CN203655316U - Top isolating device for coal mine filling bracket - Google Patents
Top isolating device for coal mine filling bracket Download PDFInfo
- Publication number
- CN203655316U CN203655316U CN201320857865.0U CN201320857865U CN203655316U CN 203655316 U CN203655316 U CN 203655316U CN 201320857865 U CN201320857865 U CN 201320857865U CN 203655316 U CN203655316 U CN 203655316U
- Authority
- CN
- China
- Prior art keywords
- filling
- hinged
- isolating
- jack
- division board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000003245 coal Substances 0.000 title claims abstract description 17
- 125000006850 spacer group Chemical group 0.000 claims description 13
- 238000010276 construction Methods 0.000 claims description 8
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 claims description 4
- 239000003063 flame retardant Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 4
- 238000007789 sealing Methods 0.000 abstract description 14
- 238000005065 mining Methods 0.000 abstract description 8
- 238000002955 isolation Methods 0.000 abstract description 7
- 238000002360 preparation method Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 2
- 230000004888 barrier function Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
Images
Landscapes
- Auxiliary Methods And Devices For Loading And Unloading (AREA)
Abstract
The utility model discloses a top isolating device for a coal mine filling bracket, belonging to an isolating device for a filling coal mining bracket. The top isolating device comprises a top beam, a sealing strip, diagonal jack, an upper telescopic box, an upward extension jacket and an isolating plate, wherein the sealing strip is arranged on the top of the upper telescopic box; the upper telescopic box is arranged on the top of the isolating plate; one end of the upward extension jack is hinged to the upper telescopic box, and the other end of the upward extension jack is hinged to the upper isolating plate; the isolating plate is hinged to the tail of the top beam; one end of the diagonal jack is hinged to the isolating plate, and the other end of the diagonal jack is hinged to the top beam. By adopting the top isolating device, the gap between the top beam of the sealing bracket and a top plate can be sealed effectively, a filling isolating barrier wall can be formed rapidly, the filling isolating effect is ensured, and the filling operation requirement is met. The top isolating device is suitable for various paste filling working faces. Filling isolation can be performed mechanically in filling coal mining, effective seal of the isolating plate is ensured, filling paste is prevented from flowing into the working face, the filling preparation working time is shortened effectively, labor work is reduced, and the overall paste filling efficiency is increased.
Description
Technical field
The utility model relates to a kind of spacer assembly of filling coal mining support, particularly a kind of top spacer assembly of coal mine paste filling support.
Background technology
Paste body filling technology is as one of Green Technique in Coal Mining system, and its main purpose is to solve " three next on " to press coal, improves colliery resource recovery ratio, extends mine service-life.
At present, the isolation leak stopping problem for the treatment of filling area is one of Major Difficulties of restriction exhibition paste body filling production technique.Isolate leak stopping work if adopt merely manual type, not only complex operation, labor strength is large, and length consuming time, efficiency is low, and traditional fully mechanized mining supporter is not provided with the spacer assembly of sealing filling slurry, need to adopt equally manual type to build isolation barricade, mechanization degree is low, seriously restricts the raising of paste body filling coal mining efficiency.Therefore, in paste body filling production technique, isolate preparation mechanization degree not high, inefficiency, while there is colliery backfill, sealing problem between support and top board, becomes those skilled in the art's problem demanding prompt solution.
Utility model content
In order to solve the problems of the technologies described above, the utility model provides a kind of top spacer assembly of coal mine paste filling support, solves in the time of the backfill of colliery sealing problem between support and top board.
The purpose of this utility model be achieved in that this spacer assembly comprise back timber, weather strip, oblique pull jack, upper expansion box, on stretch jack and division board; Weather strip is arranged on expansion box top; Expansion box is equipped with at division board top; On stretch jack one end and upper expansion box is hinged, above stretch the jack other end and upper division board is hinged; Division board and back timber afterbody are hinged; Oblique pull jack one end and division board are hinged, and the other end and back timber 1 are hinged.
Upper expansion box is box-structure, or frame construction.
Division board is box-structure, or frame construction.
Weather strip is that the flexible material of flame-retardant and anti-static is made.
Beneficial effect, owing to adopting such scheme, in the time carrying out filling isolation preparation, only need stretch out expansion box 4, be separately aided with a small amount of sealing ancillary method, can realize the sealing between support bracket at tail part and back timber, can mechanically realize the sealing to set cap and top board gap, effective sealing set cap and top board gap, form filling isolation barricade fast, guarantee filling isolation effect, meet packing job requirement.Be applicable to various paste body filling work planes.Can, in filling coal mining, in mechanization mode, filling isolation be set, guarantee division board effective sealing, prevent that fill paste from flowing into work plane, effectively shorten the filling preparation time, reduce hand labor, improve paste body filling whole work efficiency.Solve in the time of the backfill of colliery sealing problem between support and top board, reached the utility model object.
Advantage: in filling coal mining, fast sealing set cap and top board gap, cancel workman and manually build the work of isolating template, reduces hand labor, improves filling integral operating efficiency.
Accompanying drawing explanation
Fig. 1 is the utility model side-looking structure chart.
In figure: 1, back timber; 2, weather strip; 3, oblique pull jack; 4, upper expansion box; 5, on, stretch jack; 6, division board.
The specific embodiment
Embodiment 1: this spacer assembly comprise back timber 1, weather strip 2, oblique pull jack 3, upper expansion box 4, on stretch jack 5 and division board 6; Weather strip 2 is arranged on expansion box 4 tops; Expansion box 4 is equipped with at division board 6 tops, and upper expansion box 4 relatively division board 6 moves up and down, and object is that crush seal bar 2 is realized top seal function.
On stretch jack 5 one end and upper expansion box 4 hinged, above stretch jack 5 other ends and upper division board 6 hinged; Division board 6 is hinged with back timber 1 afterbody; Oblique pull jack 3 one end and division board 6 are hinged, and described oblique pull jack 3 other ends and back timber 1 are hinged, and division board 6 can be with respect to back timber 1 swing, and object is to adjust angle to adapt to different operating condition.
Division board 6 is box-structures, or frame construction.
Top of the present utility model spacer assembly, its specific embodiment is:
The realization of top board isolating seal function: when sealing preparation completes, carry out before filling operation, make division board 6 in suitable duty by operation oblique pull jack 3, then operation on stretch jack 5 by 4 liters of upper expansion boxs until top weather strip 2 contacts and pushes top board, realize top seal function with this.
Claims (4)
1. a top spacer assembly for coal mine filling support, is characterized in that: this spacer assembly comprise back timber, weather strip, oblique pull jack, upper expansion box, on stretch jack and division board; Weather strip is arranged on expansion box top; Expansion box is equipped with at division board top; On stretch jack one end and upper expansion box is hinged, above stretch the jack other end and upper division board is hinged; Division board and back timber afterbody are hinged; Oblique pull jack one end and division board are hinged, and the other end and back timber are hinged.
2. the top spacer assembly of coal mine filling support according to claim 1, is characterized in that: described upper expansion box is box-structure, or frame construction.
3. the top spacer assembly of coal mine filling support according to claim 1, is characterized in that: described division board is box-structure, or frame construction.
4. the top spacer assembly of coal mine filling support according to claim 1, is characterized in that: described weather strip is that the flexible material of flame-retardant and anti-static is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320857865.0U CN203655316U (en) | 2013-12-24 | 2013-12-24 | Top isolating device for coal mine filling bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320857865.0U CN203655316U (en) | 2013-12-24 | 2013-12-24 | Top isolating device for coal mine filling bracket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203655316U true CN203655316U (en) | 2014-06-18 |
Family
ID=50921716
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320857865.0U Expired - Lifetime CN203655316U (en) | 2013-12-24 | 2013-12-24 | Top isolating device for coal mine filling bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203655316U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105545358A (en) * | 2015-12-16 | 2016-05-04 | 山东科技大学 | Roadside seal device for retaining roadways along goaf and application method thereof |
CN109252891A (en) * | 2018-11-05 | 2019-01-22 | 徐州中矿大贝克福尔科技股份有限公司 | A kind of paste body filling continuous flexible sealing device and partition method |
CN111852551A (en) * | 2020-07-28 | 2020-10-30 | 郑州合新科技有限公司 | A isolating device for filling support |
-
2013
- 2013-12-24 CN CN201320857865.0U patent/CN203655316U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105545358A (en) * | 2015-12-16 | 2016-05-04 | 山东科技大学 | Roadside seal device for retaining roadways along goaf and application method thereof |
CN105545358B (en) * | 2015-12-16 | 2017-11-28 | 山东科技大学 | A kind of lane side sealing device and its application process for gob side entry retaining |
CN109252891A (en) * | 2018-11-05 | 2019-01-22 | 徐州中矿大贝克福尔科技股份有限公司 | A kind of paste body filling continuous flexible sealing device and partition method |
CN109252891B (en) * | 2018-11-05 | 2023-09-19 | 徐州中矿大贝克福尔科技股份有限公司 | Paste filling continuous flexible sealing device and isolation method |
CN111852551A (en) * | 2020-07-28 | 2020-10-30 | 郑州合新科技有限公司 | A isolating device for filling support |
CN111852551B (en) * | 2020-07-28 | 2022-07-08 | 郑州合新智能装备有限公司 | A isolating device for filling support |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204646285U (en) | A kind of coal mine paste filling exploitation high efficiency isolation liquid pressure support | |
CN103382849B (en) | A kind of paste body filling method after filling hydraulic support frames | |
CN203655316U (en) | Top isolating device for coal mine filling bracket | |
CN202402072U (en) | Floating retractable filling isolation board | |
CN204186424U (en) | A kind of coal mine filling exploitation end hydraulic support spacer assembly | |
CN104314577B (en) | Shield machine assembly and disassembly methods in tunnel | |
CN103670508B (en) | A kind of swing type spacer assembly of coal mine paste filling exploitation and partition method | |
CN204186410U (en) | A kind of coal mine filling transversal end hydraulic support | |
CN214007193U (en) | Adopt and fill parallel lotion and fill hydraulic support | |
CN203962014U (en) | Combine and adopt the dual-purpose working surface hydraulic support of filling | |
CN203189062U (en) | Hole drift filling sealing device | |
CN203269456U (en) | Two-way hydraulic side-pushing jack for bracket | |
CN208966359U (en) | A kind of coal mine paste filling exploitation hydraulic isolation bracket | |
CN109057846B (en) | Colliery lotion filling exploitation hydraulic pressure isolation support | |
CN201539278U (en) | Filling formwork support | |
CN209040168U (en) | A kind of subway tunnel side wall waterproof structure for deformation seams | |
CN204002884U (en) | Device of the anti-tie end of soft-rock tunnel advance timbering | |
CN202970781U (en) | Split side-extending type filling isolation device | |
CN204186422U (en) | Filling hydraulic support division board sealed sides is to compensation arrangement | |
CN203655351U (en) | Swinging type isolating device for use in paste filling coal mining | |
CN208996751U (en) | A kind of paste filling hydraulic bracket isolating device | |
CN204691796U (en) | A kind of coal mine filling exploitation gob side entry retaining transversal end hydraulic support | |
CN203230452U (en) | End support for thin seam double-unit face central transportation roadway | |
CN208966368U (en) | One kind being suitable for quick closing device by gob side entry retaining lane | |
CN203655332U (en) | Telescopic isolated type suspended support for filling of coal mines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: 221008 Jiangsu, Xuzhou Jinshan Road, north side of Xuzhou Software Park, room 11, No. 1213 Patentee after: XUZHOU CUMT BACKFILL TECHNOLOGY Co.,Ltd. Address before: 221008 Jiangsu city in Xuzhou Province, the liberation of South Park Mine Technology Pioneering Park Room 216 Patentee before: Xuzhou CUMT Backfill Technology Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140618 |