CN102720498A - Gob-side entry retaining mining process for coal face - Google Patents
Gob-side entry retaining mining process for coal face Download PDFInfo
- Publication number
- CN102720498A CN102720498A CN201210204433XA CN201210204433A CN102720498A CN 102720498 A CN102720498 A CN 102720498A CN 201210204433X A CN201210204433X A CN 201210204433XA CN 201210204433 A CN201210204433 A CN 201210204433A CN 102720498 A CN102720498 A CN 102720498A
- Authority
- CN
- China
- Prior art keywords
- lane
- support
- row
- meter
- meters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a gob-side entry retaining mining process for a coal face. The method comprises the following steps of: firstly performing temporary support on a top plate by supporting with two rows of hydraulic single support columns on the side of the designed entry retaining region beside the transport lane after the lower end of the coal face is pushed with one cycle during progress of the coal face; then performing normal support on the top plate by arranging a row of reinforcing anchor cables on the top plate of the original laneway in the position 0.3 meters from the support wall and arranging a row of steel pipe-concrete support columns on the top plate of the original laneway in the position 0.6 meters from the base plate of the original laneway; and finally performing support on a lateral wall shield lane by protecting the lane with reinforcement meshes in combination with woven bags loading gangue and then stacking gangue bags and finally injecting a concrete coating to cover the reinforcement meshes. The method fills in the blank of lane side-wall support and shield lane in the prior art, reduces the support cost, increases the support strength, greatly increases the construction speed, has a simple process and a significant effect, and effectively reduces the ten thousand ton-level drivage ratio.
Description
Technical field
The present invention relates to the coal-mining technique field, be applicable to medium stablizing, low gaseous mine, no bump and area of stress concentration structure, nearly level and gentle dip girdle and medium-thickness seam fully-mechanized mining working with the upper plate condition.
Background technology
During the coal mine fully-mechanized mining working exploitation, for reducing the loss of coal column, large tracts of land has been promoted the gob side entry retaining production practice.
At present, gob side entry retaining production practice technology mainly contains following several kinds:
Build waste pack by laying bricks or stones, install close standing props or grillage, add the Guyuan tunnel metallic support, adopt and mould to be arranged or do not have the mould filling technique.More than several kinds of technology all have following deficiency.
1. build waste pack technology by laying bricks or stones: pay the support ability in advance, cause the excessive sinking of top board to cause back to fracture easily, finally cause staying the lane failure.
2. pillar or crib protection: support material uses many, and workload is big, supporting and protect the lane weak effect.
3. the metallic support that adds the Guyuan tunnel: construction technology is complicated, and poor stability supports top board repeatedly, causes roof break, fragmentation, and it is relatively poor to protect the lane effect.
4. cement or other materials filling process: complex process, equipment has high input, and the filler cost is higher.
Therefore, how to realize high strength, low cost, simple to operate, protect the tight edge air gallery technology in lane and remain a great problem in the coal mining.
Summary of the invention
The present invention is the deficiency that overcomes prior art, has proposed a kind of new Retaining Roadways Along Goaf at Coal Face production practice method.
Technical scheme is following:
The first step: top board temporary lining
Along with the propelling of work plane, after circulation of work plane lower end propelling, the other goaf side in the lane, transportation lane of design presses individual prop to carry out supporting with two discharge opeings, and two discharge opeings press individual prop to wear footwear, prop up to be located on the work plane floor rock; The first row's pillar post that leans on goaf side is apart from 0.8 meter; Arrange metal roof bar on second row's individual prop, 1 meter of post distance, 0.5 meter of array pitch; Band strengthening cap supporting on the individual prop is pressed in two discharge opeings, and cap adopts the thick plank of 15-30cm; According to the top board lithology, before the work plane first weighting, temporary lining length is got 50 meters, and behind the first weighting, the temporary lining distance is got 30 meters; Two row's individual props layout that will be in line, two arrange individual props the prop setting angle degree be 3-4 °;
The 3rd step: the regular supporting of top board
On the top board in former tunnel, arrange row's reinforcement anchor cable apart from 0.3 meter of support wall, anchor cable specification φ 17.8 * 6200mm, spacing 3-4 rice is arranged a row steel tube concrete pillar at 0.6 meter of the former roadway floor of distance again, post is apart from 1.0 meters; Described concrete filled steel tube pillar: be at seamless steel pipe, pour into the C40 concrete, require yield strength greater than 236N/mm
2, thickness of steel pipe is not less than 4mm, the ratio 65-70 of outer diameter of steel pipes and wall thickness, and slenderness ratio is not more than 20;
The 3rd step: lateral wall protects the lane mode
Adopt steel mesh reinforcement to cooperate the packed spoil of braiding to protect the lane; Promptly fix steel mesh reinforcement in the outside of concrete filled steel tube pillar; Steel mesh reinforcement adopts φ 6mm welded steel fabric, mesh 100 * 100mm, stacking spoil bag then; 1.5 meters of spoil bag stacking bottom width, 1 meter of top width, the spoil bag is to load onto spoil with Nylon Bag in the down-hole to form; For preventing that the goaf from leaking out, on steel mesh reinforcement, spray a layer concrete again and cover.
The invention solves the gob side entry retaining traditional handicraft at roadside support and protect the technical shortcoming in lane, reduced support cost, improved supporting intensity; Improved speed of application greatly, technology is simple, and effect is remarkable; Effectively reduce ten thousand tons of drivage ratios; Shorten work plane time, stopped the protection pillar loss, improved the safe coefficient in resource recovery and colliery.
Description of drawings
Fig. 1 is the sketch map of the embodiment of the invention.
The specific embodiment
Practical implementation of the present invention such as summary of the invention are said, and those skilled in the art can implement according to the record of Fig. 1 and manual fully, are not described in detail in this.
Claims (1)
1. Retaining Roadways Along Goaf at Coal Face production practice method is characterized in that step is following:
The first step: top board temporary lining
Along with the propelling of work plane, after circulation of work plane lower end propelling, the other goaf side in the lane, transportation lane of design presses individual prop to carry out supporting with two discharge opeings, and two discharge opeings press individual prop to wear footwear, prop up to be located on the work plane floor rock; The first row's pillar post that leans on goaf side is apart from 0.8 meter; Arrange metal roof bar on second row's individual prop, 1 meter of post distance, 0.5 meter of array pitch; Band strengthening cap supporting on the individual prop is pressed in two discharge opeings, and cap adopts the thick plank of 15-30cm; According to the top board lithology, before the work plane first weighting, temporary lining length is got 50 meters, and behind the first weighting, the temporary lining distance is got 30 meters; Two row's individual props layout that will be in line, two arrange individual props the prop setting angle degree be 3-4 °;
The 3rd step: the regular supporting of top board
On the top board in former tunnel, arrange row's reinforcement anchor cable apart from 0.3 meter of support wall, anchor cable specification φ 17.8 * 6200mm, spacing 3-4 rice is arranged a row steel tube concrete pillar at 0.6 meter of the former roadway floor of distance again, post is apart from 1.0 meters; Described concrete filled steel tube pillar: be at seamless steel pipe, pour into C
40Concrete requires yield strength greater than 236N/mm
2, thickness of steel pipe is not less than 4mm, the ratio 65-70 of outer diameter of steel pipes and wall thickness, and slenderness ratio is not more than 20;
The 3rd step: lateral wall protects the lane mode
Adopt steel mesh reinforcement to cooperate the packed spoil of braiding to protect the lane; Promptly fix steel mesh reinforcement in the outside of concrete filled steel tube pillar; Steel mesh reinforcement adopts φ 6mm welded steel fabric, mesh 100 * 100mm, stacking spoil bag then; 1.5 meters of spoil bag stacking bottom width, 1 meter of top width, the spoil bag is to load onto spoil with Nylon Bag in the down-hole to form; For preventing that the goaf from leaking out, on steel mesh reinforcement, spray a layer concrete again and cover.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210204433.XA CN102720498B (en) | 2012-06-20 | 2012-06-20 | Gob-side entry retaining mining process for coal face |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210204433.XA CN102720498B (en) | 2012-06-20 | 2012-06-20 | Gob-side entry retaining mining process for coal face |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102720498A true CN102720498A (en) | 2012-10-10 |
CN102720498B CN102720498B (en) | 2015-06-17 |
Family
ID=46946346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210204433.XA Expired - Fee Related CN102720498B (en) | 2012-06-20 | 2012-06-20 | Gob-side entry retaining mining process for coal face |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102720498B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161467A (en) * | 2013-02-25 | 2013-06-19 | 湖北杉树垭矿业科技开发有限公司 | Horizontal moderately thick mine body compartment type filling mining method |
CN103291319A (en) * | 2013-05-20 | 2013-09-11 | 山东科技大学 | Rigid-flexible combination gob-side entry retaining method and rigid-flexible combination gob-side entry retaining device by aid of roadside supports |
CN103397905A (en) * | 2013-04-17 | 2013-11-20 | 唐建新 | System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining |
CN103470286A (en) * | 2013-09-25 | 2013-12-25 | 四川省煤炭产业集团有限责任公司 | Gob-side entry retaining method realizing support by intercepting self-slip gangue through strip reinforcing steel bar mesh |
CN103758529A (en) * | 2013-12-28 | 2014-04-30 | 北京昊华能源股份有限公司 | Coal mine gob-side entry retaining side supporting method |
CN104061001A (en) * | 2014-06-25 | 2014-09-24 | 枣庄矿业(集团)有限责任公司滨湖煤矿 | Gob-side entry retaining mining support process method |
CN104500071A (en) * | 2014-12-16 | 2015-04-08 | 河南理工大学 | Gob-side entry retaining method capable of avoiding dynamic pressure influence on coal mining |
CN104832188A (en) * | 2015-04-17 | 2015-08-12 | 中国矿业大学(北京) | Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof |
CN107091091A (en) * | 2017-07-03 | 2017-08-25 | 湖南科技大学 | A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support |
CN108194141A (en) * | 2017-12-28 | 2018-06-22 | 乌海市天裕工贸有限公司 | Mouth block wall under a kind of coal mine offset |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2101501C1 (en) * | 1996-06-06 | 1998-01-10 | Сибирская государственная горно-металлургическая академия | Method of preservation of mine working |
CN101503959A (en) * | 2008-11-26 | 2009-08-12 | 枣庄矿业(集团)有限责任公司滨湖煤矿 | Gob-side entry retaining support method |
CN101864987A (en) * | 2010-06-13 | 2010-10-20 | 中国矿业大学 | Building method of filled wall body for gob-side entry retaining of large-inclination coal seam |
CN101892860A (en) * | 2010-06-05 | 2010-11-24 | 中国矿业大学 | Method for entry retaining for walling at sides of road in steel cylinder support mode |
CN101922292A (en) * | 2010-02-04 | 2010-12-22 | 成云海 | Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application |
CN102278140A (en) * | 2011-07-05 | 2011-12-14 | 徐州贝壳迈宁矿业科技有限公司 | Gob-side entry retaining method for solid filling coal mining building gangue wall |
CN102425454A (en) * | 2011-09-22 | 2012-04-25 | 中国矿业大学 | Construction method of walling and filling combined gob-side entry retaining wall body |
-
2012
- 2012-06-20 CN CN201210204433.XA patent/CN102720498B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2101501C1 (en) * | 1996-06-06 | 1998-01-10 | Сибирская государственная горно-металлургическая академия | Method of preservation of mine working |
CN101503959A (en) * | 2008-11-26 | 2009-08-12 | 枣庄矿业(集团)有限责任公司滨湖煤矿 | Gob-side entry retaining support method |
CN101922292A (en) * | 2010-02-04 | 2010-12-22 | 成云海 | Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application |
CN101892860A (en) * | 2010-06-05 | 2010-11-24 | 中国矿业大学 | Method for entry retaining for walling at sides of road in steel cylinder support mode |
CN101864987A (en) * | 2010-06-13 | 2010-10-20 | 中国矿业大学 | Building method of filled wall body for gob-side entry retaining of large-inclination coal seam |
CN102278140A (en) * | 2011-07-05 | 2011-12-14 | 徐州贝壳迈宁矿业科技有限公司 | Gob-side entry retaining method for solid filling coal mining building gangue wall |
CN102425454A (en) * | 2011-09-22 | 2012-04-25 | 中国矿业大学 | Construction method of walling and filling combined gob-side entry retaining wall body |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103161467A (en) * | 2013-02-25 | 2013-06-19 | 湖北杉树垭矿业科技开发有限公司 | Horizontal moderately thick mine body compartment type filling mining method |
CN103161467B (en) * | 2013-02-25 | 2014-06-18 | 湖北杉树垭矿业科技开发有限公司 | Horizontal moderately thick mine body compartment type filling mining method |
CN103397905A (en) * | 2013-04-17 | 2013-11-20 | 唐建新 | System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining |
CN103291319A (en) * | 2013-05-20 | 2013-09-11 | 山东科技大学 | Rigid-flexible combination gob-side entry retaining method and rigid-flexible combination gob-side entry retaining device by aid of roadside supports |
CN103470286A (en) * | 2013-09-25 | 2013-12-25 | 四川省煤炭产业集团有限责任公司 | Gob-side entry retaining method realizing support by intercepting self-slip gangue through strip reinforcing steel bar mesh |
CN103758529A (en) * | 2013-12-28 | 2014-04-30 | 北京昊华能源股份有限公司 | Coal mine gob-side entry retaining side supporting method |
CN104061001A (en) * | 2014-06-25 | 2014-09-24 | 枣庄矿业(集团)有限责任公司滨湖煤矿 | Gob-side entry retaining mining support process method |
CN104061001B (en) * | 2014-06-25 | 2016-09-07 | 枣庄矿业(集团)有限责任公司滨湖煤矿 | Gob side entry retaining exploitation support process method |
CN104500071A (en) * | 2014-12-16 | 2015-04-08 | 河南理工大学 | Gob-side entry retaining method capable of avoiding dynamic pressure influence on coal mining |
CN104832188A (en) * | 2015-04-17 | 2015-08-12 | 中国矿业大学(北京) | Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof |
CN104832188B (en) * | 2015-04-17 | 2017-02-01 | 中国矿业大学(北京) | Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof |
CN107091091A (en) * | 2017-07-03 | 2017-08-25 | 湖南科技大学 | A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support |
CN108194141A (en) * | 2017-12-28 | 2018-06-22 | 乌海市天裕工贸有限公司 | Mouth block wall under a kind of coal mine offset |
CN108194141B (en) * | 2017-12-28 | 2019-03-29 | 乌海市天裕工贸有限公司 | Mouth block wall under a kind of coal mine offset |
Also Published As
Publication number | Publication date |
---|---|
CN102720498B (en) | 2015-06-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102720498B (en) | Gob-side entry retaining mining process for coal face | |
CN103410515B (en) | It is a kind of that three-soft seam is reciprocating combines mining method without coal column | |
CN102661169B (en) | Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars | |
CN104061001B (en) | Gob side entry retaining exploitation support process method | |
CN108222938A (en) | A kind of large-inclination-angle coal bed goaf combination grouting filling recovery method | |
CN107191208A (en) | Rigid protection body Support Method in flexible support Ti Yu lanes by gob side entry retaining lane | |
CN104632220B (en) | Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope | |
CN109209490B (en) | Working face withdrawing method for gangue filling auxiliary end mining stage | |
CN103470261A (en) | Method for roadway driving along goaf under original roadway top plate of fully mechanized top coal caving goaf | |
CN103397905A (en) | System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining | |
CN212296427U (en) | Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure | |
CN111608726A (en) | Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting | |
CN103061764A (en) | Goaf waste rock filling coal mining method of flexible shield support in half-edge coal seam | |
CN105003288A (en) | Medium-thickness coal seam gob-side entry retaining method and support system | |
CN107387083A (en) | A kind of medium-thickness seam gob side entry retaining roadside support body construction method supported using spoil | |
CN104863588A (en) | Advanced pier column pre-arranging gob-side entry retaining method | |
CN206707726U (en) | A kind of gob side entry retaining roadside support system | |
CN206205903U (en) | A kind of base plate release ruggedized construction of control deep tunnel bottom distension | |
CN106014443A (en) | Method for preventing roadway floor heaving and wall sliding of gob-side entry retaining | |
CN106285692B (en) | A kind of construction method of gob side entry retaining | |
CN103161467A (en) | Horizontal moderately thick mine body compartment type filling mining method | |
CN205349380U (en) | Prevent whole crest truncation support of gob entry pucking | |
CN206280090U (en) | High-dipping surrounding rock of actual mining roadway stabilization supporting facility | |
CN105604552B (en) | A kind of solid material filling coal mining gob-side entry retaining method | |
CN203730069U (en) | Round concrete filled steel tubular column gob-side entry retaining filling wall body structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150617 Termination date: 20180620 |
|