CN103382849B - A kind of paste body filling method after filling hydraulic support frames - Google Patents
A kind of paste body filling method after filling hydraulic support frames Download PDFInfo
- Publication number
- CN103382849B CN103382849B CN201310326502.9A CN201310326502A CN103382849B CN 103382849 B CN103382849 B CN 103382849B CN 201310326502 A CN201310326502 A CN 201310326502A CN 103382849 B CN103382849 B CN 103382849B
- Authority
- CN
- China
- Prior art keywords
- backboard
- hydraulic support
- top board
- flame
- adhesive tape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Processing Of Solid Wastes (AREA)
Abstract
The present invention discloses a kind of paste body filling method after lotion hydraulic support frames, comprises the following steps: (1) by adjacent two hydraulic supports separately, extensible canopy after regaining, makes hydraulic support top beam rear end be separated with top board; (2) increase flame-retardant sponge in backboard side, between top beam rear end and top board, flame-retardant sponge is placed in gap, and rise hydraulic support rear end then flame-retardant sponge is clamped between back timber and top board, controls thruster jack, makes two hydraulic supports sealings; (3) waste and old non-flammable adhesive tape is put into the gap between top board and backboard, waste and old non-flammable adhesive tape lower end is placed in the gap between base plate and backboard; (4) hydraulic support rear formed with district to be filled together with divider wall, completely close space to be filled; (5) fill lotion from top to bottom, body to be filled removes hydraulic support after solidifying and meeting support force requirement, carries out next filling.Material therefor of the present invention is flame-retardant sponge and waste and old non-flammable adhesive tape, and material price is cheap; Operating procedure is simple, easily implements.
Description
Technical field
The present invention relates to a kind of paste body filling method after filling hydraulic support frames.
Background technology
Along with the scarcity of superficial part coal resources, Part Coal Mine enters railways and water-bodies, i.e. coal mining underbuildings, Gas burst, coal mining under water bodies.Railways and water-bodies has higher requirements to control ground settlement, thus the complete filling mining method of general employing.Paste body filling has that control settlement is effective, operating procedure is simple and economically viable advantage, but at present mostly the ubiquitous problem of paste filling hydraulic bracket be: between support, seal is bad, and support and top board can not connect reality completely.In order to avoid the easy running pulp problem of filling and injecting slurry, general employing is packed filling after conventional bracket frame, when inclined shaft or stope filling, slurries pressure of hanging down is easy to filling bag to damage by pressure, both wasted filler, and polluted stope environment again, especially have a strong impact on coal mining efficiency, in addition cannot enrich goaf completely causes filling effect not good, cannot realize the Optimal Control to ground settlement.
Summary of the invention
The object of the invention is to overcome the shortcoming of paste filling hydraulic bracket to goaf seal deficiency, provide one to have the simple and economically viable lotion backfill method of good seal, operating procedure.
Object of the present invention can be achieved through the following technical solutions:
A kind of paste body filling method after filling hydraulic support frames, is characterized in that, comprise the following steps:
(1) by adjacent two hydraulic supports separately, extensible canopy after regaining, makes hydraulic support top beam rear end be separated with top board;
(2) increase flame-retardant sponge in backboard side, between top beam rear end and top board, flame-retardant sponge is placed in gap, and rise hydraulic support rear end then flame-retardant sponge is clamped between back timber and top board, controls thruster jack, makes two hydraulic supports sealings;
(3) waste and old non-flammable adhesive tape is put into the gap between top board and backboard, rise backboard, waste and old non-flammable adhesive tape is clamped between top board and backboard, waste and old non-flammable adhesive tape lower end is placed in the gap between base plate and backboard, fall backboard, waste and old non-flammable adhesive tape lower end is clamped between base plate and backboard;
(4) hydraulic support rear formed with district to be filled together with divider wall, completely close space to be filled;
(5) fill lotion from top to bottom, body to be filled removes hydraulic support after solidifying and meeting support force requirement, carries out next filling.
In described step (2), flame-retardant sponge is fixed on the side of backboard by thin wire.
Described backboard is provided with four pieces, is upper left backboard, upper right backboard, lower left backboard respectively, backboard on the right side of downside.
The present invention includes following steps:
(1) by adjacent two hydraulic supports separately, extensible canopy after regaining, makes hydraulic support top beam rear end be separated with top board, falls upper left backboard, upper right backboard, mention lower left backboard, backboard on the right side of downside;
(2) increase flame-retardant sponge in backboard side, between top beam rear end and top board, flame-retardant sponge is placed in gap, and rise hydraulic support rear end then flame-retardant sponge is clamped between back timber and top board, controls thruster jack, makes two hydraulic supports sealings;
(3) waste and old non-flammable adhesive tape is put into the gap between top board and upper left backboard, upper right backboard, rise upper left backboard, upper right backboard, waste and old non-flammable adhesive tape is clamped between top board and upper left backboard, upper right backboard, waste and old non-flammable adhesive tape lower end is placed on base plate and lower left backboard, in gap between the backboard of right side, downside, fall lower left backboard, right side, downside backboard, waste and old non-flammable adhesive tape lower end is clamped in base plate and lower left backboard, on the right side of downside between backboard;
(4) hydraulic support rear formed with district to be filled together with divider wall, completely close space to be filled;
(5) body to be filled removes hydraulic support after solidifying and meeting support force requirement, carries out next filling.
Beneficial effect of the present invention: the present invention exists following advantage relative to prior art:
1, based on traditional lotion filling method, improve perfect further, compensate for the easy running pulp of traditional filling method, the drawback of complicated operation;
2, material therefor is flame-retardant sponge and waste and old non-flammable adhesive tape, and material price is cheap;
3, operating procedure is simple, easily implements;
4, improving filling effect, thus improve pack effectiveness, creating conditions for efficiently mining;
5, goaf can be enriched completely, realize the Optimal Control to ground settlement;
6, create good filling environment, for safety work provides safe space, significantly alleviate labor strength.
Accompanying drawing explanation
Fig. 1 is that the present invention falls top beam rear end, regulates backboard schematic diagram.
Fig. 2 is that the present invention adds flame-retardant sponge and waste and old non-flammable adhesive tape schematic diagram.
Fig. 3 is that the present invention is full of space to be filled schematic diagram.
In figure: 1, hydraulic support, 2, space to be filled, 3, rear extensible canopy, 4, back timber, 5, top board, 6, backboard, 7, fill area, 8, coal body, 9, base plate, 10, flame-retardant sponge, 11, waste and old non-flammable adhesive tape, 12, newly fill lotion.
Detailed description of the invention
Below in conjunction with concrete the drawings and specific embodiments, the present invention is described in further detail.
As shown in Figure 1, one end of hydraulic support 1 contacts with coal body 8, and the opposite side of hydraulic support 1 is fill area 7, forms space 2 to be filled between fill area 7 and backboard 6.By adjacent two hydraulic supports 1 separately, extensible canopy 3 after regaining, adjustment jack, makes hydraulic support 1 back timber 4 rear end be separated with top board 5.Backboard 6 points four pieces, is respectively upper left backboard, upper right backboard, lower left backboard, backboard on the right side of downside.Fall upper left backboard, upper right backboard, promote lower left backboard, backboard on the right side of downside.
As shown in Figure 2, flame-retardant sponge 10 is increased in backboard 6 side, be fixed on backboard side with thin wire, between back timber 4 rear end and top board 5, flame-retardant sponge 10 is placed in gap, rise hydraulic support 1 rear end then flame-retardant sponge 10 is clamped between back timber 4 and top board 5, control thruster jack, two hydraulic supports 1 are sealed, waste and old non-flammable adhesive tape 11 is put into top board 5 and upper left backboard, in gap between upper right backboard, rise upper left backboard, upper right backboard, waste and old non-flammable adhesive tape 11 is clamped in top board 5 and upper left backboard, between upper right backboard, waste and old non-flammable adhesive tape 11 lower end is placed on base plate 9 and lower left backboard, in gap between the backboard of right side, downside, fall lower left backboard, right side, downside backboard, waste and old non-flammable adhesive tape 11 lower end is clamped in base plate 9 and lower left backboard, between the backboard of right side, downside.
