CN105604552B - A kind of solid material filling coal mining gob-side entry retaining method - Google Patents

A kind of solid material filling coal mining gob-side entry retaining method Download PDF

Info

Publication number
CN105604552B
CN105604552B CN201510963331.XA CN201510963331A CN105604552B CN 105604552 B CN105604552 B CN 105604552B CN 201510963331 A CN201510963331 A CN 201510963331A CN 105604552 B CN105604552 B CN 105604552B
Authority
CN
China
Prior art keywords
lane
filling
stay
solid
baffle plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510963331.XA
Other languages
Chinese (zh)
Other versions
CN105604552A (en
Inventor
海龙
隋淑梅
游志忠
卢钢
秦大健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIZHONG ENERGY GROUP CO Ltd
Original Assignee
JIZHONG ENERGY GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIZHONG ENERGY GROUP CO Ltd filed Critical JIZHONG ENERGY GROUP CO Ltd
Priority to CN201510963331.XA priority Critical patent/CN105604552B/en
Publication of CN105604552A publication Critical patent/CN105604552A/en
Application granted granted Critical
Publication of CN105604552B publication Critical patent/CN105604552B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention provides a kind of solid material filling coal mining gob-side entry retaining method, filler is set to be separated with reserved tunnel using lane isolation baffle plate is stayed, then combined using solid material filling by the way of fluid is reinforced and complete to stay lane operation, avoid using high-water material or ointment material to stay the problem of lane technique effectively can not connect top merely, lane isolation baffle plate is stayed using horizontal pillar support, Shi Liu lanes isolation baffle plate can not be to prominent inside reserved tunnel, and the tunnel structure left is consolidated;Without using filling pocket, fluid-filled materials'use amount is reduced, filling coal mining cost is reduced.

Description

A kind of solid material filling coal mining gob-side entry retaining method
Technical field
The present invention relates to technical field of coal exploitation, more particularly to a kind of solid material filling coal mining gob-side entry retaining method.
Background technology
Within the current and foreseeable some time from now on, coal can be the topmost energy of China.Coal in China yield About 90% be pit mining, underground coal exploitation not only breaks up mining area ecological environment, infringement earth's surface buildings or structures, also association Serious potential safety hazard, and the fundamental solution for solving these problems is that split mined out is filled.Existing filling is adopted Coal method can further classify from used filler, be respectively:Solid material filling, ointment material filling, height Water material filling.Solid material filling method, which is mined, can effectively liberate " under three " pressure coal, improve the recovery ratio of coal resources.Together When, solid material filling method, which is mined, can make full use of gangue, mine tailing, urban solid garbage etc. as filler, reduce The destruction of ground land resource, while reducing environmental pollution, improving mining area ecological environment.Adopted in current solid material filling method In coal technology, when needing gob side entry retaining more than lane is stayed using high-water material or ointment material.When progress stays the lane to work, Xian Liu lanes Location arrangements section is trapezoidal or rectangle filling pocket, then to filling pocket injection high-water material or ointment material, Gao Shui Formation cross-section is trapezoidal or rectangle supporter after material or ointment material solidification.Supporter with higher-strength, will be left behind Tunnel and fill area separate, complete a step supporter operation.Solid material packing job is carried out after one step supporter operation. The work of the above is so repeated, complete whole solid material filling method coal mining stays lane to work.This simple use high-water material Or ointment material stays the technique in lane can not effectively connect top, filler price is higher, also needs to use in stowing operation and fills Filler bag, thus add cost.Research it is cheap, can effectively connect top solid material filling method mine stay lane work Skill, it is significant.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of solid material filling coal mining gob-side entry retaining method, and it can be with It is simple when solving solid material filling to stay lane effectively to connect top using high-water material or ointment material, use filling pocket cost The problem of height, inefficiency.
In order to solve the above technical problems, the technical solution used in the present invention is realized by following steps:
(One)Working face fortune coal road, solid filling material lane and the digging for cutting eye
Digging work face transports coal road, solid filling material lane and cuts eye first, forms back production and the ventage of working face System;
(Two)Mine and solid material stowage unit sets up and completes the coal work of certain distance
Set up and mine and solid material stowage unit, including be accompanied with the filling coal mining hydraulic support of pressing device, mine Machine, fortune coal scratch board conveyor, fortune coal belt, solid filling material belt, solid filling materials scraper transporter, equipment have been set up Bi Hou, starts to mine, working face is pushed ahead, forms the goaf that can be filled;
(Three)Stay the laying of lane isolation baffle plate
Lane isolation baffle plate is stayed in laying on the inside of the filler lane in goaf, is isolated in filler lane Ce Biyuliu lanes and is kept off Horizontal pillar is set to stay lane isolation baffle plate for support between plate;
(Four)Stay the laying of lane stowage unit
Stay lane stowage unit is interconnected including staying stay lane to fill transverse tube, stay lane filling inclined tube, tunnel filling pipe and stay Lane fills pump, and close to staying the inside bottom of lane isolation baffle plate to set tunnel filling pipe, tunnel filling pipe top is set to exploitation Direction back sweep stays lane to fill inclined tube, stays what lane filled that inclined tube rear sets some horizontal distributions to stay the lane to fill transverse tube, lane Road filling pipe is connected with staying lane to fill pump;
(Five)Solid material is filled
To staying the goaf on the inside of the isolation baffle plate of lane to carry out the solid material filling operation of certain distance;
(Six)The solid filling material close to isolation baffle plate is reinforced using fluid-filled material
With stay lane fill pump by fluent material by tunnel filling pipe, stay lane to fill inclined tube, stay lane to fill transverse tube to solid Injected inside filler, the solid filling material that isolation baffle plate is will be close to after fluent material solidification is combined as a whole, and is formed Stay lane supporter;
(Seven)Circulation exploitation
Repeat the(Three)Step is to the(Six)The work of step, completes the coal mining of next circulation and stays lane filling operation, successively Analogize the coal mining for completing whole working face and stay lane filling operation.
It is used as the further improvement of the technical program, the step(Four)Stay lane fill transverse tube for punching pipe, stay lane Fill and valve is installed on inclined tube insertion top plate certain altitude, tunnel filling pipe.
Compared with prior art, the present invention is then adopted using staying lane isolation baffle plate filler is separated with reserved tunnel The mode that combination fluid reinforcing is filled with solid material completes to stay lane operation, it is to avoid simple to be stayed using high-water material or ointment material The problem of lane technique effectively can not connect top, stays lane isolation baffle plate using horizontal pillar support, and Shi Liu lanes isolation baffle plate can not be to pre- Stay prominent inside tunnel, the tunnel structure left is consolidated;Without using filling pocket, fluid-filled materials'use amount is reduced, Reduce filling coal mining cost.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of solid material filling coal mining gob-side entry retaining method of the present invention;
Fig. 2 is Fig. 1 of the present invention A-A to sectional view;
Wherein:1 working face transports coal road;2 solid filling material lanes;3 filling coal mining hydraulic supports;4 coal-winning machines;5 fortune coals are scraped Plate transporter;6 fortune coal belts;7 solid filling material belts;8 solid filling materials scraper transporters;9 stay lane isolation baffle plate ;10 horizontal pillars;11 stay lane to fill transverse tube;12 stay lane to fill inclined tube;13 tunnel filling pipes;14 stay lane to fill pump; 15 valves.
Embodiment
Below in conjunction with the accompanying drawings, the technical scheme in the embodiment of the present invention is clearly and completely described, such as Fig. 1 and Fig. 2 Shown, the present invention provides a kind of solid material filling coal mining gob-side entry retaining method, comprises the following steps,
(One)Working face fortune coal road, solid filling material lane and the digging for cutting eye
Digging work face transports coal road 1 and solid filling material lane 2 and cuts eye first(It is not shown), form returning for working face Adopt and ventilating system;
(Two)Mine and solid material stowage unit sets up and completes the coal work of certain distance
Set up and mine and solid material stowage unit, including be accompanied with the filling coal mining hydraulic support 3 of pressing device, mine Machine 4, fortune coal scratch board conveyor 5, fortune coal belt 6, solid filling material belt 7, solid filling materials scraper transporter 8, equipment After erection is finished, start to mine, working face is pushed ahead, form the goaf that can be filled;
(Three)Stay the laying of lane isolation baffle plate
Lane isolation baffle plate 9 is stayed in laying on the inside of the filler lane in goaf, in the isolation of filler lane Ce Biyuliu lanes Horizontal pillar 10 is set to stay lane isolation baffle plate for support between baffle plate;
(Four)Stay the laying of lane stowage unit
Stay lane stowage unit is interconnected including staying stay lane filling transverse tube 11, stay lane to fill inclined tube 12, tunnel filling pipe 13 and lane is stayed to fill pump 14, close to staying the inside bottom of lane isolation baffle plate 9 to set above tunnel filling pipe 13, tunnel filling pipe Setting to direction of extraction back sweep stays lane to fill inclined tube 12, stays lane to fill the rear of inclined tube 12 and sets staying for some horizontal distributions Lane fills transverse tube 11, and tunnel filling Guan13Yu Liu lanes filling pump 14 is connected;
(Five)Solid material is filled
To staying the goaf on the inside of the isolation baffle plate of lane to carry out the solid material filling operation of certain distance;
(Six)The solid filling material close to isolation baffle plate is reinforced using fluid-filled material
With stay lane fill pump 14 by fluent material by tunnel filling pipe 13, stay lane fill inclined tube 12, stay lane fill transverse tube In the gap of 11 injection solid filling materials, the solid filling material that isolation baffle plate is will be close to after fluent material solidification is combined into one Overall, lane supporter is stayed in formation;Specifically used fluent material is high-water material or ointment material.
(Seven)Circulation exploitation
Repeat the(Three)Step is to the(Six)The work of step, completes the coal mining of next circulation and stays lane filling operation, successively Analogize the coal mining for completing whole working face and stay lane filling operation.
In order that more uniform, the step that fluent material is distributed(Four)Stay lane fill transverse tube 11 for punching pipe, Stay lane to fill inclined tube insertion top plate certain altitude, filling vertical tube can be made effectively to fix;Valve 14 is installed on tunnel filling pipe, The backflow of fluent material can be avoided.Tunnel filling pipe 13, stay lane fill inclined tube 12, stay lane fill transverse tube 11 close to stay lane every From the inner side of baffle plate 9, only to close to staying the nearer solid filling material cracks of lane isolation baffle plate 9 to carry out fluent material filling, subtracting Lack fluent material usage amount, but not influence the structural soundness in tunnel left.
It is described above, only it is highly preferred embodiment of the present invention, any formal limitation not is made to the present invention, appoints What those skilled in the art, without departing from the scope of the technical proposal of the invention, using in the method for the disclosure above Appearance makes many possible variations and modification to technical solution of the present invention, belongs to the scope of claims protection.

Claims (2)

1. a kind of solid material filling coal mining gob-side entry retaining method, it is characterised in that comprise the following steps,
(One)Working face fortune coal road, solid filling material lane and the digging for cutting eye
Digging work face transports coal road, solid filling material lane and cuts eye first, forms back production and the ventilating system of working face;
(Two)Mine and solid material stowage unit sets up and completes the coal work of certain distance
Set up and mine and solid material stowage unit, including be accompanied with the filling coal mining hydraulic support, coal-winning machine, fortune of pressing device Coal scratch board conveyor, fortune coal belt, solid filling material belt, solid filling materials scraper transporter, after equipment erection is finished, Start to mine, working face is pushed ahead, form the goaf that can be filled;
(Three)Stay the laying of lane isolation baffle plate
On the inside of the filler lane in goaf laying stay lane isolation baffle plate, in filler lane Ce Biyuliu lanes isolation baffle plate it Between set horizontal pillar to stay lane isolation baffle plate for support;
(Four)Stay the laying of lane stowage unit
Stay lane stowage unit is interconnected including staying stay lane filling transverse tube, stay lane filling inclined tube, tunnel filling Guan Heliu lanes to fill Pump is filled out, close to staying the inside bottom of lane isolation baffle plate to set tunnel filling pipe, tunnel filling pipe top is set to direction of extraction Back sweep stays lane to fill inclined tube, stays what lane filled that inclined tube rear sets some horizontal distributions to stay the lane to fill transverse tube, tunnel is filled Tian Guanyuliu lanes filling pump is connected;
(Five)Solid material is filled
To staying the goaf on the inside of the isolation baffle plate of lane to carry out the solid material filling operation of certain distance;
(Six)The solid filling material close to isolation baffle plate is reinforced using fluid-filled material
With stay lane fill pump by fluent material by tunnel filling pipe, stay lane to fill inclined tube, stay lane to fill transverse tube to solid filling Material internal is injected, and the solid filling material that isolation baffle plate is will be close to after fluent material solidification is combined as a whole, and lane is stayed in formation Supporter;
(Seven)Circulation exploitation
Repeat the(Three)Step is to the(Six)The work of step, completes the coal mining of next circulation and stays lane filling operation, the like Complete the coal mining of whole working face and stay lane filling operation.
2. a kind of solid material filling coal mining gob-side entry retaining method according to claim 1, it is characterised in that:The step (Four)Stay lane to fill pipe of the transverse tube for punching, stay lane to fill inclined tube insertion top plate certain altitude, be provided with tunnel filling pipe Valve.
CN201510963331.XA 2015-12-21 2015-12-21 A kind of solid material filling coal mining gob-side entry retaining method Active CN105604552B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510963331.XA CN105604552B (en) 2015-12-21 2015-12-21 A kind of solid material filling coal mining gob-side entry retaining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510963331.XA CN105604552B (en) 2015-12-21 2015-12-21 A kind of solid material filling coal mining gob-side entry retaining method

Publications (2)

Publication Number Publication Date
CN105604552A CN105604552A (en) 2016-05-25
CN105604552B true CN105604552B (en) 2017-10-10

Family

ID=55984837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510963331.XA Active CN105604552B (en) 2015-12-21 2015-12-21 A kind of solid material filling coal mining gob-side entry retaining method

Country Status (1)

Country Link
CN (1) CN105604552B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971669B (en) * 2016-07-06 2018-01-12 冀中能源邯郸矿业集团有限公司 A kind of goaf encapsulating method for preventing spontaneous combustion of coal seam
CN108035769B (en) * 2017-11-29 2019-04-02 中国矿业大学 A kind of modified filling coal mining method of microorganism
CN109826665B (en) * 2019-03-29 2020-01-03 中国矿业大学 Gangue and high-water-content material mixed filling method

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4968187A (en) * 1988-03-01 1990-11-06 Mackenzie Burnett System for backfilling a subterranean void
WO2011103620A1 (en) * 2010-02-26 2011-09-01 Subsidence Control International Pty Ltd A method of reducing subsidence or windblast impacts from longwall mining
CN102996131B (en) * 2012-12-10 2014-10-29 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN103821558B (en) * 2014-02-14 2016-02-24 安徽理工大学 Coal mine gob filling mining and gob side entry retaining filling process
CN103967519B (en) * 2014-05-15 2015-10-07 山东科技大学 Compound roof inclined seam erecting dense individual props spoil reinforces gob-side entry retaining method
CN104481568B (en) * 2014-09-15 2016-08-31 辽宁工程技术大学 A kind of fully mechanized coal face gob side entry retaining technique and method of ventilation
CN104453994A (en) * 2014-11-18 2015-03-25 中国矿业大学(北京) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN104929666A (en) * 2015-04-30 2015-09-23 中国矿业大学 Top breaking gob-side entry retaining method for tender roofs
CN105089693B (en) * 2015-09-09 2017-07-04 中国矿业大学 One kind improves gob side entry retaining wall and connects top method

Also Published As

Publication number Publication date
CN105604552A (en) 2016-05-25

Similar Documents

Publication Publication Date Title
WO2020211784A1 (en) Non-pillar automatically formed roadway-based mining method applicable to fully mechanized top-coal caving of thick coal seam
CN105298496B (en) Complete adopt of reserved working face coal column is set to fill coal-mining method entirely
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN207004567U (en) Tunnel is exploited with the coal mine filling that gob side entry retaining is combined
CN104500070B (en) Continuous coal mining machine paste filling mining method
CN106050300A (en) Filling roof connecting method used for upward drift ultrahigh undersampling
CN101749020A (en) Forward coal mining by filling method
CN113914860B (en) Roof-cutting gob-side entry retaining method for non-compact solid filling working face
CN112627820B (en) Coal pillar-free mining method for 'three lower' coal pressing
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN105604552B (en) A kind of solid material filling coal mining gob-side entry retaining method
CN109869152B (en) Mining method for reserved roadway of coal and gas outburst coal seam
CN102146794A (en) Grouting, consolidating and gob-side tunneling process method
CN106968676A (en) The method that cavity is passed through in tunnelling
CN105240012B (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN111577378B (en) Gas extraction and filling collaborative mining method for coal and gas outburst coal seam
CN105756702A (en) Roadway-side mesh cage filling supporting gob-side entry retaining method
CN103161498B (en) Method for filling coal pillar beside roadway in steep coal seam section
CN106907177A (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN106968671A (en) The filling of underground coal mine coal-face return channel withdraws method
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN105649673A (en) Roadside gangue mixture filling and gob-side entry retaining method for large-dip angle coal seams
CN112647947B (en) Non-coal-pillar mining method for mining area
CN105298494A (en) Solid and cementing body composite filling coal mining method
CN117287251A (en) Method for rapidly repairing residual coal bed through underground solid filling suitable for longwall mining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant