CN106869967A - The routed sand remote jet disturbance grouting method of driving face gushing water - Google Patents

The routed sand remote jet disturbance grouting method of driving face gushing water Download PDF

Info

Publication number
CN106869967A
CN106869967A CN201710217486.8A CN201710217486A CN106869967A CN 106869967 A CN106869967 A CN 106869967A CN 201710217486 A CN201710217486 A CN 201710217486A CN 106869967 A CN106869967 A CN 106869967A
Authority
CN
China
Prior art keywords
target spot
husky
sand
induration
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710217486.8A
Other languages
Chinese (zh)
Other versions
CN106869967B (en
Inventor
朱明诚
黄选明
曹海东
王皓
李德彬
周振方
赵宝峰
张雁
李盼盼
郭晓山
张文忠
王卫刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Research Institute Co Ltd of CCTEG
Original Assignee
Xian Research Institute Co Ltd of CCTEG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Research Institute Co Ltd of CCTEG filed Critical Xian Research Institute Co Ltd of CCTEG
Priority to CN201710217486.8A priority Critical patent/CN106869967B/en
Publication of CN106869967A publication Critical patent/CN106869967A/en
Application granted granted Critical
Publication of CN106869967B publication Critical patent/CN106869967B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)

Abstract

A kind of routed sand remote jet disturbance grouting method of driving face gushing water, is included in the routed sand of gushing water and transient equilibrium occurs, when husky body no longer flows, drill site is set in trouble free service surface construction;Selection target spot, the target position should be the roadway position of neighbouring sand passage area of bursting, and is constructed from drill site to target spot and pierced;Target spot carries out high-pressure jet disturbance slip casting using drilling tool, the husky cylindric induration of cement is formed in target spot, occlusion induration is constituted by the husky cylindric induration of multiple cement, reliably blocked with forming the tunnel at target spot, the methods such as experiment, hydraulic pressure applied voltage test in situ of being cored using drilling carry out quality testing to the occlusion induration at target spot, ensure the safety of desilting to tunnel target spot;Thus, the present invention can be formed under the conditions of tunnel alluvial sand has certain limit, the occluding body of intensity, and Engineering Reliability is high, for emergency work and resumes production, and prevents secondary disaster to have larger practical value.

Description

The routed sand remote jet disturbance grouting method of driving face gushing water
Technical field
The present invention relates to the technology neck that Jing Gongkuangshan carries out rescue and relief work, production restoration after driving face gushing water bursts sand Domain, more particularly to a kind of routed sand remote jet disturbance grouting method of driving face gushing water.
Background technology
The Datong seam group of northern China is normal in Special zones such as structure development region, wash zone, wind oxidized zones when exploiting Often there is the routed husky disaster of gushing water.The husky source of buried stratum gushing water sand inrush disaster is generally weak cementing or not cementing rock stratum, burst into Passage is generally the primary geological structure of tomography class or inbreak deformation class secondary interstice band.Substantial amounts of alluvial after the generation of gushing water sand inrush disaster Thing filling underground work space.Main component is the drift of the materials such as mud, sand, it is impossible to use conventional pumps class mechanical chipping, only Manual work construction can be carried out.In the past in similar hazard management, the general drainability using by mine, risk cleaning to neighbour Nearly sand passage area of bursting, builds temporary water dash wall, then the method that the sand passage that burst is administered carries out rescue and relief work and resumes production, This construction method has following dangerous and difficult:
1st, disaster stratigraphic boundary is unclear, and husky source reserves cannot be expected.Such as it is not seeking to carry out bursting into passage plugging in advance, can makes Into repeatedly " clear up-burst into-clear up again-burst again into ... " circulation construction, workload is big, high cost, and working face top also easily occurs Plate empties other disasters that unstability causes;
2nd, the balance for usually being caused after husky stopping of bursting in advance is only temporary transient balance." damming " effect formed after balance Should be under the water sand alimentation in sand source of bursting, water sand pressure in disaster source is constantly raised, and is burst with bigger repetition husky dangerous, right Cleaning work personnel cause serious security threat;
3rd, under conditions of front is without reliable occluding body, drift stage Stability Assessment cannot be carried out.And manual cleaning Interference can cause drift balance sudden unstability.The conceptual design of rescue and production restoration and it is implemented with very big It is uncertain and adventurous.
4th, laneway plugging body construction is such as carried out using common slurry injection technique, in the alluvial that main component is the materials such as mud, sand The veiny grouting soil of " fracture grouting " can only be produced in thing, it is impossible to form reliable occluding body.
Therefore, during disaster occurs and after disaster generation, how quickly effectively to lead to neighbouring disaster in safety zone The tunnel in road carries out reliable closure body construction at a distance, and powerful guarantee, maximum limit are provided to follow-up rescue and relief work and production restoration The reduction working face personnel of degree, the loss of equipment, are always a larger problem.
Therefore, designer of the invention is in view of drawbacks described above, it is comprehensive to be engaged in for many years for a long time by concentrating on studies and designing The experience and achievement of related industry, research and design go out a kind of routed sand remote jet disturbance grouting method of driving face gushing water, with Overcome drawbacks described above.
The content of the invention
It is an object of the invention to provide a kind of routed sand remote jet disturbance grouting method of driving face gushing water, can be in well Work coal mine evacuation working face gushing water is burst after sand, carries out the underground remote jet disturbance slip casting that purpose tunnel section occluding body is reliably built Technology, for quick effectively development speedily carries out rescue work improvement and work of resuming production provides safety guarantee.
To solve the above problems, the invention discloses a kind of routed sand remote jet disturbance slip casting side of driving face gushing water Method, it is characterised in that comprise the following steps:
Step 1, gushing water burst sand there is transient equilibrium, when husky body no longer flows, trouble free service surface construction set drill site;
Step 2, selection target spot, the target position should be the roadway position of neighbouring sand passage area of bursting, from drill site to target spot Construction is pierced;
Step 3, target spot carry out high-pressure jet disturbance slip casting using drilling tool, and forming diameter in a direction of target spot is about Cement-husky cylindric the induration of 0.6m, unconfined compressive strength not less than 5MPa;
Step 4, by repeatedly step 3, carry out multiple Directional Drillings away from no more than 0.6m in the heart by bore hole axis in target spot Hole is constructed, so as to constitute occlusion induration by multiple cement-husky cylindric induration, is reliably sealed with forming the tunnel at target spot It is stifled;
The methods such as step 5, experiment of being cored using drilling, hydraulic pressure applied voltage test in situ are carried out to the occlusion induration at target spot Quality testing, ensures the safety of desilting to tunnel target spot.
Wherein:In step 1, after digging laneway work surface construction discloses tomography passage, the weak cementing routed husky source ground in top The water sand mixture of layer is burst into digging laneway working face and neighbouring tunnel by tomography passage from routed husky point, forms substantial amounts of water husky Husky body no longer flows behind alluvial region, forms temporary transient balance.
Wherein:The technological parameter of the high-pressure jet disturbance slip casting is from as follows:Grouting pressure is 20Mpa, injecting paste material For weight compares 1:1 single liquid cement mortar, cement uses PO.42.5R Portland cements.
Wherein:To ensure that purpose section slurries will not be lost in, pressure control in hole is carried out using outburst prevention device and protects slurry.
By said structure, driving face gushing water of the invention bursts sand remote jet disturbance grouting method with such as Lower effect:
1st, can be formed with certain limit, the occluding body of intensity under the conditions of tunnel alluvial sand, Engineering Reliability is high, for Emergency work and resume production, prevent secondary disaster that there is larger practical value;
2nd, occluding body is built scope and can obtain certain control, can effectively protect the husky prominent passage adjacent domain work lane of water Road personnel and equipment, reduce substantial amounts of later stage cleaning work amount;
3rd, quantities is small, short time limit, meets rescue and relief work requirement and can save substantial amounts of engineering cost.
Detailed content of the invention can be obtained by explanation described later and institute's accompanying drawing.
Brief description of the drawings
Fig. 1 shows that the routed sand remote jet of driving face gushing water of the invention disturbs the reference planes figure of grouting method.
Fig. 2 shows that the routed sand remote jet of driving face gushing water of the invention disturbs the sectional view of grouting method.
Fig. 3 shows that nearly horizontal jet grouting of the invention bores the structural representation of spray integrated construction drilling tool.
Specific embodiment
Referring to Fig. 1 and 2, it is shown that the routed sand remote jet disturbance grouting method of driving face gushing water of the invention.
The routed sand remote jet disturbance grouting method of the driving face gushing water comprises the following steps:
Step 1, gushing water burst sand there is transient equilibrium, when husky body no longer flows (both when digging laneway working face 1 construction take off After dew tomography passage 2, the water sand mixture on the weak cementing routed Sha Yuan stratum 3 in top is burst into driving by tomography passage from routed husky point 4 Tunnel working face and neighbouring tunnel, husky body no longer flows after forming the husky alluvial region 5 of substantial amounts of water, forms temporary transient balance), Trouble free service surface construction sets drill site 6;
Step 2, selection target spot 7, the target position should be the roadway position of neighbouring sand passage area of bursting, from drill site 6 to target The construction of point 7 is pierced;
Step 3, target spot 7 carry out high-pressure jet disturbance slip casting using drilling tool, and forming diameter in a direction of target spot 7 is about Cement-husky cylindric the induration 8 of 0.6m, unconfined compressive strength not less than 5MPa, it is preferred that the drilling tool is nearly level Spray integrated construction drilling tool is bored in churning, and preferably the technological parameter of high-pressure jet disturbance slip casting is from as follows:Grouting pressure is 20MPa. Injecting paste material compares 1 for weight:1 single liquid cement mortar, cement uses the nozzle of PO.42.5R Portland cements, drilling tool to select One YG8 alloy exponential convergence type nozzle of diameter 2.5mm, when the high-pressure jet for retreating disturbs slip casting, drilling tool astern speed It is 0.2m/min, rotary speed is 20r/min.Each drilling carries out the rotating jet disturbance slip casting when retreating, and is repeated 2 times.
Wherein, will not be lost in ensure purpose section slurries, pressure control in hole need to be carried out using outburst prevention device and protect slurry;
Step 4, by repeatedly step 3, carry out multiple Directional Drillings away from no more than 0.6m in the heart by bore hole axis in target spot 7 Hole is constructed, so as to constitute occlusion induration by multiple cement-husky cylindric induration 8, is reliably sealed with the tunnel for forming target spot 7 It is stifled;
The methods such as step 5, experiment of being cored using drilling, hydraulic pressure applied voltage test in situ are entered to the occlusion induration at target spot 7 Row quality testing, confirms that monomer cement-husky cylindric induration diameter is not less than 0.6m, and unconfined compressive strength is not less than 5MPa, induration internal bore original position hydraulic pressure applied voltage test is engaged at target spot 7 can be pressure-resistant not less than 0.5MPa, that is, ensure desilting extremely The safety of tunnel target spot.
Thus, by above-mentioned steps, can be formed with certain limit, the occluding body of intensity under the conditions of tunnel alluvial sand, Engineering Reliability is high.For emergency work and resume production, prevent secondary disaster that there is larger practical value.
Wherein, referring to Fig. 3, way-type drilling unit of the invention is made up of 8 kinds of parts.Wherein with hard alloy three wings into Using threaded connection two-bit triplet formula valve core of the spool valve 12, guiding valve valve body 14 uses spline connection guiding valve to drill 11 in direction of rotation Valve element 12, axially carries out Stroke Control using the shaft shoulder.What is fixed outside at drill bit 11 and the composition surface of valve body 14 is protective case 13, is prevented Mud nitre enters spool stroke region.Y shape polyurethane high-pressure seal ring 15 is fixed on the periphery of valve core of the spool valve 12, positioned at valve core of the spool valve Between 12 circumferential side openings.The nozzle boss 16 of churning hard alloy shower nozzle is with using being threaded on guiding valve valve body 14, and churning is hard Matter alloy shower nozzle 17 is using on tight fit press-in nozzle boss 16.Adapter 18 is threadedly coupled guiding valve valve body 14, adapter with use Stacks after 18.
In drilling and forming hole, because by drilling resistance, way-type drilling unit is axially compressed into Fig. 1 states, and at this moment churning is hard The base closed of matter alloy shower nozzle 17, drill-in fluid by drilling rod centrally through combination bore behind the side on valve element 12, into valve body 14 Connection chamber, then the centre bore of drill bit 11 is entered by combination bore before the side on valve element 12, reach row's nitre, cooling, the lubrication of drilling Purpose.When churning is needed in lifting drilling tool after creeping into stopping, because drilling resistance is released, by high pressure damping effect, combination Drilling tool is axially expanded to the right, and at this moment by the poppet body 14 of adapter 18, sealing ring 15 blocks the original flushing liquor of closing to drilling rod Lower aquaporin, flushing liquor under the effect of the pressure, open by churning hard alloy shower nozzle 17, and churning slurries are by the high pressure of churning shower nozzle 17 Spray, realize the purpose of churning pile.
Preferably, the outburst prevention device is made up of protrusion-dispelling overcoat and elastic packing component, fixed gear in its protrusion-dispelling overcoat Ring, is successively from the bottom to top wear-resistant seal support ring, elastic caoutchouc seal assembly and wear-resisting in the elastic packing component on baffle ring Seal joint, protrusion-dispelling outer set upper side threaded connection spiral propeller, the spiral propeller lower end bottom surface that can be controlled up and down and bullet Property seal assembly upper surface contact.
There are the shunt valve of excretion, the shunt valve outer end connecting valve below elastic packing component in protrusion-dispelling overcoat outside.
Propeller handle is fixed in spiral propeller upper end.
Thus, in instantaneous exposure containing high pressure, big flow, high concentration water, gas evil region, drilling rod non-return valve can be prevented Water, gas are protruded by drilling rod center, it is ensured that the safety of dismounting drilling tool.Block outburst prevention device and bore by screwing propeller handle The gap of rod member is simultaneously held drilling rod tightly and closes valve, can be rapidly reached closure drilling, be prevented from protruding the purpose of accident.
The high-pressure jet disturbance slurry injection technique that the present invention is used is to enter scall, by gel paste materials ( As be cement mortar) be forced into more than 20MPa, by the 2-3mm diameter high strength cemented carbide nozzles of exponential convergence shape with height Fast pattern is disturbed to discrete material, cut, mix, consolidation, to form the induration with certain limit and intensity. This technology remote construction occluding body after technology of the invention can be efficiently applied to the routed sand of mining face under mine gushing water, so as to solve Certainly underground special equipment is supporting, directional drilling, parameters of construction technology experiment and selection, nearly horizontal jet grouting high-pressure vibro-grouting, level Drilling pressure control protects the technical barriers such as slurry.
It is readily apparent that the description of the above and record are only to illustrate rather than in order to limit in disclosure of the invention Hold, using or use.Although embodiment was described and be described in the drawings in embodiment, the present invention is not limited By accompanying drawing example and described in embodiment as it is now recognized that optimal mode implementing the particular case of the teachings of the present invention Son, the scope of the present invention will include falling into any embodiment of description and appended claims above.

