CN202047853U - Gob-side entry retaining end hydraulic support - Google Patents

Gob-side entry retaining end hydraulic support Download PDF

Info

Publication number
CN202047853U
CN202047853U CN2011201428390U CN201120142839U CN202047853U CN 202047853 U CN202047853 U CN 202047853U CN 2011201428390 U CN2011201428390 U CN 2011201428390U CN 201120142839 U CN201120142839 U CN 201120142839U CN 202047853 U CN202047853 U CN 202047853U
Authority
CN
China
Prior art keywords
side entry
entry retaining
template
gob
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201428390U
Other languages
Chinese (zh)
Inventor
张守祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Coal Mining Equipment Co., Ltd.
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN2011201428390U priority Critical patent/CN202047853U/en
Application granted granted Critical
Publication of CN202047853U publication Critical patent/CN202047853U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a gob-side entry retaining end hydraulic support, which comprises end supports. A gob-side entry retaining template assembly which is equipped on the outer side of the outermost end support comprises an upper template and a lower template. The upper template is fixed on the top beam of the end support while the lower template is fixed on the base of the end support. The upper template and the lower template are in movably overlapping joint relation. During a coal mine exploitation process, a tunnel filling template is equipped inside a tunnel of an exploiting working face. Filling operations are performed between the gob-side entry retaining template assembly and the tunnel filling template. A new tunnel which is retained along a goaf is applied as a tunnel for exploiting a next working face. The gob-side entry retaining end hydraulic support which has high formwork efficiency and high safety saves the trouble of reserving coal pillars on working faces and improves the coal resource recovery rate and the working face advancing efficiency.

Description

The gob side entry retaining end hydraulic support
Technical field
The utility model relates to the hydraulic support that a kind of coal mining is used, and relates in particular to a kind of gob side entry retaining end hydraulic support.
Background technology
In the prior art, in the process of coal mining, generally all be provided with the coal column that work plane is reserved, when a working face mining finishes, when carrying out next working face mining, driving face tunnel again all usually.
There is shortcoming at least in above-mentioned prior art:
Coal recovery rate is low, tunnelling rate height, cost of production height, advance of the face efficient are low.
The utility model content
The purpose of this utility model provides a kind of formwork efficient and safe, can improve the gob side entry retaining end hydraulic support of coal recovery rate and advance of the face efficient.
The purpose of this utility model is achieved through the following technical solutions:
Gob side entry retaining end hydraulic support of the present utility model, comprise face end support, the outside of described face end support is provided with the gob side entry retaining template assembly, described gob side entry retaining template assembly comprises cope match-plate pattern, lower bolster, described cope match-plate pattern is fixed on the back timber of described face end support, described lower bolster is fixed on the base of described face end support, movable overlap joint between described cope match-plate pattern and the lower bolster.
The technical scheme that is provided by above-mentioned the utility model as can be seen, the gob side entry retaining end hydraulic support that the utility model provides, because the outside of face end support is provided with the gob side entry retaining template assembly, propelling along with coal-face, can carry out roadside packing by template assembly, stay the tunnel along the goaf, as the tunnel of the next work plane of exploitation.Formwork efficient and safe has been saved the coal column that work plane is reserved, and has improved coal recovery rate and advance of the face efficient.
Description of drawings
The structural representation of the gob side entry retaining end hydraulic support that Fig. 1 provides for the utility model embodiment;
The floor map that the gob side entry retaining end hydraulic support that Fig. 2 provides for the utility model embodiment carries out gob side entry retaining coal mining.
Among the figure:
1, face end support back timber, 2, cope match-plate pattern, 3, middle template, 4, lower bolster, 5, the face end support base;
11, former tunnel center line, 12, the gob side entry retaining template assembly, 13, the tunnel filling template, 14, new tunnel, 15, obturator, 16, face end support, 17, the middle transition support.
The specific embodiment
Below in conjunction with accompanying drawing the utility model embodiment is described in further detail.
Gob side entry retaining end hydraulic support of the present utility model, its preferable specific embodiment be as shown in Figure 1 and Figure 2:
Comprise face end support, the outside of described face end support is provided with the gob side entry retaining template assembly, described gob side entry retaining template assembly comprises cope match-plate pattern, lower bolster, described cope match-plate pattern is fixed on the back timber of described face end support, described lower bolster is fixed on the base of described face end support, movable overlap joint between described cope match-plate pattern and the lower bolster.
Be provided with middle template between described cope match-plate pattern and the described lower bolster, reach movable overlap joint between described middle template and the lower bolster between described cope match-plate pattern and the middle template.
Comprise three frame end head brackets, the outside of the face end support of outer end is provided with described gob side entry retaining template assembly in the three frame end head brackets.
Described three frame end head brackets are provided with the anti-skid device, and described anti-skid device comprises drag-line, and an end of described drag-line is fixed on the back timber of face end support of outer end, and the other end of described drag-line is fixed on the base of inner face end support.
Also comprise anchor device, on the fixing described lower bolster of an end of described anchor device, the other end tension of described anchor device is on the base of the face end support of the inner.
Use the method that above-mentioned gob side entry retaining end hydraulic support of the present utility model carries out gob side entry retaining coal mining, as shown in Figure 2:
In the process of coal mining, in the tunnel of exploitation work plane, the tunnel filling template is set, carry out filling between described gob side entry retaining template assembly and described tunnel filling template, stay new tunnel along the goaf, described new tunnel is as the tunnel of exploiting next work plane.
The backfill of filling usefulness can form for ashes and the cement mixing from power plant, can adopt spoil to make the roadside support material.
The utility model is blended in filling process in the coal winning technology, at arranged outside cope match-plate pattern, middle template and the lower bolster of the face end support of outermost end, and three frame end head brackets design anti-skid device.Form the filling space after moving frame, improve formwork efficient and safety by the quick formwork erection of mechanization.
Use edge air gallery technology of the present utility model, the colliery is along with the propelling of coal-face, adopt the roadside packing method, stay the tunnel along the goaf, all can be used as the crossheading of the next work plane of exploitation along the empty tunnel that stays, following crossheading will become the last crossheading of next work plane subsequently, can be maintained by the backfill of certain width (as 3 meters).One lane is dual-purpose, saves the expense of digging laneway, avoids debalance of preparation and winning work, anxiety continues;
Gob side entry retaining has saved the coal column that work plane is reserved, and raising coal recovery rate, reduction tunnelling rate, the digging tight relationship of alleviating, realization mine intensification production are had remarkable result.Reduce production costs, adapt to the needs that the high-yield and high-efficiency work plane advances fast.
In concrete the application, can select backfill pump or miscellaneous equipment for use, carry out edge the fast continuous filling in lane of leaving a blank.Backfill is for mixing by certain ratio from power plant's ashes (or other article) and cement.The siccative of backfill feed bin is delivered to down-hole transitional storehouse (surge bunker) by compressed air piping.Mix the station in emulsification, mix the back with water and be pumped to the back filled region by hydraulic concrete.The paste body filling material, pumps in the filling template under the effect of high-pressure pump by pressure piping, solidifies the back and forms filled wall; Can adopt spoil to make the roadside support material, can gather materials on the spot, both can reduce pick lane cost and spoil cost of transportation, can reduce soil, minimizing environment pollution that hillock takies again, have very extensive applicability.
The above; it only is the preferable specific embodiment of the utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claims.

Claims (5)

1. gob side entry retaining end hydraulic support, comprise face end support, it is characterized in that, the outside of described face end support is provided with the gob side entry retaining template assembly, described gob side entry retaining template assembly comprises cope match-plate pattern, lower bolster, described cope match-plate pattern is fixed on the back timber of described face end support, and described lower bolster is fixed on the base of described face end support, movable overlap joint between described cope match-plate pattern and the lower bolster.
2. gob side entry retaining end hydraulic support according to claim 1 is characterized in that, is provided with middle template between described cope match-plate pattern and the described lower bolster, reaches movable overlap joint between described middle template and the lower bolster between described cope match-plate pattern and the middle template.
3. gob side entry retaining end hydraulic support according to claim 2 is characterized in that, comprises three frame end head brackets, and the outside of the face end support of outer end is provided with described gob side entry retaining template assembly in the three frame end head brackets.
4. gob side entry retaining end hydraulic support according to claim 3, it is characterized in that, described three frame end head brackets are provided with the anti-skid device, described anti-skid device comprises drag-line, one end of described drag-line is fixed on the back timber of face end support of outer end, and the other end of described drag-line is fixed on the base of inner face end support.
5. gob side entry retaining end hydraulic support according to claim 4 is characterized in that, also comprises anchor device, and on the fixing described lower bolster of an end of described anchor device, the other end tension of described anchor device is on the base of the face end support of the inner.
CN2011201428390U 2011-05-06 2011-05-06 Gob-side entry retaining end hydraulic support Expired - Lifetime CN202047853U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201428390U CN202047853U (en) 2011-05-06 2011-05-06 Gob-side entry retaining end hydraulic support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201428390U CN202047853U (en) 2011-05-06 2011-05-06 Gob-side entry retaining end hydraulic support

Publications (1)

Publication Number Publication Date
CN202047853U true CN202047853U (en) 2011-11-23

Family

ID=44988164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201428390U Expired - Lifetime CN202047853U (en) 2011-05-06 2011-05-06 Gob-side entry retaining end hydraulic support

Country Status (1)

Country Link
CN (1) CN202047853U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287211A (en) * 2011-05-06 2011-12-21 中煤北京煤矿机械有限责任公司 Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN103422884A (en) * 2013-08-05 2013-12-04 山西晋城无烟煤矿业集团有限责任公司 Construction technology for formwork making and filling among gob-side entry retaining supports
CN104879154A (en) * 2015-06-17 2015-09-02 山东天晟煤矿装备有限公司 Hydraulic support for bidirectional isolating paste filling at ends

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287211A (en) * 2011-05-06 2011-12-21 中煤北京煤矿机械有限责任公司 Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN103422884A (en) * 2013-08-05 2013-12-04 山西晋城无烟煤矿业集团有限责任公司 Construction technology for formwork making and filling among gob-side entry retaining supports
CN103422884B (en) * 2013-08-05 2015-12-23 山西晋城无烟煤矿业集团有限责任公司 Molding filling construction technology between gob side entry retaining frame
CN104879154A (en) * 2015-06-17 2015-09-02 山东天晟煤矿装备有限公司 Hydraulic support for bidirectional isolating paste filling at ends

Similar Documents

Publication Publication Date Title
CN104018837B (en) A kind of interval filling gob-side entry retaining method processing planted agent's spoil
CN103615285B (en) A kind of stope route arrangement and method being beneficial to Tight filling
CN102425427B (en) Method for constructing tunnel by utilizing shield empty-pushing crossing mine method
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN108222938A (en) A kind of large-inclination-angle coal bed goaf combination grouting filling recovery method
CN101942999A (en) Coal mining method for high-dipping low seam
CN101858215B (en) Road retained method for extrusion molding of waste rock
CN110424966B (en) Ultrahigh water material filling working face gangue pumping entry retaining non-coal pillar mining method
CN109026006A (en) Exploitation open pit slope covers the new method of mineral products
CN102937035B (en) Method for rock mining and filling in mine goaf
CN101749020A (en) Forward coal mining by filling method
CN107829742A (en) Caving-filling-open stope-caving mining method
CN109322669B (en) Method for alternately filling rigid and flexible strips in inclined coal seam goaf without coal pillars and continuously mining
CN103061767B (en) Lower to horizontal slice Dry-placed fill mining
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN104564137A (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN102877848B (en) Method for performing coal mining and gangue cementation stripe filling simultaneously
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN103161498B (en) Method for filling coal pillar beside roadway in steep coal seam section
CN109630112A (en) A kind of N00 mining codes for cutting top filling
CN202047853U (en) Gob-side entry retaining end hydraulic support
CN105649673A (en) Roadside gangue mixture filling and gob-side entry retaining method for large-dip angle coal seams
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN109505604B (en) Slope ramp arrangement method applied to stope adopting upward layered filling mining method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA NATIONAL COAL MINING EQUIPMENT CO., LTD.

Effective date: 20120314

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120314

Address after: 102400 Beijing city Fangshan District Mill Road No. 1

Co-patentee after: China National Coal Mining Equipment Co., Ltd.

Patentee after: China Coal Beijing Coal Mining Machinery Co., Ltd.

Address before: 102400 Beijing city Fangshan District Mill Road No. 1

Patentee before: China Coal Beijing Coal Mining Machinery Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20111123

CX01 Expiry of patent term