CN204509885U - Track sleeper dismantling equipment for construction of water diversion type hydropower station - Google Patents

Track sleeper dismantling equipment for construction of water diversion type hydropower station Download PDF

Info

Publication number
CN204509885U
CN204509885U CN201520107417.8U CN201520107417U CN204509885U CN 204509885 U CN204509885 U CN 204509885U CN 201520107417 U CN201520107417 U CN 201520107417U CN 204509885 U CN204509885 U CN 204509885U
Authority
CN
China
Prior art keywords
frame
mechanical
jig arm
sleeper
power station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520107417.8U
Other languages
Chinese (zh)
Inventor
赵琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN201520107417.8U priority Critical patent/CN204509885U/en
Application granted granted Critical
Publication of CN204509885U publication Critical patent/CN204509885U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a track sleeper demolishs equipment for in diversion formula power station construction, include the frame and install the driver's cabin in the frame front portion, it is provided with the transportation area to lie in the driver's cabin bilateral symmetry in the frame, transportation area the place ahead is provided with mechanical arm lock, transportation area rear portion is provided with stores up the sleeper storehouse, the frame bottom is provided with running gear, the frame rear portion still is provided with pushes away the shovel, the inside operating means that is provided with of driver's cabin, the slope of transportation area sets up in the frame, and the one end of keeping away from mechanical arm lock places on the border that stores up the sleeper storehouse, be connected through hydraulic transmission between mechanical arm lock and mechanical arm lock hydraulic lifting rod and the frame, mechanical arm lock front portion is mechanical forearm, is provided with mechanical tong at mechanical forearm front end. The utility model discloses simple structure, safe practical can demolish the shield fast and construct the sleeper rail, demolish efficiently, can effectively shorten construction period, improves the efficiency of construction greatly.

Description

A kind of for the railway sleeper dismounting equipment in run-of-river power station construction
Technical field
The utility model relates to a kind of Construction of Hydropower Engineering equipment, specifically relates to a kind of for the railway sleeper dismounting equipment in run-of-river power station construction.
Background technology
Run-of-river power station, in construction process, needs to build diversion tunnel and tailwater tunnel.In tunnel when building, usually adopting the native rock ballast of rail locomotive transport tunnel excavation, therefore needing to lay the track for locomotive running gear, or when execution conditions need adopt TBM constructing tunnel, then need, for TBM lays driving track, after construction, to need railway sleeper to remove.
At present, in run-of-river power station construction process, the dismounting mode of railway sleeper usually has and has two kinds as follows, the pure manpower of a kind of employing is removed, because railway sleeper lays complex procedures, and sleeper is comparatively heavy, and not only efficiency of construction is not high to adopt manual demolition, and safety is lower, easily there is security incident; Another kind adopts artificial and mechanical bond, the mode detaching sleeper of dress transported by manual demolition machinery, although the construction of which bonding apparatus fortune dress decreases the physical load of workman, but still dismounting efficiency is not high, construction period is long, and can not reach the effect that rear Land leveling removed by sleeper.Therefore existing railway sleeper dismounting mode is desirable not enough, awaits perfect further.
Utility model content
The purpose of this utility model is to overcome the deficiency existing for existing railway sleeper dismounting mode, provide a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, thus tunnel tie can be removed by fast dismantling, effectively shorten the construction period, greatly improve and remove efficiency and safety.
The utility model is achieved by following technical solution.
A kind of for the railway sleeper dismounting equipment in run-of-river power station construction, comprise frame and be arranged on the driver's cabin of frame front, described frame is positioned at driver's cabin bilateral symmetry and is provided with conveyer belt, described conveyer belt front is provided with mechanical jig arm, described conveyer belt rear portion is provided with storage sleeper storehouse, be provided with running gear bottom described frame, described frame rear portion is also provided with shoveling.
Described cabin interior is provided with operating means.
Described conveyer belt is inclined in frame, and is placed on the edge in storage sleeper storehouse away from one end of mechanical jig arm.
Described mechanical jig arm bottom is provided with mechanical jig arm hydraulic lifting arm, and mechanical jig arm hydraulic lifting arm is fixed away from one end of mechanical jig arm and frame.
Described mechanical jig arm is connected by hydraulic transmission with between mechanical jig arm hydraulic lifting arm and frame.
Described mechanical jig arm front portion is mechanical forearm, and mechanical forearm front end is provided with mechanical tong, and is provided with mechanical forearm hydraulically extensible bar between mechanical jig arm with mechanical forearm and is connected.
Described shoveling top is connected with frame by shoveling raise-lower hydraulic bar, and shoveling bottom is provided with pivot point.
The beneficial effects of the utility model are:
Compared with prior art, the utility model combines with mechanical jig arm by adopting running gear, in use, is transported in storage sleeper storehouse by conveyer belt by shield structure sleeper; Move shoveling simultaneously, sleeper roadbed can be bulldozed whole, for follow-up work is prepared.The utility model structure is simple, safe and practical, and can remove shield structure tie by fast dismantling, dismounting efficiency is high, effectively can shorten the construction period, greatly improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is plane structure schematic diagram of the present utility model;
Fig. 2 is lateral view of the present utility model.
In figure: 1-frame, 2-driver's cabin, 3-conveyer belt, 4-machinery jig arm, 5-stores up sleeper storehouse, 6-running gear, 7-shoveling, 8-operating means, 9-machinery jig arm hydraulic lifting arm, 10-machinery forearm, 11-machinery tong, 12-machinery forearm hydraulically extensible bar, 13-hydraulic transmission, 14-shoveling raise-lower hydraulic bar, 15-pivot point.
Detailed description of the invention
The technical solution of the utility model is further described below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As shown in Figure 1 and Figure 2, described in the utility model a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, comprise frame 1 and be arranged on the driver's cabin 2 of frame 1 front portion, described frame 1 is positioned at driver's cabin 2 bilateral symmetry and is provided with conveyer belt 3, described conveyer belt 3 front is provided with mechanical jig arm 4, described conveyer belt 3 rear portion is provided with storage sleeper storehouse 5, and be provided with running gear 6 bottom described frame 1, described frame 1 rear portion is also provided with shoveling 7.
Described driver's cabin 2 inside is provided with operating means 8.The operating means of the similar excavator of described operating means, specifically comprises left and right control lever, pilot control switch lever, left and right walking pedal, the parts such as left and right walking action bars.
Described conveyer belt 3 is inclined in frame 1, and is placed on the edge in storage sleeper storehouse 5 away from one end of mechanical jig arm 4.
Described mechanical jig arm 4 bottom is provided with mechanical jig arm hydraulic lifting arm 9, and mechanical jig arm hydraulic lifting arm 9 is fixed away from one end of mechanical jig arm 4 and frame 1.
Described mechanical jig arm 4 is connected by hydraulic transmission 13 with between mechanical jig arm hydraulic lifting arm 9 and frame 1.Hydraulic transmission is by hydraulic motor, brake, reductor, valve group, and gear end structure forms, and is modular designs, is transferred to gear-box and plays increase moment of torsion, the effect underspeeded, realize the requirement of low-speed big by hydraulic motor.
Described mechanical jig arm 4 front portion is mechanical forearm 10, and mechanical forearm 10 front end is provided with mechanical tong 11, and is provided with mechanical forearm hydraulically extensible bar 12 between mechanical jig arm 4 with mechanical forearm 10 and is connected.
Described shoveling 7 top is connected with frame 1 by shoveling raise-lower hydraulic bar 14, and shoveling 7 bottom is provided with pivot point 15.Supported by pivot point 15 pairs of shovelings 7.
As Fig. 1, shown in Fig. 2, operating principle of the present utility model is: in use, before the dismounting equipment of shield structure sleeper can be driven into the shield structure sleeper needing to remove by the running gear 6 of this equipment, then manipulation operation device 8, start conveyer belt 3, conveyer belt 3 brings into operation, then mechanical jig arm 4 is manipulated, mechanical jig arm hydraulic lifting arm 9 can be manipulated mechanical jig arm 4 is moved up and down, hydraulic transmission 13 can be manipulated mechanical jig arm 4 is rotated freely simultaneously, also can manipulate mechanical forearm hydraulically extensible bar 12 simultaneously, freely can move up and down the mechanical forearm 1 of mechanical jig arm 4 forward part, the mechanical tong 11 that simultaneously can manipulate mechanical forearm 10 front end loosens and firmly grasps.Movable mechanical jig arm 4, mechanical tong 11 is moved on the shield structure sleeper of needs dismounting, then manipulate mechanical tong 11 and firmly grasped shield structure sleeper, then mechanically moving jig arm 4, put it to conveyer belt 3, shield structure sleeper is transported in storage sleeper storehouse 5 by conveyer belt 3.Move shoveling 7 simultaneously, sleeper roadbed can be bulldozed whole, for follow-up work is prepared.

Claims (7)

