CN101608552A - The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process - Google Patents

The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process Download PDF

Info

Publication number
CN101608552A
CN101608552A CNA200810050051XA CN200810050051A CN101608552A CN 101608552 A CN101608552 A CN 101608552A CN A200810050051X A CNA200810050051X A CN A200810050051XA CN 200810050051 A CN200810050051 A CN 200810050051A CN 101608552 A CN101608552 A CN 101608552A
Authority
CN
China
Prior art keywords
aquifer
boring
seat earth
water barrier
limestone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA200810050051XA
Other languages
Chinese (zh)
Inventor
郭国政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA200810050051XA priority Critical patent/CN101608552A/en
Publication of CN101608552A publication Critical patent/CN101608552A/en
Pending legal-status Critical Current

Links

Landscapes

  • Curing Cements, Concrete, And Artificial Stone (AREA)

Abstract

The invention discloses a kind of seat earth aquifer reinforced and protected water barrier in reinforcing process method, may further comprise the steps: 1) at first utilize transient electromagnetic that stope is carried out physical prospecting, verify the position, aquifer; 2) reinforce boring according to the physical prospecting result at the aquifer location arrangements, the angle α that reinforces between boring and the horizontal plane adopts high inclination-angle, 3 as far as possible) adopt cement paste slip casting, 4 by reinforcing boring) the whole hole of slip casting pressure should be controlled at L 8Below 2 times of limestone hydraulic pressure, this method have thoroughly solved stope and have been forced to the passive situation that stops to produce because of gushing water is dangerous.

Description

The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
Technical field
The present invention relates to field of mining, especially at seat earth L 8The mine that limestone has gushing water to threaten is carrying out base plate L 8The limestone grouting and reinforcing is also effectively protected seat earth and L in reinforcing process 8The method of water barrier between the limestone.
Background technology
Along with the increase of the pit mining degree of depth, seat earth L 8The hydraulic pressure of limestone also increases thereupon, and this just requires carrying out seat earth L 8Grouting pressure during the limestone grouting and reinforcing also increases, owing to existing reinforce boring and all adopt the small inclination construction, grouting pressure did not add control when the big and grouting and reinforcing of the length of seat earth water barrier was passed in boring in the slip casting process; Cause seat earth L 8Seat earth and L have been destroyed in the time of the limestone grouting and reinforcing 8Water barrier between the limestone causes coal seam bottom water bursting in the exploitation process.
Summary of the invention
The purpose of this invention is to provide a kind of stope working surface of coal mines seat earth L 8Seat earth and L are reinforced and effectively protected to limestone in reinforcing process 8The method of water barrier between the limestone.
Technical scheme of the present invention is: a kind of seat earth aquifer reinforces and protects the method for water barrier in reinforcing process, may further comprise the steps:
1) at first utilizes transient electromagnetic that stope is carried out physical prospecting, verify the position, aquifer;
2) reinforce boring according to the physical prospecting result at the aquifer location arrangements, the angle α that reinforces between boring and the horizontal plane adopts high inclination-angle as far as possible, reinforces to enter L after water barrier is passed in boring 8The ash rock stratum reinforces the seat earth L of boring to stope by this 8Grouting and reinforcing is carried out in the limestone crack; High inclination-angle boring can make the destruction water barrier of minimum degree in the slip casting process;
3) adopt cement paste slip casting by reinforcing boring, cement paste had both been reinforced seat earth L 8Limestone aquifer has been protected the water barrier between seat earth and the aquifer again;
4) the whole hole of slip casting pressure should be controlled at L 8Below 2 times of limestone hydraulic pressure, too high grouting pressure is to shutoff L 8The crack effect of limestone aquifer is not too obvious, but can very seriously destroy the water barrier between the seat earth aquifer.
Angle α between boring and the horizontal plane is 25 °-90 °.
Advantage of the present invention:
1, simple to operate, be convenient to construction, effect is very good.
2, for remarkable by the stope effect of gushing water danger, this method has thoroughly solved stope and has been forced to the passive situation that stops to produce because of gushing water is dangerous.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Structure of the present invention is as shown in Figure 1: comprise tunnel 1, seat earth L in coal seam 3, the coal seam 8Limestone aquifer 5 and seat earth L 8Water barrier 2 between limestone aquifer and the coal seam.
According to the analysis of causes of stope coal seam bottom water bursting, the reason of gushing water mainly is: to seat earth aquifer L 8When limestone is reinforced, seat earth and L have also been destroyed 8Water barrier between the limestone, because that press in the ore deposit is bigger, during working face extraction, seat earth destroys serious, end distension especially, therefore coal seam bottom water bursting in the time of will causing back production like this, is carrying out stope seat earth L 8During the limestone grouting and reinforcing, the present invention takes the following slip casting measure of controlling targetedly, and concrete steps are as follows:
1) at first utilizes transient electromagnetic that stope is carried out physical prospecting, verify seat earth L 8The limestone aquifer position;
2) according to the physical prospecting result at seat earth L 8The limestone aquifer position reinforces boring 4 by arranging in the tunnel 1, the angle α that reinforces between boring 4 and the horizontal plane adopts high inclination-angle as far as possible, the angle α of high inclination-angle boring is 25 °-90 °, thereby can make the destruction seat earth water barrier of short minimum degree of distance in the slip casting process;
3); Adopt cement paste to carry out slip casting by reinforcing boring 4, cement paste had both been reinforced seat earth L 8Limestone aquifer has been protected the water barrier 2 between seat earth and the aquifer again;
4) the whole hole of slip casting pressure should be controlled at L 8Below 2 times of limestone hydraulic pressure are because draw too high grouting pressure to shutoff L by test 8The crack effect of limestone aquifer is not too obvious, but has very seriously destroyed the water barrier between the seat earth aquifer.
High hydraulic pressure mine coal seam base plate aquifer reinforces the new method Economic and Efficiency Analysis
(1) for seat earth L 8When reinforcing, adopts limestone seat earth and L 8The guard method of limestone water barrier has thoroughly solved the base plate gushing water of stope in exploitation process and has been forced to the passive situation that stops to produce.
(2) guaranteed the safety of stope, it produces economic benefit and can't calculate.

Claims (2)

1, a kind of seat earth aquifer reinforce and in reinforcing process the method for protection water barrier, may further comprise the steps:
1) at first utilizes transient electromagnetic that stope is carried out physical prospecting, verify the position, aquifer;
2) reinforce boring according to the physical prospecting result at the aquifer location arrangements, the angle α that reinforces between boring and the horizontal plane adopts high inclination-angle as far as possible, reinforces to enter L after water barrier is passed in boring 8The ash rock stratum reinforces the seat earth L of boring to stope by this 8Grouting and reinforcing is carried out in the limestone crack; High inclination-angle boring can make the destruction water barrier of minimum degree in the slip casting process;
3) adopt cement paste slip casting by reinforcing boring, cement paste had both been reinforced seat earth L 8Limestone aquifer has been protected the water barrier between seat earth and the aquifer again;
4) the whole hole of slip casting pressure should be controlled at L 8Below 2 times of limestone hydraulic pressure, too high grouting pressure is to shutoff L 8The crack effect of limestone aquifer is not too obvious, but can very seriously destroy the water barrier between the seat earth aquifer.
2, seat earth according to claim 1 aquifer reinforce and in reinforcing process the method for protection water barrier, it is characterized in that: the angle α between boring and the horizontal plane is 25 °-90 °.
CNA200810050051XA 2008-06-18 2008-06-18 The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process Pending CN101608552A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA200810050051XA CN101608552A (en) 2008-06-18 2008-06-18 The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA200810050051XA CN101608552A (en) 2008-06-18 2008-06-18 The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process

Publications (1)

Publication Number Publication Date
CN101608552A true CN101608552A (en) 2009-12-23

Family

ID=41482449

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA200810050051XA Pending CN101608552A (en) 2008-06-18 2008-06-18 The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process

Country Status (1)

Country Link
CN (1) CN101608552A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400698A (en) * 2010-09-17 2012-04-04 焦作煤业集团赵固(新乡)能源有限责任公司 Method for controlling rib spalling in double hard high-mining-height fully-mechanized mining face coal wall
CN102877884A (en) * 2012-09-13 2013-01-16 山东能源集团有限公司 Method for modification and construction of top of Ordovician limestone of mine based on kilometer directional drilling technique
CN103032083A (en) * 2012-12-21 2013-04-10 中南大学 Reconstruction method for water-proof shell
CN103291325A (en) * 2013-06-25 2013-09-11 山东科技大学 Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body
CN104088619A (en) * 2014-06-26 2014-10-08 新奥气化采煤有限公司 Method for increasing strength of rock stratum above coal seam and underground gasification furnace building method
CN104847379A (en) * 2015-03-20 2015-08-19 山东科技大学 Method for reinforcing working surface bottom plate by Ordovician limestone top grouting
CN104989403A (en) * 2015-06-02 2015-10-21 国投新集能源股份有限公司 Method for reconstructing floor limestone aquifer into natural-artificial composite integrated aquiclude
CN106437790A (en) * 2016-12-02 2017-02-22 淮北矿业股份有限公司 High-pressure-intensity water-containing layer karst fissure grouting method of difficult mining coal seam base plate thin-layer limestone
CN106869967A (en) * 2017-04-05 2017-06-20 中煤科工集团西安研究院有限公司 The routed sand remote jet disturbance grouting method of driving face gushing water
CN107740701A (en) * 2017-11-27 2018-02-27 山东省邱集煤矿 A kind of method of the accurate grout transformation of top plate thin layer limestone aquifer
CN108798589A (en) * 2018-04-28 2018-11-13 安徽建筑大学 A kind of water-bearing layer method of modifying
CN110566118A (en) * 2019-09-09 2019-12-13 中煤科工集团西安研究院有限公司 Advanced grouting transformation method for combined directional hole of underground deep-buried aquifer bottom plate of coal mine
CN111075482A (en) * 2020-01-02 2020-04-28 华北科技学院 Working face collapse column grouting waterproof treatment method
WO2020192055A1 (en) * 2019-03-25 2020-10-01 中国矿业大学 Two-step grouting modified water-protective coal mining method for roof aquifers
CN112761677A (en) * 2020-12-09 2021-05-07 中国矿业大学 Underground coal mine water prevention and control method for grouting water-resisting layer by adopting mechanical digging groove construction
CN113738445A (en) * 2021-09-13 2021-12-03 紫金矿业集团股份有限公司 Water plugging and leaking-off process for floor aquifer

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400698A (en) * 2010-09-17 2012-04-04 焦作煤业集团赵固(新乡)能源有限责任公司 Method for controlling rib spalling in double hard high-mining-height fully-mechanized mining face coal wall
CN102877884B (en) * 2012-09-13 2016-03-16 山东能源集团有限公司 The difficult to understand grey top transformation of a kind of mine based on km directional drilling technology and construction method
CN102877884A (en) * 2012-09-13 2013-01-16 山东能源集团有限公司 Method for modification and construction of top of Ordovician limestone of mine based on kilometer directional drilling technique
CN103032083A (en) * 2012-12-21 2013-04-10 中南大学 Reconstruction method for water-proof shell
CN103291325A (en) * 2013-06-25 2013-09-11 山东科技大学 Method for preventing and controlling water burst of coal mining base board rock stratum on pressure bearing water body
CN103291325B (en) * 2013-06-25 2015-08-19 山东科技大学 The preventing control method of Coal-mining Above Confined-water floor strata gushing water
CN104088619A (en) * 2014-06-26 2014-10-08 新奥气化采煤有限公司 Method for increasing strength of rock stratum above coal seam and underground gasification furnace building method
CN104847379A (en) * 2015-03-20 2015-08-19 山东科技大学 Method for reinforcing working surface bottom plate by Ordovician limestone top grouting
CN104847379B (en) * 2015-03-20 2016-01-13 山东科技大学 The method of a kind of Austria grey top grouting and reinforcing floor undulation
CN104989403A (en) * 2015-06-02 2015-10-21 国投新集能源股份有限公司 Method for reconstructing floor limestone aquifer into natural-artificial composite integrated aquiclude
CN104989403B (en) * 2015-06-02 2017-05-10 国投新集能源股份有限公司 Method for reconstructing floor limestone aquifer into natural-artificial composite integrated aquiclude
CN106437790A (en) * 2016-12-02 2017-02-22 淮北矿业股份有限公司 High-pressure-intensity water-containing layer karst fissure grouting method of difficult mining coal seam base plate thin-layer limestone
CN106437790B (en) * 2016-12-02 2018-12-25 淮北矿业股份有限公司 Hard-to-recovery reserve bottom plate thin layer limestone high pressure strong aquifer Karst Fissures grouting method
CN106869967A (en) * 2017-04-05 2017-06-20 中煤科工集团西安研究院有限公司 The routed sand remote jet disturbance grouting method of driving face gushing water
CN107740701A (en) * 2017-11-27 2018-02-27 山东省邱集煤矿 A kind of method of the accurate grout transformation of top plate thin layer limestone aquifer
CN108798589A (en) * 2018-04-28 2018-11-13 安徽建筑大学 A kind of water-bearing layer method of modifying
CN108798589B (en) * 2018-04-28 2020-07-28 安徽建筑大学 Modification method of aquifer
WO2020192055A1 (en) * 2019-03-25 2020-10-01 中国矿业大学 Two-step grouting modified water-protective coal mining method for roof aquifers
CN110566118A (en) * 2019-09-09 2019-12-13 中煤科工集团西安研究院有限公司 Advanced grouting transformation method for combined directional hole of underground deep-buried aquifer bottom plate of coal mine
CN110566118B (en) * 2019-09-09 2021-03-26 中煤科工集团西安研究院有限公司 Advanced grouting transformation method for combined directional hole of underground deep-buried aquifer bottom plate of coal mine
CN111075482A (en) * 2020-01-02 2020-04-28 华北科技学院 Working face collapse column grouting waterproof treatment method
CN112761677A (en) * 2020-12-09 2021-05-07 中国矿业大学 Underground coal mine water prevention and control method for grouting water-resisting layer by adopting mechanical digging groove construction
CN113738445A (en) * 2021-09-13 2021-12-03 紫金矿业集团股份有限公司 Water plugging and leaking-off process for floor aquifer
CN113738445B (en) * 2021-09-13 2022-12-09 紫金矿业集团股份有限公司 Water plugging and leaking-off process for floor aquifer

Similar Documents

Publication Publication Date Title
CN101608552A (en) The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN103821558B (en) Coal mine gob filling mining and gob side entry retaining filling process
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN108518222B (en) Paste body filling combination top plate presplitting second mining super high seam stops the method for adopting line coal column
CN102635392B (en) Co-extraction method for pillar-less coal and gas of advanced entry-retaining construction extraction engineering
CN111305876A (en) Deep roadway anchoring-splitting grouting-hydraulic fracturing pressure relief cooperative control method
CN104481540A (en) Method for controlling multiple coal mining hazards by high level borehole grouting
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN104863629A (en) Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN102518436A (en) Method for controlling tectonic rock burst in coal mine tunneling
CN104847406B (en) Method for fracturing retained filled wall of adjacent coal face
CN108457653A (en) A kind of advanced deep hole presplitting top plate gob-side entry retaining method
CN104775816A (en) Isolated grouting-filling mining method for overburden rock without village migration under cut-side local pressed-coal conditions
CN110344831B (en) Roof-cutting pressure-relief non-coal-pillar gob-side entry-forming entry retaining method
CN103867229A (en) Coal mine large-mining-depth and next-group coal exploitation water control comprehensive treatment method
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN103195467A (en) Hydraulic fracturing and grouting solidification combined rock cross-cut coal uncovering method
CN109611146B (en) Separation layer water drainage grouting method
CN108798769A (en) Item adopts goaf integrated synthesis and administers construction method
CN101021154A (en) Thin basic rock shallow buried coal seam longwall face water retaining mining method
WO2014187171A1 (en) Method for networked reinforcement of cross boreholes of outburst coal seam
CN105781597A (en) Method for performing anchoring and grouting reinforcement inside deep well soft rock gob-side entry retaining
CN102383728A (en) Coal mine rockburst defect segmentation and control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091223