CN103400033A - 基于实时数据库的制丝设备停机率计算系统 - Google Patents

基于实时数据库的制丝设备停机率计算系统 Download PDF

Info

Publication number
CN103400033A
CN103400033A CN2013103177687A CN201310317768A CN103400033A CN 103400033 A CN103400033 A CN 103400033A CN 2013103177687 A CN2013103177687 A CN 2013103177687A CN 201310317768 A CN201310317768 A CN 201310317768A CN 103400033 A CN103400033 A CN 103400033A
Authority
CN
China
Prior art keywords
time
data
real
equipment
supplied materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103177687A
Other languages
English (en)
Inventor
虞文进
黎勇
徐元根
胡仲达
徐培富
王柳婧
舒梦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tobacco Zhejiang Industrial Co Ltd
Original Assignee
China Tobacco Zhejiang Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tobacco Zhejiang Industrial Co Ltd filed Critical China Tobacco Zhejiang Industrial Co Ltd
Priority to CN2013103177687A priority Critical patent/CN103400033A/zh
Publication of CN103400033A publication Critical patent/CN103400033A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种基于实时数据库的制丝设备停机率计算系统,该系统包括数据采集系统、数据存储系统和数据分析计算系统,数据采集系统采集电子皮带秤的瞬时流量,将瞬时流量存入数据存储系统,数据存储系统采用实时数据库,所述的数据分析计算系统调取实时数据库的数据通过以下方式进行停机率计算:1)设备运行时间:设备运行时间=来料结束时间-来料开始时间;2)设备停机时间;3)设备停机率:停机率=总停机时间/总运行时间*100%。本计算系统的数据源头来自设备实时数据库,相对于人工记录,数据客观性强,准确率高,工作量少;本计算系统为设备管理人员安排设备运维计划,提供了更加可靠的数据基础。

Description

基于实时数据库的制丝设备停机率计算系统
技术领域
本发明涉及卷烟企业制丝设备的运行时间、停机时间的自动采集和停机率计算。
背景技术
停机率是反应设备运行情况的重要数据,其公式为停机率=总停机时间/总运行时间*100%,目前卷烟工业企业制丝线段的停机率计算,基本采用人工记录停机时间,用制度时间代替运行时间,所以计算出的停机率不客观,准确率不高,不能真实反应的设备生产、运行情况。
实时数据库(RTDB-Real Time DataBase)是数据库系统发展的一个分支,是数据库技术结合实时处理技术产生的。实时数据库的一个重要特性就是实时性,包括数据实时性和事务实时性。实时数据库为最终用户提供了快捷、高效的工厂信息,广泛用于工艺改进、质量控制、故障预防维护等方面。
发明内容
为了解决上述的技术问题,本发明的目的是提供一种基于实时数据库的制丝设备停机率计算系统,该系统通过采集实时数据库中电子皮带秤的瞬时流量,累计流量的实时数据值,分析设备入料数据,以此来计算设备运行、停机时间、停机率。
为了实现上述目的,本发明采用了以下的技术方案:
基于实时数据库的制丝设备停机率计算系统,该系统包括数据采集系统、数据存储系统和数据分析计算系统,数据采集系统采集电子皮带秤的瞬时流量,将瞬时流量存入数据存储系统,数据存储系统采用实时数据库,所述的数据分析计算系统调取实时数据库的数据通过以下方式进行停机率计算:
1)设备运行时间
设备运行时间=来料结束时间-来料开始时间;
来料开始时间与来料结束时间采集计算:
首先获取工单运行过程中所有瞬时流量、累计量的数值和时间点,从工单开始时间向后推算,将瞬时流量大于100kg的第二个采集值对应的时间作为来料开始时间;从工单结束时间向前推算,将第二个瞬时流量大于100KG的时间点作为来料结束时间;
2)设备停机时间 在工单正常运行过程中,当流量秤的瞬时流量为零时,表示设备处于故障状态,系统计算瞬时流量为0的时间长度作为设备停机时间;
3)设备停机率
停机率=总停机时间/总运行时间*100%
每个工艺段每个班都有若干个工单执行,将每个工单的停机时间求和就是总停机时间,将每个工单的运行时间求和就是总运行时间。
本发明由于采用了上述的技术方案,与现有人工采集、计算相比,具有以下的特点:
(1)   本计算系统的数据源头来自设备实时数据库,相对于人工记录,数据客观性强;
(2)   本计算系统相对于人工计算,准确率高,工作量少;
(3)   本计算系统为设备管理人员安排设备运维计划,提供了更加可靠的数据基础。
附图说明
图1为来料开始时间与来料结束时间采集图,a为工单开始时间,d为工单结束时间,b为来料开始时间,c为来料结束时间。
图2为设备停机时间采集图。
具体实施方式
基于实时数据库的制丝设备停机率计算系统,该系统包括数据采集系统、数据存储系统和数据分析计算系统,本发明在制丝车间的每个工艺段配有皮带输送机,在的入口处安装了电子皮带秤,数据采集系统采集电子皮带秤的瞬时流量,将瞬时流量存入数据存储系统,数据存储系统采用实时数据库,所述的数据分析计算系统调取实时数据库的数据通过以下方式进行停机率计算:
1、设备运行时间
设备运行时间=来料结束时间-来料开始时间;
制丝生产是以工单方式来组织的,系统中记录了每个工单的开始时间与结束时间,工单的开始时间与结束时间是由人工在系统界面上输入的,但不能实际反映设备的运行时间,应该以设备来料开始和结束时间为准;
如图1所示,来料开始时间与来料结束时间采集计算:
首先获取工单运行过程中所有瞬时流量、累计量的数值和时间点,从工单开始时间向后推算,将瞬时流量大于100kg的第二个采集值对应的时间作为来料开始时间;从工单结束时间向前推算,将第二个瞬时流量大于100KG的时间点作为来料结束时间。图1中:a为工单开始时间,d为工单结束时间, b为来料开始时间,c为来料结束时间。
2. 设备停机时间
如图2所示,在工单正常运行过程中,当流量秤的瞬时流量为零时,表示设备处于故障状态(bc之间,de之间),系统计算瞬时流量为0的时间长度作为故障停机时间。
3、设备停机率
停机率=总停机时间/总运行时间*100%
每个工艺段每个班都有若干个工单执行,将每个工单的停机时间求和就是总停机时间,将每个工单的运行时间求和就是总运行时间,这样就可以求出客观、准确的停机率。

Claims (1)

1.基于实时数据库的制丝设备停机率计算系统,其特征在于:该系统包括数据采集系统、数据存储系统和数据分析计算系统,数据采集系统采集电子皮带秤的瞬时流量,将瞬时流量存入数据存储系统,数据存储系统采用实时数据库,所述的数据分析计算系统调取实时数据库的数据通过以下方式进行停机率计算:
1)设备运行时间
设备运行时间=来料结束时间-来料开始时间;
来料开始时间与来料结束时间采集计算:
首先获取工单运行过程中所有瞬时流量、累计量的数值和时间点,从工单开始时间向后推算,将瞬时流量大于100kg的第二个采集值对应的时间作为来料开始时间;从工单结束时间向前推算,将第二个瞬时流量大于100KG的时间点作为来料结束时间;
2)设备停机时间 在工单正常运行过程中,当流量秤的瞬时流量为零时,表示设备处于故障状态,系统计算瞬时流量为0的时间长度作为设备停机时间;
3)设备停机率
停机率=总停机时间/总运行时间*100%
每个工艺段每个班都有若干个工单执行,将每个工单的停机时间求和就是总停机时间,将每个工单的运行时间求和就是总运行时间。
CN2013103177687A 2013-07-24 2013-07-24 基于实时数据库的制丝设备停机率计算系统 Pending CN103400033A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103177687A CN103400033A (zh) 2013-07-24 2013-07-24 基于实时数据库的制丝设备停机率计算系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103177687A CN103400033A (zh) 2013-07-24 2013-07-24 基于实时数据库的制丝设备停机率计算系统

Publications (1)

Publication Number Publication Date
CN103400033A true CN103400033A (zh) 2013-11-20

Family

ID=49563660

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103177687A Pending CN103400033A (zh) 2013-07-24 2013-07-24 基于实时数据库的制丝设备停机率计算系统

Country Status (1)

Country Link
CN (1) CN103400033A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105389335A (zh) * 2015-10-15 2016-03-09 佛山市云端容灾信息技术有限公司 一种基于自动演练的数据挖掘分析方法和装置
CN105905511A (zh) * 2016-05-20 2016-08-31 河南中烟工业有限责任公司 一种烟草生产储柜存量物料实时计量的方法和装置
CN106227175A (zh) * 2016-08-31 2016-12-14 北京泰清科技有限公司 一种采集灌装包装生产线停机数据系统及其采集方法
CN106980892A (zh) * 2017-02-16 2017-07-25 威海市冠维智能科技有限公司 一种基于wifi无线组网的智能lcd屏显计数器
CN110262914A (zh) * 2019-06-20 2019-09-20 北京北方华创微电子装备有限公司 一种半导体设备工艺数据处理方法及系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004104746A2 (en) * 2003-05-16 2004-12-02 Aptech Engineering Services, Inc. Process for estimating and reducing cost of cycling
CN2701270Y (zh) * 2003-01-12 2005-05-25 王兴茂 烟草热风润叶机的蒸汽管路控制装置
CN201683017U (zh) * 2010-03-30 2010-12-29 长沙赛普尔自动化工程设备有限公司 烘丝机蒸喷装置及烘丝机
CN102915478A (zh) * 2012-09-25 2013-02-06 徐广国 生产执行力管理系统及方法
CN103063482A (zh) * 2013-01-08 2013-04-24 中国工程物理研究院核物理与化学研究所 含氚废气排放监测自动取样系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2701270Y (zh) * 2003-01-12 2005-05-25 王兴茂 烟草热风润叶机的蒸汽管路控制装置
WO2004104746A2 (en) * 2003-05-16 2004-12-02 Aptech Engineering Services, Inc. Process for estimating and reducing cost of cycling
CN201683017U (zh) * 2010-03-30 2010-12-29 长沙赛普尔自动化工程设备有限公司 烘丝机蒸喷装置及烘丝机
CN102915478A (zh) * 2012-09-25 2013-02-06 徐广国 生产执行力管理系统及方法
CN103063482A (zh) * 2013-01-08 2013-04-24 中国工程物理研究院核物理与化学研究所 含氚废气排放监测自动取样系统

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
岳圆: "SPC在烟厂制丝线信息管理系统中的设计", 《中国优秀硕士学位论文全文数据库》 *
汤永花: "制丝线电子皮带秤动态称重系统的设计研究", 《中国优秀硕士学位论文全文数据库》 *
魏斌: "利用计算机集控设备考核流水线故障停机率", 《中国设备工程》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105389335A (zh) * 2015-10-15 2016-03-09 佛山市云端容灾信息技术有限公司 一种基于自动演练的数据挖掘分析方法和装置
CN105389335B (zh) * 2015-10-15 2018-08-28 佛山市云端容灾信息技术有限公司 一种基于自动演练的数据挖掘分析方法和装置
CN105905511A (zh) * 2016-05-20 2016-08-31 河南中烟工业有限责任公司 一种烟草生产储柜存量物料实时计量的方法和装置
CN105905511B (zh) * 2016-05-20 2018-03-27 河南中烟工业有限责任公司 一种烟草生产储柜存量物料实时计量的方法和装置
CN106227175A (zh) * 2016-08-31 2016-12-14 北京泰清科技有限公司 一种采集灌装包装生产线停机数据系统及其采集方法
CN106980892A (zh) * 2017-02-16 2017-07-25 威海市冠维智能科技有限公司 一种基于wifi无线组网的智能lcd屏显计数器
CN106980892B (zh) * 2017-02-16 2020-07-07 威海市冠维智能科技有限公司 一种基于wifi无线组网的智能lcd屏显计数器
CN110262914A (zh) * 2019-06-20 2019-09-20 北京北方华创微电子装备有限公司 一种半导体设备工艺数据处理方法及系统

Similar Documents

Publication Publication Date Title
CN103400033A (zh) 基于实时数据库的制丝设备停机率计算系统
CN111191878A (zh) 一种基于异常分析的台区及电能表状态评价方法及系统
CN103345209B (zh) 生产监控方法及系统
US11035217B2 (en) Graphical indexing for life cycle management of drilling system assets
CN104425046B (zh) 核电站运行安全指数量化方法和系统
CN116308211B (zh) 一种基于大数据的企业智能化管理系统及方法
KR20170060653A (ko) 모바일 기반의 양만장 통합관리 시스템
CN110412966B (zh) 监测变桨电机温度异常的方法和装置
CN108319638B (zh) 一种应用手持巡检设备的危险品生产制造执行系统
CN104503361B (zh) 基于多模式融合的齿轮加工过程换刀决策方法
CN104503362A (zh) 基于多信息融合的批量工件数控加工进度自动采集方法
US10311399B2 (en) Apparatus and method for maintaining multi-referenced stored data
CN103359466B (zh) 一种基于电子皮带称瞬时流量的制丝线段停机率计算系统
CN116629523A (zh) 一种刀具管理方法及其相关设备
CN115097797A (zh) 一种基于互联网分布式能源云管控系统
RU98387U1 (ru) Система поддержки принятия решений для оперативно-диспетчерского и эксплуатационного персонала автоматизированной сортировочной горки (сппр кдк су)
CN111915223B (zh) 用于加料设备生产能力的评估方法和评估装置
RU2760167C1 (ru) Интеллектуальная система определения технического состояния трубопроводной арматуры
CN103760858B (zh) 一种真空制盐dcs控制系统
CN117784737B (zh) 一种油田井场智能rtu控制系统
CN111626448B (zh) 一种基于风险最小的预防性维护计划动态编排方法
CN106295841B (zh) 一种液压制造设备生产参数的统计方法
CN203164669U (zh) 远程诊断服务系统
CN117452892A (zh) 一种自动化加工产线的生产管控方法及相关装置
CN113568937A (zh) 一种基于vee流程的电量拟合方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131120