1. remove equipment for the railway sleeper in run-of-river power station construction for one kind, it is characterized in that: comprise frame (1) and be arranged on the anterior driver's cabin (2) of frame (1), described frame (1) is positioned at driver's cabin (2) bilateral symmetry and is provided with conveyer belt (3), described conveyer belt (3) front is provided with mechanical jig arm (4), described conveyer belt (3) rear portion is provided with storage sleeper storehouse (5), described frame (1) bottom is provided with running gear (6), and described frame (1) rear portion is also provided with shoveling (7).
2. according to claim 1 a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, it is characterized in that: described driver's cabin (2) inside is provided with operating means (8).
3. according to claim 1 a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, it is characterized in that: described conveyer belt (3) is inclined in frame (1), and be placed on the edge of storage sleeper storehouse (5) away from one end of mechanical jig arm (4).
4. according to claim 1 a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, it is characterized in that: described mechanical jig arm (4) bottom is provided with mechanical jig arm hydraulic lifting arm (9), and mechanical jig arm hydraulic lifting arm (9) is fixed away from one end of mechanical jig arm (4) and frame (1).
5. according to claim 1 a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, it is characterized in that: described mechanical jig arm (4) is connected by hydraulic transmission (13) with between mechanical jig arm hydraulic lifting arm (9) and frame (1).
6. according to claim 1 a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, it is characterized in that: described mechanical jig arm (4) front portion is mechanical forearm (10), mechanical forearm (10) front end is provided with mechanical tong (11), and is provided with mechanical forearm hydraulically extensible bar (12) between mechanical jig arm (4) with mechanical forearm (10) and is connected.
7. according to claim 1 a kind of for the railway sleeper dismounting equipment in run-of-river power station construction, it is characterized in that: described shoveling (7) top is connected with frame (1) by shoveling raise-lower hydraulic bar (14), and shoveling (7) bottom is provided with pivot point (15).
CN201520107417.8U 2015-02-13 2015-02-13 Track sleeper dismantling equipment for construction of water diversion type hydropower station Active CN204509885U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520107417.8U CN204509885U (en) 2015-02-13 2015-02-13 Track sleeper dismantling equipment for construction of water diversion type hydropower station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520107417.8U CN204509885U (en) 2015-02-13 2015-02-13 Track sleeper dismantling equipment for construction of water diversion type hydropower station

Publications (1)

Publication Number Publication Date
CN204509885U true CN204509885U (en) 2015-07-29

Family

ID=53707879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520107417.8U Active CN204509885U (en) 2015-02-13 2015-02-13 Track sleeper dismantling equipment for construction of water diversion type hydropower station

Country Status (1)

Country Link
CN (1) CN204509885U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109940747A (en) * 2019-04-28 2019-06-28 中铁二局第一工程有限公司 A kind of railway tunnel ditch cable trench self-propelled hydraulic dabbing machine
CN112411276A (en) * 2020-11-11 2021-02-26 中铁北京工程局集团第二工程有限公司 Track laying device and method for large-scale track traffic engineering construction
GB2608636A (en) * 2021-07-08 2023-01-11 Txm Plant Ltd Railway-works support apparatus

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109940747A (en) * 2019-04-28 2019-06-28 中铁二局第一工程有限公司 A kind of railway tunnel ditch cable trench self-propelled hydraulic dabbing machine
CN112411276A (en) * 2020-11-11 2021-02-26 中铁北京工程局集团第二工程有限公司 Track laying device and method for large-scale track traffic engineering construction
CN112411276B (en) * 2020-11-11 2021-08-31 中铁北京工程局集团第二工程有限公司 Track laying device and method for large-scale track traffic engineering construction
GB2608636A (en) * 2021-07-08 2023-01-11 Txm Plant Ltd Railway-works support apparatus

Similar Documents

Publication Publication Date Title
CN102116164B (en) Temporary supporting device for roadway drifting
CN204982633U (en) Can cooperate tunnel invert face to go out single track railway crawler -type landing stage of cause of a quarrel
CN102410017B (en) Supporting type integrated tunneling-anchoring machine
CN204291922U (en) A kind of construction of the highway tree digging device
CN204509885U (en) Track sleeper dismantling equipment for construction of water diversion type hydropower station
CN103953082A (en) Multifunctional special mechanical engineering working vehicle
CN202391424U (en) Supporting type comprehensive bolter miner
CN105386769A (en) Multifunctional tunnel repairing machine
CN205990920U (en) A kind of tunnel inverted arch self-propelled trestle
CN201915980U (en) Mine temporary support device for roadway excavation
CN103075153B (en) Drilling type coal mining machine for open air
CN204299617U (en) One is anti-breaks type gob side entry retaining filling air bag
CN208441848U (en) Freezing Method for Cross-passage Construction class rectangle push-bench
CN102587951B (en) Hydraulic U-type steel bracket supporting machine
CN203905071U (en) Multifunctional special mechanical engineering operating vehicle
CN203925511U (en) With the overhead trolley of multi-functional driving platform
CN108691553A (en) A kind of Freezing Method for Cross-passage Construction class rectangle push-bench
CN103121626B (en) Mining power-driven monorail crane
CN208702443U (en) A kind of hydraulic-driven crawler type digging laneway suspension device
CN202989972U (en) Underground relief trolley
CN101434347A (en) Continuous track raking loader
CN201896617U (en) Coal charging machinery used on blasting driving face of coal mine
CN204532119U (en) A kind of drill boom device of two-arm hydraulic anchor rod drill carriage
CN205036391U (en) Impulse type hydraulic support machine of taking one's place
CN204344162U (en) A kind of crawler-type traveling filling machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant