CN102278140A - Gob-side entry retaining method for solid filling coal mining building gangue wall - Google Patents

Gob-side entry retaining method for solid filling coal mining building gangue wall Download PDF

Info

Publication number
CN102278140A
CN102278140A CN2011101999298A CN201110199929A CN102278140A CN 102278140 A CN102278140 A CN 102278140A CN 2011101999298 A CN2011101999298 A CN 2011101999298A CN 201110199929 A CN201110199929 A CN 201110199929A CN 102278140 A CN102278140 A CN 102278140A
Authority
CN
China
Prior art keywords
entry retaining
wall
pack wall
side entry
retaining method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101999298A
Other languages
Chinese (zh)
Inventor
张吉雄
周楠
巨峰
昝东峰
邓雪杰
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUZHOU BEIKE MAINING MINING TECHNOLOGY CO LTD
Original Assignee
XUZHOU BEIKE MAINING MINING TECHNOLOGY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU BEIKE MAINING MINING TECHNOLOGY CO LTD filed Critical XUZHOU BEIKE MAINING MINING TECHNOLOGY CO LTD
Priority to CN2011101999298A priority Critical patent/CN102278140A/en
Publication of CN102278140A publication Critical patent/CN102278140A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a gob-side entry retaining method for a solid filling coal mining building gangue wall. The method comprises the following steps of: building the gangue wall on one side of a filling body in a gob of a filling coal mining surface, and filling coal gangue into a weaving bag or a snakeskin bag and building to form the gangue wall, wherein filling gangue of the filling coal mining surface can be used as the coal gangue directly; and pretightening and timbering the built gangue wall by using a single-layer metal net, a 'W'-shaped steel belt, a ladder beam and a double-ended anchor rod with threads. With the advance of a working surface, the gob-side entry retaining method preserves the complete gangue wall for the mining of the next working surface. The entry retaining method is simple, practical, high in timbering strength and low in cost.

Description

A kind of solid filling is mined and is assembled pack wall gob side entry retaining method
Technical field
The present invention relates to a kind of solid filling coal mining and assemble pack wall gob side entry retaining method, being particularly useful for the filling coal mining work plane does not have the coal column gob side entry retaining.
Background technology
Along with the solid filling coal-mining technique develops gradually, liberated " three times " and pressed coal, improve mine resource recovery ratio, realized the needs of mining area resource and environment harmonic extraction.But the protection pillar about in the filling coal mining between section two stopes stays and establishes width is 20~30m, has caused the loss of a large amount of coal resources, has become the bottleneck that improves the coal resources rate of extraction in the filling coal mining technology.Existing gob-side entry retaining method and relevant patented technology great majority are to adopt the roadside packing technology to carry out on the basis of conventional coal mining activity, the construction technology complexity, need expend more manpower and materials, and this kind mode can to cause inter process to influence each other very serious, inefficiency.
At above problem, a kind of solid filling of the present invention is mined and is assembled pack wall gob side entry retaining method, improved the rate of extraction of coal resources greatly, can increase an escape way for this work plane, can prepare stope drift active workings for next work plane again, can save the tunnelling expense, can alleviate the coal mine excavation imbalance and the nervous situation that continues again, the condition of " Y " type ventilation is provided for high Gassy Coal Face again simultaneously, and on the basis of goaf filling, stay the lane difficulty low, method is simple, and is easy and simple to handle, has important practical significance and wide application prospect.
Summary of the invention
Technical problem: it is simple to the purpose of this invention is to provide a kind of method, and easy construction is safe and reliable, and the solid filling coal mining that has than strong support force assembles pack wall gob side entry retaining method.
Technical scheme: solid filling of the present invention is mined and is assembled pack wall gob side entry retaining method, is to assemble pack wall in filling coal mining face goaf obturation one side, and the width that assembles pack wall is 1.5m~3m, and it is identical with the work plane mining height to assemble the pack wall height; Pack wall is coal mine waste rock is filled and to be assembled and be body of wall with encapsulation bag, and the spoil encapsulation bag of employing is common woven bag or snakeskin bag, and coal mine waste rock directly adopts the filing gangue in mined-out area of even proportioning, and particle diameter is less than 50mm; Adopt single-layer metal net, " W " steel band of model, ladder beam and the supporting of anchor pole pretension then, array pitch is 600mm * 800mm between anchor pole, and " W " steel band of model and ladder beam are right-angled intersection and arrange.
Beneficial effect: the invention solves " three times " and press coal to reach the loss of coal pillar between section two stopes up and down, improved the rate of extraction of coal resources greatly, can increase an escape way for this work plane, can prepare stope drift active workings for next work plane again, can save the tunnelling expense, can alleviate the coal mine excavation imbalance and the pressure that continues again, the condition of " Y " type ventilation is provided for high Gassy Coal Face again simultaneously, and on the basis of goaf filling, stay the lane difficulty low, its method method is simple, practical, the supporting intensity height, cost is low, has practicality widely.
Description of drawings
Fig. 1 is that work plane of the present invention is arranged schematic diagram;
Fig. 2 is the schematic side view that the A-A structure of Fig. 1 assembles the supporting of spoil body of wall;
Fig. 3 is the B-B structure gob side entry retaining schematic diagram of Fig. 1.
Among the figure: 1-goaf filling body, 2-pack wall, 3-encapsulate bag, 4-wire lath, 5-" W " steel band of model, 6-ladder beam, 7-anchor pole.
The specific embodiment
Below in conjunction with accompanying drawing one embodiment of the present of invention are further described:
Figure 1 shows that work plane layout schematic diagram of the present invention, along with work plane is pushed ahead, form the goaf, filling is carried out with spoil in the goaf, form goaf filling body 1, and then goaf filling body 1 one sides assemble pack wall 2, and the width that assembles pack wall 2 is 1.5m~3m, and it is identical with the work plane mining height to assemble pack wall 2 height; Pack wall 2 is coal mine waste rock is filled and to be assembled and be body of wall with encapsulation bag 3, and the spoil encapsulation bag 3 of employing is common woven bag or snakeskin bag, and coal mine waste rock directly adopts the filing gangue in mined-out area of even proportioning, and the spoil particle diameter is less than 50mm; The support pattern of pack wall 2 as shown in Figure 2, adopt single-layer metal net 4, " W " steel band of model 5, ladder beam 6 and anchor pole 7 to carry out the composite reinforcement supporting, array pitch is 600mm * 800mm between anchor pole, wherein " W " steel band of model 5 and ladder beam 6 are " ten " word arranged crosswise, and the final gob side entry retaining lateral view of the present invention that forms as shown in Figure 3.

Claims (7)

1. a solid filling is mined and is assembled pack wall gob side entry retaining method, it is characterized in that assembling pack wall (2) in filling coal mining face goaf obturation (1) one side, and described pack wall is coal mine waste rock is filled and to be assembled and be body of wall with encapsulation bag (3).
2. solid filling according to claim 1 is mined and is assembled pack wall gob side entry retaining method, it is characterized in that the described width that assembles pack wall is 1.5m~3m, and it is identical with the work plane mining height to assemble the pack wall height.
3. solid filling according to claim 1 is mined and is assembled pack wall gob side entry retaining method, it is characterized in that described pack wall both sides employing single-layer metal net (4), " W " steel band of model (5), ladder beam (6) and the threaded anchor pole of double end (7) pretension supporting.
4. array pitch is 600mm * 800mm between anchor pole according to claim 3.
5. " W " steel band of model according to claim 3 and ladder beam are right-angled intersection and arrange.
6. solid filling according to claim 1 is mined and is assembled pack wall gob side entry retaining method, it is characterized in that described spoil encapsulation bag is common woven bag or snakeskin bag.
7. solid filling according to claim 1 is mined and is assembled pack wall gob side entry retaining method, it is characterized in that described coal mine waste rock directly adopts the filing gangue in mined-out area of even proportioning, and particle diameter is less than 50mm.
CN2011101999298A 2011-07-05 2011-07-05 Gob-side entry retaining method for solid filling coal mining building gangue wall Pending CN102278140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101999298A CN102278140A (en) 2011-07-05 2011-07-05 Gob-side entry retaining method for solid filling coal mining building gangue wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101999298A CN102278140A (en) 2011-07-05 2011-07-05 Gob-side entry retaining method for solid filling coal mining building gangue wall

Publications (1)

Publication Number Publication Date
CN102278140A true CN102278140A (en) 2011-12-14

Family

ID=45103828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101999298A Pending CN102278140A (en) 2011-07-05 2011-07-05 Gob-side entry retaining method for solid filling coal mining building gangue wall

Country Status (1)

Country Link
CN (1) CN102278140A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661169A (en) * 2012-04-28 2012-09-12 山东科技大学 Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN102720498A (en) * 2012-06-20 2012-10-10 鄂托克前旗长城煤矿有限责任公司 Gob-side entry retaining mining process for coal face
CN102733820A (en) * 2012-07-05 2012-10-17 山东新阳能源有限公司 Gob-side entry retaining support wall and integrated construction method thereof
CN103147793A (en) * 2013-02-22 2013-06-12 山东科技大学 Non-chain-pillar roadway protection method adopting filling beside thin coal seam roadway
CN103334769A (en) * 2013-06-18 2013-10-02 中国矿业大学 Cross building block wall supporting method for reinforcing empty roadway of advanced working face
CN103967519A (en) * 2014-05-15 2014-08-06 山东科技大学 Method for reinforcing gob-side entry retaining through fallen gangue in gob of composite top board inclined seam
CN104088662A (en) * 2014-06-25 2014-10-08 中国矿业大学 Construction method of gob-side entry retaining wall of solid filling coal mining
CN104612729A (en) * 2014-11-27 2015-05-13 中国矿业大学(北京) Asymmetric anchor beam structure and supporting method for goaf-side roadway roof
CN105351004A (en) * 2015-12-04 2016-02-24 山东科技大学 Bagged gangue concrete united roadside supporting method
CN105422172A (en) * 2015-12-25 2016-03-23 山东科技大学 Waste rock bag roadside support method for anchoring low coal seam with strong roof
CN105756702A (en) * 2016-03-18 2016-07-13 安徽理工大学 Roadway-side mesh cage filling supporting gob-side entry retaining method
CN108590655A (en) * 2018-03-27 2018-09-28 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN109098752A (en) * 2018-10-15 2018-12-28 中国矿业大学 A kind of trapezoidal ruggedized construction of filling mining roadside support body and method
CN109209485A (en) * 2018-11-02 2019-01-15 中国矿业大学 A kind of trapezoidal roadside support body of filling mining and method for protecting support
CN109915138A (en) * 2019-03-26 2019-06-21 中国矿业大学(北京) Spontaneous fire seam cuts top self-contained lane without pillar mining method
CN109973094A (en) * 2019-03-05 2019-07-05 中国矿业大学 Recovery method is filled by a kind of coplanar full office of adopting of mine resources

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4340254A (en) * 1979-02-14 1982-07-20 Tatabanyai Szenbanyak Method of mining heavy coal seams in two or more benches
CN201363157Y (en) * 2009-03-17 2009-12-16 天地科技股份有限公司 Gauge protecting member combined by steel bar supporting beam and W steel protecting plate
CN101864987A (en) * 2010-06-13 2010-10-20 中国矿业大学 Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN101949301A (en) * 2010-08-30 2011-01-19 山东新矿赵官能源有限责任公司 Different-strength bearing roadway-beside filling body of gob-side entry under coal mine
CN201826891U (en) * 2010-09-17 2011-05-11 山东新矿赵官能源有限责任公司 Unequal-strength bearing roadside filling body for no coal pillar mining of thin coal seam

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4340254A (en) * 1979-02-14 1982-07-20 Tatabanyai Szenbanyak Method of mining heavy coal seams in two or more benches
CN201363157Y (en) * 2009-03-17 2009-12-16 天地科技股份有限公司 Gauge protecting member combined by steel bar supporting beam and W steel protecting plate
CN101864987A (en) * 2010-06-13 2010-10-20 中国矿业大学 Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN101949301A (en) * 2010-08-30 2011-01-19 山东新矿赵官能源有限责任公司 Different-strength bearing roadway-beside filling body of gob-side entry under coal mine
CN201826891U (en) * 2010-09-17 2011-05-11 山东新矿赵官能源有限责任公司 Unequal-strength bearing roadside filling body for no coal pillar mining of thin coal seam

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661169B (en) * 2012-04-28 2015-05-06 山东科技大学 Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN102661169A (en) * 2012-04-28 2012-09-12 山东科技大学 Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN102720498A (en) * 2012-06-20 2012-10-10 鄂托克前旗长城煤矿有限责任公司 Gob-side entry retaining mining process for coal face
CN102720498B (en) * 2012-06-20 2015-06-17 鄂托克前旗长城煤矿有限责任公司 Gob-side entry retaining mining process for coal face
CN102733820A (en) * 2012-07-05 2012-10-17 山东新阳能源有限公司 Gob-side entry retaining support wall and integrated construction method thereof
CN103147793A (en) * 2013-02-22 2013-06-12 山东科技大学 Non-chain-pillar roadway protection method adopting filling beside thin coal seam roadway
CN103147793B (en) * 2013-02-22 2016-01-20 山东科技大学 Girdle roadside packing non chain pillar entryprotection method
CN103334769A (en) * 2013-06-18 2013-10-02 中国矿业大学 Cross building block wall supporting method for reinforcing empty roadway of advanced working face
CN103967519A (en) * 2014-05-15 2014-08-06 山东科技大学 Method for reinforcing gob-side entry retaining through fallen gangue in gob of composite top board inclined seam
CN104088662A (en) * 2014-06-25 2014-10-08 中国矿业大学 Construction method of gob-side entry retaining wall of solid filling coal mining
CN104088662B (en) * 2014-06-25 2016-08-31 中国矿业大学 A kind of construction method of solid filling coal mining gob-side entry retaining support body of wall
CN104612729A (en) * 2014-11-27 2015-05-13 中国矿业大学(北京) Asymmetric anchor beam structure and supporting method for goaf-side roadway roof
CN105351004A (en) * 2015-12-04 2016-02-24 山东科技大学 Bagged gangue concrete united roadside supporting method
CN105422172A (en) * 2015-12-25 2016-03-23 山东科技大学 Waste rock bag roadside support method for anchoring low coal seam with strong roof
CN105756702A (en) * 2016-03-18 2016-07-13 安徽理工大学 Roadway-side mesh cage filling supporting gob-side entry retaining method
CN105756702B (en) * 2016-03-18 2018-10-19 安徽理工大学 A kind of lane side cylinder mould filling and support gob-side entry retaining method
CN108590655A (en) * 2018-03-27 2018-09-28 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN108590655B (en) * 2018-03-27 2019-05-31 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN109098752A (en) * 2018-10-15 2018-12-28 中国矿业大学 A kind of trapezoidal ruggedized construction of filling mining roadside support body and method
CN109209485A (en) * 2018-11-02 2019-01-15 中国矿业大学 A kind of trapezoidal roadside support body of filling mining and method for protecting support
CN109209485B (en) * 2018-11-02 2020-05-08 中国矿业大学 Filling mining trapezoid roadside support body and support method
CN109973094A (en) * 2019-03-05 2019-07-05 中国矿业大学 Recovery method is filled by a kind of coplanar full office of adopting of mine resources
CN109973094B (en) * 2019-03-05 2020-01-21 中国矿业大学 Mine resource same-face full-mining local-filling mining method
CN109915138A (en) * 2019-03-26 2019-06-21 中国矿业大学(北京) Spontaneous fire seam cuts top self-contained lane without pillar mining method

Similar Documents

Publication Publication Date Title
CN102278140A (en) Gob-side entry retaining method for solid filling coal mining building gangue wall
CN202215249U (en) Layering pack wall along for hollow entry retaining in solid filling coal mining
CN101761338B (en) Gob-side entry retaining method of a solid filling coal mining half-section one-leg shed
CN101514633B (en) Non-roadside supporting gob-side entry retaining process
CN101864956B (en) Sectional coal pillar-free exploitation method
CN102383857A (en) Gob-side entry retaining process for solid-filling, coal-mining and laying gangue wall
CN107905790B (en) Broadwall N00 engineering method
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN103233751B (en) Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN107829742B (en) Caving-filling-open stope-caving mining method
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN102900449B (en) Support method for underground goaf roof of coal mine
CN102587914A (en) Strip-type Wongawilli mining method of coal buried under building
CN104088638B (en) Large-inclination-angle coal bed longwell large-mining-height working surface coal wall caving and roof fall control technology
CN101881167B (en) Coal face stump mining method
EA037966B1 (en) Fractured roof mining method
CN103742171A (en) Mining roadway coal pillar reinforcing method
CN102733836A (en) Roadway support method for fully mechanized caving mining of weak extra-thick coal seam
CN104847406A (en) Method for fracturing retained filled wall of adjacent coal face
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN112610258A (en) Impact mine stoping roadway advanced support method applied to smart mine
CN205172609U (en) Asymmetric supporting device in tunnel
CN104074534A (en) Gob-side entry retaining method of fully-mechanized mining/full-mechanized caving mining working face
CN106285692B (en) A kind of construction method of gob side entry retaining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111214