Claims (4)

1. a kind of routed sand remote jet of driving face gushing water disturbs grouting method, it is characterised in that comprise the following steps:
Step 1, gushing water burst sand there is transient equilibrium, when husky body no longer flows, trouble free service surface construction set drill site;
Step 2, selection target spot, the target position should be the roadway position of neighbouring sand passage area of bursting, and be constructed from drill site to target spot Pierce;
Step 3, target spot using drilling tool carry out high-pressure jet disturbance slip casting, target spot a direction formed diameter be about 0.6m, Cement-husky cylindric induration of the unconfined compressive strength not less than 5MPa;
Step 4, by repeatedly step 3, carry out multiple directional drillings away from no more than 0.6m in the heart by bore hole axis in target spot and apply Work, so as to constitute occlusion induration by multiple cement-husky cylindric induration, is reliably blocked with forming the tunnel at target spot;
The methods such as step 5, experiment of being cored using drilling, hydraulic pressure applied voltage test in situ carry out quality to the occlusion induration at target spot Detection, ensures the safety of desilting to tunnel target spot.
2. grouting method as claimed in claim 1, it is characterised in that:In step 1, when digging laneway work surface construction is disclosed After tomography passage, the water sand mixture on the weak cementing routed Sha Yuan stratum in top is burst into digging laneway work by tomography passage from routed husky point Make face and neighbouring tunnel, husky body no longer flows after forming the husky alluvial region of substantial amounts of water, forms temporary transient balance.
3. grouting method as claimed in claim 1, it is characterised in that:The technological parameter of the high-pressure jet disturbance slip casting is selected It is as follows:Grouting pressure is 20Mpa, and injecting paste material compares 1 for weight:1 single liquid cement mortar, cement uses the common silicic acid of PO.42.5R Salt cement.
4. grouting method as claimed in claim 1, it is characterised in that:To ensure that purpose section slurries will not be lost in, using protrusion-dispelling Device carries out pressure control in hole and protects slurry.
CN201710217486.8A 2017-04-05 2017-04-05 The routed husky remote jet of driving face gushing water disturbs grouting method Active CN106869967B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710217486.8A CN106869967B (en) 2017-04-05 2017-04-05 The routed husky remote jet of driving face gushing water disturbs grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710217486.8A CN106869967B (en) 2017-04-05 2017-04-05 The routed husky remote jet of driving face gushing water disturbs grouting method

Publications (2)

Publication Number Publication Date
CN106869967A true CN106869967A (en) 2017-06-20
CN106869967B CN106869967B (en) 2018-10-19

Family

ID=59160966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710217486.8A Active CN106869967B (en) 2017-04-05 2017-04-05 The routed husky remote jet of driving face gushing water disturbs grouting method

Country Status (1)

Country Link
CN (1) CN106869967B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108318933A (en) * 2018-01-05 2018-07-24 中煤科工集团西安研究院有限公司 A kind of method that single hole jet stream detects fault parameter
CN111550288A (en) * 2020-05-22 2020-08-18 陕西煤业化工技术研究院有限责任公司 Method for monitoring water burst and sand burst disasters
CN116291201A (en) * 2023-02-08 2023-06-23 中交第二公路勘察设计研究院有限公司 Underground engineering emergency rescue method based on horizontal directional drill

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020057948A1 (en) * 2000-08-10 2002-05-16 Steinar Roald Multi grouting system
CN1737337A (en) * 2004-08-19 2006-02-22 神华集团有限责任公司 Water preventing method for mine in structure of thin base rock and thick loose aquifer
CN101608552A (en) * 2008-06-18 2009-12-23 郭国政 The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN102146794A (en) * 2011-03-04 2011-08-10 河南理工大学 Grouting, consolidating and gob-side tunneling process method
CN103016049A (en) * 2012-12-24 2013-04-03 大同煤矿集团有限责任公司 Comprehensive treatment method of gas on firstly mined permian system working face
CN103643994A (en) * 2013-12-19 2014-03-19 中煤科工集团西安研究院有限公司 Method for controlling water inrush and sand inrush under coal mine
CN104234750A (en) * 2014-06-23 2014-12-24 王经明 Rapid self-built movable sluice wall of mine and construction method of rapid self-built movable sluice wall
CN204804872U (en) * 2015-06-24 2015-11-25 柴兆喜 Fill ability of swimming gas drainage water seal drilling yard to drilling yard coal road on colliery
CN106545025A (en) * 2017-01-10 2017-03-29 陈剑 A kind of apparatus and method for being adapted to the routed sand quick drainage of sand bed water burst

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020057948A1 (en) * 2000-08-10 2002-05-16 Steinar Roald Multi grouting system
CN1737337A (en) * 2004-08-19 2006-02-22 神华集团有限责任公司 Water preventing method for mine in structure of thin base rock and thick loose aquifer
CN101608552A (en) * 2008-06-18 2009-12-23 郭国政 The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN102146794A (en) * 2011-03-04 2011-08-10 河南理工大学 Grouting, consolidating and gob-side tunneling process method
CN103016049A (en) * 2012-12-24 2013-04-03 大同煤矿集团有限责任公司 Comprehensive treatment method of gas on firstly mined permian system working face
CN103643994A (en) * 2013-12-19 2014-03-19 中煤科工集团西安研究院有限公司 Method for controlling water inrush and sand inrush under coal mine
CN104234750A (en) * 2014-06-23 2014-12-24 王经明 Rapid self-built movable sluice wall of mine and construction method of rapid self-built movable sluice wall
CN204804872U (en) * 2015-06-24 2015-11-25 柴兆喜 Fill ability of swimming gas drainage water seal drilling yard to drilling yard coal road on colliery
CN106545025A (en) * 2017-01-10 2017-03-29 陈剑 A kind of apparatus and method for being adapted to the routed sand quick drainage of sand bed water burst

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吕兆海等: "富水砂层巷道溃水溃沙因素分析及防治对策", 《煤炭工程》 *
王振荣: "厚松散含水层煤层开采突水溃沙防治技术", 《煤炭科学技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108318933A (en) * 2018-01-05 2018-07-24 中煤科工集团西安研究院有限公司 A kind of method that single hole jet stream detects fault parameter
CN111550288A (en) * 2020-05-22 2020-08-18 陕西煤业化工技术研究院有限责任公司 Method for monitoring water burst and sand burst disasters
CN111550288B (en) * 2020-05-22 2022-03-15 陕西煤业化工技术研究院有限责任公司 Method for monitoring water burst and sand burst disasters
CN116291201A (en) * 2023-02-08 2023-06-23 中交第二公路勘察设计研究院有限公司 Underground engineering emergency rescue method based on horizontal directional drill

Also Published As

Publication number Publication date
CN106869967B (en) 2018-10-19

Similar Documents

Publication Publication Date Title
AU2020101047A4 (en) Method for filling underground cavity in bedrock by grouting and hydraulic filling device
CN106869967B (en) The routed husky remote jet of driving face gushing water disturbs grouting method
CN110424892B (en) Water inrush treatment method for nearly horizontal directional drilling of mine
CN111520184A (en) Comprehensive control system and method for coal mine rock burst and harmful gas
CN102561950A (en) Process for realizing grouting consolidation for aggregates filled in cavities of strata and jetting drill bit
CN106978821A (en) A kind of soft soil layer reduces shield driving and applies method to the retaining design that building foundation influences
CN108386193A (en) A kind of hard integrality top plate chemically expansible pressure break pressure relief method in end
CN106894820A (en) A kind of waterproof well wall retractable device and its construction technology
CN203702071U (en) Water inrush preventing drill ejecting device for water exploration and grouting construction of vertical shaft
RU2312972C2 (en) Method and device for fluid-containing reservoir isolation
CN105178858B (en) A kind of drilling tool for two-tube high-pressure rotary-spray technique
CN105274994B (en) Anti-suck sludge proof grouting process and grouting device in deep saturated sand
CN114233374A (en) Ground grouting construction method for reinforcing collapsed cavity area of inclined shaft after mud burst and water burst
CN112253040B (en) Segmented rapid hole sealing method for coal mine top-breaking blasting drilling
CN210738530U (en) Filling tool and well completion string
Adamo et al. Mystery of Mosul Dam the most dangerous dam in the world: maintenance grouting
CN105298443B (en) Oil pipe blowout, gaslift and pressure break connection make method under oil pipe float valve and insufficient balance well completion
CN105134125B (en) Annular space bottom end construction technology for plugging after gas vertical wall
Adamo et al. Mystery of Mosul Dam the most dangerous dam in the world: problems encountered during and after impounding the reservoir
CN107218010B (en) Water plugging bridge plug for damaged drilling sleeve and double-bridge plug type water plugging method
CN113863984B (en) Method for preventing and controlling air leakage in exploitation of extremely-close coal seam group
CN211258508U (en) Drilling tool structure for cast-in-situ bored pile
CN212318072U (en) Colliery rock burst and harmful gas comprehensive control system
CN210105807U (en) Outburst prevention and blowout prevention combined water control device for mine advanced water exploration orifice
CN108193688A (en) The orifice sealing device device and method of horizontal comprehensive superhigh pressure jetting slip casting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant