CN102720498A - Gob-side entry retaining mining process for coal face - Google Patents

Gob-side entry retaining mining process for coal face Download PDF

Info

Publication number
CN102720498A
CN102720498A CN201210204433XA CN201210204433A CN102720498A CN 102720498 A CN102720498 A CN 102720498A CN 201210204433X A CN201210204433X A CN 201210204433XA CN 201210204433 A CN201210204433 A CN 201210204433A CN 102720498 A CN102720498 A CN 102720498A
Authority
CN
China
Prior art keywords
lane
support
row
meter
meters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210204433XA
Other languages
Chinese (zh)
Other versions
CN102720498B (en
Inventor
刘笃鸿
陈东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Original Assignee
OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OTOG FRONT BANNER CHANGCHENG MINE CO Ltd filed Critical OTOG FRONT BANNER CHANGCHENG MINE CO Ltd
Priority to CN201210204433.XA priority Critical patent/CN102720498B/en
Publication of CN102720498A publication Critical patent/CN102720498A/en
Application granted granted Critical
Publication of CN102720498B publication Critical patent/CN102720498B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a gob-side entry retaining mining process for a coal face. The method comprises the following steps of: firstly performing temporary support on a top plate by supporting with two rows of hydraulic single support columns on the side of the designed entry retaining region beside the transport lane after the lower end of the coal face is pushed with one cycle during progress of the coal face; then performing normal support on the top plate by arranging a row of reinforcing anchor cables on the top plate of the original laneway in the position 0.3 meters from the support wall and arranging a row of steel pipe-concrete support columns on the top plate of the original laneway in the position 0.6 meters from the base plate of the original laneway; and finally performing support on a lateral wall shield lane by protecting the lane with reinforcement meshes in combination with woven bags loading gangue and then stacking gangue bags and finally injecting a concrete coating to cover the reinforcement meshes. The method fills in the blank of lane side-wall support and shield lane in the prior art, reduces the support cost, increases the support strength, greatly increases the construction speed, has a simple process and a significant effect, and effectively reduces the ten thousand ton-level drivage ratio.

Description

Retaining Roadways Along Goaf at Coal Face production practice method
Technical field
The present invention relates to the coal-mining technique field, be applicable to medium stablizing, low gaseous mine, no bump and area of stress concentration structure, nearly level and gentle dip girdle and medium-thickness seam fully-mechanized mining working with the upper plate condition.
Background technology
During the coal mine fully-mechanized mining working exploitation, for reducing the loss of coal column, large tracts of land has been promoted the gob side entry retaining production practice.
At present, gob side entry retaining production practice technology mainly contains following several kinds:
Build waste pack by laying bricks or stones, install close standing props or grillage, add the Guyuan tunnel metallic support, adopt and mould to be arranged or do not have the mould filling technique.More than several kinds of technology all have following deficiency.
1. build waste pack technology by laying bricks or stones: pay the support ability in advance, cause the excessive sinking of top board to cause back to fracture easily, finally cause staying the lane failure.
2. pillar or crib protection: support material uses many, and workload is big, supporting and protect the lane weak effect.
3. the metallic support that adds the Guyuan tunnel: construction technology is complicated, and poor stability supports top board repeatedly, causes roof break, fragmentation, and it is relatively poor to protect the lane effect.
4. cement or other materials filling process: complex process, equipment has high input, and the filler cost is higher.
Therefore, how to realize high strength, low cost, simple to operate, protect the tight edge air gallery technology in lane and remain a great problem in the coal mining.
Summary of the invention
The present invention is the deficiency that overcomes prior art, has proposed a kind of new Retaining Roadways Along Goaf at Coal Face production practice method.
Technical scheme is following:
The first step: top board temporary lining
Along with the propelling of work plane, after circulation of work plane lower end propelling, the other goaf side in the lane, transportation lane of design presses individual prop to carry out supporting with two discharge opeings, and two discharge opeings press individual prop to wear footwear, prop up to be located on the work plane floor rock; The first row's pillar post that leans on goaf side is apart from 0.8 meter; Arrange metal roof bar on second row's individual prop, 1 meter of post distance, 0.5 meter of array pitch; Band strengthening cap supporting on the individual prop is pressed in two discharge opeings, and cap adopts the thick plank of 15-30cm; According to the top board lithology, before the work plane first weighting, temporary lining length is got 50 meters, and behind the first weighting, the temporary lining distance is got 30 meters; Two row's individual props layout that will be in line, two arrange individual props the prop setting angle degree be 3-4 °;
The 3rd step: the regular supporting of top board
On the top board in former tunnel, arrange row's reinforcement anchor cable apart from 0.3 meter of support wall, anchor cable specification φ 17.8 * 6200mm, spacing 3-4 rice is arranged a row steel tube concrete pillar at 0.6 meter of the former roadway floor of distance again, post is apart from 1.0 meters; Described concrete filled steel tube pillar: be at seamless steel pipe, pour into the C40 concrete, require yield strength greater than 236N/mm 2, thickness of steel pipe is not less than 4mm, the ratio 65-70 of outer diameter of steel pipes and wall thickness, and slenderness ratio is not more than 20;
The 3rd step: lateral wall protects the lane mode
Adopt steel mesh reinforcement to cooperate the packed spoil of braiding to protect the lane; Promptly fix steel mesh reinforcement in the outside of concrete filled steel tube pillar; Steel mesh reinforcement adopts φ 6mm welded steel fabric, mesh 100 * 100mm, stacking spoil bag then; 1.5 meters of spoil bag stacking bottom width, 1 meter of top width, the spoil bag is to load onto spoil with Nylon Bag in the down-hole to form; For preventing that the goaf from leaking out, on steel mesh reinforcement, spray a layer concrete again and cover.
The invention solves the gob side entry retaining traditional handicraft at roadside support and protect the technical shortcoming in lane, reduced support cost, improved supporting intensity; Improved speed of application greatly, technology is simple, and effect is remarkable; Effectively reduce ten thousand tons of drivage ratios; Shorten work plane time, stopped the protection pillar loss, improved the safe coefficient in resource recovery and colliery.
Description of drawings
Fig. 1 is the sketch map of the embodiment of the invention.
The specific embodiment
Practical implementation of the present invention such as summary of the invention are said, and those skilled in the art can implement according to the record of Fig. 1 and manual fully, are not described in detail in this.

Claims (1)

1. Retaining Roadways Along Goaf at Coal Face production practice method is characterized in that step is following:
The first step: top board temporary lining
Along with the propelling of work plane, after circulation of work plane lower end propelling, the other goaf side in the lane, transportation lane of design presses individual prop to carry out supporting with two discharge opeings, and two discharge opeings press individual prop to wear footwear, prop up to be located on the work plane floor rock; The first row's pillar post that leans on goaf side is apart from 0.8 meter; Arrange metal roof bar on second row's individual prop, 1 meter of post distance, 0.5 meter of array pitch; Band strengthening cap supporting on the individual prop is pressed in two discharge opeings, and cap adopts the thick plank of 15-30cm; According to the top board lithology, before the work plane first weighting, temporary lining length is got 50 meters, and behind the first weighting, the temporary lining distance is got 30 meters; Two row's individual props layout that will be in line, two arrange individual props the prop setting angle degree be 3-4 °;
The 3rd step: the regular supporting of top board
On the top board in former tunnel, arrange row's reinforcement anchor cable apart from 0.3 meter of support wall, anchor cable specification φ 17.8 * 6200mm, spacing 3-4 rice is arranged a row steel tube concrete pillar at 0.6 meter of the former roadway floor of distance again, post is apart from 1.0 meters; Described concrete filled steel tube pillar: be at seamless steel pipe, pour into C 40Concrete requires yield strength greater than 236N/mm 2, thickness of steel pipe is not less than 4mm, the ratio 65-70 of outer diameter of steel pipes and wall thickness, and slenderness ratio is not more than 20;
The 3rd step: lateral wall protects the lane mode
Adopt steel mesh reinforcement to cooperate the packed spoil of braiding to protect the lane; Promptly fix steel mesh reinforcement in the outside of concrete filled steel tube pillar; Steel mesh reinforcement adopts φ 6mm welded steel fabric, mesh 100 * 100mm, stacking spoil bag then; 1.5 meters of spoil bag stacking bottom width, 1 meter of top width, the spoil bag is to load onto spoil with Nylon Bag in the down-hole to form; For preventing that the goaf from leaking out, on steel mesh reinforcement, spray a layer concrete again and cover.
CN201210204433.XA 2012-06-20 2012-06-20 Gob-side entry retaining mining process for coal face Expired - Fee Related CN102720498B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210204433.XA CN102720498B (en) 2012-06-20 2012-06-20 Gob-side entry retaining mining process for coal face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210204433.XA CN102720498B (en) 2012-06-20 2012-06-20 Gob-side entry retaining mining process for coal face

Publications (2)

Publication Number Publication Date
CN102720498A true CN102720498A (en) 2012-10-10
CN102720498B CN102720498B (en) 2015-06-17

Family

ID=46946346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210204433.XA Expired - Fee Related CN102720498B (en) 2012-06-20 2012-06-20 Gob-side entry retaining mining process for coal face

Country Status (1)

Country Link
CN (1) CN102720498B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161467A (en) * 2013-02-25 2013-06-19 湖北杉树垭矿业科技开发有限公司 Horizontal moderately thick mine body compartment type filling mining method
CN103291319A (en) * 2013-05-20 2013-09-11 山东科技大学 Rigid-flexible combination gob-side entry retaining method and rigid-flexible combination gob-side entry retaining device by aid of roadside supports
CN103397905A (en) * 2013-04-17 2013-11-20 唐建新 System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN103470286A (en) * 2013-09-25 2013-12-25 四川省煤炭产业集团有限责任公司 Gob-side entry retaining method realizing support by intercepting self-slip gangue through strip reinforcing steel bar mesh
CN103758529A (en) * 2013-12-28 2014-04-30 北京昊华能源股份有限公司 Coal mine gob-side entry retaining side supporting method
CN104061001A (en) * 2014-06-25 2014-09-24 枣庄矿业(集团)有限责任公司滨湖煤矿 Gob-side entry retaining mining support process method
CN104500071A (en) * 2014-12-16 2015-04-08 河南理工大学 Gob-side entry retaining method capable of avoiding dynamic pressure influence on coal mining
CN104832188A (en) * 2015-04-17 2015-08-12 中国矿业大学(北京) Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof
CN107091091A (en) * 2017-07-03 2017-08-25 湖南科技大学 A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support
CN108194141A (en) * 2017-12-28 2018-06-22 乌海市天裕工贸有限公司 Mouth block wall under a kind of coal mine offset

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2101501C1 (en) * 1996-06-06 1998-01-10 Сибирская государственная горно-металлургическая академия Method of preservation of mine working
CN101503959A (en) * 2008-11-26 2009-08-12 枣庄矿业(集团)有限责任公司滨湖煤矿 Gob-side entry retaining support method
CN101864987A (en) * 2010-06-13 2010-10-20 中国矿业大学 Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN101892860A (en) * 2010-06-05 2010-11-24 中国矿业大学 Method for entry retaining for walling at sides of road in steel cylinder support mode
CN101922292A (en) * 2010-02-04 2010-12-22 成云海 Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
CN102278140A (en) * 2011-07-05 2011-12-14 徐州贝壳迈宁矿业科技有限公司 Gob-side entry retaining method for solid filling coal mining building gangue wall
CN102425454A (en) * 2011-09-22 2012-04-25 中国矿业大学 Construction method of walling and filling combined gob-side entry retaining wall body

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2101501C1 (en) * 1996-06-06 1998-01-10 Сибирская государственная горно-металлургическая академия Method of preservation of mine working
CN101503959A (en) * 2008-11-26 2009-08-12 枣庄矿业(集团)有限责任公司滨湖煤矿 Gob-side entry retaining support method
CN101922292A (en) * 2010-02-04 2010-12-22 成云海 Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application
CN101892860A (en) * 2010-06-05 2010-11-24 中国矿业大学 Method for entry retaining for walling at sides of road in steel cylinder support mode
CN101864987A (en) * 2010-06-13 2010-10-20 中国矿业大学 Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN102278140A (en) * 2011-07-05 2011-12-14 徐州贝壳迈宁矿业科技有限公司 Gob-side entry retaining method for solid filling coal mining building gangue wall
CN102425454A (en) * 2011-09-22 2012-04-25 中国矿业大学 Construction method of walling and filling combined gob-side entry retaining wall body

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161467A (en) * 2013-02-25 2013-06-19 湖北杉树垭矿业科技开发有限公司 Horizontal moderately thick mine body compartment type filling mining method
CN103161467B (en) * 2013-02-25 2014-06-18 湖北杉树垭矿业科技开发有限公司 Horizontal moderately thick mine body compartment type filling mining method
CN103397905A (en) * 2013-04-17 2013-11-20 唐建新 System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN103291319A (en) * 2013-05-20 2013-09-11 山东科技大学 Rigid-flexible combination gob-side entry retaining method and rigid-flexible combination gob-side entry retaining device by aid of roadside supports
CN103470286A (en) * 2013-09-25 2013-12-25 四川省煤炭产业集团有限责任公司 Gob-side entry retaining method realizing support by intercepting self-slip gangue through strip reinforcing steel bar mesh
CN103758529A (en) * 2013-12-28 2014-04-30 北京昊华能源股份有限公司 Coal mine gob-side entry retaining side supporting method
CN104061001A (en) * 2014-06-25 2014-09-24 枣庄矿业(集团)有限责任公司滨湖煤矿 Gob-side entry retaining mining support process method
CN104061001B (en) * 2014-06-25 2016-09-07 枣庄矿业(集团)有限责任公司滨湖煤矿 Gob side entry retaining exploitation support process method
CN104500071A (en) * 2014-12-16 2015-04-08 河南理工大学 Gob-side entry retaining method capable of avoiding dynamic pressure influence on coal mining
CN104832188A (en) * 2015-04-17 2015-08-12 中国矿业大学(北京) Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof
CN104832188B (en) * 2015-04-17 2017-02-01 中国矿业大学(北京) Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof
CN107091091A (en) * 2017-07-03 2017-08-25 湖南科技大学 A kind of steeply-inclined seam mining gob-side entry retaining method of prefabricated arc support
CN108194141A (en) * 2017-12-28 2018-06-22 乌海市天裕工贸有限公司 Mouth block wall under a kind of coal mine offset
CN108194141B (en) * 2017-12-28 2019-03-29 乌海市天裕工贸有限公司 Mouth block wall under a kind of coal mine offset

Also Published As

Publication number Publication date
CN102720498B (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN102720498B (en) Gob-side entry retaining mining process for coal face
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN104061001B (en) Gob side entry retaining exploitation support process method
CN108222938A (en) A kind of large-inclination-angle coal bed goaf combination grouting filling recovery method
CN107191208A (en) Rigid protection body Support Method in flexible support Ti Yu lanes by gob side entry retaining lane
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN109209490B (en) Working face withdrawing method for gangue filling auxiliary end mining stage
CN103470261A (en) Method for roadway driving along goaf under original roadway top plate of fully mechanized top coal caving goaf
CN103397905A (en) System and method for achieving natural striding, falling and filling of coal beds, flexible roadway protection and complete gob-side entry retaining
CN212296427U (en) Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure
CN111608726A (en) Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting
CN103061764A (en) Goaf waste rock filling coal mining method of flexible shield support in half-edge coal seam
CN105003288A (en) Medium-thickness coal seam gob-side entry retaining method and support system
CN107387083A (en) A kind of medium-thickness seam gob side entry retaining roadside support body construction method supported using spoil
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN206707726U (en) A kind of gob side entry retaining roadside support system
CN206205903U (en) A kind of base plate release ruggedized construction of control deep tunnel bottom distension
CN106014443A (en) Method for preventing roadway floor heaving and wall sliding of gob-side entry retaining
CN106285692B (en) A kind of construction method of gob side entry retaining
CN103161467A (en) Horizontal moderately thick mine body compartment type filling mining method
CN205349380U (en) Prevent whole crest truncation support of gob entry pucking
CN206280090U (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility
CN105604552B (en) A kind of solid material filling coal mining gob-side entry retaining method
CN203730069U (en) Round concrete filled steel tubular column gob-side entry retaining filling wall body structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150617

Termination date: 20180620

CF01 Termination of patent right due to non-payment of annual fee