CN103382849A - Method for filling paste behind filling hydraulic supports - Google Patents

Method for filling paste behind filling hydraulic supports Download PDF

Info

Publication number
CN103382849A
CN103382849A CN2013103265029A CN201310326502A CN103382849A CN 103382849 A CN103382849 A CN 103382849A CN 2013103265029 A CN2013103265029 A CN 2013103265029A CN 201310326502 A CN201310326502 A CN 201310326502A CN 103382849 A CN103382849 A CN 103382849A
Authority
CN
China
Prior art keywords
backboard
filling
hydraulic support
flame
waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103265029A
Other languages
Chinese (zh)
Other versions
CN103382849B (en
Inventor
成云海
陈加胜
林继凯
张明
庞继禄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201310326502.9A priority Critical patent/CN103382849B/en
Publication of CN103382849A publication Critical patent/CN103382849A/en
Application granted granted Critical
Publication of CN103382849B publication Critical patent/CN103382849B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for filling paste behind filling hydraulic supports. The method comprises the steps of (1), separating two adjacent hydraulic supports and taking a rear telescopic girder, so that back ends of top beams of the hydraulic supports are separated from a top plate; (2), adding flame-retardant sponges tosides of back baffles, placing flame-retardant sponges in gaps between back ends of the top beams and the top plate, lifting the back ends of the hydraulic supports to enable the flame-retardant sponges to be clamped between the top beams and the top plate, and controlling a side-pushing jack to seal the two hydraulic supports; (3) placing waste non-flammable adhesive tapes in gaps between the top plate and the back baffles, and placing lower ends of the waste non-flammable adhesive tapes in gaps between a bottom plate and the back baffles; (4) forming a separation wall between the back of the hydraulic supports and an area to be filled to completely seal the space to be filled; (5), filling the space to be filled with paste from top to bottom, removing the hydraulic supports after a filling body solidifies and meets requirements for support force, and performing the next filling. Materials used in the method are the flame-retardant sponges and the waste non-flammable adhesive tapes, the materials are cheap, the operation process is simple, and the implementation is easy.

Description

A kind of paste body filling method after filling hydraulic support frames
Technical field
The present invention relates to a kind of paste body filling method after filling hydraulic support frames.
Background technology
Along with the scarcity of superficial part coal resources, Part Coal Mine has entered railways and water-bodies, i.e. coal mining, coal mining under water bodies under coal mining underbuildings, railway.Railways and water-bodies has higher requirements to controlling ground settlement, thereby generally adopts complete filling mining method.Paste body filling has controls that effect of settling is good, operating procedure is simple and economically viable advantage, but at present mostly the ubiquitous problem of paste filling hydraulic bracket be: between support, seal is bad, and support and top board can not connect reality fully.For fear of the easy running pulp problem of filling and injecting slurry, generally adopt packed filling after the conventional bracket frame, when inclined shaft or stope filling, slurries hang down to pressing and are easy to filling bag is damaged by pressure, both waste filler, polluted again the stope environment, especially had a strong impact on coal mining efficient, can't enrich the goaf in addition fully and cause filling effect not good, can't realize the Optimal Control to ground settlement.
Summary of the invention
The objective of the invention is to overcome paste filling hydraulic bracket to the shortcoming of goaf seal deficiency, provide a kind of and have good seal, operating procedure is simple and economically viable lotion backfill method.
Purpose of the present invention can be achieved through the following technical solutions:
A kind of paste body filling method after lotion hydraulic support frames is characterized in that, comprises the following steps:
(1) with adjacent two hydraulic supports separately, extensible canopy after regaining makes the hydraulic support top beam rear end separate with top board;
(2) increase flame-retardant sponge in the backboard side, between top beam rear end and top board, flame-retardant sponge is placed in the gap, rise the hydraulic support rear end flame-retardant sponge be clamped between back timber and top board, control the thruster jack, make two hydraulic supports sealings;
(3) waste and old non-flammable adhesive tape is put into gap between top board and backboard, rise backboard, waste and old non-flammable adhesive tape is clamped between top board and backboard, waste and old non-flammable adhesive tape lower end is placed in gap between base plate and backboard, fall backboard, waste and old non-flammable adhesive tape lower end is clamped between base plate and backboard;
(4) the hydraulic support rear with treat the filling area form together with divider wall, the filling space is treated in sealing fully;
(5) fill from top to bottom lotion, solidify until obturation and remove hydraulic support after satisfying the support force requirement, carry out next filling.
In described step (2), flame-retardant sponge is fixed on the side of backboard by thin wire.
Described backboard is provided with four, is respectively top left side backboard, right side, top backboard, left side, below backboard, downside right side backboard.
The present invention includes following steps:
(1) with adjacent two hydraulic supports separately, extensible canopy after regaining makes the hydraulic support top beam rear end separate with top board, falls left side, top backboard, right side, top backboard, mentions left side, below backboard, downside right side backboard;
(2) increase flame-retardant sponge in the backboard side, between top beam rear end and top board, flame-retardant sponge is placed in the gap, rise the hydraulic support rear end flame-retardant sponge be clamped between back timber and top board, control the thruster jack, make two hydraulic supports sealings;
(3) waste and old non-flammable adhesive tape is put into gap between top board and top left side backboard, right side, top backboard, rise left side, top backboard, right side, top backboard, waste and old non-flammable adhesive tape is clamped between top board and top left side backboard, right side, top backboard, waste and old non-flammable adhesive tape lower end is placed on base plate and left side, below backboard, in gap between the backboard of downside right side, fall left side, below backboard, downside right side backboard, waste and old non-flammable adhesive tape lower end is clamped in base plate and below left side backboard, between the backboard of downside right side;
(4) the hydraulic support rear with treat the filling area form together with divider wall, the filling space is treated in sealing fully;
(5) solidify until obturation and remove hydraulic support after satisfying the support force requirement, carry out next filling.
Beneficial effect of the present invention: there is following advantage in the present invention with respect to prior art:
1, take traditional lotion filling method as the basis, further improve perfectly, made up the easy running pulp of traditional filling method, the drawback of complicated operation;
2, material therefor is flame-retardant sponge and waste and old non-flammable adhesive tape, and material price is cheap;
3, operating procedure is simple, easily implements;
4, improve filling effect, thereby improve pack effectiveness, for efficient the coal mining creates conditions;
5, can enrich the goaf fully, realize the Optimal Control to ground settlement;
6, create good filling environment, for safety work provides the safe space, significantly alleviate labor strength.
Description of drawings
Fig. 1 is that the present invention falls top beam rear end, regulates the backboard schematic diagram.
Fig. 2 is that the present invention adds flame-retardant sponge and waste and old non-flammable adhesive tape schematic diagram.
Fig. 3 is that the present invention is full of and treats the filling space schematic diagram.
In figure: 1, hydraulic support, 2, treat the filling space, 3, rear extensible canopy, 4, back timber, 5, top board, 6, backboard, 7, fill area, 8, coal body, 9, base plate, 10, flame-retardant sponge, 11, waste and old non-flammable adhesive tape, 12, newly fill lotion.
The specific embodiment
Below in conjunction with concrete the drawings and specific embodiments, the present invention is described in further detail.
As shown in Figure 1, an end of hydraulic support 1 contacts with coal body 8, and the opposite side of hydraulic support 1 is fill area 7, has formed between fill area 7 and backboard 6 and has treated filling space 2.With adjacent two hydraulic supports 1 separately, extensible canopy 3 after regaining, the adjustment jack makes hydraulic support 1 back timber 4 rear ends separate with top board 5.Four of backboards 6 minutes are respectively left side, top backboard, right side, top backboard, left side, below backboard, downside right side backboard.Fall top left side backboard, right side, top backboard, promote left side, below backboard, downside right side backboard.
as shown in Figure 2, at backboard 6 sides increase flame-retardant sponges 10, be fixed on the backboard side with thin wire, between back timber 4 rear ends and top board 5, flame-retardant sponge 10 is placed in the gap, rise hydraulic support 1 rear end flame-retardant sponge 10 is clamped between back timber 4 and top board 5, control the thruster jack, make two hydraulic support 1 sealings, waste and old non-flammable adhesive tape 11 is put into top board 5 and left side, top backboard, in gap between the backboard of right side, top, rise left side, top backboard, right side, top backboard, waste and old non-flammable adhesive tape 11 is clamped in top board 5 and left side, top backboard, between the backboard of right side, top, waste and old non-flammable adhesive tape 11 lower ends are placed on base plate 9 and left side, below backboard, in gap between the backboard of downside right side, fall left side, below backboard, downside right side backboard, waste and old non-flammable adhesive tape 11 lower ends are clamped in base plate 9 and left side, below backboard, between the backboard of downside right side.
As shown in Figure 3, hydraulic support 1 rear with treat filling space 2 form together with divider wall, filling space 2 is treated in sealing fully, forms the new lotion 12 of filling.Fill from top to bottom lotion, solidify until obturation and remove hydraulic support after satisfying the support force requirement, carry out next filling.

Claims (4)

1. paste body filling method after a lotion hydraulic support frames, is characterized in that, comprises the following steps:
(1) with adjacent two hydraulic supports separately, extensible canopy after regaining makes the hydraulic support top beam rear end separate with top board;
(2) increase flame-retardant sponge in the backboard side, between top beam rear end and top board, flame-retardant sponge is placed in the gap, rise the hydraulic support rear end flame-retardant sponge be clamped between back timber and top board, control the thruster jack, make two hydraulic supports sealings;
(3) waste and old non-flammable adhesive tape is put into gap between top board and backboard, rise backboard, waste and old non-flammable adhesive tape is clamped between top board and backboard, waste and old non-flammable adhesive tape lower end is placed in gap between base plate and backboard, fall backboard, waste and old non-flammable adhesive tape lower end is clamped between base plate and backboard;
(4) the hydraulic support rear with treat the filling area form together with divider wall, the filling space is treated in sealing fully;
(5) fill from top to bottom lotion, solidify until obturation and remove hydraulic support after satisfying the support force requirement, carry out next filling.
2. paste body filling method after lotion hydraulic support frames according to claim 1, is characterized in that, in described step (2), flame-retardant sponge is fixed on the side of backboard by thin wire.
3. paste body filling method after lotion hydraulic support frames according to claim 1, is characterized in that, described backboard is provided with four, is respectively top left side backboard, right side, top backboard, left side, below backboard, downside right side backboard.
4. paste body filling method after lotion hydraulic support frames according to claim 3, is characterized in that, comprises the following steps:
(1) with adjacent two hydraulic supports separately, extensible canopy after regaining makes the hydraulic support top beam rear end separate with top board, falls left side, top backboard, right side, top backboard, mentions left side, below backboard, downside right side backboard;
(2) increase flame-retardant sponge in the backboard side, between top beam rear end and top board, flame-retardant sponge is placed in the gap, rise the hydraulic support rear end flame-retardant sponge be clamped between back timber and top board, control the thruster jack, make two hydraulic supports sealings;
(3) waste and old non-flammable adhesive tape is put into gap between top board and top left side backboard, right side, top backboard, rise left side, top backboard, right side, top backboard, waste and old non-flammable adhesive tape is clamped between top board and top left side backboard, right side, top backboard, waste and old non-flammable adhesive tape lower end is placed on base plate and left side, below backboard, in gap between the backboard of downside right side, fall left side, below backboard, downside right side backboard, the adhesive tape lower end is clamped in base plate and below left side backboard, between the backboard of downside right side;
(4) the hydraulic support rear with treat the filling area form together with divider wall, the filling space is treated in sealing fully;
(5) solidify until obturation and remove hydraulic support after satisfying the support force requirement, carry out next filling.
CN201310326502.9A 2013-07-31 2013-07-31 A kind of paste body filling method after filling hydraulic support frames Expired - Fee Related CN103382849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310326502.9A CN103382849B (en) 2013-07-31 2013-07-31 A kind of paste body filling method after filling hydraulic support frames

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310326502.9A CN103382849B (en) 2013-07-31 2013-07-31 A kind of paste body filling method after filling hydraulic support frames

Publications (2)

Publication Number Publication Date
CN103382849A true CN103382849A (en) 2013-11-06
CN103382849B CN103382849B (en) 2015-09-09

Family

ID=49490753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310326502.9A Expired - Fee Related CN103382849B (en) 2013-07-31 2013-07-31 A kind of paste body filling method after filling hydraulic support frames

Country Status (1)

Country Link
CN (1) CN103382849B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821558A (en) * 2014-02-14 2014-05-28 安徽理工大学 Coal mine gob filling mining system and gob-side entry retaining filling process
CN104213920A (en) * 2014-08-25 2014-12-17 中国矿业大学 Bag type filling method for suspension brackets
CN104405438A (en) * 2014-10-15 2015-03-11 山东科技大学 Roof-contacted method for mine gob-side entry paste filling wall body
CN105298496A (en) * 2015-12-17 2016-02-03 冀中能源集团有限责任公司 Full-mining and full-filling coal mining method with reserved working face coal pillar
CN111608726A (en) * 2020-07-06 2020-09-01 西安科技大学 Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting
CN114737915A (en) * 2022-04-19 2022-07-12 安徽理工大学 Deep mining water inrush rock burst prevention and control device
CN117266922A (en) * 2023-10-17 2023-12-22 济宁矿业集团矿产资源勘查开发有限公司 Postmining filling water-reducing process and postmining filling water-reducing equipment for goaf of shallow-buried thin coal seam coal mine

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1180537A1 (en) * 1984-05-04 1985-09-23 Государственный проектный и научно-исследовательский институт "Гипроникель" Stowing fence for powered support
CN101793159A (en) * 2010-03-19 2010-08-04 中国矿业大学 Dam-type filling hydraulic bracket in mined-out region
CN102261257A (en) * 2011-08-04 2011-11-30 成云海 Hydraulic support for filling after installation and operating method thereof
CN102493838A (en) * 2011-12-17 2012-06-13 湖南科技大学 Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam
CN102493839A (en) * 2011-12-10 2012-06-13 太原理工大学 Method for filling gob
CN202325590U (en) * 2011-11-22 2012-07-11 徐州中矿大贝克福尔科技有限公司 Filling hydraulic support frame for backfill of coal mine
CN102606207A (en) * 2012-04-06 2012-07-25 陕西开拓建筑科技有限公司 Mine gob filling and entry retaining device system and filling method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1180537A1 (en) * 1984-05-04 1985-09-23 Государственный проектный и научно-исследовательский институт "Гипроникель" Stowing fence for powered support
CN101793159A (en) * 2010-03-19 2010-08-04 中国矿业大学 Dam-type filling hydraulic bracket in mined-out region
CN102261257A (en) * 2011-08-04 2011-11-30 成云海 Hydraulic support for filling after installation and operating method thereof
CN202325590U (en) * 2011-11-22 2012-07-11 徐州中矿大贝克福尔科技有限公司 Filling hydraulic support frame for backfill of coal mine
CN102493839A (en) * 2011-12-10 2012-06-13 太原理工大学 Method for filling gob
CN102493838A (en) * 2011-12-17 2012-06-13 湖南科技大学 Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam
CN102606207A (en) * 2012-04-06 2012-07-25 陕西开拓建筑科技有限公司 Mine gob filling and entry retaining device system and filling method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821558A (en) * 2014-02-14 2014-05-28 安徽理工大学 Coal mine gob filling mining system and gob-side entry retaining filling process
CN103821558B (en) * 2014-02-14 2016-02-24 安徽理工大学 Coal mine gob filling mining and gob side entry retaining filling process
CN104213920A (en) * 2014-08-25 2014-12-17 中国矿业大学 Bag type filling method for suspension brackets
CN104405438A (en) * 2014-10-15 2015-03-11 山东科技大学 Roof-contacted method for mine gob-side entry paste filling wall body
CN104405438B (en) * 2014-10-15 2016-06-01 山东科技大学 Mine gob-side entry retaining paste body filling body of wall connect top method
CN105298496A (en) * 2015-12-17 2016-02-03 冀中能源集团有限责任公司 Full-mining and full-filling coal mining method with reserved working face coal pillar
CN111608726A (en) * 2020-07-06 2020-09-01 西安科技大学 Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting
CN114737915A (en) * 2022-04-19 2022-07-12 安徽理工大学 Deep mining water inrush rock burst prevention and control device
CN114737915B (en) * 2022-04-19 2024-02-09 安徽理工大学 Deep mining water burst rock burst control device
CN117266922A (en) * 2023-10-17 2023-12-22 济宁矿业集团矿产资源勘查开发有限公司 Postmining filling water-reducing process and postmining filling water-reducing equipment for goaf of shallow-buried thin coal seam coal mine
CN117266922B (en) * 2023-10-17 2024-03-19 济宁矿业集团矿产资源勘查开发有限公司 Postmining filling water-reducing process and postmining filling water-reducing equipment for goaf of shallow-buried thin coal seam coal mine

Also Published As

Publication number Publication date
CN103382849B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103382849A (en) Method for filling paste behind filling hydraulic supports
CN204646285U (en) A kind of coal mine paste filling exploitation high efficiency isolation liquid pressure support
CN203066995U (en) Steep coal seam work face double-lane forepoling hydraulic support side protection device
CN103437792B (en) Filling sealing device and placement method thereof
CN211975051U (en) Filling equipment for open-air end slope coal-pressing filling mining
CN204299617U (en) One is anti-breaks type gob side entry retaining filling air bag
CN204283488U (en) A kind of constant-resistance allows presses gob side entry retaining filling air bag
CN203962014U (en) Combine and adopt the dual-purpose working surface hydraulic support of filling
CN203756173U (en) Delay filling original roadway coal-pillar-free gob-side entrydriving system
CN206233944U (en) Underground coal mine removes the cover frame of hydraulic support
CN203655316U (en) Top isolating device for coal mine filling bracket
CN106761874A (en) A kind of automatic moving type forepoling hydraulic support with side guard plate
CN201539278U (en) Filling formwork support
CN204186410U (en) A kind of coal mine filling transversal end hydraulic support
CN203925530U (en) A kind of first active relief is pressed the adjustable gob side entry retaining body of wall of supporting
CN203114338U (en) Supporting equipment for filling
CN204344162U (en) A kind of crawler-type traveling filling machine
CN103883336A (en) Adjustable gob-side entry retaining wall with initial active and later buffering support and implementing method thereof
CN204283455U (en) Novel thin coal seam filling hydraulic support
CN203655332U (en) Telescopic isolated type suspended support for filling of coal mines
CN202970781U (en) Split side-extending type filling isolation device
CN203412607U (en) Hydraulic support for realizing placing top coal and filling operation
CN201747391U (en) Two-stage lateral protection transition bracket of large mining height working surface
CN205876369U (en) Great mining height face hydraulic bracket transition rack
CN204492853U (en) A kind of anchor rod stirring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20160731