CN103016049A - Comprehensive treatment method of gas on firstly mined permian system working face - Google Patents

Comprehensive treatment method of gas on firstly mined permian system working face Download PDF

Info

Publication number
CN103016049A
CN103016049A CN2012105655195A CN201210565519A CN103016049A CN 103016049 A CN103016049 A CN 103016049A CN 2012105655195 A CN2012105655195 A CN 2012105655195A CN 201210565519 A CN201210565519 A CN 201210565519A CN 103016049 A CN103016049 A CN 103016049A
Authority
CN
China
Prior art keywords
working face
air
meters
drill site
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105655195A
Other languages
Chinese (zh)
Other versions
CN103016049B (en
Inventor
张有喜
于斌
王岗
关占胜
高润平
孟凡龙
邢叶红
蔡海
祁龙胜
李渊
任鸿杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datong Coal Mine Group Co Ltd
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201210565519.5A priority Critical patent/CN103016049B/en
Publication of CN103016049A publication Critical patent/CN103016049A/en
Application granted granted Critical
Publication of CN103016049B publication Critical patent/CN103016049B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a comprehensive treatment method of gas on a firstly mined permian system working face, which solves the problem that accidents such as explosion and fire are easy to cause due to outburst of the gas on the working face. The method comprises the following steps: constructing a first drill site at the part that a working face air return way is 70 meters apart from the working face; arranging a drill site every 40 meters; forming holes on the drill site along a top plate of the air return way, wherein each drill hole is arranged to be in a fan shape, the elevation angle of the drill hole is 6-9 degrees; a casing pipe is arranged in a coal body when the holes are drilled; and the depth of the casing pipe to a rock top is 1-2 meters; b, laying a DN 400mm pipe on the air return way in front of an advance support of the working face, wherein the two ends of the DN 400mm pipe are respectively communicated with a steel framework air barrel of which the diameter is 500mm, and a casing pipe hung at an upper corner, and the drainage amount is 50-75m<3>/min; and arranging an L-shaped windbreak on the air return way; c, top pouring malisan on the working surface; and d, arranging an exhaust fan in the air return way, wherein the exhaust fan is connected with a positive pressure air barrel, and is connected with a negative pressure air barrel; the other end of a glass-reinforced plastic air barrel is connected with a telescopic air barrel; and the air mount of the exhaust fan is 284m<3>/min. With the adoption of the method, safe production of mines can be guaranteed.

Description

The first mining face Comprehensive Gas Control of Permian System method
Technical field
The present invention relates to mash gas harnessing method, be specially the first mining face Comprehensive Gas Control of a kind of Permian System method.
Background technology
Coal and Gas Outburst are one of serious natural calamities in the process of coal mining, it is coal and rock quick crashing around the getting working face, follow coal petrography to dish out to the tunnel or a kind of extremely complicated dynamic phenomenon of mobile and the gas that pours out, can cause casualties and be ruined with the roadway electromechanical equipment, destroy mine ventilation system, in coal and Gas Outburst, easily cause gas explosion and fire incident.
In recent years, along with the increase of mining depth, some low gaseous mines or highly gassy mine progressively become projecting mine, and outstanding number of times day by day increases, and the disaster that causes is day by day serious.
Summary of the invention
The present invention provides the first mining face Comprehensive Gas Control of a kind of Permian System method in order to solve the problem that existing first mining face Gas Outburst easily sets off an explosion and fire incident occurs.
The present invention adopts following technical scheme to realize: the first mining face Comprehensive Gas Control of Permian System method, adopt following steps: a, tailentry first drill site of constructing apart from 70 meters of work plane, every 40 meters a drill site is set subsequently, drill site is along the back perforate, and each boring is fan-shaped layout, the elevation angle of boring is 6-9 °, and at when boring setting of casing in the coal body, tubing depth is pushed up 1-2 rice for entering rock; B, return airway are laid the DN400mm pipeline to the ahead work face supporting, the two ends of DN400mm pipeline are communicated with the steel frame air duct of diameter 500mm and the sleeve pipe of hanging at the upper corner place respectively, drawing and deflating flux is 50-75m3/min, and beats " L " type air partition at return airway; C, work plane teeming horse are beautiful loose; Be provided with the pump drainage blower fan in d, the return airway, the positive pressure wind pipe that the pump drainage blower fan connects adopts the soft air duct of 1000mm, the negative pressure air duct that the pump drainage blower fan connects adopts the 800mm glass fiber reinforced plastic wind tube, and the other end of glass fiber reinforced plastic wind tube is connected with the 1000mm Telescopic air duct, and the pump drainage fan delivery is 284m3/min.
The structure design of drill site draws by repetition test repeatedly, be difficult for the hole of collapsing, stop to hole plug-hole or scrap the generation of phenomenon, the arranging of the boring elevation angle being communicated with of Kong Houneng and goaf that guaranteed to collapse, and overcome by the extraction of upper corner pipe laying, high-order oblique angle drilling-draining, the rationally setting of work plane air distribution amount and air partition that existing first mining face Gas Outburst easily sets off an explosion and the problem of fire incident generation.
The present invention takes comprehensive means to administer after damp, work plane intake volume 2653m3/min, return air air quantity 2150 m3/min, upper corner extraction air-out 133 m3/min, high-order oblique drilling-draining air-out 60 m3/min, pump drainage blower fan air-out 331 m3/min, gold-plating tail gas density 0.17-0.2%, upper corner gas density 0.25-0.28%, face gas concentration 0.22-0.24%, return gas density 0.4~0.5 %; And make a call to less a top return airway, and reduce expenses 3,000,000 yuan, can make exploitation carry the previous year simultaneously, guaranteed mine safety production, the employee's life security that greatly ensures.
The specific embodiment
The first mining face Comprehensive Gas Control of Permian System method, adopt following steps: a, tailentry first drill site of constructing apart from 70 meters of work plane, every 40 meters a drill site is set subsequently, drill site is along the back perforate, and each boring is fan-shaped layout, the elevation angle of boring is 6-9 °, and at when boring setting of casing in the coal body, tubing depth is pushed up 1-2 rice for entering rock; B, return airway are laid the DN400mm pipeline to the ahead work face supporting, the two ends of DN400mm pipeline are communicated with the steel frame air duct of diameter 500mm and the sleeve pipe of hanging at the upper corner place respectively, drawing and deflating flux is 50-75m3/min, and beats " L " type air partition at return airway; C, work plane teeming horse are beautiful loose; Be provided with the pump drainage blower fan in d, the return airway, the positive pressure wind pipe that the pump drainage blower fan connects adopts the soft air duct of 1000mm, the negative pressure air duct that the pump drainage blower fan connects adopts the 800mm glass fiber reinforced plastic wind tube, and the other end of glass fiber reinforced plastic wind tube is connected with the 1000mm Telescopic air duct, and the pump drainage fan delivery is 284m3/min.

Claims (1)

1. the first mining face Comprehensive Gas Control of Permian System method, it is characterized in that: adopt following steps: a, tailentry first drill site of constructing apart from 70 meters of work plane, every 40 meters a drill site is set subsequently, drill site is along the back perforate, and each boring is fan-shaped layout, the elevation angle of boring is 6-9 °, and at when boring setting of casing in the coal body, tubing depth is pushed up 1-2 rice for entering rock; B, return airway are laid the DN400mm pipeline to the ahead work face supporting, the two ends of DN400mm pipeline are communicated with the steel frame air duct of diameter 500mm and the sleeve pipe of hanging at the upper corner place respectively, drawing and deflating flux is 50-75m3/min, and beats " L " type air partition at return airway; C, work plane teeming horse are beautiful loose; Be provided with the pump drainage blower fan in d, the return airway, the positive pressure wind pipe that the pump drainage blower fan connects adopts the soft air duct of 1000mm, the negative pressure air duct that the pump drainage blower fan connects adopts the 800mm glass fiber reinforced plastic wind tube, and the other end of glass fiber reinforced plastic wind tube is connected with the 1000mm Telescopic air duct, and the pump drainage fan delivery is 284m3/min.
CN201210565519.5A 2012-12-24 2012-12-24 Comprehensive treatment method of gas on firstly mined permian system working face Active CN103016049B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210565519.5A CN103016049B (en) 2012-12-24 2012-12-24 Comprehensive treatment method of gas on firstly mined permian system working face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210565519.5A CN103016049B (en) 2012-12-24 2012-12-24 Comprehensive treatment method of gas on firstly mined permian system working face

Publications (2)

Publication Number Publication Date
CN103016049A true CN103016049A (en) 2013-04-03
CN103016049B CN103016049B (en) 2014-12-17

Family

ID=47965092

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210565519.5A Active CN103016049B (en) 2012-12-24 2012-12-24 Comprehensive treatment method of gas on firstly mined permian system working face

Country Status (1)

Country Link
CN (1) CN103016049B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869967A (en) * 2017-04-05 2017-06-20 中煤科工集团西安研究院有限公司 The routed sand remote jet disturbance grouting method of driving face gushing water

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1438405A (en) * 2003-01-27 2003-08-27 张朝喜 Method for preventing coal-mine underground gas and coal-dust from explosion
CN101029577A (en) * 2007-04-02 2007-09-05 中国矿业大学 Method for extracting released-gas of protected coal-bedding under unstabilized thin coal bedding set condition
CN101349157A (en) * 2008-09-01 2009-01-21 宜兴市星洲复合材料有限公司 Integral organic glass fiber reinforced plastic wind pipe and manufacture thereof
CN102207004A (en) * 2010-03-30 2011-10-05 淮南矿业(集团)有限责任公司 Method for carrying out gas control on coal faces
CN102392679A (en) * 2011-11-21 2012-03-28 大同煤矿集团有限责任公司 Comprehensive and integrative gas drainage method
CN102410040A (en) * 2011-12-06 2012-04-11 中国神华能源股份有限公司 Gas control method for return airflow corner of coalmine coal working face
CN102518464A (en) * 2011-12-09 2012-06-27 中国神华能源股份有限公司 Method for extracting gas at corner on recovery working face in coal mine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1438405A (en) * 2003-01-27 2003-08-27 张朝喜 Method for preventing coal-mine underground gas and coal-dust from explosion
CN101029577A (en) * 2007-04-02 2007-09-05 中国矿业大学 Method for extracting released-gas of protected coal-bedding under unstabilized thin coal bedding set condition
CN101349157A (en) * 2008-09-01 2009-01-21 宜兴市星洲复合材料有限公司 Integral organic glass fiber reinforced plastic wind pipe and manufacture thereof
CN102207004A (en) * 2010-03-30 2011-10-05 淮南矿业(集团)有限责任公司 Method for carrying out gas control on coal faces
CN102392679A (en) * 2011-11-21 2012-03-28 大同煤矿集团有限责任公司 Comprehensive and integrative gas drainage method
CN102410040A (en) * 2011-12-06 2012-04-11 中国神华能源股份有限公司 Gas control method for return airflow corner of coalmine coal working face
CN102518464A (en) * 2011-12-09 2012-06-27 中国神华能源股份有限公司 Method for extracting gas at corner on recovery working face in coal mine

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
于斌: "大同矿区综采40a开采技术研究", 《煤炭学报》 *
常大怒: "综采工作面瓦斯防治技术", 《科技之友》 *
绳本福: "矿井瓦斯排放方法研究", 《中国煤炭工业》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869967A (en) * 2017-04-05 2017-06-20 中煤科工集团西安研究院有限公司 The routed sand remote jet disturbance grouting method of driving face gushing water

Also Published As

Publication number Publication date
CN103016049B (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN103628911B (en) Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining
CN103696800B (en) A kind of brill cuts pressure and takes out method
WO2015103861A1 (en) Method for extracting gas by drilling hole in gob-side entry retaining y-type ventilation high-position return airway
CN102518464B (en) Method for extracting gas at corner on recovery working face in coal mine
CN101956546B (en) Method for improving crossing-hole gas extraction concentration
CN104832208A (en) Anti-collapse method for long-distance horizontal hole drilling in soft coal seam of underground coal mine
CN104329113B (en) A kind of method of surface drilling standing seat earth release mash gas extraction
CN104389618A (en) Method for constructing multiple-arch tunnel hole body large room-free pipe shed support
CN104295263A (en) Radial hole sealing device for drill holes for exhausting coal bed gas
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN103437803A (en) Structure and method for gas drainage of drill holes of high-drainage drill field of coal mine
CN102392679A (en) Comprehensive and integrative gas drainage method
CN105134286A (en) Method for extracting gas of gob of L-shaped well
CN205277446U (en) Colliery collecting space area roadway support device
CN105156067A (en) Coal mine underground hydraulic fracturing drill hole sealing device and method
CN202851078U (en) High water material filling column bag body
CN103016049B (en) Comprehensive treatment method of gas on firstly mined permian system working face
HRP20221469T1 (en) Tunneled gas storage
CN204960882U (en) Underground hydraulic fracturing drill hole sealing device of coal mine
CN101825417A (en) Kerf sand inclusion blasting cartridge and blasting installation device and production technology thereof
CN102644477A (en) Method for extracting gas of protected layer through wear layer drilling in protective layer airway high-position drilling field
CN204419239U (en) Ground gas drainage system
CN104594942B (en) A kind of cherry coal district draws coal release permeability improvement device and technique continuously
CN204299579U (en) A kind of tunnel grouting pipe passing through artificial accumulation waste-rock yard
CN205036404U (en) Problem of working face gas transfinites is solved special gas drainage under suction lane arrange device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant