CN106592600A - 紧邻运行地铁复杂环境预警支护体系施工方法 - Google Patents
紧邻运行地铁复杂环境预警支护体系施工方法 Download PDFInfo
- Publication number
- CN106592600A CN106592600A CN201611105234.8A CN201611105234A CN106592600A CN 106592600 A CN106592600 A CN 106592600A CN 201611105234 A CN201611105234 A CN 201611105234A CN 106592600 A CN106592600 A CN 106592600A
- Authority
- CN
- China
- Prior art keywords
- wall
- ground
- pressure rotary
- even wall
- subway station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Abstract
本发明公开了紧邻运行地铁复杂环境预警支护体系施工方法,包括步骤:(1)在拟建建筑物地连墙的内外两侧分别进行两排搅拌桩支护;(2)在两排搅拌桩之间建造建筑物地连墙;(3)在地铁车站地连墙和建筑物地连墙的外侧土体内分别采用高压旋喷进行多根第一高压旋喷桩和多根第二高压旋喷桩的支护;(4)在地铁车站地连墙的外侧和建筑物地连墙外侧的交接面处安装袖阀管体系;(5)在建筑物地连墙顶浇筑一圈帽梁;(6)在建筑物地连墙的内侧分层开挖基坑;在基坑开挖过程中,如果安装在地铁车站地连墙上的测斜仪发出变形预警信号时,立即启动袖阀管体系的注浆系统进行注浆直至预警信号停止,再继续施工。本方法保证了预警支护体系的稳定建立。
Description
技术领域
本发明涉及预警支护体系施工方法,尤其涉及紧邻运行地铁复杂环境预警支护体系施工方法。
背景技术
随着城市地铁的大规模建设,地铁车站安全运行成为人们越来越关心的课题。建立良好的地铁环境的目的在于提供一个安全、舒适的乘车环境。如果拟建建筑物紧邻正在运行的地铁时,而且拟建建筑物基坑又是拐角处异形深基坑时,在施工时就要特别建立一套安全可靠的预警支护体系。一旦出现运行的地铁变形超过允许值时,要立即启动预警支护体系。
申请号为CN200910039944.9的中国专利公开了“双阀布袋袖阀管注浆技术”,该技术针对袖阀管注浆技术的缺点,在袖阀管上套一条土工布制作的布袋,将布袋每隔1.5~2m利用塑料扣牢固地绑扎在袖阀管上,利用机械设备钻孔至设计深度,将制作好的双阀布袋袖阀管安装好,自下而上分段注浆,每个注浆段在达到设计注浆压力后塑料扣可以自动打开;同时在布袋外侧设置1~2根塑料排水板,不但可以排除浆液中部分水分,而且消散注浆在地基中产生的超静孔隙水压力,减少挤土效应;此专利公开了双阀布袋袖阀管注浆技术,不适用于本申请的周边紧邻地铁车站、及地质复杂的异形基坑拐角处的深基坑预警支护体系施工方法。
申请号为2010101688608的中国专利公开了“地下连续墙“Y”型嵌岩槽段护壁结构及地下连续墙“Y”型嵌岩槽段的护壁成槽施工方法”,它包括水泥土深层搅拌桩墙,水泥土深层搅拌桩墙上设有钢筋混凝土导墙,所述水泥土深层搅拌桩墙包括三个“V”型水泥土深层搅拌桩墙,三个“V”型水泥土深层搅拌桩墙构成“Y”形,所述“Y”形水泥土深层搅拌桩墙的的两个竖向拐角处设有塑性混凝土桩与两侧的水泥土深层搅拌桩连接,从而构成“Y”型嵌岩槽段护壁结构。地下连续墙“Y”型嵌岩槽段采用“五铣”成槽施工方法。此专利公开了地下连续墙“Y”型嵌岩槽段护壁施工方法,两个竖向拐角处设有塑性混凝土桩与两侧的水泥土深层搅拌桩连接,不适用于周边紧邻正在运行的地铁车站、及地质复杂的异形基坑拐角处的深基坑预警支护体系施工。
发明内容
本发明的目的在于克服已有技术的不足,提供一种结构简单、安全可靠的紧邻运行地铁复杂环境预警支护体系施工方法。
紧邻运行地铁复杂环境预警支护体系施工方法,包括以下步骤:
(1)在拟建建筑物地连墙的内外两侧分别进行两排搅拌桩支护,所述的拟建建筑物地连墙与正在运行的地铁车站地连墙相交设置;
(2)在所述的两排搅拌桩之间建造建筑物地连墙,所述的建筑物地连墙顶面低于地面;
(3)在地铁车站地连墙和建筑物地连墙的外侧土体内分别采用高压旋喷进行多根第一高压旋喷桩和多根第二高压旋喷桩的支护,相邻的两根第一高压旋喷桩之间、相邻的两根第二高压旋喷桩之间以及第一高压旋喷桩与第二高压旋喷桩交接处分别相互搭接咬合;
(4)在地铁车站地连墙的外侧和建筑物地连墙外侧的交接面处安装袖阀管体系;
(5)在所述的建筑物地连墙顶浇筑一圈帽梁;
(6)在所述的建筑物地连墙的内侧开挖基坑至第一深度,然后在挖好的基坑的侧壁上间隔支设第一道水平支撑并且将第一道水平支撑的端部与建筑物地连墙上建造的围檩固定相连;
(7)重复步骤(6)分层进行基坑开挖直至到达预定深度,并且在每层基坑开挖过程中分别进行相应层的水平支撑的支设;
在进行所述的步骤(6)、步骤(7)的基坑开挖过程中,如果安装在地铁车站地连墙上的测斜仪发出变形预警信号时,立即启动袖阀管体系的注浆系统进行注浆直至预警信号停止,再继续施工。
本方法在拟建建筑物地连墙的前后两侧分别施工两排搅拌桩,在地铁车站地连墙和拟建建筑物地连墙的外侧土体建造有相互搭接的多根高压旋喷桩和袖阀管体系,以及帽梁、围檩、水平支撑,整个形成了一整套复杂的异形基坑拐角处的深基坑预警支护体系。保证了紧邻正在运行地铁处施工深基坑的安全可靠的预警支护体系的稳定建立。
附图说明
图1是本发明的紧邻运行地铁复杂环境预警支护体系施工方法的紧邻运行地铁拟建建筑拐角处异形深基坑预警支护体系俯视示意图;
图2是本发明的紧邻运行地铁复杂环境预警支护体系施工方法的深基坑支护剖面示意图。
具体实施方式
下面结合附图,对本发明的具体实施方式进行详细说明。
如附图所示的紧邻运行地铁复杂环境预警支护体系施工方法,包括以下步骤:
(1)在拟建建筑物地连墙的内外两侧分别进行两排搅拌桩支护,所述的拟建建筑物地连墙与正在运行的地铁车站地连墙1相交设置;
(2)在所述的两排搅拌桩之间建造建筑物地连墙2,所述的建筑物地连墙2顶面低于地面;
(3)在地铁车站地连墙1和建筑物地连墙2的外侧土体内分别采用高压旋喷进行多根第一高压旋喷桩3和多根第二高压旋喷桩4的支护,相邻的两根第一高压旋喷桩3之间、相邻的两根第二高压旋喷桩4之间以及第一高压旋喷桩3与第二高压旋喷桩4交接处分别相互搭接咬合;
(4)在地铁车站地连墙的外侧和建筑物地连墙2外侧的交接面处安装袖阀管体系10;
(5)在所述的建筑物地连墙2顶浇筑一圈帽梁9;
(6)在所述的建筑物地连墙2的内侧开挖基坑至第一深度,然后在挖好的基坑的侧壁上间隔支设第一道水平支撑6并且将第一道水平支撑6的端部与建筑物地连墙2上建造的围檩固定相连;
(7)重复步骤(6)分层进行基坑开挖直至到达预定深度,并且在每层基坑开挖过程中分别进行相应层的水平支撑7的支设;
在进行所述的步骤(6)、步骤(7)的基坑开挖过程中,如果安装在地铁车站地连墙1上的测斜仪发出变形预警信号时,立即启动袖阀管10体系的注浆系统进行注浆。
实施例1
(1)在拟建建筑物地连墙的内外两侧分别进行两排搅拌桩支护,所述的拟建建筑物地连墙与正在运行的地铁车站地连墙1相交设置;
(2)在所述的两排搅拌桩之间建造建筑物地连墙2,所述的建筑物地连墙2顶面低于地面;
(3)在地铁车站地连墙1和建筑物地连墙2的外侧土体内分别采用高压旋喷进行多根第一高压旋喷桩3和多根第二高压旋喷桩4的支护,相邻的两根第一高压旋喷桩3之间、相邻的两根第二高压旋喷桩4之间以及第一高压旋喷桩3与第二高压旋喷桩4交接处分别相互搭接咬合;
(4)在地铁车站地连墙的外侧和建筑物地连墙2外侧的交接面处安装袖阀管体系10;
(5)在所述的建筑物地连墙2顶浇筑一圈帽梁9;
(6)在所述的建筑物地连墙2的内侧开挖基坑至2.7m,然后在挖好的基坑的侧壁上间隔支设第一道水平支撑6并且将第一道水平支撑6的端部与建筑物地连墙2上建造的围檩固定相连;
(7)重复步骤(6)开挖基坑至3.5m,此时测斜仪发出变形预警信号,立即启动袖阀管体系的注浆系统进行注浆。注浆过程中测斜仪预警信号停止,基坑达到安全状态,停止袖阀管10体系的注浆,然后继续开挖基坑至4.5m,最后完成第二道水平支撑7的支设;
(8)重复步骤施工(7)开挖基坑至5m达到设计的基坑深度,然后完成第三道水平支撑8的支设
通过本方法保证了紧邻正在运行地铁处施工深基坑的安全可靠的预警支护体系的稳定建立。
Claims (1)
1.紧邻运行地铁复杂环境预警支护体系施工方法,包括以下步骤:
(1)在拟建建筑物地连墙的内外两侧分别进行两排搅拌桩支护,所述的拟建建筑物地连墙与正在运行的地铁车站地连墙相交设置;
(2)在所述的两排搅拌桩之间建造建筑物地连墙,所述的建筑物地连墙顶面低于地面;
(3)在地铁车站地连墙和建筑物地连墙的外侧土体内分别采用高压旋喷进行多根第一高压旋喷桩和多根第二高压旋喷桩的支护,相邻的两根第一高压旋喷桩之间、相邻的两根第二高压旋喷桩之间以及第一高压旋喷桩与第二高压旋喷桩交接处分别相互搭接咬合;
(4)在地铁车站地连墙的外侧和建筑物地连墙外侧的交接面处安装袖阀管体系;
(5)在所述的建筑物地连墙顶浇筑一圈帽梁;
(6)在所述的建筑物地连墙的内侧开挖基坑至第一深度,然后在挖好的基坑的侧壁上间隔支设第一道水平支撑并且将第一道水平支撑的端部与建筑物地连墙上建造的围檩固定相连;
(7)重复步骤(6)分层进行基坑开挖直至到达预定深度,并且在每层基坑开挖过程中分别进行相应层的水平支撑的支设;
在进行所述的步骤(6)、步骤(7)的基坑开挖过程中,如果安装在地铁车站地连墙上的测斜仪发出变形预警信号时,立即启动袖阀管体系的注浆系统进行注浆直至预警信号停止,再继续施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611105234.8A CN106592600B (zh) | 2016-12-05 | 2016-12-05 | 紧邻运行地铁复杂环境预警支护体系施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611105234.8A CN106592600B (zh) | 2016-12-05 | 2016-12-05 | 紧邻运行地铁复杂环境预警支护体系施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106592600A true CN106592600A (zh) | 2017-04-26 |
CN106592600B CN106592600B (zh) | 2019-12-27 |
Family
ID=58595047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611105234.8A Active CN106592600B (zh) | 2016-12-05 | 2016-12-05 | 紧邻运行地铁复杂环境预警支护体系施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106592600B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108330955A (zh) * | 2018-04-27 | 2018-07-27 | 中铁十二局集团有限公司 | 地连墙施工方法 |
CN108343097A (zh) * | 2018-01-26 | 2018-07-31 | 山东大学 | 一种基坑旋喷桩对高架高铁施工效应的监控方法 |
CN109252531A (zh) * | 2018-11-05 | 2019-01-22 | 深圳市工勘岩土集团有限公司 | 搅拌桩或旋喷桩与袖阀管注浆组合的止水帷幕施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1107194A (zh) * | 1994-03-16 | 1995-08-23 | 沙祥林 | 三维高强复合地基 |
JP4286433B2 (ja) * | 2000-06-09 | 2009-07-01 | 株式会社竹中工務店 | 切梁支持点位置を可変とした斜杭による山留め工法 |
CN102146679A (zh) * | 2010-02-09 | 2011-08-10 | 中铁十一局集团有限公司 | 复杂地质地段土压平衡盾构通过中间风井施工方法 |
CN203097896U (zh) * | 2013-01-31 | 2013-07-31 | 中铁十四局集团有限公司 | 分离式大断面群洞下穿既有构筑物控制沉降结构 |
CN103243720A (zh) * | 2013-05-20 | 2013-08-14 | 中冶天工集团有限公司 | 软土地基超深基坑支护方法 |
CN105178326A (zh) * | 2015-06-03 | 2015-12-23 | 福建工程学院 | 上软下硬富水地层基坑工程围护结构止水方法 |
CN106120805A (zh) * | 2016-06-23 | 2016-11-16 | 程华清 | 危房环境下的超深基坑支护的施工方法 |
-
2016
- 2016-12-05 CN CN201611105234.8A patent/CN106592600B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1107194A (zh) * | 1994-03-16 | 1995-08-23 | 沙祥林 | 三维高强复合地基 |
JP4286433B2 (ja) * | 2000-06-09 | 2009-07-01 | 株式会社竹中工務店 | 切梁支持点位置を可変とした斜杭による山留め工法 |
CN102146679A (zh) * | 2010-02-09 | 2011-08-10 | 中铁十一局集团有限公司 | 复杂地质地段土压平衡盾构通过中间风井施工方法 |
CN203097896U (zh) * | 2013-01-31 | 2013-07-31 | 中铁十四局集团有限公司 | 分离式大断面群洞下穿既有构筑物控制沉降结构 |
CN103243720A (zh) * | 2013-05-20 | 2013-08-14 | 中冶天工集团有限公司 | 软土地基超深基坑支护方法 |
CN105178326A (zh) * | 2015-06-03 | 2015-12-23 | 福建工程学院 | 上软下硬富水地层基坑工程围护结构止水方法 |
CN106120805A (zh) * | 2016-06-23 | 2016-11-16 | 程华清 | 危房环境下的超深基坑支护的施工方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343097A (zh) * | 2018-01-26 | 2018-07-31 | 山东大学 | 一种基坑旋喷桩对高架高铁施工效应的监控方法 |
CN108343097B (zh) * | 2018-01-26 | 2019-10-18 | 山东大学 | 一种基坑旋喷桩对高架高铁施工效应的监控方法 |
CN108330955A (zh) * | 2018-04-27 | 2018-07-27 | 中铁十二局集团有限公司 | 地连墙施工方法 |
CN109252531A (zh) * | 2018-11-05 | 2019-01-22 | 深圳市工勘岩土集团有限公司 | 搅拌桩或旋喷桩与袖阀管注浆组合的止水帷幕施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106592600B (zh) | 2019-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102094425B (zh) | 采用浅埋深拉森钢板桩作为防护围堰的基坑施工方法 | |
CN103774675B (zh) | 组合双排桩联合竖向预应力锚杆支护体系的施工方法 | |
CN104099943B (zh) | 地下连续墙与废弃地下人防工程交会处理方法 | |
CN207003499U (zh) | 一种地铁隧道上方基坑开挖的抗浮起装置 | |
CN104110038A (zh) | 深厚淤泥质软土地区大面积基坑围护结构的施工方法 | |
CN103938634B (zh) | 一种深基坑支护结构及施工方法 | |
CN105239598A (zh) | 井式全自动立体车库的整体下沉施工方法 | |
CN104404974A (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺 | |
CN108560580B (zh) | 挡土墙施工方法 | |
CN102926392A (zh) | 一种基坑降水系统及其施工方法 | |
CN110318410A (zh) | 一种深基坑遇承压水突涌减压控水处理施工方法 | |
CN106592600A (zh) | 紧邻运行地铁复杂环境预警支护体系施工方法 | |
CN107964971B (zh) | 一种采用pba工法施工的地铁车站的降水方法 | |
CN209923959U (zh) | 一种高地下水位软弱土场地干法作业沉井结构 | |
CN104652444A (zh) | 超大型深基坑中心岛式交替土方开挖的整体逆作施工方法 | |
CN103572764A (zh) | 超深人工挖孔桩护壁止水结构及其施工方法 | |
CN107288665A (zh) | 暗挖车站的施工方法 | |
CN101413269A (zh) | 真空帷幕止水与大气压力支护深基坑开挖工法 | |
CN206346200U (zh) | 异形基坑拐角处施工结构 | |
CN111042161A (zh) | 一种崩坡积高边坡柔性处理结构及其施工方法 | |
CN216194845U (zh) | 卵石覆盖层钢板桩围堰系统 | |
CN204435321U (zh) | 一种火力发电厂取水明渠 | |
CN108914959A (zh) | 一种适用于山区房建的基础结构及其施工方法 | |
CN1361333A (zh) | 跟踪补偿注浆控制地层位移方法 | |
CN108487331B (zh) | 一种集廊道排水和肥槽防渗为一体的地下结构抗浮系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PP01 | Preservation of patent right | ||
PP01 | Preservation of patent right |
Effective date of registration: 20210415 Granted publication date: 20191227 |