native 15cm of barrow base pad, 3, collection rain bed surface, 4, coal gangue hill, 5, salix monogolica or sand sagebrush (Artemisia filifolia) sand-protecting barrier, 6, long stalk almond, 7, Sabina vulgaris, 8, shrubby flase indigo, 9, pulse family vegetation (prairie milk vetch, alfalfa and daghestan sweet clover), 10, the trapezoidal low bank of earth between fields around collection rain bed surface.
Embodiment
Below will be described in further detail the embodiment of the present invention.
The quick Reclamation method of semi-arid wind-sand area coal gangue hill of the present invention, its preferably embodiment be:
Comprise the following steps of carrying out successively:
The shaping transformation; Pad soil covers sand; Collection rain bed surface is set; Set up sand-protecting barrier; With grass, urge to fill with and cultivation or the combination of filling grass and cultivation; Reclaim management, prevent the gangue resume combustion.
Described shaping transformation comprises:
To Gangue platform compacting, smooth and cut the slope off-load, form the side slope of 1:1.5 around platform.
Described pad soil covers sand hill to be drawn together:
Cover husky 50cm after the table top of whole good hillock platform and side slope pad soil 15cm.
The described collection rain bed surface that arranges comprises:
By pad soil and cover the grid that the table top of husky platform is renovated into several 50m * 50m, the low bank of earth between fields is set around grid, described low bank of earth between fields top width is 30cm, highly for 30cm, the inside and outside side slope ratio of the low bank of earth between fields is 1:1, form low collection rain bed surface between surrounding senior middle school in grid, integrate the slope ratio of rain bed surface as 1:20.
The described sand-protecting barrier of setting up comprises:
Set up half hidden salix monogolica grid sand-protecting barrier or the sand sagebrush (Artemisia filifolia) sand-protecting barrier of 2m * 2m in described collection rain bed surface and side slope.
Describedly so that grass is short, fill with and cultivation comprises:
Select have that certain sand is living, drought-enduring, antipollution, fast-growing and perennial leguminous forage prairie milk vetch, alfalfa and daghestan sweet clover carry out mixed seeding in spring after rain, ratio is prairie milk vetch 70%, alfalfa 15%, daghestan sweet clover 15%, the amount of broadcasting is 0.75 thousand g/acre.
The combination of described filling grass and cultivation comprise:
Select have that certain sand is living, drought-enduring, the long stalk of the living shrub of 2-3 almond, Sabina vulgaris and the shrubby flase indigo of antipollution, fast-growing, in spring or autumn, carry out mixedly between strain handing over afforestation, seeding row spacing is 2m * 2m;
The front root of planting will be processed with root-inducing powder, while planting, according to " three bury two step on one carry seedling " technical key point, carry out, add organic fertilizer in the root system compact district in the landfill process, complete the rear plant pit of soil surface lower than collection rain bed surface 10-15cm, the remaining soil dug out is put in interior formation of groove of nursery stock one side and blocks shelves.
The described management of reclaiming, prevent that the spoil resume combustion from comprising:
Carry out the preventing and controlling of Epidemic Disease of Forest; Improve gangue field drainage system; Cover in time husky fire extinguishing when barrow has cigarette to emerge, to avoid forest and catch fire and the hillock avalanche.
The quick Reclamation method of semi-arid wind-sand area coal gangue hill of the present invention, quick, simple and direct, economical and practical, benefit is lasting, and the quick Reclamation of applicable semi-arid wind-sand area coal gangue hill.
Specific embodiment, as shown in Figure 1, Figure 2, Figure 3 shows:
Comprise the following steps successively:
(1) shaping transformation;
(2) pad soil covers sand;
(3) collection rain bed surface is set;
(4) set up sand-protecting barrier;
(5) fill with so that grass is short, fill with grass combination and cultivation;
(5) management of reclaiming, prevent the gangue resume combustion;
Described coal gangue hill shaping transformation, its method is that the platform of hillock and side slope are carried out to comprehensive whole ground, leveling makes real, and side slope is cut down, and forms the side slope of 1:1.5, to reach the stable side slope purpose.
Described pad soil covers sand, and its step, for to after hillock side slope and platform base pad soil 15cm, covering husky 50cm, improves matrix and adjusts fertile somatotrophic effect with water to reach.
The described collection rain bed surface that arranges, its step is grid that the table top of compacting is renovated into to several 50m * 50m, and low bank of earth between fields top width is 30cm, highly is 30cm on every side, and inside and outside side slope is than being 1:1, form several collection rain concave surfaces low between surrounding senior middle school, integrate the domatic slope of rain ratio as 1:20.
The described sand-protecting barrier of setting up, its step, for set up half hidden salix monogolica grid sand-protecting barrier or the sand sagebrush (Artemisia filifolia) sand-protecting barrier of 2m * 2m with side slope in collection rain bed surface, plays and checks winds and fixes drifting sand and the base material improvement effect.
Described with the short filling of grass and cultivation, its step be advisable select have that certain sand is living, drought-enduring, antipollution, fast-growing and perennial leguminous forage prairie milk vetch, alfalfa and daghestan sweet clover carry out mixed seeding in spring after rain, ratio is prairie milk vetch 70%, alfalfa 15%, daghestan sweet clover 15%, the amount of broadcasting is 0.75 thousand g/acre, to reach the fixed nitrogen phosphorization, the effect in improvement habitat.
Described filling grass in conjunction with and cultivation, its step be advisable select have that certain sand is livings, drought-enduring, the long stalk of the livings shrub of 2-3 almond, Sabina vulgaris and the shrubby flase indigo of antipollution, fast-growing, carry out between strain mixing friendship in spring or autumn and afforest, seeding row spacing is 2m * 2m.The front root of planting will be processed with root-inducing powder, while planting, according to " three bury two pearls one carries seedling " technical key point, carry out, in the situation of having ready conditions, can add organic fertilizer in the root system compact district in the landfill process, after completing soil, the plant pit surface is lower than collection rain bed surface 10-15cm, and the remaining soil dug out is put in interior formation of groove of nursery stock one side and blocks shelves.Built the careless vegetational type of constitutionally stable filling, reached gather materials on the spot, cost-saving, reply immediately green, the simple and economical and practical semi-arid wind-sand area coal gangue hill new model of reclaiming soon.
The described management of reclaiming, prevent that spoil resume combustion step from being to carry out the preventing and controlling of Epidemic Disease of Forest; Improve gangue field drainage system; Cover in time husky fire extinguishing when barrow has cigarette to emerge, to avoid forest and catch fire and the hillock avalanche.
After quick Reclamation technology governance of the present invention then cover degree can reach 35%, 2-3 and enter animated period, average height reaches 60cm; Shrub mixed forest survival rate can reach 90%, and vegetation coverage reaches 52.5%, and the soil organic matter and available N, K and full P content improve 5%-10%.Effectively prevent and treat hillock dust, leaching pollution problem, reached the effect of beautifying the environment and purifying air.
The above; be only the present invention's embodiment preferably, but protection scope of the present invention is not limited to this, anyly is familiar with in technical scope that those skilled in the art disclose in the present invention; the variation that can expect easily or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (8)

1. the quick Reclamation method of semi-arid wind-sand area coal gangue hill, is characterized in that, comprises the following steps of carrying out successively:
The shaping transformation;
Pad soil covers sand;
Collection rain bed surface is set;
Set up sand-protecting barrier;
With grass, urge to fill with and cultivation or the combination of filling grass and cultivation;
Reclaim management, prevent the gangue resume combustion.
2. the quick Reclamation method of semi-arid wind-sand area coal gangue hill according to claim 1, is characterized in that, described shaping transformation comprises:
To Gangue platform compacting, smooth and cut the slope off-load, form the side slope of 1:1.5 around platform.
3. the quick Reclamation method of semi-arid wind-sand area coal gangue hill according to claim 1, is characterized in that, described pad soil covers sand hill to be drawn together:
Cover husky 50cm after the table top of whole good hillock platform and side slope pad soil 15cm.
4. the quick Reclamation method of semi-arid wind-sand area coal gangue hill according to claim 1, is characterized in that, the described collection rain bed surface that arranges comprises:
By pad soil and cover the grid that the table top of husky platform is renovated into several 50m * 50m, the low bank of earth between fields is set around grid, described low bank of earth between fields top width is 30cm, highly for 30cm, the inside and outside side slope ratio of the low bank of earth between fields is 1:1, form low collection rain bed surface between surrounding senior middle school in grid, integrate the slope ratio of rain bed surface as 1:20.
5. the quick Reclamation method of semi-arid wind-sand area coal gangue hill according to claim 1, is characterized in that, the described sand-protecting barrier of setting up comprises:
Set up half hidden salix monogolica grid sand-protecting barrier or the sand sagebrush (Artemisia filifolia) sand-protecting barrier of 2m * 2m in described collection rain bed surface and side slope.
6. the quick Reclamation method of semi-arid wind-sand area coal gangue hill according to claim 1, is characterized in that, describedly so that grass is short, fills with and cultivation comprises:
Select have that certain sand is living, drought-enduring, antipollution, fast-growing and perennial leguminous forage prairie milk vetch, alfalfa and daghestan sweet clover carry out mixed seeding in spring after rain, ratio is prairie milk vetch 70%, alfalfa 15%, daghestan sweet clover 15%, the amount of broadcasting is 0.75 thousand g/acre.
7. the quick Reclamation method of semi-arid wind-sand area coal gangue hill according to claim 1, is characterized in that, the combination of described filling grass and cultivation comprise:
Select have that certain sand is living, drought-enduring, the long stalk of the living shrub of 2-3 almond, Sabina vulgaris and the shrubby flase indigo of antipollution, fast-growing, in spring or autumn, carry out mixedly between strain handing over afforestation, seeding row spacing is 2m * 2m;
The front root of planting will be processed with root-inducing powder, while planting, according to " three bury two step on one carry seedling " technical key point, carry out, add organic fertilizer in the root system compact district in the landfill process, complete the rear plant pit of soil surface lower than collection rain bed surface 10-15cm, the remaining soil dug out is put in interior formation of groove of nursery stock one side and blocks shelves.
8. the quick Reclamation method of semi-arid wind-sand area coal gangue hill according to claim 1, is characterized in that, the described management of reclaiming, prevents that the spoil resume combustion from comprising:
Carry out the preventing and controlling of Epidemic Disease of Forest; Improve gangue field drainage system; Cover in time husky fire extinguishing when barrow has cigarette to emerge, to avoid forest and catch fire and the hillock avalanche.
CN201310364794.5A 2013-08-20 2013-08-20 The quick Reclamation method of semi-arid wind-sand area coal gangue hill Active CN103416129B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310364794.5A CN103416129B (en) 2013-08-20 2013-08-20 The quick Reclamation method of semi-arid wind-sand area coal gangue hill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310364794.5A CN103416129B (en) 2013-08-20 2013-08-20 The quick Reclamation method of semi-arid wind-sand area coal gangue hill

Publications (2)

Publication Number Publication Date
CN103416129A true CN103416129A (en) 2013-12-04
CN103416129B CN103416129B (en) 2015-12-02

Family

ID=49641940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310364794.5A Active CN103416129B (en) 2013-08-20 2013-08-20 The quick Reclamation method of semi-arid wind-sand area coal gangue hill

Country Status (1)

Country Link
CN (1) CN103416129B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103988684A (en) * 2014-05-16 2014-08-20 永升建设集团有限公司 Desert dry and semi-dry turf transplantation and re-laying method suitable for roadbed construction
CN105133565A (en) * 2015-08-20 2015-12-09 赵国平 Composite desertification control method for high-altitude gobi wind-blown sand region
CN106664867A (en) * 2017-02-17 2017-05-17 西北师范大学 Comprehensive control method for water and soil loss in loess plateau gully regions
CN108338041A (en) * 2017-12-30 2018-07-31 内蒙古上海庙矿业有限责任公司 A kind of desert control method
RU2684236C1 (en) * 2017-11-13 2019-04-04 Федеральное государственное бюджетное образовательное учреждение высшего образования "Красноярский государственный аграрный университет" Method of recoating rock dumps
CN110337855A (en) * 2019-08-28 2019-10-18 中铁三局集团有限公司 Sandy soil modification method
CN110710409A (en) * 2019-09-29 2020-01-21 阳泉煤业(集团)股份有限公司 Vegetation recovery method for acid coal gangue dump
CN113293750A (en) * 2021-05-27 2021-08-24 甘肃省林业科学研究院 Comprehensive ecological restoration method for moving dune

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101011009A (en) * 2007-02-02 2007-08-08 中国矿业大学(北京) Greening method of self-ignition coal gangue hill
CN102561366A (en) * 2011-12-08 2012-07-11 刘聪 Vegetation recovery technology for coal gangue mountain of mining area
CN102787610A (en) * 2012-08-30 2012-11-21 新汶矿业集团有限责任公司翟镇煤矿 Method for improving and processing hillock surface body
RU2471579C1 (en) * 2011-07-07 2013-01-10 Государственное Научное Учреждение Сибирский Научно-Исследовательский Институт Сельского Хозяйства И Торфа Россельхозакадемии (Гну Сибниисхит Россельхозакадемии) Reclamation of soil damaged in coal production

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101011009A (en) * 2007-02-02 2007-08-08 中国矿业大学(北京) Greening method of self-ignition coal gangue hill
RU2471579C1 (en) * 2011-07-07 2013-01-10 Государственное Научное Учреждение Сибирский Научно-Исследовательский Институт Сельского Хозяйства И Торфа Россельхозакадемии (Гну Сибниисхит Россельхозакадемии) Reclamation of soil damaged in coal production
CN102561366A (en) * 2011-12-08 2012-07-11 刘聪 Vegetation recovery technology for coal gangue mountain of mining area
CN102787610A (en) * 2012-08-30 2012-11-21 新汶矿业集团有限责任公司翟镇煤矿 Method for improving and processing hillock surface body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
符亚儒等: "陕北沙区煤歼石废弃地的植被恢复技术研究", 《西北林学院学报》, no. 5, 15 September 2012 (2012-09-15), pages 1 - 4 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103988684A (en) * 2014-05-16 2014-08-20 永升建设集团有限公司 Desert dry and semi-dry turf transplantation and re-laying method suitable for roadbed construction
CN105133565A (en) * 2015-08-20 2015-12-09 赵国平 Composite desertification control method for high-altitude gobi wind-blown sand region
CN106664867A (en) * 2017-02-17 2017-05-17 西北师范大学 Comprehensive control method for water and soil loss in loess plateau gully regions
RU2684236C1 (en) * 2017-11-13 2019-04-04 Федеральное государственное бюджетное образовательное учреждение высшего образования "Красноярский государственный аграрный университет" Method of recoating rock dumps
CN108338041A (en) * 2017-12-30 2018-07-31 内蒙古上海庙矿业有限责任公司 A kind of desert control method
CN110337855A (en) * 2019-08-28 2019-10-18 中铁三局集团有限公司 Sandy soil modification method
CN110710409A (en) * 2019-09-29 2020-01-21 阳泉煤业(集团)股份有限公司 Vegetation recovery method for acid coal gangue dump
CN110710409B (en) * 2019-09-29 2022-01-25 山西华阳集团新能股份有限公司 Vegetation recovery method for acid coal gangue dump
CN113293750A (en) * 2021-05-27 2021-08-24 甘肃省林业科学研究院 Comprehensive ecological restoration method for moving dune

Also Published As

Publication number Publication date
CN103416129B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103416129B (en) The quick Reclamation method of semi-arid wind-sand area coal gangue hill
CN103806454B (en) Method for pollution control and vegetation recovery of metal sulfide ore solid waste storage yard
CN102652480B (en) Vegetation recovery method for acid metal mine solid waste stock dump
CN102204434B (en) Method for preventing water erosion desertification by using biological crust
CN101112157B (en) Method for greening high precipitous rock slope
CN102577789B (en) Method of cyclic sustainable vegetation recovery for waste dump of grassland mining area
CN103650882B (en) Method for cultivating peonies on coastal saline and alkaline land
CN102584456A (en) Greening substrate of quarry waste muck as well as preparation method and application of greening substrate
CN202652889U (en) Spontaneous combustion coal gangue mountain comprehensive treatment system
CN102668835A (en) Revegetation method for tailings dams in northern region
CN105474938A (en) Restoration method of degraded ecosystem in hilly areas of Funiu Mountain in Western Henan Province
CN102067753A (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN106688357A (en) Iron mine waste land vegetation recovery method
CN105210770B (en) Dust storm forward position Desert Regions sacsaoul Ecology method of forestation
CN103609303A (en) Method for rebuilding gangue dump close-to-nature ecological system
CN107509406A (en) A kind of quick method for improving abandoned location of industry and mining soil carbon sequestration capacity using
CN106576474A (en) Efficient ecological restoration method for slope in South China
CN107155790A (en) A kind of method that saline-alkali soil is improved by microbial fermented stalk
CN106305030A (en) Method for restoring vegetation in grassland and mining area through biological fence technology
CN105594564A (en) Rainwater collecting and deep infiltrating method for economic forest in mountainous region
CN116138113B (en) Degraded grassland vegetation restoration method for forestry planting
CN102714941A (en) Water-conserving fertilizer-conserving ridging compaction-farming method for dry lands
CN109169014A (en) A kind of the Northeast's magnesite mining junkyard temporarily plants raw restorative procedure
CN104846912B (en) Dune area water collection irrigation system
CN201593424U (en) Cave-like soil-filled green pit on coal gangue heap

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant