CN204299617U - One is anti-breaks type gob side entry retaining filling air bag - Google Patents

One is anti-breaks type gob side entry retaining filling air bag Download PDF

Info

Publication number
CN204299617U
CN204299617U CN201420674951.2U CN201420674951U CN204299617U CN 204299617 U CN204299617 U CN 204299617U CN 201420674951 U CN201420674951 U CN 201420674951U CN 204299617 U CN204299617 U CN 204299617U
Authority
CN
China
Prior art keywords
air bag
flexible rubber
rubber air
diamond mesh
cuboid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420674951.2U
Other languages
Chinese (zh)
Inventor
张天池
马百龙
刘文慧
冯晓巍
范红瑞
杨林
郑西贵
王化洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201420674951.2U priority Critical patent/CN204299617U/en
Application granted granted Critical
Publication of CN204299617U publication Critical patent/CN204299617U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model one is anti-breaks type gob side entry retaining filling air bag, comprise the diamond mesh covered outside cuboid flexible rubber air bag and cuboid flexible rubber air bag, it is characterized in that diamond mesh is covered in the outside of cuboid flexible rubber air bag uniformly, diamond mesh is woven by steel wire or iron wire to form.Flexible rubber air bag is identical with working face mining height, width is 1-5 rice, length is 1-10 rice, the diamond mesh covered outward can prevent spoil scratch cuboid flexible rubber air bag, during filling, cuboid flexible rubber air bag is easy to connect top, can close the goaf in time, and construction technology is simple, safe and reliable, operating efficiency is high, the filled wall formed is economical and practical, is suitable for constructing fast of filled wall bodies of gob-side retained entries.

Description

One is anti-breaks type gob side entry retaining filling air bag
Technical field
The utility model is that the mining anti-of a kind of high-efficiency and economic breaks type gob side entry retaining filling air bag, is used for replacing traditional filled wall bodies of gob-side retained entries, is particularly useful for the coal mine work area adopting gob-side entry retaining method exploitation.
Background technology
In order to reclaim the safety pillar staying in traditional mining mode mode and establish, adopt certain technological means the tunnel of a upper section again supporting to be left for next section to use, this way in lane of staying is called gob side entry retaining, do like this and can retain former tunnel and again utilize, be conducive to reasonable development coal resources, improve coal recovery rate, fundamentally improve the nervous situation that coal mine excavation is taken over.Domestic main employing concrete filling body of wall at present, but concrete filling materials for wall consumption is large, complex process, speed of application are slow, engineering cost is high, and therefore a kind of simple, safe and reliable obturation needs the production problem of solution at present badly.
Summary of the invention
Technical problem: the purpose of this utility model is the deficiency overcome in prior art, by changing material and the structure of traditional obturation, propose and a kind of simple, efficient, safe and reliablely anti-ly break type gob side entry retaining filling air bag, be used for replacing existing filled wall bodies of gob-side retained entries.
Technical scheme: the utility model ` mono-kind is anti-breaks type gob side entry retaining filling air bag, comprises the diamond mesh covered outside cuboid flexible rubber air bag and cuboid flexible rubber air bag.Diamond mesh is covered in the outside of cuboid flexible rubber air bag uniformly.Diamond mesh is woven by steel wire or iron wire to form.Flexible rubber air bag height is identical with working face mining height, and width is 1-5 rice, and length is 1-10 rice.
Beneficial effect:
1. can prevent spoil scratch cuboid flexible rubber air bag, safe and reliable;
2.structure is simple, simplifies construction technology, saves filler, decreases the filling procedure time used, reduce labor strength, and save the mine supplement production links such as the transport of material;
3.during filling, cuboid flexible rubber air bag is easy to connect top, can close the goaf in time.
Accompanying drawing explanation
Fig. 1 is plane figure of the present utility model;
1-diamond mesh in figure, 2-cuboid flexible rubber air bag, 3-stays lane, 4-goaf, 5-coal-face, 6-coal.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, the utility model will be further described:
The utility model one is anti-as shown in Figure 1 breaks type gob side entry retaining filling air bag, and comprise diamond mesh (1), cuboid flexible rubber air bag (2), diamond mesh (1) is covered in the outside of cuboid flexible rubber air bag (2) uniformly.Diamond mesh (1) is woven by steel wire or iron wire to form.Flexible rubber air bag height (2) is identical with mining height, and width is 1-5 rice, and length is 1-10 rice.A kind of anti-using method breaking type gob side entry retaining filling air bag of the utility model: after working face extraction, on the edge at coal-face (5) rear, the height cuboid flexible rubber air bag (2) identical with coal-face height is laid near goaf (4) side in the empty tunnel (3) that retains, inflation, make cuboid flexible rubber air bag (2) fully connect top and reach intended support power, along with constantly pushing ahead of coal-face (5), often push ahead a step pitch, complete the layout of a cuboid flexible rubber air bag (2), wholely stay lane until complete.

Claims (1)

1. prevent breaking type gob side entry retaining filling air bag for one kind, it is characterized in that: it is made up of diamond mesh (1) and cuboid flexible rubber air bag (2), diamond mesh (1) is overlying on the outside of cuboid flexible rubber air bag (2) uniformly, diamond mesh (1) is woven by steel wire or iron wire to form, flexible rubber air bag height is identical with working face mining height, width is 1-5 rice, and length is 1-10 rice.
CN201420674951.2U 2014-11-13 2014-11-13 One is anti-breaks type gob side entry retaining filling air bag Expired - Fee Related CN204299617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420674951.2U CN204299617U (en) 2014-11-13 2014-11-13 One is anti-breaks type gob side entry retaining filling air bag

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420674951.2U CN204299617U (en) 2014-11-13 2014-11-13 One is anti-breaks type gob side entry retaining filling air bag

Publications (1)

Publication Number Publication Date
CN204299617U true CN204299617U (en) 2015-04-29

Family

ID=53105163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420674951.2U Expired - Fee Related CN204299617U (en) 2014-11-13 2014-11-13 One is anti-breaks type gob side entry retaining filling air bag

Country Status (1)

Country Link
CN (1) CN204299617U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971669A (en) * 2016-07-06 2016-09-28 冀中能源邯郸矿业集团有限公司 Gob sealing method capable of protecting coal seam from spontaneous combustion
CN106382118A (en) * 2016-11-30 2017-02-08 长沙矿山研究院有限责任公司 Separation-wall-free initiative top filling wall type filling mining method
CN109162759A (en) * 2018-11-02 2019-01-08 榆林学院 One kind being suitable for quick closing device and method by gob side entry retaining lane
CN109915138A (en) * 2019-03-26 2019-06-21 中国矿业大学(北京) Spontaneous fire seam cuts top self-contained lane without pillar mining method
CN112746863A (en) * 2021-02-04 2021-05-04 太原理工大学 Rapid closing device and method for mine roof cutting gob-side entry retaining goaf

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971669A (en) * 2016-07-06 2016-09-28 冀中能源邯郸矿业集团有限公司 Gob sealing method capable of protecting coal seam from spontaneous combustion
CN106382118A (en) * 2016-11-30 2017-02-08 长沙矿山研究院有限责任公司 Separation-wall-free initiative top filling wall type filling mining method
CN106382118B (en) * 2016-11-30 2018-04-17 长沙矿山研究院有限责任公司 No divider wall actively connects the roof formula method of mining by the way of filling
CN109162759A (en) * 2018-11-02 2019-01-08 榆林学院 One kind being suitable for quick closing device and method by gob side entry retaining lane
CN109915138A (en) * 2019-03-26 2019-06-21 中国矿业大学(北京) Spontaneous fire seam cuts top self-contained lane without pillar mining method
CN109915138B (en) * 2019-03-26 2021-03-30 中国矿业大学(北京) Easy-to-self-fire coal layer top-cutting self-tunneling coal-pillar-free mining method
CN112746863A (en) * 2021-02-04 2021-05-04 太原理工大学 Rapid closing device and method for mine roof cutting gob-side entry retaining goaf

Similar Documents

Publication Publication Date Title
CN102155260B (en) Method for filling heavy-pitch coal bed goaf
CN204299617U (en) One is anti-breaks type gob side entry retaining filling air bag
CN103883350B (en) The filling coal mining method of adopting is jumped at a kind of interval
CN101864956B (en) Sectional coal pillar-free exploitation method
CN104018837B (en) A kind of interval filling gob-side entry retaining method processing planted agent's spoil
CN104775819A (en) Deep inclined coal seam mining roadway mine pressure control mining method
CN105240048B (en) A kind of gas filling method based on paste body filling
CN101942999A (en) Coal mining method for high-dipping low seam
CN104564137B (en) Handling method and device for double-medium stacked supporting and hard top plate type mined-out area
CN104088638B (en) Large-inclination-angle coal bed longwell large-mining-height working surface coal wall caving and roof fall control technology
CN102392643A (en) Under-building filling, mining and coal pillar recovering method
AU2016370451A1 (en) Method for determining length of filling section of fully mechanized coal mining-filling mixed mining working face
CN105003299A (en) Flexible filling bag for gob-side entry retaining and its application method
CN204283488U (en) A kind of constant-resistance allows presses gob side entry retaining filling air bag
CN103953345A (en) Exploitation method of gob-side entry retaining with small section
CN104453994A (en) Gob-side entry retaining method for putting top waste rock down to achieve roadway side packing
CN103953346A (en) Non-chain-pillar exploitation method
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN104405392B (en) Three soft high seam tunnel jackings are kept on file anchor rete cord active support longwall top coal caving method
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof
CN103161498A (en) Steep coal seam section coal pillar roadside filling method
CN104454001A (en) In-tunnel dewatering system and method for tunnel in low-permeability silty-fine sand stratum
CN106285692A (en) A kind of construction method of gob side entry retaining
WO2019109535A1 (en) Clean and efficient coal mining method
CN105221185A (en) A kind of coal winning technology

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20151113

EXPY Termination of patent right or utility model