As shown in Figure 3, divider wall together with hydraulic support 1 rear is formed with space 2 to be filled, closes space 2 to be filled completely, forms new filling lotion 12.Fill lotion from top to bottom, body to be filled removes hydraulic support after solidifying and meeting support force requirement, carries out next filling.
Claims (1)
1. a paste body filling method after filling hydraulic support frames, is characterized in that, comprise the following steps:
(1) backboard is provided with four pieces, is upper left backboard, upper right backboard, lower left backboard respectively, backboard on the right side of downside; By adjacent two hydraulic supports separately, extensible canopy after regaining, makes hydraulic support top beam rear end be separated with top board, falls upper left backboard, upper right backboard, mention lower left backboard, backboard on the right side of downside;
(2) increase flame-retardant sponge in backboard side, between top beam rear end and top board, flame-retardant sponge is placed in gap, and rise hydraulic support rear end then flame-retardant sponge is clamped between back timber and top board, controls thruster jack, makes two hydraulic supports sealings; Flame-retardant sponge is fixed on the side of backboard by thin wire;
(3) waste and old non-flammable adhesive tape is put into the gap between top board and upper left backboard, upper right backboard, rise upper left backboard, upper right backboard, waste and old non-flammable adhesive tape is clamped between top board and upper left backboard, upper right backboard, waste and old non-flammable adhesive tape lower end is placed on base plate and lower left backboard, in gap between the backboard of right side, downside, fall lower left backboard, right side, downside backboard, adhesive tape lower end is clamped in base plate and lower left backboard, on the right side of downside between backboard;
(4) hydraulic support rear formed with district to be filled together with divider wall, completely close space to be filled;
(5) body to be filled removes hydraulic support after solidifying and meeting support force requirement, carries out next filling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310326502.9A CN103382849B (en) | 2013-07-31 | 2013-07-31 | A kind of paste body filling method after filling hydraulic support frames |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310326502.9A CN103382849B (en) | 2013-07-31 | 2013-07-31 | A kind of paste body filling method after filling hydraulic support frames |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103382849A CN103382849A (en) | 2013-11-06 |
CN103382849B true CN103382849B (en) | 2015-09-09 |
Family
ID=49490753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310326502.9A Expired - Fee Related CN103382849B (en) | 2013-07-31 | 2013-07-31 | A kind of paste body filling method after filling hydraulic support frames |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103382849B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821558B (en) * | 2014-02-14 | 2016-02-24 | 安徽理工大学 | Coal mine gob filling mining and gob side entry retaining filling process |
CN104213920A (en) * | 2014-08-25 | 2014-12-17 | 中国矿业大学 | Bag type filling method for suspension brackets |
CN104405438B (en) * | 2014-10-15 | 2016-06-01 | 山东科技大学 | Mine gob-side entry retaining paste body filling body of wall connect top method |
CN105298496B (en) * | 2015-12-17 | 2018-02-27 | 冀中能源集团有限责任公司 | Complete adopt of reserved working face coal column is set to fill coal-mining method entirely |
CN111608726A (en) * | 2020-07-06 | 2020-09-01 | 西安科技大学 | Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting |
CN114737915B (en) * | 2022-04-19 | 2024-02-09 | 安徽理工大学 | Deep mining water burst rock burst control device |
CN117266922B (en) * | 2023-10-17 | 2024-03-19 | 济宁矿业集团矿产资源勘查开发有限公司 | Postmining filling water-reducing process and postmining filling water-reducing equipment for goaf of shallow-buried thin coal seam coal mine |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1180537A1 (en) * | 1984-05-04 | 1985-09-23 | Государственный проектный и научно-исследовательский институт "Гипроникель" | Stowing fence for powered support |
CN101793159A (en) * | 2010-03-19 | 2010-08-04 | 中国矿业大学 | Dam-type filling hydraulic bracket in mined-out region |
CN102261257A (en) * | 2011-08-04 | 2011-11-30 | 成云海 | Hydraulic support for filling after installation and operating method thereof |
CN102493839A (en) * | 2011-12-10 | 2012-06-13 | 太原理工大学 | Method for filling gob |
CN102493838A (en) * | 2011-12-17 | 2012-06-13 | 湖南科技大学 | Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam |
CN202325590U (en) * | 2011-11-22 | 2012-07-11 | 徐州中矿大贝克福尔科技有限公司 | Filling hydraulic support frame for backfill of coal mine |
CN102606207A (en) * | 2012-04-06 | 2012-07-25 | 陕西开拓建筑科技有限公司 | Mine gob filling and entry retaining device system and filling method |
-
2013
- 2013-07-31 CN CN201310326502.9A patent/CN103382849B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1180537A1 (en) * | 1984-05-04 | 1985-09-23 | Государственный проектный и научно-исследовательский институт "Гипроникель" | Stowing fence for powered support |
CN101793159A (en) * | 2010-03-19 | 2010-08-04 | 中国矿业大学 | Dam-type filling hydraulic bracket in mined-out region |
CN102261257A (en) * | 2011-08-04 | 2011-11-30 | 成云海 | Hydraulic support for filling after installation and operating method thereof |
CN202325590U (en) * | 2011-11-22 | 2012-07-11 | 徐州中矿大贝克福尔科技有限公司 | Filling hydraulic support frame for backfill of coal mine |
CN102493839A (en) * | 2011-12-10 | 2012-06-13 | 太原理工大学 | Method for filling gob |
CN102493838A (en) * | 2011-12-17 | 2012-06-13 | 湖南科技大学 | Method for fully mechanized continuously-filling coal mining of steeply pitching coal seam |
CN102606207A (en) * | 2012-04-06 | 2012-07-25 | 陕西开拓建筑科技有限公司 | Mine gob filling and entry retaining device system and filling method |
Also Published As
Publication number | Publication date |
---|---|
CN103382849A (en) | 2013-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103382849B (en) | A kind of paste body filling method after filling hydraulic support frames | |
CN204646285U (en) | A kind of coal mine paste filling exploitation high efficiency isolation liquid pressure support | |
CN105240048B (en) | A kind of gas filling method based on paste body filling | |
CN204532426U (en) | A kind of gob side entry retaining flexible filling bag | |
CN205618200U (en) | Inflatable tunnel shield seals high -pressure rubber gasbag | |
CN202768070U (en) | Height adjustable gob-side entry retaining filling bag | |
CN103437792A (en) | Filling sealing device and filling method thereof | |
CN214007193U (en) | Adopt and fill parallel lotion and fill hydraulic support | |
CN204186424U (en) | A kind of coal mine filling exploitation end hydraulic support spacer assembly | |
CN203655316U (en) | Top isolating device for coal mine filling bracket | |
CN203756173U (en) | Delay filling original roadway coal-pillar-free gob-side entrydriving system | |
CN204186410U (en) | A kind of coal mine filling transversal end hydraulic support | |
CN211312994U (en) | Hang stone material curtain wall construction futilely | |
CN203925530U (en) | A kind of first active relief is pressed the adjustable gob side entry retaining body of wall of supporting | |
CN205135648U (en) | Rib wall caving anchor | |
CN202229674U (en) | Lead structure for fireworks | |
CN203570351U (en) | Supporting device for low coal seam comprehensive mechanized remained gateway along goaf | |
CN103883336A (en) | Adjustable gob-side entry retaining wall with initial active and later buffering support and implementing method thereof | |
CN202047853U (en) | Gob-side entry retaining end hydraulic support | |
CN109057846A (en) | A kind of coal mine paste filling exploitation hydraulic isolation bracket | |
CN204921029U (en) | Bag is filled to gob entry flexibility | |
CN204344162U (en) | A kind of crawler-type traveling filling machine | |
CN204919483U (en) | Power station seam stagnant water structure | |
CN209483388U (en) | A kind of coal mine paste filling end hydraulic support | |
CN209976564U (en) | Three-stage isolation paste filling type hydraulic support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150909 Termination date: 20160731 |