CN104131566A - 一种地下室无水平支撑基坑的施工方法 - Google Patents
一种地下室无水平支撑基坑的施工方法 Download PDFInfo
- Publication number
- CN104131566A CN104131566A CN201410227624.7A CN201410227624A CN104131566A CN 104131566 A CN104131566 A CN 104131566A CN 201410227624 A CN201410227624 A CN 201410227624A CN 104131566 A CN104131566 A CN 104131566A
- Authority
- CN
- China
- Prior art keywords
- cement mixing
- basement
- mixing pile
- foundation pit
- foundation ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种地下室无水平支撑基坑的施工方法。该方法采用二级基坑支护法进行施工;第一级是先沿地下室外缘施工一圈闭合的水泥搅拌桩,利用水泥搅拌桩在地下室外缘形成闭合的止水帷幕;然后在闭合的止水帷幕内通过降水井降低地下水位,进行第一阶段土方开挖,并同时完成预制管柱的施工;第二级是采用SMW工法完成基坑的二级支护和止水帷幕,通过降水井降水后,然后再进行以下土方的开挖。本发明在满足基坑支护安全的前提下,取消了基坑水平内支撑,可节约施工成本和加快施工进度。
Description
技术领域
本发明涉及一种地下室无水平支撑基坑的施工方法,属于土建施工技术领域。
背景技术
随着我国建筑业的不断发展,各类建筑型式不断涌现,超大基坑工程越来越多,常规工程地下室正作法施工中,在基坑原始地面进行桩基的施工,再进行基坑支护施工、土方开挖。这种作法造成较大浪费,不满足目前国家节能减排的思路。
发明内容
本发明的目的在于,提供一种地下室无水平支撑基坑的施工方法,在满足基坑支护安全的前提下,取消基坑水平内支撑,以节约施工成本和加快施工进度,从而克服现有技术的不足。
本发明的技术方案是这样实现的:
本发明的一种地下室无水平支撑基坑的施工方法为,该方法采用二级基坑支护法进行施工;第一级是先沿地下室外缘施工一圈闭合的水泥搅拌桩,利用水泥搅拌桩在地下室外缘形成闭合的止水帷幕;然后在闭合的止水帷幕内通过降水井降低地下水位,进行第一阶段土方开挖,并同时完成预制管柱的施工;第二级是采用SMW工法完成基坑的二级支护和止水帷幕,然后再进行以下土方的开挖。
前述方法中,所述水泥搅拌桩的深度深至地面以下的中砂层中部,水泥搅拌桩顶部内侧通过向下倾斜25度,长度1.2米的锚管与基坑锚固;水泥搅拌桩顶部内侧采用C20混凝土喷射护面将锚管端部封闭;水泥搅拌桩顶部外侧设有施工道路,施工道路与水泥搅拌桩之间设有排水沟。
前述方法中,所述第一阶段土方开挖深度挖至杂填土层以下的粉砂层;第一阶段土方开挖的底部边缘设有排水沟。
前述方法中,所述二级支护采用三轴水泥搅拌桩,三轴水泥搅拌桩的深度深至地面以下的砾砂层,并在三轴水泥搅拌桩内插入H型钢,形成二级止水帷幕和二级支护结构;三轴水泥搅拌桩内侧通过向下倾斜30度,长度1.3米的锚杆与基坑锚固;三轴水泥搅拌桩顶部通过钢筋砼冠梁将锚杆端部封闭。
前述方法中,所述以下土方的开挖深度挖至粉砂层以下的中砂层;土方开挖的底部边缘设有排水沟。
由于采用了上述技术方案,本发明与现有技术相比,本发明在设计初期,考虑地下室水位较高,基坑采用无水平支撑体系的二级基坑支护。本发明的优势在于,取消基坑水平内支撑,可以加快施工进度。基坑支护施工过程中,可同时插入预桩基施工。在第一级基坑支护完成和第一级降水完全形成后,可同时插入第一阶段土方开挖,接着再进行桩基施工,可以节省切割预制管柱长度或节省冲(钻)孔灌注桩深度,节约成本。待第一阶段土方开挖完、桩基施工完后,接着再进行第二级基坑支护、基坑降水、第二阶段土方开挖及地下室结构施工,可加快施工进度。
附图说明
图1是本发明的施工方法示意图。
图中的标记为:1-杂土填层,2-粉砂层,3-中砂层,4-砾砂层,5-单轴水泥搅拌桩,6-锚管,7-C20混凝土喷射护面,8-H型钢桩,9-三轴水泥搅拌桩,10-道路,11-排水沟,12-锚杆,13-钢筋混凝土冠梁。
具体实施方式
下面结合附图和实施例对本发明作进一步的详细说明,但不作为对本发明的任何限制。
本发明的一种地下室无水平支撑基坑的施工方法为,该方法采用二级基坑支护法进行施工;第一级是先沿地下室外缘施工一圈闭合的水泥搅拌桩1,利用水泥搅拌桩在地下室外缘形成闭合的止水帷幕;然后在闭合的止水帷幕内通过降水井降低地下水位,进行第一阶段土方开挖,并同时完成预制管柱的施工;第二级是采用SMW工法完成基坑的二级支护2和降水,然后再进行以下土方的开挖。水泥搅拌桩的深度深至地面以下的中砂层中部,水泥搅拌桩顶部内侧通过向下倾斜25度,长度1.2米的锚管与基坑锚固;水泥搅拌桩顶部内侧采用C20混凝土喷射护面将锚管端部封闭;水泥搅拌桩顶部外侧设有施工道路,施工道路与水泥搅拌桩之间设有排水沟。第一阶段土方开挖深度挖至杂填土层以下的粉砂层;第一阶段土方开挖的底部边缘设有排水沟。二级支护采用三轴水泥搅拌桩,三轴水泥搅拌桩的深度深至地面以下的砾砂层,并在三轴水泥搅拌桩内插入H型钢,形成二级止水帷幕和二级支护结构;三轴水泥搅拌桩内侧通过向下倾斜30度,长度1.3米的锚杆与基坑锚固;三轴水泥搅拌桩顶部通过钢筋砼冠梁将锚杆端部封闭。所述以下土方的开挖深度挖至粉砂层以下的中砂层;土方开挖的底部边缘设有排水沟。
实施例
如图1所示,图中标号1-4是地面以下土层的标号,1为杂土填层,2为粉砂层,3为中砂层,4为砾砂层。本例适用于地下室两层及两层以内的超大基坑大开挖施工的工程。施工方式是采用二级基坑支护施工技术。
第一级按以下步骤施工:
1、先采用单轴水泥搅拌桩5沿地下室外缘施工一圈水泥搅拌桩形成闭合的止水帷幕;水泥搅拌桩的深度深至地面以下的中砂层2中部;
2、水泥搅拌桩顶部内侧通过向下倾斜25度,长度1.2米的锚管6与基坑侧壁锚固;水泥搅拌桩顶部内侧采用C20混凝土喷射护面7将锚管端部封闭;
3、第一级降水井施工;
4、基坑内第一级降水,水位降低设计要求,进行第一阶段土方开挖,同时也进行桩基施工。
第二级按以下步骤施工:
1、二级支护采用HN700×300×13×24型钢桩,止水帷幕采用三轴水泥搅拌桩9,兼作H型钢桩8插入桩孔,桩径为??850×600mm;
2、三轴水泥搅拌桩施工步骤主要为:搅拌桩机就位→边搅拌边喷浆下沉→复搅提升→插入H型钢桩;
3、扩孔式预应力土层锚杆施工;扩孔锚杆的施工顺序主要为:锚杆制作→放样、定位→自由段钻孔→锚固段扩孔注浆→安放锚杆→二次注浆→养护→张拉锁定;
4、扩孔式预应力土层锚杆有效孔径不少于??350mm,锚杆12的拉杆采用?? 25精轧螺纹钢,σ
s
=830N/mm
2
;
5、二级支护桩的钢筋混凝土冠梁13施工;
6、第二级降水井施工及降水;
7、地下室第二阶段土方开挖;
8、地下室结构施工。
最后施工如图1所示的道路10和排水沟11。
Claims (5)
1. 一种地下室无水平支撑基坑的施工方法,其特征在于:该方法采用二级基坑支护法进行施工;第一级是先沿地下室外缘施工一圈闭合的水泥搅拌桩,利用水泥搅拌桩在地下室外缘形成闭合的止水帷幕;然后在闭合的止水帷幕内通过降水井降低地下水位,进行第一阶段土方开挖,并同时完成预制管柱的施工;第二级是采用SMW工法完成基坑的二级支护和止水帷幕,然后再进行以下土方的开挖。
2.根据权利要求1所述地下室无水平支撑基坑的施工方法,其特征在于:所述水泥搅拌桩的深度深至地面以下的中砂层中部,水泥搅拌桩顶部内侧通过向下倾斜25度,长度1.2米的锚管与基坑锚固;水泥搅拌桩顶部内侧采用C20混凝土喷射护面将锚管端部封闭;水泥搅拌桩顶部外侧设有施工道路,施工道路与水泥搅拌桩之间设有排水沟。
3.根据权利要求1所述地下室无水平支撑基坑的施工方法,其特征在于:所述第一阶段土方开挖深度挖至杂填土层以下的粉砂层;第一阶段土方开挖的底部边缘设有排水沟。
4.根据权利要求1所述地下室无水平支撑基坑的施工方法,其特征在于:所述二级支护采用三轴水泥搅拌桩,三轴水泥搅拌桩的深度深至地面以下的砾砂层,并在三轴水泥搅拌桩内插入H型钢,形成二级止水帷幕和二级支护结构;三轴水泥搅拌桩内侧通过向下倾斜30度,长度1.3米的锚杆与基坑锚固;三轴水泥搅拌桩顶部通过钢筋砼冠梁将锚杆端部封闭。
5.根据权利要求1所述地下室无水平支撑基坑的施工方法,其特征在于:所述以下土方的开挖深度挖至粉砂层以下的中砂层;土方开挖的底部边缘设有排水沟。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410227624.7A CN104131566B (zh) | 2014-05-27 | 2014-05-27 | 一种地下室无水平支撑基坑的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410227624.7A CN104131566B (zh) | 2014-05-27 | 2014-05-27 | 一种地下室无水平支撑基坑的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104131566A true CN104131566A (zh) | 2014-11-05 |
CN104131566B CN104131566B (zh) | 2016-08-24 |
Family
ID=51804405
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410227624.7A Active CN104131566B (zh) | 2014-05-27 | 2014-05-27 | 一种地下室无水平支撑基坑的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104131566B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695446A (zh) * | 2015-03-13 | 2015-06-10 | 朱奎 | 地下室支护施工方法 |
CN104831737A (zh) * | 2015-04-29 | 2015-08-12 | 孔志坚 | 地铁车站地下室支护施工方法 |
CN104947686A (zh) * | 2015-06-11 | 2015-09-30 | 叶长青 | 软土地区地下室支护结构 |
CN106400810A (zh) * | 2015-12-29 | 2017-02-15 | 上海建工五建集团有限公司 | 基坑支护结构及其施工方法 |
CN110747861A (zh) * | 2019-10-30 | 2020-02-04 | 中国建筑第四工程局有限公司 | 一种高水位深基坑开挖施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101270579A (zh) * | 2007-03-19 | 2008-09-24 | 上海市第一建筑有限公司 | 深基坑向浅基坑的扩展施工的基坑围护方法 |
CN101892667A (zh) * | 2010-07-23 | 2010-11-24 | 中国建筑第二工程局有限公司 | 基坑支护装置及施工方法 |
CN102108708A (zh) * | 2010-12-16 | 2011-06-29 | 张继红 | 一种复合锚杆基坑围护结构及其施工方法、所用的水泥土开槽器 |
CN203256751U (zh) * | 2013-05-22 | 2013-10-30 | 中国建筑第八工程局有限公司 | 软土地基深基坑支护结构 |
CN103603357A (zh) * | 2013-10-12 | 2014-02-26 | 姚攀峰 | 一种多平台无内支撑自防水基坑围护结构及其施工方法 |
-
2014
- 2014-05-27 CN CN201410227624.7A patent/CN104131566B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101270579A (zh) * | 2007-03-19 | 2008-09-24 | 上海市第一建筑有限公司 | 深基坑向浅基坑的扩展施工的基坑围护方法 |
CN101892667A (zh) * | 2010-07-23 | 2010-11-24 | 中国建筑第二工程局有限公司 | 基坑支护装置及施工方法 |
CN102108708A (zh) * | 2010-12-16 | 2011-06-29 | 张继红 | 一种复合锚杆基坑围护结构及其施工方法、所用的水泥土开槽器 |
CN203256751U (zh) * | 2013-05-22 | 2013-10-30 | 中国建筑第八工程局有限公司 | 软土地基深基坑支护结构 |
CN103603357A (zh) * | 2013-10-12 | 2014-02-26 | 姚攀峰 | 一种多平台无内支撑自防水基坑围护结构及其施工方法 |
Non-Patent Citations (1)
Title |
---|
黄伟达: ""SMW工法及扩孔锚杆在深大基坑中的工程实践"", 《岩土工程学报》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695446A (zh) * | 2015-03-13 | 2015-06-10 | 朱奎 | 地下室支护施工方法 |
CN104695446B (zh) * | 2015-03-13 | 2016-08-24 | 朱奎 | 地下室支护施工方法 |
CN104831737A (zh) * | 2015-04-29 | 2015-08-12 | 孔志坚 | 地铁车站地下室支护施工方法 |
CN105926671A (zh) * | 2015-04-29 | 2016-09-07 | 孔志坚 | 地铁车站的地下室支护施工技术 |
CN105926670A (zh) * | 2015-04-29 | 2016-09-07 | 孔志坚 | 地铁车站的地下室施工方法 |
CN105926671B (zh) * | 2015-04-29 | 2018-02-27 | 孔志坚 | 地铁车站的地下室支护施工技术 |
CN105926670B (zh) * | 2015-04-29 | 2018-03-02 | 孔志坚 | 地铁车站的地下室施工方法 |
CN104947686A (zh) * | 2015-06-11 | 2015-09-30 | 叶长青 | 软土地区地下室支护结构 |
CN106400810A (zh) * | 2015-12-29 | 2017-02-15 | 上海建工五建集团有限公司 | 基坑支护结构及其施工方法 |
CN110747861A (zh) * | 2019-10-30 | 2020-02-04 | 中国建筑第四工程局有限公司 | 一种高水位深基坑开挖施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104131566B (zh) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108868778B (zh) | 一种大型地下结构非开挖修建方法 | |
CN202969392U (zh) | 复杂地质深基坑联合支护 | |
CN110905530B (zh) | 穿越断层破碎带的富水软岩隧道稳定性控制施工方法 | |
CN106013053B (zh) | 一种用于建造地下车库沉井的钢板桩支护施工方法 | |
CN105201516B (zh) | 一种地铁车站主体结构及其四联拱pba暗挖施工方法 | |
CN111502696A (zh) | 暗挖隧道的密网式超前支护系统及施工方法 | |
CN105064397A (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的明挖施工方法 | |
CN105804119A (zh) | 一桩二用地下廊道结构及其施工方法 | |
CN110566223B (zh) | 一种深埋pba地铁车站断面设计方法 | |
CN105804089A (zh) | 一种原深基坑施工后局部增深支护体系及其施工方法 | |
CN112160755B (zh) | 一种先行施工盾构隧道后扩挖车站的地铁线路施工方法 | |
CN104131566B (zh) | 一种地下室无水平支撑基坑的施工方法 | |
CN112663625A (zh) | 一种高寒区浅埋偏压软弱围岩隧道洞口施工及防护方法 | |
CN103452120B (zh) | 一种用于基坑支护的高强预应力管桩的桩顶冠梁结构及其施工方法 | |
CN111734425A (zh) | 一种下穿机场航站楼的暗挖隧道的施工方法 | |
CN211500658U (zh) | 一种适用于砂土地基的浅埋近接隧道支护结构 | |
CN102330436B (zh) | 一种用于半岩土层超深圆形旋流池的组合支护结构及方法 | |
CN105442605A (zh) | 拔出phc桩再利用于深基坑支护施工方法 | |
CN113236259A (zh) | 一种团结隧道开挖及支护专项施工工艺 | |
CN106930768A (zh) | 隧洞施工方法及应用 | |
CN110080779A (zh) | 隧道隧底溶洞处理施工方法 | |
CN110117959B (zh) | 一种临近江河基坑支护施工方法 | |
CN110259456B (zh) | 一种隧道施工用的溶洞处理方法 | |
CN108374674A (zh) | 六导洞十二步地下空间开挖支护方法 | |
CN101793032A (zh) | 一种小场地深基坑施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |