CN103243720A - 软土地基超深基坑支护方法 - Google Patents

软土地基超深基坑支护方法 Download PDF

Info

Publication number
CN103243720A
CN103243720A CN2013101872648A CN201310187264A CN103243720A CN 103243720 A CN103243720 A CN 103243720A CN 2013101872648 A CN2013101872648 A CN 2013101872648A CN 201310187264 A CN201310187264 A CN 201310187264A CN 103243720 A CN103243720 A CN 103243720A
Authority
CN
China
Prior art keywords
soft foundation
foundation
layer
earthwork
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101872648A
Other languages
English (en)
Inventor
申培利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN2013101872648A priority Critical patent/CN103243720A/zh
Publication of CN103243720A publication Critical patent/CN103243720A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

本发明涉及一种软土地基超深基坑支护方法,其方法步骤为:⑴、软土地基的止水帷幕施工;⑵、软土地基的支护桩施工;⑶、软土地基的开挖土方;⑷、软土地基帽梁施工;⑸、开挖软土地基的第一层土方;⑹、软土地基第一道水平支撑施工;⑺、开挖软土地基的第二层土方;⑻、软土地基第二道水平支撑施工;⑼、开挖软土地基的第三层土方;⑽、软土地基第三道水平支撑施工;⑾、开挖软土地基的第四层土方;⑿、在开挖完软土地基第四层土方的土层上安装钢筋,然后支模进行混凝土浇筑形成加厚的配筋混凝土垫层,该加厚的配筋混凝土垫层作为最后一层水平支撑,软土地基超深基坑支护完毕。本发明操作简单,有效降低工程造价,缩短了施工工期,安全性好。

Description

软土地基超深基坑支护方法
技术领域
本发明属于软土地基领域,尤其是一种软土地基超深基坑支护方法。
背景技术
随着城市化的发展,人口膨胀、住房困难、用地紧张等问题日益突出,为满足日益增长的市民出行、轨道交通换乘、商业、停车等功能的需要,在用地愈发紧张的密集城市中心,结合城市建设和改造开发地下停车库、地下街道、地下商场、地下变电站、地下仓库、地下民防工事以及多种地下民用和工业设施等。地下空间开发规模越来越大,基坑深度也越来越深,这些深大基坑通常都位于密集城市中心,常常紧邻建筑物、交通干道、地铁隧道及各种地下管线等,施工场地紧张、施工条件复杂、工期紧迫。所有这些导致基坑工程的支护设计和施工的难度越来越大,重大恶性基坑事故不断发生,工程建设的安全生产形势越来越严峻。目前深基坑中的电梯井、集水坑等坑中坑属于超深基坑,该超深基坑的支护安全性差、工程造价较高、施工工期较长。
发明内容
本发明的目的在于克服现有技术的不足,提供一种软土地基超深基坑支护方法,该方法操作简单,有效降低工程造价,缩短了施工工期,安全性好。
本发明解决其技术问题是通过以下技术方案实现的:
一种软土地基超深基坑支护方法,其方法的步骤为:
⑴、软土地基的止水帷幕施工;
⑵、软土地基的支护桩施工;
⑶、软土地基的开挖土方;
⑷、软土地基帽梁施工;
⑸、开挖软土地基的第一层土方;
⑹、软土地基第一道水平支撑施工;
⑺、开挖软土地基的第二层土方;
⑻、软土地基第二道水平支撑施工;
⑼、开挖软土地基的第三层土方;
⑽、软土地基第三道水平支撑施工;
⑾、开挖软土地基的第四层土方;
⑿、在开挖完软土地基第四层土方的土层上安装钢筋,然后支模进行混凝土浇筑形成加厚的配筋混凝土垫层,该加厚的配筋混凝土垫层作为最后一层水平支撑,软土地基超深基坑支护完毕。
本发明的优点和有益效果为:
本软土地基超深基坑支护方法的最后一层水平支撑主要采用在开挖完软土地基第四层土方的土层上制作钢筋层,然后支模进行混凝土浇筑形成加厚的配筋混凝土垫层,该加厚的配筋混凝土垫层作为最后一层水平支撑,软土地基超深基坑支护完毕,省去了制作第四道水平支撑步骤,利用开挖完第四层土方的土层上面加厚其垫层的方式,做到既能当水平支撑又能当垫层,本发明操作简单,有效降低工程造价,缩短了施工工期,安全性好。
附图说明
图1为本发明的软土地基示意图。
具体实施方式
下面通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种软土地基超深基坑支护方法,其方法的步骤为:⑴、软土地基的止水帷幕1施工;⑵、软土地基的支护桩3施工;⑶、软土地基的开挖土方;⑷、软土地基帽梁2施工;⑸、开挖软土地基的第一层土方8;⑹、软土地基第一道水平支撑4施工;⑺、开挖软土地基的第二层土方9;⑻、软土地基第二道水平支撑5施工;⑼、开挖软土地基的第三层土方10;⑽、软土地基第三道水平支撑6施工;⑾、开挖软土地基的第四层土方11;⑿、在开挖完软土地基第四层土方的土层上制作钢筋层,然后支模进行混凝土浇筑形成加厚的配筋混凝土垫层7,该加厚的配筋混凝土垫层作为最后一层水平支撑,软土地基超深基坑支护完毕,在局部深坑12挖土方进行后续施工。
本发明在软土地基超深基坑施工中,基坑面积约为19000㎡,加厚配筋垫层的面积为4219㎡,省去第四道水平支撑,工程造价大约节省了256万元,增加垫层厚度的钢筋混凝土造价为63.3万元,总计节省192.7万元,工艺中都节省了钢筋量、支模量、砼量,大约节省了60天时间。

Claims (1)

1.一种软土地基超深基坑支护方法,其特征在于:该方法的步骤为:
⑴、软土地基的止水帷幕施工;
⑵、软土地基的支护桩施工;
⑶、软土地基的开挖土方;
⑷、软土地基帽梁施工;
⑸、开挖软土地基的第一层土方;
⑹、软土地基第一道水平支撑施工;
⑺、开挖软土地基的第二层土方;
⑻、软土地基第二道水平支撑施工;
⑼、开挖软土地基的第三层土方;
⑽、软土地基第三道水平支撑施工;
⑾、开挖软土地基的第四层土方;
⑿、在开挖完软土地基第四层土方的土层上安装钢筋,然后支模进行混凝土浇筑形成加厚的配筋混凝土垫层,该加厚的配筋混凝土垫层作为最后一层水平支撑,软土地基超深基坑支护完毕。
CN2013101872648A 2013-05-20 2013-05-20 软土地基超深基坑支护方法 Pending CN103243720A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101872648A CN103243720A (zh) 2013-05-20 2013-05-20 软土地基超深基坑支护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101872648A CN103243720A (zh) 2013-05-20 2013-05-20 软土地基超深基坑支护方法

Publications (1)

Publication Number Publication Date
CN103243720A true CN103243720A (zh) 2013-08-14

Family

ID=48923572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101872648A Pending CN103243720A (zh) 2013-05-20 2013-05-20 软土地基超深基坑支护方法

Country Status (1)

Country Link
CN (1) CN103243720A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469798A (zh) * 2013-08-28 2013-12-25 中国建筑第七工程局有限公司 一种基坑支护结构及其施工方法
CN105089060A (zh) * 2015-08-05 2015-11-25 上海金同济土木技术工程有限公司 利用大气压强作为支撑力的基坑支护系统
CN106592600A (zh) * 2016-12-05 2017-04-26 中建六局土木工程有限公司 紧邻运行地铁复杂环境预警支护体系施工方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5595459A (en) * 1995-10-02 1997-01-21 Lomonaco; Stenis Cofferdam for 4', 8' and 12' diameter tanks
JPH10114956A (ja) * 1996-10-09 1998-05-06 Maeda Corp 地下水によるボイリング対策工法
CN101328713A (zh) * 2008-07-18 2008-12-24 华丰建设股份有限公司 圆形深基坑支护的施工方法
CN102322063A (zh) * 2011-06-28 2012-01-18 天津住宅集团建设工程总承包有限公司 一种深基坑二次开挖及支护施工方法
CN102425172A (zh) * 2011-12-05 2012-04-25 中冶天工集团有限公司 紧邻高层建筑开挖深基坑的支护方法
CN102425173A (zh) * 2011-12-07 2012-04-25 中冶天工集团有限公司 深基坑土方开挖方法
CN102691300A (zh) * 2012-04-18 2012-09-26 浙江省建工集团有限责任公司 基坑土方的施工方法
CN202689005U (zh) * 2012-04-19 2013-01-23 苏州工业园区设计研究院股份有限公司 边框架半逆作深基坑支护结构
CN202745062U (zh) * 2012-08-13 2013-02-20 上海市政工程设计研究总院(集团)有限公司 一种紧邻已建地下结构的基坑支撑结构

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5595459A (en) * 1995-10-02 1997-01-21 Lomonaco; Stenis Cofferdam for 4', 8' and 12' diameter tanks
JPH10114956A (ja) * 1996-10-09 1998-05-06 Maeda Corp 地下水によるボイリング対策工法
CN101328713A (zh) * 2008-07-18 2008-12-24 华丰建设股份有限公司 圆形深基坑支护的施工方法
CN102322063A (zh) * 2011-06-28 2012-01-18 天津住宅集团建设工程总承包有限公司 一种深基坑二次开挖及支护施工方法
CN102425172A (zh) * 2011-12-05 2012-04-25 中冶天工集团有限公司 紧邻高层建筑开挖深基坑的支护方法
CN102425173A (zh) * 2011-12-07 2012-04-25 中冶天工集团有限公司 深基坑土方开挖方法
CN102691300A (zh) * 2012-04-18 2012-09-26 浙江省建工集团有限责任公司 基坑土方的施工方法
CN202689005U (zh) * 2012-04-19 2013-01-23 苏州工业园区设计研究院股份有限公司 边框架半逆作深基坑支护结构
CN202745062U (zh) * 2012-08-13 2013-02-20 上海市政工程设计研究总院(集团)有限公司 一种紧邻已建地下结构的基坑支撑结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曾成: ""深基坑工程施工过程中围护体出现异常变形的应对措施"", 《建设监理》, 20 April 2010 (2010-04-20) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469798A (zh) * 2013-08-28 2013-12-25 中国建筑第七工程局有限公司 一种基坑支护结构及其施工方法
CN103469798B (zh) * 2013-08-28 2016-01-20 中国建筑第七工程局有限公司 一种基坑支护结构及其施工方法
CN105089060A (zh) * 2015-08-05 2015-11-25 上海金同济土木技术工程有限公司 利用大气压强作为支撑力的基坑支护系统
CN106592600A (zh) * 2016-12-05 2017-04-26 中建六局土木工程有限公司 紧邻运行地铁复杂环境预警支护体系施工方法

Similar Documents

Publication Publication Date Title
CN109723085B (zh) 一种深基坑分坑施工肋墙换撑结构及其施工方法
CN205776249U (zh) 一种组合型内支撑结构
CN101914925A (zh) 利用优化复合预制拱墙作外墙的地下室
CN104652443B (zh) 深基坑临时水平支撑兼作永久结构梁的施工方法
CN101418569B (zh) 预制拱片、支护与主体结构结合的优化复合拱墙
CN104074524B (zh) 一种浅埋下穿高速公路大断面隧道的施工方法
CN102127974A (zh) 既有建筑下方新增地下室的设计和施工方法
CN102943479A (zh) 分区卸荷控制深大基坑变形的系统及方法
CN204418187U (zh) 地铁保护区域土钉墙结合双排桩深基坑复合支护结构
CN206512723U (zh) 一种多层水平连梁双排桩及地下管廊整体式结构
CN204098043U (zh) 留土后开挖结合内支撑双排桩支护结构
CN104343131A (zh) 一种半预制半现浇地下连续墙体及施工工艺
CN103410152B (zh) 一种用于狭长深基坑土方开挖的施工方法
CN205875209U (zh) 临时路面系统与混凝土支撑合设的地铁车站半幅铺盖结构
CN105089670A (zh) 一种在并行区间盾构隧道基础上扩挖地铁车站施工方法
CN104652444A (zh) 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法
CN103243720A (zh) 软土地基超深基坑支护方法
CN104131566A (zh) 一种地下室无水平支撑基坑的施工方法
CN206128077U (zh) 一种深基坑支护的内支撑结构
CN205475257U (zh) 一种用于加深开挖的复合桩锚支护结构
CN201687480U (zh) 立井通过厚软弱土层整体顶移钢护筒
CN109024609A (zh) 一种基于老旧排桩的基坑支护结构及其施工方法
CN202787001U (zh) 一种城市道路地下通道施工处理结构
CN208815566U (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造
CN102116036A (zh) 联合逆作法和跳仓法技术对道路地下大型建筑物进行施工的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814