CN105604552B - A kind of solid material filling coal mining gob-side entry retaining method - Google Patents
A kind of solid material filling coal mining gob-side entry retaining method Download PDFInfo
- Publication number
- CN105604552B CN105604552B CN201510963331.XA CN201510963331A CN105604552B CN 105604552 B CN105604552 B CN 105604552B CN 201510963331 A CN201510963331 A CN 201510963331A CN 105604552 B CN105604552 B CN 105604552B
- Authority
- CN
- China
- Prior art keywords
- lane
- filling
- stay
- solid
- baffle plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003245 coal Substances 0.000 title claims abstract description 47
- 239000011343 solid material Substances 0.000 title claims abstract description 31
- 238000005065 mining Methods 0.000 title claims abstract description 25
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000000463 material Substances 0.000 claims abstract description 58
- 238000002955 isolation Methods 0.000 claims abstract description 31
- 239000000945 filler Substances 0.000 claims abstract description 13
- 239000012530 fluid Substances 0.000 claims abstract description 7
- 239000007787 solid Substances 0.000 claims description 26
- 238000007711 solidification Methods 0.000 claims description 4
- 230000008023 solidification Effects 0.000 claims description 4
- 230000032258 transport Effects 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 3
- 238000009826 distribution Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 238000003825 pressing Methods 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 238000000605 extraction Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 claims description 2
- 241001364889 Helius Species 0.000 claims 1
- 239000002674 ointment Substances 0.000 abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 8
- 239000000243 solution Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 230000006378 damage Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/18—Methods of underground mining; Layouts therefor for brown or hard coal
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The present invention provides a kind of solid material filling coal mining gob-side entry retaining method, filler is set to be separated with reserved tunnel using lane isolation baffle plate is stayed, then combined using solid material filling by the way of fluid is reinforced and complete to stay lane operation, avoid using high-water material or ointment material to stay the problem of lane technique effectively can not connect top merely, lane isolation baffle plate is stayed using horizontal pillar support, Shi Liu lanes isolation baffle plate can not be to prominent inside reserved tunnel, and the tunnel structure left is consolidated;Without using filling pocket, fluid-filled materials'use amount is reduced, filling coal mining cost is reduced.
Description
Technical field
The present invention relates to technical field of coal exploitation, more particularly to a kind of solid material filling coal mining gob-side entry retaining method.
Background technology
Within the current and foreseeable some time from now on, coal can be the topmost energy of China.Coal in China yield
About 90% be pit mining, underground coal exploitation not only breaks up mining area ecological environment, infringement earth's surface buildings or structures, also association
Serious potential safety hazard, and the fundamental solution for solving these problems is that split mined out is filled.Existing filling is adopted
Coal method can further classify from used filler, be respectively:Solid material filling, ointment material filling, height
Water material filling.Solid material filling method, which is mined, can effectively liberate " under three " pressure coal, improve the recovery ratio of coal resources.Together
When, solid material filling method, which is mined, can make full use of gangue, mine tailing, urban solid garbage etc. as filler, reduce
The destruction of ground land resource, while reducing environmental pollution, improving mining area ecological environment.Adopted in current solid material filling method
In coal technology, when needing gob side entry retaining more than lane is stayed using high-water material or ointment material.When progress stays the lane to work, Xian Liu lanes
Location arrangements section is trapezoidal or rectangle filling pocket, then to filling pocket injection high-water material or ointment material, Gao Shui
Formation cross-section is trapezoidal or rectangle supporter after material or ointment material solidification.Supporter with higher-strength, will be left behind
Tunnel and fill area separate, complete a step supporter operation.Solid material packing job is carried out after one step supporter operation.
The work of the above is so repeated, complete whole solid material filling method coal mining stays lane to work.This simple use high-water material
Or ointment material stays the technique in lane can not effectively connect top, filler price is higher, also needs to use in stowing operation and fills
Filler bag, thus add cost.Research it is cheap, can effectively connect top solid material filling method mine stay lane work
Skill, it is significant.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of solid material filling coal mining gob-side entry retaining method, and it can be with
It is simple when solving solid material filling to stay lane effectively to connect top using high-water material or ointment material, use filling pocket cost
The problem of height, inefficiency.
In order to solve the above technical problems, the technical solution used in the present invention is realized by following steps:
(One)Working face fortune coal road, solid filling material lane and the digging for cutting eye
Digging work face transports coal road, solid filling material lane and cuts eye first, forms back production and the ventage of working face
System;
(Two)Mine and solid material stowage unit sets up and completes the coal work of certain distance
Set up and mine and solid material stowage unit, including be accompanied with the filling coal mining hydraulic support of pressing device, mine
Machine, fortune coal scratch board conveyor, fortune coal belt, solid filling material belt, solid filling materials scraper transporter, equipment have been set up
Bi Hou, starts to mine, working face is pushed ahead, forms the goaf that can be filled;
(Three)Stay the laying of lane isolation baffle plate
Lane isolation baffle plate is stayed in laying on the inside of the filler lane in goaf, is isolated in filler lane Ce Biyuliu lanes and is kept off
Horizontal pillar is set to stay lane isolation baffle plate for support between plate;
(Four)Stay the laying of lane stowage unit
Stay lane stowage unit is interconnected including staying stay lane to fill transverse tube, stay lane filling inclined tube, tunnel filling pipe and stay
Lane fills pump, and close to staying the inside bottom of lane isolation baffle plate to set tunnel filling pipe, tunnel filling pipe top is set to exploitation
Direction back sweep stays lane to fill inclined tube, stays what lane filled that inclined tube rear sets some horizontal distributions to stay the lane to fill transverse tube, lane
Road filling pipe is connected with staying lane to fill pump;
(Five)Solid material is filled
To staying the goaf on the inside of the isolation baffle plate of lane to carry out the solid material filling operation of certain distance;
(Six)The solid filling material close to isolation baffle plate is reinforced using fluid-filled material
With stay lane fill pump by fluent material by tunnel filling pipe, stay lane to fill inclined tube, stay lane to fill transverse tube to solid
Injected inside filler, the solid filling material that isolation baffle plate is will be close to after fluent material solidification is combined as a whole, and is formed
Stay lane supporter;
(Seven)Circulation exploitation
Repeat the(Three)Step is to the(Six)The work of step, completes the coal mining of next circulation and stays lane filling operation, successively
Analogize the coal mining for completing whole working face and stay lane filling operation.
It is used as the further improvement of the technical program, the step(Four)Stay lane fill transverse tube for punching pipe, stay lane
Fill and valve is installed on inclined tube insertion top plate certain altitude, tunnel filling pipe.
Compared with prior art, the present invention is then adopted using staying lane isolation baffle plate filler is separated with reserved tunnel
The mode that combination fluid reinforcing is filled with solid material completes to stay lane operation, it is to avoid simple to be stayed using high-water material or ointment material
The problem of lane technique effectively can not connect top, stays lane isolation baffle plate using horizontal pillar support, and Shi Liu lanes isolation baffle plate can not be to pre-
Stay prominent inside tunnel, the tunnel structure left is consolidated;Without using filling pocket, fluid-filled materials'use amount is reduced,
Reduce filling coal mining cost.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of solid material filling coal mining gob-side entry retaining method of the present invention;
Fig. 2 is Fig. 1 of the present invention A-A to sectional view;
Wherein:1 working face transports coal road;2 solid filling material lanes;3 filling coal mining hydraulic supports;4 coal-winning machines;5 fortune coals are scraped
Plate transporter;6 fortune coal belts;7 solid filling material belts;8 solid filling materials scraper transporters;9 stay lane isolation baffle plate
;10 horizontal pillars;11 stay lane to fill transverse tube;12 stay lane to fill inclined tube;13 tunnel filling pipes;14 stay lane to fill pump;
15 valves.
Embodiment
Below in conjunction with the accompanying drawings, the technical scheme in the embodiment of the present invention is clearly and completely described, such as Fig. 1 and Fig. 2
Shown, the present invention provides a kind of solid material filling coal mining gob-side entry retaining method, comprises the following steps,
(One)Working face fortune coal road, solid filling material lane and the digging for cutting eye
Digging work face transports coal road 1 and solid filling material lane 2 and cuts eye first(It is not shown), form returning for working face
Adopt and ventilating system;
(Two)Mine and solid material stowage unit sets up and completes the coal work of certain distance
Set up and mine and solid material stowage unit, including be accompanied with the filling coal mining hydraulic support 3 of pressing device, mine
Machine 4, fortune coal scratch board conveyor 5, fortune coal belt 6, solid filling material belt 7, solid filling materials scraper transporter 8, equipment
After erection is finished, start to mine, working face is pushed ahead, form the goaf that can be filled;
(Three)Stay the laying of lane isolation baffle plate
Lane isolation baffle plate 9 is stayed in laying on the inside of the filler lane in goaf, in the isolation of filler lane Ce Biyuliu lanes
Horizontal pillar 10 is set to stay lane isolation baffle plate for support between baffle plate;
(Four)Stay the laying of lane stowage unit
Stay lane stowage unit is interconnected including staying stay lane filling transverse tube 11, stay lane to fill inclined tube 12, tunnel filling pipe
13 and lane is stayed to fill pump 14, close to staying the inside bottom of lane isolation baffle plate 9 to set above tunnel filling pipe 13, tunnel filling pipe
Setting to direction of extraction back sweep stays lane to fill inclined tube 12, stays lane to fill the rear of inclined tube 12 and sets staying for some horizontal distributions
Lane fills transverse tube 11, and tunnel filling Guan13Yu Liu lanes filling pump 14 is connected;
(Five)Solid material is filled
To staying the goaf on the inside of the isolation baffle plate of lane to carry out the solid material filling operation of certain distance;
(Six)The solid filling material close to isolation baffle plate is reinforced using fluid-filled material
With stay lane fill pump 14 by fluent material by tunnel filling pipe 13, stay lane fill inclined tube 12, stay lane fill transverse tube
In the gap of 11 injection solid filling materials, the solid filling material that isolation baffle plate is will be close to after fluent material solidification is combined into one
Overall, lane supporter is stayed in formation;Specifically used fluent material is high-water material or ointment material.
(Seven)Circulation exploitation
Repeat the(Three)Step is to the(Six)The work of step, completes the coal mining of next circulation and stays lane filling operation, successively
Analogize the coal mining for completing whole working face and stay lane filling operation.
In order that more uniform, the step that fluent material is distributed(Four)Stay lane fill transverse tube 11 for punching pipe,
Stay lane to fill inclined tube insertion top plate certain altitude, filling vertical tube can be made effectively to fix;Valve 14 is installed on tunnel filling pipe,
The backflow of fluent material can be avoided.Tunnel filling pipe 13, stay lane fill inclined tube 12, stay lane fill transverse tube 11 close to stay lane every
From the inner side of baffle plate 9, only to close to staying the nearer solid filling material cracks of lane isolation baffle plate 9 to carry out fluent material filling, subtracting
Lack fluent material usage amount, but not influence the structural soundness in tunnel left.
It is described above, only it is highly preferred embodiment of the present invention, any formal limitation not is made to the present invention, appoints
What those skilled in the art, without departing from the scope of the technical proposal of the invention, using in the method for the disclosure above
Appearance makes many possible variations and modification to technical solution of the present invention, belongs to the scope of claims protection.
Claims (2)
1. a kind of solid material filling coal mining gob-side entry retaining method, it is characterised in that comprise the following steps,
(One)Working face fortune coal road, solid filling material lane and the digging for cutting eye
Digging work face transports coal road, solid filling material lane and cuts eye first, forms back production and the ventilating system of working face;
(Two)Mine and solid material stowage unit sets up and completes the coal work of certain distance
Set up and mine and solid material stowage unit, including be accompanied with the filling coal mining hydraulic support, coal-winning machine, fortune of pressing device
Coal scratch board conveyor, fortune coal belt, solid filling material belt, solid filling materials scraper transporter, after equipment erection is finished,
Start to mine, working face is pushed ahead, form the goaf that can be filled;
(Three)Stay the laying of lane isolation baffle plate
On the inside of the filler lane in goaf laying stay lane isolation baffle plate, in filler lane Ce Biyuliu lanes isolation baffle plate it
Between set horizontal pillar to stay lane isolation baffle plate for support;
(Four)Stay the laying of lane stowage unit
Stay lane stowage unit is interconnected including staying stay lane filling transverse tube, stay lane filling inclined tube, tunnel filling Guan Heliu lanes to fill
Pump is filled out, close to staying the inside bottom of lane isolation baffle plate to set tunnel filling pipe, tunnel filling pipe top is set to direction of extraction
Back sweep stays lane to fill inclined tube, stays what lane filled that inclined tube rear sets some horizontal distributions to stay the lane to fill transverse tube, tunnel is filled
Tian Guanyuliu lanes filling pump is connected;
(Five)Solid material is filled
To staying the goaf on the inside of the isolation baffle plate of lane to carry out the solid material filling operation of certain distance;
(Six)The solid filling material close to isolation baffle plate is reinforced using fluid-filled material
With stay lane fill pump by fluent material by tunnel filling pipe, stay lane to fill inclined tube, stay lane to fill transverse tube to solid filling
Material internal is injected, and the solid filling material that isolation baffle plate is will be close to after fluent material solidification is combined as a whole, and lane is stayed in formation
Supporter;
(Seven)Circulation exploitation
Repeat the(Three)Step is to the(Six)The work of step, completes the coal mining of next circulation and stays lane filling operation, the like
Complete the coal mining of whole working face and stay lane filling operation.
2. a kind of solid material filling coal mining gob-side entry retaining method according to claim 1, it is characterised in that:The step
(Four)Stay lane to fill pipe of the transverse tube for punching, stay lane to fill inclined tube insertion top plate certain altitude, be provided with tunnel filling pipe
Valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510963331.XA CN105604552B (en) | 2015-12-21 | 2015-12-21 | A kind of solid material filling coal mining gob-side entry retaining method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510963331.XA CN105604552B (en) | 2015-12-21 | 2015-12-21 | A kind of solid material filling coal mining gob-side entry retaining method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105604552A CN105604552A (en) | 2016-05-25 |
CN105604552B true CN105604552B (en) | 2017-10-10 |
Family
ID=55984837
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510963331.XA Active CN105604552B (en) | 2015-12-21 | 2015-12-21 | A kind of solid material filling coal mining gob-side entry retaining method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105604552B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971669B (en) * | 2016-07-06 | 2018-01-12 | 冀中能源邯郸矿业集团有限公司 | A kind of goaf encapsulating method for preventing spontaneous combustion of coal seam |
CN108035769B (en) * | 2017-11-29 | 2019-04-02 | 中国矿业大学 | A kind of modified filling coal mining method of microorganism |
CN109826665B (en) * | 2019-03-29 | 2020-01-03 | 中国矿业大学 | Gangue and high-water-content material mixed filling method |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4968187A (en) * | 1988-03-01 | 1990-11-06 | Mackenzie Burnett | System for backfilling a subterranean void |
WO2011103620A1 (en) * | 2010-02-26 | 2011-09-01 | Subsidence Control International Pty Ltd | A method of reducing subsidence or windblast impacts from longwall mining |
CN102996131B (en) * | 2012-12-10 | 2014-10-29 | 中国矿业大学 | Solid-filling coal mining method with two pre-excavating tunnels for advancing |
CN103821558B (en) * | 2014-02-14 | 2016-02-24 | 安徽理工大学 | Coal mine gob filling mining and gob side entry retaining filling process |
CN103967519B (en) * | 2014-05-15 | 2015-10-07 | 山东科技大学 | Compound roof inclined seam erecting dense individual props spoil reinforces gob-side entry retaining method |
CN104481568B (en) * | 2014-09-15 | 2016-08-31 | 辽宁工程技术大学 | A kind of fully mechanized coal face gob side entry retaining technique and method of ventilation |
CN104453994A (en) * | 2014-11-18 | 2015-03-25 | 中国矿业大学(北京) | Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing |
CN104929666A (en) * | 2015-04-30 | 2015-09-23 | 中国矿业大学 | Top breaking gob-side entry retaining method for tender roofs |
CN105089693B (en) * | 2015-09-09 | 2017-07-04 | 中国矿业大学 | One kind improves gob side entry retaining wall and connects top method |
-
2015
- 2015-12-21 CN CN201510963331.XA patent/CN105604552B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105604552A (en) | 2016-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020211784A1 (en) | Non-pillar automatically formed roadway-based mining method applicable to fully mechanized top-coal caving of thick coal seam | |
CN105298496B (en) | Complete adopt of reserved working face coal column is set to fill coal-mining method entirely | |
CN103016053B (en) | Method of local filling to control surface subsidence in gob | |
CN207004567U (en) | Tunnel is exploited with the coal mine filling that gob side entry retaining is combined | |
CN104500070B (en) | Continuous coal mining machine paste filling mining method | |
CN106050300A (en) | Filling roof connecting method used for upward drift ultrahigh undersampling | |
CN101749020A (en) | Forward coal mining by filling method | |
CN113914860B (en) | Roof-cutting gob-side entry retaining method for non-compact solid filling working face | |
CN112627820B (en) | Coal pillar-free mining method for 'three lower' coal pressing | |
CN102720498A (en) | Gob-side entry retaining mining process for coal face | |
CN105604552B (en) | A kind of solid material filling coal mining gob-side entry retaining method | |
CN109869152B (en) | Mining method for reserved roadway of coal and gas outburst coal seam | |
CN102146794A (en) | Grouting, consolidating and gob-side tunneling process method | |
CN106968676A (en) | The method that cavity is passed through in tunnelling | |
CN105240012B (en) | F-type section coal-mining method allowing commingled mining of coal pillars | |
CN111577378B (en) | Gas extraction and filling collaborative mining method for coal and gas outburst coal seam | |
CN105756702A (en) | Roadway-side mesh cage filling supporting gob-side entry retaining method | |
CN103161498B (en) | Method for filling coal pillar beside roadway in steep coal seam section | |
CN106907177A (en) | A kind of girdle gob side entry retaining roadside packing method for protecting support | |
CN106968671A (en) | The filling of underground coal mine coal-face return channel withdraws method | |
CN102287211A (en) | Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof | |
CN105649673A (en) | Roadside gangue mixture filling and gob-side entry retaining method for large-dip angle coal seams | |
CN112647947B (en) | Non-coal-pillar mining method for mining area | |
CN105298494A (en) | Solid and cementing body composite filling coal mining method | |
CN117287251A (en) | Method for rapidly repairing residual coal bed through underground solid filling suitable for longwall mining |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |