CN108194141B - Mouth block wall under a kind of coal mine offset - Google Patents

Mouth block wall under a kind of coal mine offset Download PDF

Info

Publication number
CN108194141B
CN108194141B CN201711458813.5A CN201711458813A CN108194141B CN 108194141 B CN108194141 B CN 108194141B CN 201711458813 A CN201711458813 A CN 201711458813A CN 108194141 B CN108194141 B CN 108194141B
Authority
CN
China
Prior art keywords
column
monomer
block wall
plank
anchor cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201711458813.5A
Other languages
Chinese (zh)
Other versions
CN108194141A (en
Inventor
郭金龙
吕继保
白秋生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhai City Tianyu Industry & Trade Co Ltd
Original Assignee
Wuhai City Tianyu Industry & Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhai City Tianyu Industry & Trade Co Ltd filed Critical Wuhai City Tianyu Industry & Trade Co Ltd
Priority to CN201711458813.5A priority Critical patent/CN108194141B/en
Publication of CN108194141A publication Critical patent/CN108194141A/en
Application granted granted Critical
Publication of CN108194141B publication Critical patent/CN108194141B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The present invention provides mouth block walls under a kind of coal mine offset, including block plank, monomer column, in an opposite direction column, diagonal brace monomer, π beam, stull, I-steel, anchor cable, and monomer column branch is set under offset in the slotting of mouth bottom plate;Plank is blocked to be close on the inside of monomer column;Every monomer column all installs column in an opposite direction, and column is located on the outside of monomer column in an opposite direction;Diagonal brace monomer branch is set on the outside of column in an opposite direction;π beam is respectively set at monomer column and diagonal brace monomer bottom lateral position;Stull is located between two π beams;The I-steel of fixed anchor cable is respectively set in monomer column outer upper and lower part, I-steel is perpendicular to monomer column, top plate and bottom plate brill on the inside of block wall beats anchor cable eye, anchor cable is kept to be fixed on I-steel across plank is blocked after installing anchor cable, anchor cable, which is blocked on I-steel and used with U-shaped card, twists rod tensioner lock jail.Mouth block wall under coal mine offset of the invention, installation is simple, highly-safe, and the recyclable recycling of material, reduces the cost of enterprise.

Description

Mouth block wall under a kind of coal mine offset
Technical field
The present invention relates to the block walls blocked in a kind of coal mine to mouth under goaf back production offset.
Background technique
To exploitation cavity after the seam mining of underground coal mine, can be left, to prevent surface collapse, it is necessary to will be mined out Area is filled, and when filling first has to block goaf, could inject filler.Currently, common method for blocking Block wall is usually set, and the effect of block wall is mainly reflected in following two aspect: first is that closed isolation goaf, prevents from filling The excessive and slurry of bursting of material;Second is that water filtering function is played, when the effect of drainage will seriously affect the maintenance of later period filler Between and filling quality.
In the prior art, the form of block wall mainly has wooden block wall, concrete block wall, brick structure block wall, steel Structural traps wall, hydraulic block wall etc., wherein the construction cost of concrete block wall is high, curing cycle is long;Brick structure blocks Wall freight volume is big, labor intensity is high;Steel construction block wall material cost is high, labor intensity of workers is big;And hydraulic block wall is to envelope The condition of wall requires relatively high and equipment difficult in maintenance.The cost of material is low for wooden block wall, labor intensity of workers also compared with It is small, but the intensity of wooden block wall is less than normal, easily fails in stowing operation, it is therefore necessary to reinforce wooden block wall Supporting improves the intensity of wooden block wall.
The monomer supporting cooperation used in colliery industry at present blocks wooden block wall made of plank, by blocking Monomer column is added on the outside of plank, the intensity of block wall can be improved to a certain extent, but disadvantage is it is also obvious that main Have: first, supporting intensity is limited, and the safety of block wall is poor, it cannot be guaranteed that the safety problem in stowing operation, and fill effect Rate is low, affects the construction working in later period.Second, since plugging strength is smaller, plugging material is easily damaged, and leads to material Recycling rate of waterused is low.Third, in filling, mouth pressure is larger at present, in order to reinforce plugging strength, needs to increase the close of monomer supporting Degree, causes material consumption larger.4th, in order to guarantee plugging effect, height, width when needing strict control laneway opening and Roadway gradient influences production efficiency.
Utility model patent (CN204002917 fills wall supporting mechanism) discloses a kind of supporting mechanism for filling wall, Iron plate is set on the inside of block wall, and iron plate connects vertical fixed mechanism by supporting mechanism, and vertical fixed mechanism is on connection offset The support column with spacing regulation pipe and fine tuning pipe in portion and lower part, supporting mechanism have two, are respectively hinged at block wall iron plate Between vertical fixed mechanism, using the support force of vertical fixed mechanism, filling wall is supported.This supporting mechanism is only Carry out supporting block wall by the support force of vertical fixed mechanism, support pattern is single, and to the material of vertical fixed mechanism and Installation process is more demanding, and processing cost is high.
Utility model patent (CN206071644, a kind of plugging device of coal mine roadway) discloses one kind by plank layer structure At plugging device, iron wire stratum reticulare, filtering layer of cloth and plank layer are set from inside to outside, and being equipped on the outside of plank layer being capable of support board The upright hydraulic prop of layer is additionally provided with the hydraulic column in an opposite direction being used to support on the outside of every hydraulic prop.This plugging device is to wood The support action of plate layer (namely block wall) is single, adds that the wooden block wall of monomer column is similar, and supporting intensity has with above-mentioned Limit.
To solve the above-mentioned problems, there is an urgent need to propose a kind of effective technical solution.
Summary of the invention
In order to reinforce the closure in goaf in coal mine, the present invention provides mouth block walls under a kind of coal mine offset, including envelope Stifled plank, monomer column, in an opposite direction column, diagonal brace monomer, π beam, stull, I-steel, anchor cable,
The monomer column branch is set under offset in the slotting of mouth bottom plate;
The closure plank is close on the inside of monomer column;
The every monomer column all installs column in an opposite direction, and column is located on the outside of monomer column in an opposite direction;
The diagonal brace monomer branch is set on the outside of column in an opposite direction;
π beam is respectively set at the monomer column and diagonal brace monomer bottom lateral position;
The stull is located between two π beams;
The I-steel of fixed anchor cable is respectively set in the monomer column outer upper and lower part, I-steel is perpendicular to monomer Column, the top plate and bottom plate brill on the inside of the block wall beat anchor cable eye, keep anchor cable solid across plank is blocked after installing anchor cable It is scheduled on the I-steel, anchor cable, which is blocked on I-steel and used with U-shaped card, twists rod tensioner lock jail.
Preferably, mouth lifter cut depth is not less than 0.3m under the offset, and width can guarantee that blocking plank and monomer stands In column can be placed into, the coal wall on block wall both sides is cleared up, guarantees that coal wall is straight.
Preferably, the monomer column column connects bottom bracing top away from equal, and every monomer column salutes wooden cap, anti-down rope, column leg It is sitting in slotting on real bottom, setting load is not less than 90KN.
Preferably, described to block the willow plate that plank is 50mm thickness, both ends are more than that lane side is not less than 1.0m, block wood up and down Sheet separation is no more than 20mm, and front-back staggered is no more than 10mm between blocking plank, blocks plank and back closely connects reality, maximum Gap is no more than 50mm.
Preferably, away from equal, capital band cap, column leg is sitting on real bottom the diagonal brace monomer column, with monomer column in falling eight Font.
Preferably, for the column in an opposite direction in an opposite direction at monomer column handle, column angle is not less than 45 ° in an opposite direction, in column column undercut in an opposite direction, makes Column column leg is supported on real bottom in an opposite direction.
Preferably, the stull setting load is not less than 90KN.
Preferably, the I-steel length is not less than the width for blocking plank;The I-steel is 11# mining i beam.
Preferably, the anchor cable spacing is equal, is no more than 0.30 meter away from roadway's sides.
A method of it is blocked using mouth block wall under coal mine offset, operating procedure is as follows:
(1) preparation before blocking transports the plugging material in place;
(2) the mouth lifter cut under offset, and clear up block wall two sides coal wall, it is ensured that coal wall is smooth;
(3) the top plate and bottom plate brill on the inside of block wall beats anchor cable eye, installs anchor cable;
(3) monomer column branch is located in slotting;
(4) woven straw of jumping a queue on the inside of mouth surrounding is blocked;
(5) plank will be blocked and is close to the stacking of monomer column, blocked completely until mouth entirely will be blocked;
(6) column in an opposite direction is installed on the outside of every monomer column;
(7) row's diagonal brace monomer is installed on the outside of column in an opposite direction;
(8) π beam is set in monomer column and diagonal brace monomer bottom lateral position;
(9) stull is installed between two π beams;
(10) I-steel is respectively set in monomer column outer upper and lower part, will be arranged at the top plate on the inside of block wall Anchor cable pass through and block plank and be fixed on the I-steel of monomer column outer upper, the anchor being arranged on the inside of block wall at bottom plate Bands passes through closure plank and is fixed on the I-steel of monomer column outer lower portion, and anchor cable uses U-shaped card subcard on I-steel It is firmly and firm with rod tensioner lock is twisted;
(11) it after the completion of blocking work, checks comprehensively and blocks quality, it is ensured that meet filling and require.
Compared with prior art, the beneficial effects of the present invention are:
(1) strong applicability can adjust the size of block wall according to offset opening size.
(2) expense is low, and closure plank, monomer column in closure scheme etc. can recycle and reuse.
(3) time is short, and it is fast that speed is set up in block wall installation, will not influence normal production.
(4) safety is higher, can change the shape of block wall according to block-up position, prevent the distance of face roof under control excessive, after influencing The safety in production of phase.
(5) it is simple, easy to learn to block wall construction, the easy learning and mastering of worker sets up in the process not complicated machinery, process, It does not need that special messenger arrange to remove producer or nonlocal training and learning.
(6) freight is low, and safety is secure, simple due to blocking wall construction, does not have special machine equipment, saves spy Different mechanical transport expense, does not need to specify special traffic program and route.
Detailed description of the invention
Fig. 1 is that mouth blocks floor map under offset.
Fig. 2 is that mouth blocks diagrammatic cross-section under offset.
In figure: 1- π beam, 2- monomer column, 3- wood top cap, 4- diagonal brace monomer, 5- clash column, 6- stull, 7- haulage gate, 8- Block plank, 9-11# mining i beam, 10- monomer column handle, 11- lifter cut, 12- anchor cable.
Specific embodiment
With reference to the accompanying drawing, specific embodiments of the present invention are described in detail.
Using 110902 working face pilot production sections of Wuhai City Tian Yu Trade Co., Ltd. design as construction ground, returned in back production offset It needs to be blocked in time after the completion of adopting, blocks point and be located at below offset, it is ensured that the height and width of block wall can block entirely Offset opening.
In order to increase block wall intensity, need to carry out closure preparation in advance, first by various plugging materials, comprising: Block plank 8, π beam 1 (length determines according to field condition), monomer column 2, stull 6, woven straw, anchor cable 12 (length according to Field condition determines), the transports such as rigging in place.
Determine mouth block-up position under offset, establishment officer starts to construct, and clears up sundries on roadway floor, draws on bottom plate Slot, the depth of lifter cut 11 are not less than 0.3m, and the width of lifter cut 11 guarantees that blocking plank 8 and monomer column 2 can put It sets in slot, clears up the coal wall on block wall both sides, guarantee that coal wall is straight.
Block wall (on) front be the inside place 1-2m top plate and 3-5 rice at bottom plate at brill beat anchor cable eye, installation anchor Anchor cable 12 is drawn after rope;It is the steel strand wires of φ 15.24mm that anchor cable 12, which selects specification, and powder stick is CK2335 type resin explosive roll, Every fills the medicines of volume 3, and the pulling capacity of every anchor cable is no less than 200kN.
It installs monomer column 2 in slotting 11 on bottom plate, 0.3 meter of spacing, connects bottom bracing top, 2 °~3 ° of prop setting angle degree.Often There are the wooden top cap 3, anti-down rope on root monomer column 2, column leg is sitting in kerve 11 on real bottom, meets that mountain is strong, and setting load is not less than 90kN。
Installing blocks plank 8 since kerve 11, blocks plank 8 and selects specification for the willow plate of 4000 × 200 × 50mm, Blocking 8 both ends of plank is more than that lane side is not less than 1.0m, and upper and lower plank gap is no more than 20mm, and front-back staggered is no more than between plank 10mm, plank and the critical contiguity of back are real, and maximal clearance is no more than 50mm, on the inside of block wall surrounding with woven straw plug sternly, Compacting avoids dropping down slurry, and the moisture being precipitated in obturation is filtered out by the woven straw of surrounding.
Block wall outer patch block plank 8 the outer top of monomer column 2 away from top 0.8~1.2 meter at lower part far from bottom 0.8~ The 11# mining i beam 9 of fixed anchor cable is set at 1.2 meters, the anchor cable 12 being arranged on top plate on the inside of block wall is passed through and is blocked Plank 8 is fixed on the 11# mining i beam 9 of 2 top of monomer column setting, and the anchor cable 12 on bottom plate on the inside of block wall is worn It crosses closure plank 8 to be fixed on the 11# mining i beam 9 of 2 lower part of monomer column setting, 11# mining i beam 9 is perpendicular to closure The outer monomer column 2 of plank 8 is laid, and length is not less than block wall length, blocks anchor cable with U-shaped card on 11# mining i beam 9 Line 12 is simultaneously firm with rod tensioner lock is twisted, and anchor cable spacing 1m is no more than 0.3m away from roadway's sides.
Outside block wall, away from row's diagonal brace monomer 4 is installed at block wall 1m left-right position, column is away from 1m, capital band cap, column leg It is sitting on real bottom, is laid with monomer column 2 in herringbone.Laterally (column is in a row square for diagonal brace monomer 4 and 2 bottom of monomer column To) π beam 1 is placed, longitudinal (offset direction of advance) installs strong and reliable stull 6, spacing 0.8m.Monomer column 2 and π beam 1 support Fastening jail, setting load are not less than 90kN.
Monomer column 2 outside close to block wall, every all installs column 5 in an opposite direction, and column 5 is clashed at individual prop handle 10 in an opposite direction, in an opposite direction 5 angle of column is not less than 45 °, and 5 column leg of column is supported on real bottom and (draws nest in column bottom) in an opposite direction.
After the completion of entire closure work, closure quality is checked comprehensively, it is ensured that blocked quality satisfaction filling and required.
Mouth block wall under coal mine offset provided by the invention, installation is simple, highly-safe, and the recyclable repetition benefit of material With reducing the cost of enterprise.
A series of detailed description illustrating only for feasible embodiment of the invention described above, They are not to limit the scope of the invention, in the knowledge that the technical field those of ordinary skill has Interior, the various change made without departing from the purpose of the present invention all belongs to the scope of protection of the present invention.

Claims (10)

1. mouth block wall under a kind of coal mine offset, it is characterised in that: including blocking plank, monomer column, in an opposite direction column, diagonal brace monomer, π Beam, stull, I-steel, anchor cable,
The monomer column branch is set under offset in the slotting of mouth bottom plate;
The closure plank is close on the inside of monomer column;
The every monomer column all installs column in an opposite direction, and column is located on the outside of monomer column in an opposite direction;
The diagonal brace monomer branch is set on the outside of column in an opposite direction;
π beam is respectively set at the monomer column and diagonal brace monomer bottom lateral position;
The stull is located between two π beams;
The I-steel of fixed anchor cable is respectively set in the monomer column outer upper and lower part, I-steel is vertical perpendicular to monomer Column, the top plate and bottom plate brill on the inside of the block wall beat anchor cable eye, keep anchor cable to fix across plank is blocked after installing anchor cable On the I-steel, anchor cable, which is blocked on I-steel and used with U-shaped card, twists rod tensioner lock jail.
2. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: mouth lifter cut under the offset Depth is not less than 0 .3m, and width can guarantee that interior, the coal on cleaning block wall both sides can be placed by blocking plank and monomer column Wall guarantees that coal wall is straight.
3. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: the monomer column column is away from phase Deng connecing bottom bracing top, every monomer column salutes wooden cap, anti-down rope, and column leg is sitting in slotting on real bottom, and setting load is not less than 90KN。
4. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: the closure plank is 50mm thick Willow plate, both ends be more than lane side be not less than 1.0m, up and down block plank gap be no more than 20mm, block plank between front-back staggered No more than 10mm, blocks plank and back closely connects reality, maximal clearance is no more than 50mm.
5. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: the diagonal brace monomer column is away from phase Deng, capital band cap, column leg is sitting on real bottom, is in herringbone with monomer column.
6. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: the column in an opposite direction is in an opposite direction in monomer column At handle, in an opposite direction column angle be not less than 45 °, in column column undercut in an opposite direction, make in an opposite direction column column leg be supported on real bottom.
7. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: the stull setting load is not less than 90KN。
8. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: the I-steel length is not less than Block the width of plank;The I-steel is 11# mining i beam.
9. mouth block wall under a kind of coal mine offset as described in claim 1, it is characterised in that: the anchor cable spacing is equal, away from Roadway's sides are no more than 0 .30 meters.
10. the method blocked using mouth block wall under the coal mine offset of any of claims 1-9, feature are existed In operating procedure is as follows:
(1) preparation before blocking transports the plugging material in place;
(2) the mouth lifter cut under offset, and clear up block wall two sides coal wall, it is ensured that coal wall is smooth;
(3) the top plate and bottom plate brill on the inside of block wall beats anchor cable eye, installs anchor cable;
(4) monomer column branch is located in slotting;
(5) woven straw of jumping a queue on the inside of mouth surrounding is blocked;
(6) plank will be blocked and is close to the stacking of monomer column, blocked completely until mouth entirely will be blocked;
(7) column in an opposite direction is installed on the outside of every monomer column;
(8) row's diagonal brace monomer is installed on the outside of column in an opposite direction;
(9) π beam is set in monomer column and diagonal brace monomer bottom lateral position;
(10) stull is installed between two π beams;
(11) I-steel is respectively set in monomer column outer upper and lower part, the anchor being arranged at the top plate on the inside of block wall Bands passes through closure plank and is fixed on the I-steel of monomer column outer upper, the anchor cable being arranged at bottom plate on the inside of block wall It is fixed on the I-steel of monomer column outer lower portion across plank is blocked, anchor cable is blocked simultaneously on I-steel with U-shaped card With twisting, rod tensioner lock is firm;
(12) it after the completion of blocking work, checks comprehensively and blocks quality, it is ensured that meet filling and require.
CN201711458813.5A 2017-12-28 2017-12-28 Mouth block wall under a kind of coal mine offset Expired - Fee Related CN108194141B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711458813.5A CN108194141B (en) 2017-12-28 2017-12-28 Mouth block wall under a kind of coal mine offset

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711458813.5A CN108194141B (en) 2017-12-28 2017-12-28 Mouth block wall under a kind of coal mine offset

Publications (2)

Publication Number Publication Date
CN108194141A CN108194141A (en) 2018-06-22
CN108194141B true CN108194141B (en) 2019-03-29

Family

ID=62584929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711458813.5A Expired - Fee Related CN108194141B (en) 2017-12-28 2017-12-28 Mouth block wall under a kind of coal mine offset

Country Status (1)

Country Link
CN (1) CN108194141B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0996194A (en) * 1995-09-29 1997-04-08 Shimizu Corp Structure of support wall and construction method therefor
CN101514633A (en) * 2009-02-10 2009-08-26 河北金牛能源股份有限公司葛泉矿 Gob-side entry retaining process without roadside support
CN102606207A (en) * 2012-04-06 2012-07-25 陕西开拓建筑科技有限公司 Mine gob filling and entry retaining device system and filling method
CN102720498A (en) * 2012-06-20 2012-10-10 鄂托克前旗长城煤矿有限责任公司 Gob-side entry retaining mining process for coal face
CN104832188A (en) * 2015-04-17 2015-08-12 中国矿业大学(北京) Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0996194A (en) * 1995-09-29 1997-04-08 Shimizu Corp Structure of support wall and construction method therefor
CN101514633A (en) * 2009-02-10 2009-08-26 河北金牛能源股份有限公司葛泉矿 Gob-side entry retaining process without roadside support
CN102606207A (en) * 2012-04-06 2012-07-25 陕西开拓建筑科技有限公司 Mine gob filling and entry retaining device system and filling method
CN102720498A (en) * 2012-06-20 2012-10-10 鄂托克前旗长城煤矿有限责任公司 Gob-side entry retaining mining process for coal face
CN104832188A (en) * 2015-04-17 2015-08-12 中国矿业大学(北京) Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof

Also Published As

Publication number Publication date
CN108194141A (en) 2018-06-22

Similar Documents

Publication Publication Date Title
CN104763425B (en) Pressure relief presplitting blasting gob-side entry retaining pillar-free mining method
CN102777182B (en) Rapid end extracting method of large mining height working face
CN102140800B (en) Quick, safe and environment-friendly method for constructing non-excavated anti-slide pile
CN106593497B (en) A kind of coal working face crosses crossheading caving place supporting processing method
CN105089680B (en) A kind of gob side entry retaining light high strength concrete blockwork and its construction technology
CN101845958A (en) Fully mechanized coal face bracket withdrawing method and withdrawing bracket traction spring exerciser
CN107013229A (en) Folding telescopic gob side entry retaining roadside packing Flexible formwork assembly and its construction method
CN103758529A (en) Coal mine gob-side entry retaining side supporting method
KR20200081823A (en) Segmental precast concrete ventilating slabs of structure and construction way in tunnel for rapid installation
CN109763861A (en) One kind cutting intraocular fault belt treatment of roof collapse method
CN106014479A (en) Bracket reducing method for mining lower-layer working surface of ultra-close coal seam
CN206035505U (en) Stride across hangar tunnel structure of debris flow gully
CN108166978A (en) A kind of equipment arrangement system for three-soft seam stope
CN106761867A (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN108166395A (en) A kind of construction method that beam bridge is built across Business Line
CN108194141B (en) Mouth block wall under a kind of coal mine offset
CN106917358B (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN211081970U (en) Assembled reusable flexible filling retaining wall
CN105370307B (en) Coal working face crosses freeboard section support process
CN105201529B (en) Double tow ties up Flexible formwork assembly and its placement methods to a kind of gob side entry retaining crosswise
CN105156111B (en) The method for protecting support of high working face lane formula filling Striping noise
CN105937400A (en) One-time tunneling two-roadway-retained excavating operation production line
CN102979572A (en) Active reinforced filling wall and construction method
CN105937401B (en) The method for protecting support in Liu Sheshuan lanes is once tunneled in a kind of U-shaped ventilation
CN105909290B (en) The apparatus and method that controlroof sinks in a kind of filling mining of pillar part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190329