CN101793032A CN 201010151849 CN201010151849A CN101793032A CN 101793032 A CN101793032 A CN 101793032A CN 201010151849 CN201010151849 CN 201010151849 CN 201010151849 A CN201010151849 A CN 201010151849A CN 101793032 A CN101793032 A CN 101793032A
Authority
CN
China
Prior art keywords
construction
pile
earthwork
foundation ditch
waist rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010151849
Other languages
English (en)
Inventor
邵辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010151849 priority Critical patent/CN101793032A/zh
Publication of CN101793032A publication Critical patent/CN101793032A/zh
Pending legal-status Critical Current

Links

Abstract

一种小场地深基坑施工方法,施工螺旋钻孔桩进行基坑支护,为减少螺旋钻孔桩的长度,自自然地坪以下2-4米范围内使用砖墙支护,砖墙设在螺旋钻孔桩桩顶连梁上,基坑周围留一个出土口,多个挖掘机下到基坑内部进行梯次挖土,施工钻孔桩腰梁施工时要把出土口部位的土方挖掉,待腰梁施工完毕后再恢复出土口处的土方形成出土坡道,最后在基坑中留1-2台挖掘机进行坡道土方收尾,然后用吊车将挖掘机吊出基坑,该方法节约成本,适用于在城区狭小地区进行深基坑施工。

Description

一种小场地深基坑施工方法
技术领域:
本发明涉及一种小场地深基坑施工方法。
背景技术:
在现代都市城区内部进行施工往往会遇到施工场地狭小但是建筑物基坑比较深的情况,同时还可能有地下水,因此在这种情况下传统的放坡开挖是不可能实现的,但是简单的桩支护成本有太高而且不方便配合出土。为了解决这样的问题特提出下面的施工方法。
发明内容:
一种小场地深基坑施工方法,施工螺旋钻孔桩进行基坑支护,为减少螺旋钻孔桩的长度,自自然地坪以下2-4米范围内使用砖墙支护,砖墙设在螺旋钻孔桩桩顶连梁上,基坑周围留一个出土口,多个挖掘机下到基坑内部进行梯次挖土,施工钻孔桩腰梁施工时要把出土口部位的土方挖掉,待腰梁施工完毕后再恢复出土口处的土方形成出土坡道,最后在基坑中留1-2台挖掘机进行坡道土方收尾,然后用吊车将挖掘机吊出基坑,该方法节约成本,适用于在城区狭小地区进行深基坑施工。其具体步骤如下:第一步是根据地质勘查情况确定是否需要对基坑进行降水,如果需要则首先进行降水施工;第二步是进行螺旋钻孔支护桩施工,螺旋钻孔桩的桩顶位于自然地坪以下2-4米,螺旋钻孔桩施工的同时开始基坑土方的开挖,螺旋钻孔桩施工采用跳打,隔一个或两个桩位进行跳打施工;第三步是螺旋钻孔桩施工完毕后,待基坑土方施工至桩顶标高位置后进行桩顶连梁的施工;第四步是桩顶连梁施工完毕后,在其上砌筑挡土砖墙,挡土砖墙在出土口处断开并对出土口处地面及侧面进行水泥锚杆或混凝土锚杆加固及地面硬化施工;第五步是基坑土方开挖至一定深度后,按要求对螺旋钻孔桩进行腰梁和锚固施工;出土坡道为自出土口向基坑土方施工面延伸的运土通道,该部位腰梁施工时,应当先将其部位的土方移走,待腰梁的锚杆张拉完毕后再恢复出土坡道。第六步是利用挖掘机配合塔吊对出土坡道的土方进行收尾处理。降水施工采用井点降水施工,降水井深度超过基坑深度10米以上。为减少回填土施工,桩边距建筑物外皮为50厘米。
具体实施方式
根据现场情况确定基坑出土口的位置。根据地质勘查情况,确定是否先进行基坑降水施工,然后进行螺凝钻孔支护桩的施工,确定桩径,以及桩身混凝土强度和桩的钢筋配置,在施工螺旋钻孔桩的同时也进行基坑开挖。为了节省成本,根据地质情况在基坑自自然地坪以下2-4米范围内利用砖墙进行挡土,这样不仅可以减少桩身长度还可以加快施工速度。当挡土墙施工完毕后进行进一步的基坑土方开挖,基坑开挖时采用多个挖掘机梯次配置逐级倒土,最后留置一台或两台挖掘机将最后出土坡道的土方挖出并利用塔吊将土导出基坑,土方完成后利用吊车将挖掘机吊出基坑。利用桩顶连梁和腰梁对基坑支护桩进行拉接。
例如基坑深度为自自然地坪以下20米,基坑长度80米,宽度40米。首先进行基坑降水施工,降水井深度不小于30米,间距不大于5米。桩身设计长度为20米,桩径600毫米,桩心间距1.5米,桩身的施工深度为自自然地坪向下4米开始至基坑坑底向下4米,桩的嵌固深度为4米,施工过程中采用跳打桩,可以跳一个或两个桩进行施工。螺旋钻孔桩施工完毕后,土方施工已经将所有的桩头挖出,此时进行桩顶连梁的施工,连梁的截面尺寸为宽度600毫米,高度为1米,连梁顶面距自然地坪为4米,桩身钢筋按照规范要求长度锚固入桩顶连梁,同时上部挡土墙中的构造柱钢筋也锚固在桩顶连梁中。自连梁向下设置两道腰梁,每道腰梁采用两个工字钢上下焊接而成,两个工字钢之间留有间隙,土体锚杆的锚头及锚定板卡在工字钢之外,无粘结预应力锚索穿过该间隙进入桩间的土体。第一道腰梁设置在自连梁底面以下5米处,第二道腰梁位置为再向下5米。为节省回填土步骤并充分利用场地,桩心距地下建筑物外皮尺寸为800毫米,然后利用砌筑砖墙将建筑物外皮和桩之间的空间填满,同时该砖墙还可以作为建筑物外墙防水卷材的载体。
选定出土口,挡土墙在该出土口处断开,出土口的宽度设计为6-8米,在出土口两侧的挡土墙上设置构造柱,同时对出土口处形成的坡道的地面土体以及侧面土体进行加固,加固方法可以采用水泥或混凝土锚杆进行,并对地面进行混凝土硬化。自出土口向下形成尽量小的基坑运土坡道,挖掘机在基坑内进行倒土。同时当腰梁施工时,挖掘机先将出土坡道挖除,腰梁施工完毕后再将出土坡道恢复。当基坑土方除坡道部分基本施工完毕后,用挖掘机挖除坡道并利用塔吊将土方运出,利用吊车将挖掘机吊出基坑。

Claims (4)

1.一种小场地深基坑施工方法,其特征在于,包括如下步骤:第一步是根据地质勘查情况确定是否需要对基坑进行降水,如果需要则首先进行降水施工;第二步是进行螺旋钻孔支护桩施工,螺旋钻孔桩的桩顶位于自然地坪以下2-4米,螺旋钻孔桩施工的同时开始基坑土方的开挖;第三步是螺旋钻孔桩施工完毕后,待基坑土方施工至桩顶标高位置后进行桩顶连梁的施工;第四步是桩顶连梁施工完毕后,在其上砌筑挡土砖墙,挡土砖墙在出土口处断开并对出土口处地面及侧面进行水泥锚杆或混凝土锚杆加固及地面硬化施工;第五步是基坑土方开挖至一定深度后,按要求对螺旋钻孔桩进行腰梁和锚固施工;第六步是利用挖掘机配合塔吊对出土坡道的土方进行收尾处理。
2.如权利要求1所述的施工方法,其特征在于,降水施工采用井点降水施工,降水井深度超过基坑深度10米以上。
3.如权利要求1所述的施工方法,其特征在于,螺旋钻孔桩施工采用跳打,隔一个或两个桩位进行跳打施工。
4.如权利要求1所述的施工方法,其特征在于,出土坡道为自出土口向基坑土方施工面延伸的运土通道,该部位腰梁施工时,应当先将其部位的土方移走,待腰梁的锚杆张拉完毕后再恢复出土坡道。
CN 201010151849 2010-04-21 2010-04-21 一种小场地深基坑施工方法 Pending CN101793032A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010151849 CN101793032A (zh) 2010-04-21 2010-04-21 一种小场地深基坑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010151849 CN101793032A (zh) 2010-04-21 2010-04-21 一种小场地深基坑施工方法

Publications (1)

Publication Number Publication Date
CN101793032A true CN101793032A (zh) 2010-08-04

Family

ID=42585930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010151849 Pending CN101793032A (zh) 2010-04-21 2010-04-21 一种小场地深基坑施工方法

Country Status (1)

Country Link
CN (1) CN101793032A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898915A (zh) * 2014-04-18 2014-07-02 中国二十二冶集团有限公司 建筑物小面积深基坑抗浮止水施工方法
CN104131571A (zh) * 2014-08-18 2014-11-05 中冶建工集团有限公司 一种深基坑支护施工方法
CN107023012A (zh) * 2017-03-28 2017-08-08 深圳市工勘岩土集团有限公司 多道环形砼支撑深基坑土方外运施工方法
CN113216197A (zh) * 2021-05-08 2021-08-06 浙江大学建筑设计研究院有限公司 一种通过分坑围护桩开洞设置斜坡道的出土防护结构
CN115387347A (zh) * 2022-06-06 2022-11-25 中煤江南建设发展集团有限公司 一种基于受限空间的深基坑支护方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1195730A (zh) * 1998-05-06 1998-10-14 顺德市永基建筑基础有限公司 一种建筑基坑支护方法及其专用扁砼桩
JP2002348886A (ja) * 2001-05-24 2002-12-04 Shimizu Corp 複合杭
JP2003003464A (ja) * 2001-06-21 2003-01-08 Geotop Corp 鋼管杭中掘工法
CN1800512A (zh) * 2005-01-07 2006-07-12 中船第九设计研究院 超大直径圆形深基坑无支撑施工方法
CN101225661A (zh) * 2008-02-02 2008-07-23 浙江环宇建设集团有限公司 桩加锚基坑支护工法
CN101280564A (zh) * 2008-06-06 2008-10-08 北京建工集团有限责任公司 基坑桩锚护壁混凝土腰梁结构及其施工方法
CN101629422A (zh) * 2009-08-06 2010-01-20 朱奎 加筋水泥土墙基坑支护施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1195730A (zh) * 1998-05-06 1998-10-14 顺德市永基建筑基础有限公司 一种建筑基坑支护方法及其专用扁砼桩
JP2002348886A (ja) * 2001-05-24 2002-12-04 Shimizu Corp 複合杭
JP2003003464A (ja) * 2001-06-21 2003-01-08 Geotop Corp 鋼管杭中掘工法
CN1800512A (zh) * 2005-01-07 2006-07-12 中船第九设计研究院 超大直径圆形深基坑无支撑施工方法
CN101225661A (zh) * 2008-02-02 2008-07-23 浙江环宇建设集团有限公司 桩加锚基坑支护工法
CN101280564A (zh) * 2008-06-06 2008-10-08 北京建工集团有限责任公司 基坑桩锚护壁混凝土腰梁结构及其施工方法
CN101629422A (zh) * 2009-08-06 2010-01-20 朱奎 加筋水泥土墙基坑支护施工方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898915A (zh) * 2014-04-18 2014-07-02 中国二十二冶集团有限公司 建筑物小面积深基坑抗浮止水施工方法
CN103898915B (zh) * 2014-04-18 2016-02-10 中国二十二冶集团有限公司 建筑物小面积深基坑抗浮止水施工方法
CN104131571A (zh) * 2014-08-18 2014-11-05 中冶建工集团有限公司 一种深基坑支护施工方法
CN104131571B (zh) * 2014-08-18 2016-03-23 中冶建工集团有限公司 一种深基坑支护施工方法
CN107023012A (zh) * 2017-03-28 2017-08-08 深圳市工勘岩土集团有限公司 多道环形砼支撑深基坑土方外运施工方法
CN113216197A (zh) * 2021-05-08 2021-08-06 浙江大学建筑设计研究院有限公司 一种通过分坑围护桩开洞设置斜坡道的出土防护结构
CN113216197B (zh) * 2021-05-08 2022-04-19 浙江大学建筑设计研究院有限公司 一种通过分坑围护桩开洞设置斜坡道的出土防护结构
CN115387347A (zh) * 2022-06-06 2022-11-25 中煤江南建设发展集团有限公司 一种基于受限空间的深基坑支护方法

Similar Documents

Publication Publication Date Title
CN104612162B (zh) 一种地铁车站深基坑开挖施工方法
CN202969392U (zh) 复杂地质深基坑联合支护
CN108035335A (zh) 一种冻结法施工井筒式地下停车库方法
CN102518135A (zh) 水平旋喷土锚和灌注桩复合基坑支护施工工法
CN102505695A (zh) 一种立体车库深基坑施工方法
CN102518453A (zh) 一种偏压浅埋或单压倾斜砂质黄土隧道快速进洞施工方法
CN102505704A (zh) 软弱地质竖井中大型沉井施工方法
CN103147442A (zh) 超深基坑压灌桩与预应力锚杆联合支护施工方法
CN105804089A (zh) 一种原深基坑施工后局部增深支护体系及其施工方法
CN103669365A (zh) 一种外斜拉内斜撑人字型基坑支护桩及其施工方法
CN111560962A (zh) 一种回填区基坑支护结构及其施工方法
CN112663625A (zh) 一种高寒区浅埋偏压软弱围岩隧道洞口施工及防护方法
CN106869151A (zh) 一种桥梁深基坑施工方法
CN102330436B (zh) 一种用于半岩土层超深圆形旋流池的组合支护结构及方法
CN103452120B (zh) 一种用于基坑支护的高强预应力管桩的桩顶冠梁结构及其施工方法
CN104047222A (zh) 一种傍山临水桥梁结构及其施工方法
CN109518699A (zh) 微型钢管桩加格栅喷锚深基坑联合支护体系及其施工方法
CN101793032A (zh) 一种小场地深基坑施工方法
CN104532853A (zh) 型钢水泥土桩+易破除锚杆+自动监测预警的深基坑支护方法及系统
CN108560572A (zh) 一种超高边坡支护体系的施工方法
CN105714748A (zh) 一种碎石沙土层中的调压井开挖施工方法
CN104131566A (zh) 一种地下室无水平支撑基坑的施工方法
CN110080779A (zh) 隧道隧底溶洞处理施工方法
CN201459749U (zh) 一种深水钢管桩施工平台稳定结构
CN212077981U (zh) 组合式边坡支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100804