CN103821558B - Coal mine gob filling mining and gob side entry retaining filling process - Google Patents

Coal mine gob filling mining and gob side entry retaining filling process Download PDF

Info

Publication number
CN103821558B
CN103821558B CN201410051780.2A CN201410051780A CN103821558B CN 103821558 B CN103821558 B CN 103821558B CN 201410051780 A CN201410051780 A CN 201410051780A CN 103821558 B CN103821558 B CN 103821558B
Authority
CN
China
Prior art keywords
filling
coal
face
goaf
stowboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410051780.2A
Other languages
Chinese (zh)
Other versions
CN103821558A (en
Inventor
刘增辉
吕辰
冯英华
孟祥瑞
赵光明
高召宁
王成军
孟龙
杨敏
苏亮文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Otog Front Banner Changcheng Mine Co.,Ltd.
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201410051780.2A priority Critical patent/CN103821558B/en
Publication of CN103821558A publication Critical patent/CN103821558A/en
Application granted granted Critical
Publication of CN103821558B publication Critical patent/CN103821558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

A kind of filling process being applicable to coal mining, this technique is, stope filling material fragmentation and agitator chamber arrangement mountain top portion in orbit, stowboard is arranged in the certain distance of coal-face overlying rock, to fan drilling to goaf under being constructed by the stowboard of above goaf, filling pipeline is laid in stowboard, coal-face and goaf separate by the shielding plate between coal-face and goaf on rear side of close measure hydraulic support, gob side entry retaining and bashing are separated by gob side entry retaining filling process hydraulic prop and steel form.By filling pipeline, filler is transported to goaf; After filler solidifies and has certain intensity, coal-face is pushed ahead, and goes round and begins again and carries out exploiting and filling.Beneficial effect of the present invention is: effectively control stope ground pressure, reduces subsidence; Avoid gangue to take good farmland, eliminate hillock and cause environment pollution, the lasting exploit in colliery can be realized.

Description

Coal mine gob filling mining and gob side entry retaining filling process
Technical field
The present invention relates to one and be applicable to coal mining filling, particularly relate in the gentle dip being subject to mining influence violent and inclined seam exploitation field.
Background technology
Coal is the disposable energy, in the energy resource structure of China, account for the principal status of public economy.Along with the fast development of China's economy, along with the increase of the demand to the energy, the yield of coal also rolls up, and has exceeded 4,000,000,000 tons at the coal production of China in 2013.Simultaneously the environmental problem brought of coal mining is more and more serious, as coal mining causes strata movement and destruction, is formed in overlying rock " three bands ", causes the flowing of water and gas in rock stratum, cause coal mine gas explosion and down-hole water inrush accident; Subsidence is caused to ground, the damage of building facilities; Bulk deposition, at the spoil on ground, both took good farmland, caused environment pollution again; Along with the continuous increase of China's pit mining degree of depth, the frequency that the dynamic disaster such as strata behaviors and bump occurs increases, and intensity increases, and jeopardizes the safety in production of mine.Application number be 201110388670.1 Chinese patent disclose in the strip-type fluid expansion filling mining method in thick following coal seam, adopt strip-type exploitation, limit by seam inclination simultaneously; Application number be 201110070870.2 Chinese patent disclose in the laneway type filling mining method in thick and above coal seam, pick anchor all-in-one or continuous miner is adopted to adopt laneway type exploitation and filling, production efficiency is low, and the method is only suitable for small mine or local " three times " exploitation; Application number be 201110028042.2 Chinese patent disclose a kind of coal mine filling exploitation face timbering system; Application number is that the Chinese patent of 2011100396497.X discloses Moveable type mechanical seal filling exploitation bracket.Application number be 201310184020.4 Chinese patent disclose the method for arranging of drilling chamber in a kind of filling mining, the method is applicable to metal mine, is arranged in obturation by drilling chamber.
The present invention is a kind of method belonging to Coal Green exploitation, by eliminating seam mining to the destruction of environment to the filling in goaf, reducing mine disaster simultaneously and occurring.
Summary of the invention
According to the restriction of above deficiency of the prior art or applicable elements, the technical problem to be solved in the present invention is: under the condition that can meet now widely used longwall actual mining work plane normal productive capacity, realizes lasting exploit to by the violent gentle dip of mining influence and inclined seam exploitation.
For achieving the above object, technical scheme of the present invention is as follows:
Extensively adopting Mined-out Area control in progress of coal mining is at present comprehensive caving method, detailed process: when coal-face is after open-off cut advances certain distance, immediate roof exposes and reaches certain area and be about to begin to collapse and fall behind in mixed and disorderly accumulation in the goaf in, hard old top due to its fracture step larger, above goaf is exposed to so that platy structure is outstanding, when main roof strata reaches its strength limit, form fracture by the edge of old top platy structure and middle part, namely coal-face is pressed.After immediate roof and main roof caving are ruptured, can there are three representative parts in the destruction of overlying strata and movement, be called from bottom to top: caving zone, fissure zone and warp damage, generally referred to as " three bands ".Final initiation subsidence and underground water and aquifer are destroyed, and cause surface buildings to damage; Simultaneously a large amount of spoil directly outer row store up, account for firming ground, contaminated environment.
Coal mine gob filling exploitation is propelling along with coal-face, by filling pipeline and filling borehole by filling waste rock, flyash, building waste and the special filler technology to goaf.
The advantage of coal mine gob filling mining: increase stope filling material fragmentation and agitator chamber, stowboard, filling borehole and filling pipeline on existing production technology basis, forms process for filling coal mine goaf.This filling process and existing coal mining technique and stope production technology separate.The overlying strata of coal mine filling exploitation are caving feature and surface movement mechanism is completely different is caving formula process comprehensively exploits in adopting goaf.Main manifestations is: by goaf filling, form obturation roof supporting, the exploitation of Overburden Rock Failure scope more comprehensive caving method is less, generally only causes cracking behavior destroy and destroy without inbreak; Mainly bend the boil down to master with obturation with rock stratum above production zone during filling mining, the exploitation of longwall whole caving method is then based on the flexural deformation of the inbreak of bottom rock, fracture and rock stratum, top, and both moving characteristics exist significant difference.Achieve and both ensure that coal mining intensity does not reduce, the destruction of coal mining to environment can be reduced again; Underground goaf water, methane accumulation space can be reduced, reduce the accident possibility occurrences such as goaf gushing water, gas explosion, pernicious gas are outstanding, spontaneous combustion of float, suppress the dynamic phenomenon of coal seam and roof and floor, improve mine safety degree of protection; Spoil can be digested in a large number, alleviate the impact of coal mining on earth's surface, reduce cultivated land occupancy and mining area village migration, protect and improve mining area ecological environment, promote development of resources and Coordination Development Between Eco-environment.
The mechanism of coal mine filling exploitation: obturation supports overlying rock effect.Along with work plane is from the propelling of open-off cut, every the cemented fill of a segment distance filling one fixed width, is supported by obturation and cover top board, improve characteristics of surrounding rock.When after stope excavation, due to stress redistribution, in the scope that overlying strata top layer is certain, create weakening region, in this district, rock mass is stressed has exceeded its peak strength.Being filled with of obturation, can make the excavation surface residual strength of this part rock mass be improved; The effect of obturation to country rock mainly supports, allow pressure and stop overburden deformation (or displacement), be then secondary to the improvement of overlying strata top layer residual strength.For large area obturation, it can also reach the effect controlling large-area pressure activity.The mechanism of obturation to overlying strata is one and supports and press through journey with allowing.
Coal mine gob filling mining technology comprises: stope filling material fragmentation and agitator chamber, and underground stowboard is arranged and filling pipeline, filling borehole, close measure between coal-face and goaf.
This system is carried out in the steps below: a construction stowboard in coal-face overlying rock, to fan drilling to goaf under constructing, lays filling pipeline in stowboard in stowboard; After the coal advance of the face one segment distance, with the shielding plate on rear side of hydraulic support, coal-face and goaf are separated; Filler enters goaf through filling pipeline and filling borehole, and after filler solidifies and has certain intensity, coal-face is pushed ahead; Filler is the barren rock on the spoil of down-hole or ground hillock, spoil on the hillock existed ground is transported to down-hole stope filling material fragmentation and agitator chamber after floor crushing, and the barren rock be excavated for stone head under mine directly transports to stope filling material fragmentation and agitator chamber.
Filler is barren rock, flyash, building waste and special filler on the spoil of down-hole or ground hillock, and cementitious materials adopts cement, flyash, blast-furnace cinder, adds accelerating admixture simultaneously.
The filling process of gob side entry retaining lane side: at lane side erection hydraulic prop as primary structure member, install steel form in hydraulic prop, and steel form is fixed on hydraulic prop; After goaf filling terminates, when filler has certain intensity, first remove a hydraulic prop and corresponding steel form from away from work plane position, then remove hydraulic prop and steel form successively in order.
Advantageous Effects of the present invention is: the filling realizing goaf when not changing existing coal-face equipment and arranging; Adopt the method for mining by the way of filling effectively can reduce the mine pressure of country rock around coal-face and stope drift active workings; Filler effectively can reduce ground settlement to the support of goaf top plate country rock, avoids the destruction of above ground structure; Barren rock on hillock, as filler, can be eliminated gangue and takies good farmland and cause environment pollution; At lane side erection suspension device, fully achieve gob side entry retaining and without coal pillar mining.
The present invention is applicable to the goaf of Types Below coal-face: level and flat seam, gently inclined seam and inclined seam; The coal-face that stope ground pressure is large; The coal-face that " three times " exploitation is suitable for.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of coal mine gob filling mining and gob side entry retaining filling process;
Fig. 2 is coal mine gob filling mining technology elevational schematic view;
Fig. 3 is coal mine gob filling mining and gob side entry retaining filling process generalized section;
Fig. 4 is gob side entry retaining device for filling and process schematic representation.
In figure: 1. stope filling material fragmentation and agitator chamber; 2. underground stowboard; 3. filling pipeline; 4. filling borehole; 5. gob side entry retaining device for filling; 6. filling area; 7. goaf; 8. coal-face; 9. treat coal mining body; 10. hydraulic prop; 11. steel forms; 12. back timbers.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be further described.
Coal mine filling production practice carries out in the steps below: (1) is in the recovery process of coal-face 8, prepare filler simultaneously, spoil on the hillock existed ground is transported to down-hole stope filling material fragmentation and agitator chamber 1 after floor crushing, and the barren rock be excavated for stone head under mine directly transports to stope filling material fragmentation and agitator chamber 1; (2) in the process preparing coal-face correlation engineering, construction stope filling material fragmentation and agitator chamber 1, underground stowboard 2, wherein stowboard is positioned at the top of coal work face tilt; (3) started filling borehole 4 of constructing in stowboard push ahead the width of open-off cut at coal-face 8 after, filling borehole 4 adopts fan-shaped layout, installs monomer hydraulic supporting 10, back timber 12 and steel form 11 in the lane of gob side entry retaining side.Along with coal-face 8 continues to push ahead, the lane side of gob side entry retaining is corresponding installs monomer hydraulic supporting 10, back timber 12 and steel form 11.When coal-face 8 pushes ahead about 10m, stop the recovery activity of coal-face 8.With the shielding plate on rear side of hydraulic support, coal-face 8 and goaf 7 are separated; The filler of stope filling material fragmentation and agitator chamber 1 enters goaf 7 through filling pipeline 3 and filling borehole 4, and after filler solidifies and has certain intensity, coal-face 8 is pushed ahead.
The filling process of gob side entry retaining lane side: at lane side erection hydraulic prop 10 as primary structure member, install steel form 11 in hydraulic prop 10, and steel form 11 is fixed on hydraulic prop 10; After goaf 8 sand off and filler have certain intensity, first remove hydraulic prop 10 and steel form 11 successively in order from away from work plane position.
The above; be only the specific embodiment of the present invention; but the protection domain of invention is not limited thereto; any engineers and technicians being familiar with the art are in technical scope of the present invention; some conversion can be done; as the quantity of the position of stowboard, filling borehole, the filling lane side quarantine measures etc. of gob side entry retaining, all should as infringement protection scope of the present invention.Therefore protection scope of the present invention should be as the criterion with the protection domain of claims.

Claims (1)

1. coal mine gob filling mining and gob side entry retaining filling process, by stope filling material fragmentation and agitator chamber, stowboard, filling pipeline, filling borehole, between coal-face and goaf, plugging device forms, and it is characterized in that:
(1) filler fragmentation and agitator chamber are set at the track mountain upper top in exploiting field;
(2) a construction stowboard in coal-face overlying rock;
(3) in stowboard, filling pipeline is laid;
(4) to fan drilling to goaf under constructing in stowboard, set up hydraulic prop as primary structure member in lane side simultaneously, in hydraulic prop, steel form is installed, and steel form is fixed on hydraulic prop;
(5) after coal-face advances a segment distance, with the shielding plate on rear side of filling hydraulic support, coal-face and goaf are separated;
(6) filler of stope filling material fragmentation and agitator chamber enters goaf through filling pipeline and filling borehole, and after filler solidifies and has certain intensity, coal-face is pushed ahead;
(7) filler is that barren rock on the spoil of down-hole or ground hillock enters agitator after fragmentation, and cementitious materials adopts cement, flyash, blast-furnace cinder, adds accelerating admixture simultaneously;
(8) bashing has certain intensity when filler after terminating, and removes hydraulic prop and steel form successively in order from away from coal-face position.
CN201410051780.2A 2014-02-14 2014-02-14 Coal mine gob filling mining and gob side entry retaining filling process Active CN103821558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410051780.2A CN103821558B (en) 2014-02-14 2014-02-14 Coal mine gob filling mining and gob side entry retaining filling process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410051780.2A CN103821558B (en) 2014-02-14 2014-02-14 Coal mine gob filling mining and gob side entry retaining filling process

Publications (2)

Publication Number Publication Date
CN103821558A CN103821558A (en) 2014-05-28
CN103821558B true CN103821558B (en) 2016-02-24

Family

ID=50756819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410051780.2A Active CN103821558B (en) 2014-02-14 2014-02-14 Coal mine gob filling mining and gob side entry retaining filling process

Country Status (1)

Country Link
CN (1) CN103821558B (en)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104948191A (en) * 2015-07-15 2015-09-30 辽宁工程技术大学 Method for preventing and treating rock burst by using filling mode
CN106522980A (en) * 2015-09-15 2017-03-22 四川达竹煤电(集团)有限责任公司金刚煤矿 Gob-side roadway protection support for inclined middle-thickness coal bed layered roof and construction method for gob-side roadway protection support
CN105604552B (en) * 2015-12-21 2017-10-10 冀中能源集团有限责任公司 A kind of solid material filling coal mining gob-side entry retaining method
CN106321103B (en) * 2016-09-08 2018-04-13 中国矿业大学 A kind of solid filling collaboration artificial ore pillar recycling room formula coal column method
CN106968708A (en) * 2016-11-17 2017-07-21 湖南科技大学 A kind of half-edge coal seam moves towards fully mechanized mining without coal column sublevel fill stoping coal-mining method
CN107524469B (en) * 2017-07-25 2019-05-28 中南大学 A kind of gently inclined orebody paneling barren rock and the cementing combination filling method of tailings
CN108222938B (en) * 2018-02-07 2020-01-03 西安科技大学 Combined grouting filling mining method for large-inclination-angle coal seam goaf
CN108468564B (en) * 2018-03-12 2020-07-17 中国矿业大学 Near-horizontal coal seam roadway type cemented filling method
CN108625862A (en) * 2018-04-11 2018-10-09 贵州开磷建设集团有限公司 A kind of sinking and drifting method on loose crushing rock mass
CN110043311A (en) * 2019-03-29 2019-07-23 新汶矿业集团有限责任公司 A kind of goaf grouting filling process for being suitble to stay lane
CN109973144B (en) * 2019-04-04 2022-04-12 中国矿业大学(北京) Two-wing mining method for filling and rotating alternative cooperative operation
CN109944634B (en) * 2019-04-19 2020-07-31 中国矿业大学(北京) Coal seam top and bottom plate filling type goaf filling structure and filling method thereof
CN112943243B (en) * 2021-02-08 2023-03-24 中国矿业大学 Method for old hole cutting of oversize section of fully mechanized caving face of shallow-buried extra-thick coal seam
CN113404531B (en) * 2021-06-18 2022-05-13 中国矿业大学 Goaf filling method for reconstructing broken roof structure in coal pillar-free mining
CN113586053B (en) * 2021-08-27 2022-04-12 东莞理工学院 Trinity gob-side entry retaining gangue filling mining method
CN113622993B (en) * 2021-09-06 2022-05-17 中国矿业大学 Mineralization ecological protective coal mining method utilizing CO2 waste gas
CN114673550A (en) * 2022-03-31 2022-06-28 中国矿业大学(北京) Waste rock treatment method for continuous filling mining
CN115263412A (en) * 2022-07-22 2022-11-01 中国矿业大学 Method for filling caving coal goaf
CN117266922B (en) * 2023-10-17 2024-03-19 济宁矿业集团矿产资源勘查开发有限公司 Postmining filling water-reducing process and postmining filling water-reducing equipment for goaf of shallow-buried thin coal seam coal mine

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201486566U (en) * 2009-08-27 2010-05-26 王晓利 Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN101806226A (en) * 2010-03-19 2010-08-18 中国矿业大学 Mined out space dam-type filling method
CN102817614A (en) * 2012-05-29 2012-12-12 中钢集团马鞍山矿山研究院有限公司 Stope structure arrangement mode suitable for underground mine high productivity and low cost subsequent filling
CN103382849A (en) * 2013-07-31 2013-11-06 安徽理工大学 Method for filling paste behind filling hydraulic supports
CN103485820A (en) * 2013-10-09 2014-01-01 山东科技大学 Filling wall body capable of protecting laneway through soft yielding in non-chain-pillar filling mining and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201486566U (en) * 2009-08-27 2010-05-26 王晓利 Device for pouring concrete continuous wall through gob-side entry retaining of mining working surface
CN101806226A (en) * 2010-03-19 2010-08-18 中国矿业大学 Mined out space dam-type filling method
CN102817614A (en) * 2012-05-29 2012-12-12 中钢集团马鞍山矿山研究院有限公司 Stope structure arrangement mode suitable for underground mine high productivity and low cost subsequent filling
CN103382849A (en) * 2013-07-31 2013-11-06 安徽理工大学 Method for filling paste behind filling hydraulic supports
CN103485820A (en) * 2013-10-09 2014-01-01 山东科技大学 Filling wall body capable of protecting laneway through soft yielding in non-chain-pillar filling mining and construction method thereof

Also Published As

Publication number Publication date
CN103821558A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103821558B (en) Coal mine gob filling mining and gob side entry retaining filling process
CN112360462B (en) Mining process for filling and grouting short-wall fully-mechanized mining gangue
CN112031775B (en) Novel coal mine rock burst treatment method
CN108518222B (en) Paste body filling combination top plate presplitting second mining super high seam stops the method for adopting line coal column
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
WO2011103620A1 (en) A method of reducing subsidence or windblast impacts from longwall mining
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN108087021A (en) A kind of method that filling coal mining recycling leaves coal column and water-resisting key strata is controlled to stablize
CN105317459A (en) Subarea filling method used for controlling large-area falling disaster of hard roof
CN101608552A (en) The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN108643907A (en) One kind being crushed direct top edge sky caving into lane without pillar mining method
CN104847355A (en) Continuous mining method for hollow ground of medium-thickness steeply inclined ore body
CN103470261A (en) Method for roadway driving along goaf under original roadway top plate of fully mechanized top coal caving goaf
CN110173264A (en) Lane bump method is stayed with conventional release prevention and treatment tight roof in disconnected top
CN111608726A (en) Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting
CN111411962A (en) Coal mine rock burst treatment method
CN112360550A (en) Method for injecting and filling coal-based solid waste paste in low-position roof separation zone in gob-side entry retaining
CN104533419B (en) Method for partial recovery of residual coal from wide coal pillar
WO2016150188A1 (en) Method for fracturing filler wall left behind in adjacent coal-mining face
CN113187486A (en) Gob-side entry driving method for deep well without coal pillar and formed entry
CN104989408A (en) Safe and high-efficiency mining method for metal mine in mountainous area
CN112593939A (en) Method for mining 'three lower' coal seam by replacing all coal pillars through gangue double filling
CN110359910B (en) Fully mechanized caving high-level filling mining method for thick coal seam strips under coal mine railway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190812

Address after: 016200 Manhatu Town, Shanghai Miao Town, Etok Qianqi, Ordos City, Inner Mongolia Autonomous Region

Patentee after: Otog Front Banner Changcheng Mine Co.,Ltd.

Address before: 232001 Anhui Province, Huainan city Shungeng Road No. 168