CN103205983A - 一种地下室后支撑体系的施工方法 - Google Patents

一种地下室后支撑体系的施工方法 Download PDF

Info

Publication number
CN103205983A
CN103205983A CN2013101293768A CN201310129376A CN103205983A CN 103205983 A CN103205983 A CN 103205983A CN 2013101293768 A CN2013101293768 A CN 2013101293768A CN 201310129376 A CN201310129376 A CN 201310129376A CN 103205983 A CN103205983 A CN 103205983A
Authority
CN
China
Prior art keywords
support system
ring beam
ring
underground structure
former
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101293768A
Other languages
English (en)
Other versions
CN103205983B (zh
Inventor
刘德朋
黄亮
王良波
熊小堂
徐宗研
窦炜
冉旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Group Jiangsu Co ltd
China Construction Third Engineering Bureau Second Construction And Installation Co ltd
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
China Construction Third Bureau Green Industry Investment Co Ltd
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201310129376.8A priority Critical patent/CN103205983B/zh
Publication of CN103205983A publication Critical patent/CN103205983A/zh
Application granted granted Critical
Publication of CN103205983B publication Critical patent/CN103205983B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)

Abstract

本发明涉及一种地下室后支撑体系的施工方法,本发明利用原地下结构的部分结构构件和新增格构柱、水平环梁形成双圆环对称支撑体系,通过在地下结构楼板上安装剪力钉传递水平力到搁置在楼板的双圆环环梁上,在原有地下结构体系增加新的支撑体系,保证了地下结构拆除过程中“先撑后拆”的安全原则的一种施工方法。本发明采用了双圆环对称支撑体系,水平力最终均匀的传递到环梁上;利用原结构的部分构件作为支撑体系的一部分,保证了支撑体系的稳定性;双圆环环梁放在原有楼板上,通过设置剪力钉传递水平力到环梁上,大大减少了技术和施工难度。

Description

一种地下室后支撑体系的施工方法
技术领域:
本发明涉及一种地下室后支撑体系的施工方法。主要用于建筑工程中,地下室已封顶的地下结构改造工程。
背景技术:
目前建筑工程中,现有的基坑支护体系有:
1、先撑后挖环梁支撑体系:即在基坑挖土之前,先施工环梁支撑体系,再进行挖土。该体系适用于新建建筑的支护体系,对于地下室已施工完成的改造工程,不适用。
2、钢支撑体系:利用特制钢框架提供水平及竖向的支撑。该系统虽然方便,但成本较高。
发明内容:
本发明的目的为了克服上述现有技术存在的实际问题和缺点,提供一种地下室后支撑体系的施工方法,本发明利用环梁后支撑体系来完成对结构水平及竖向的支撑,本发明无需过多的投入,利用原结构部分柱子及新安装的格构柱作为竖向支撑,利用在原结构板上新建环梁,环梁与原结构板有可靠连接,将环梁与原结构梁板及地连墙形成稳定的水平支撑,本发明方法使体系新建与拆除都比较方便,省时省工,并且不影响原结构破除:
一种地下室后支撑体系的施工方法,其特征在于按以下步骤进行:(1)在预设环梁连接的原地下结构的楼板上放线、定位,然后打若干孔,在若干孔内分别安装一剪力钉 ,并在安装的剪力钉缝隙浇筑水泥砂浆,在原地下结构的楼板预设环梁处支设若干模板及铺设若干钢筋,形成环梁;
(2)在原地下室底板上植上若干植筋,并在每两根植筋焊接一锚板,每一锚板焊接一新增格构柱;
(3)在原地下结构柱打孔植上若干植筋,每根植筋与环梁内的一钢筋焊接在一起;
(4)在原地下室底板上做若干立柱桩,每个立柱桩内插入一竖托桩格构柱,并将每个竖托桩格构柱上部插入预设环梁的模板内,浇筑混凝土,待固结后形成一个整体,环梁与若干竖托桩格构柱整浇在一起。
因为本发明的工程底板拆除区域之外的梁板柱体系均予以保留,所以支撑立柱尽量利用已有的结构体系,减小立柱桩施工量及难度。在底板拆除范围之外的区域,立柱尽量利用原结构柱,通过在原结构柱上植筋与水平支撑体系锚固连接;若不能利用原结构柱,则在底板上植筋焊接锚板,锚板上直接焊接施工钢格构柱;在底板拆除范围之内的区域,施工立柱桩+钢格构立柱。设计利用原800mm地下连续墙作为支护体系,利用现有的楼板系统作为支撑系统。在现有的楼板上施工环梁及支撑,环梁尽量避让塔楼处结构。因环梁施工在楼面板上,在有结构梁部位楼面板上植筋与环梁连接抗剪;在结构梁两侧楼面板上开槽,设置环梁及楼板封闭箍筋抗扭兼做抗剪。
本发明无需过多的投入,利用施工现场原结构柱子作为部分格构柱,通过在楼板上植筋制作环梁,节省材料的同时,还缩短了工期。
附图说明:
图1a、图1b分别是本发明的环梁植筋位置示意图。
图2是本发明的格构柱立面示意图。
图3是本发明的原结构柱植筋示意图。
图4是本发明的后支撑体系剖面示意图。
图5是本发明的后支撑体系平面示意图。
具体实施方式:
下面结合附图对本发明进行详细说明:
如图1a、图1b、图2、图3、图4、图5所示,一种地下室后支撑体系的施工方法,其特征在于按以下步骤进行:(1)在预设环梁连接的原地下结构的楼板1上放线、定位,然后打若干孔,在若干孔内分别安装一剪力钉7 ,并在安装的剪力钉7缝隙浇筑水泥砂浆,在原地下结构的楼板1预设环梁处支设若干模板9及铺设若干钢筋8,形成环梁12;
(2)如图2所示,在原地下室底板上植上若干植筋13,并在每两根植筋13焊接一锚板6,每一锚板6焊接一新增格构柱3;
(3) 如图3所示,在原地下结构柱2打孔植上若干植筋13,每根植筋13与环梁12内的一钢筋8焊接在一起;
(4) 如图4所示,在原地下室底板上做若干立柱桩5,每个立柱桩5内插入一竖托桩格构柱4,并将每个竖托桩格构柱4上部插入预设环梁12的模板9内,浇筑混凝土10,待固结后形成一个整体,环梁12与若干竖托桩格构柱4整浇在一起。
根据图5所示, 若干新增格构柱3与若干竖托桩格构柱4制作完成之后,再浇筑环梁12。
本发明利用原地下结构的部分结构构件和新增格构柱、水平环梁形成双圆环对称支撑体系,通过在地下结构楼板上安装剪力钉传递水平力到搁置在楼板的双圆环环梁上,在原有地下结构体系增加新的支撑体系,保证了地下结构拆除过程中“先撑后拆”的安全原则的一种施工方法。
本发明是利用水平支撑体系+竖向支撑体系形成完整的既有地下结构改造工程的支撑体系,在原有的地下结构形成的支撑体系后新增加了地下结构支撑体系,从而保证地下结构改造施工的顺利施工,此发明的实施,节约工期,降低成本,创造较高经济效益。
本发明采用了双圆环对称支撑体系,水平力最终均匀的传递到环梁上;利用原结构的部分构件作为支撑体系的一部分,保证了支撑体系的稳定性;双圆环环梁放在原有楼板上,通过设置剪力钉传递水平力到环梁上,大大减少了技术和施工难度。

Claims (1)

1.一种地下室后支撑体系的施工方法,其特征在于按以下步骤进行:(1)在预设环梁连接的原地下结构的楼板上放线、定位,然后打若干孔,在若干孔内分别安装一剪力钉 ,并在安装的剪力钉缝隙浇筑水泥砂浆,在原地下结构的楼板预设环梁处支设若干模板及铺设若干钢筋,形成环梁;
(2)在原地下室底板上植上若干植筋,并在每两根植筋焊接一锚板,每一锚板焊接一新增格构柱;
(3)在原地下结构柱打孔植上若干植筋,每根植筋与环梁内的一钢筋焊接在一起;
(4)在原地下室底板上做若干立柱桩,每个立柱桩内插入一竖托桩格构柱,并将每个竖托桩格构柱上部插入预设环梁的模板内,浇筑混凝土,待固结后形成一个整体,环梁与若干竖托桩格构柱整浇在一起。
CN201310129376.8A 2013-04-15 2013-04-15 一种地下室后支撑体系的施工方法 Active CN103205983B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310129376.8A CN103205983B (zh) 2013-04-15 2013-04-15 一种地下室后支撑体系的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310129376.8A CN103205983B (zh) 2013-04-15 2013-04-15 一种地下室后支撑体系的施工方法

Publications (2)

Publication Number Publication Date
CN103205983A true CN103205983A (zh) 2013-07-17
CN103205983B CN103205983B (zh) 2014-12-10

Family

ID=48753375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310129376.8A Active CN103205983B (zh) 2013-04-15 2013-04-15 一种地下室后支撑体系的施工方法

Country Status (1)

Country Link
CN (1) CN103205983B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397660A (zh) * 2013-08-05 2013-11-20 中国建筑股份有限公司 一种装配施工的地下建筑及其施工方法
CN111335669A (zh) * 2020-04-17 2020-06-26 中国建筑第四工程局有限公司 一种地下室结构梁后做的植筋加固结构
CN111810202A (zh) * 2020-07-20 2020-10-23 武汉市市政建设集团有限公司 一种地下联络通道接口施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1150480A (ja) * 1997-08-04 1999-02-23 Shimizu Corp 建物の建替工法
JP2004044223A (ja) * 2002-07-11 2004-02-12 Kajima Corp 既存地下躯体を利用した解体および新築工法
CN1900467A (zh) * 2006-07-20 2007-01-24 上海市第一建筑有限公司 用于地下建筑物改造的水平力转换方法
CN101748758A (zh) * 2008-12-04 2010-06-23 中国二十冶建设有限公司 厂房内在线设备基础改造基坑支护方法
CN101939492A (zh) * 2008-02-01 2011-01-05 斯博泰科有限公司 预浇制临时设施结构及其建造方法
JP2011163074A (ja) * 2010-02-15 2011-08-25 Toda Constr Co Ltd 山留め工法
CN102966108A (zh) * 2012-11-23 2013-03-13 中铁四局集团建筑工程有限公司 紧临既有建筑物以地下结构为内支撑的深基坑施工方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1150480A (ja) * 1997-08-04 1999-02-23 Shimizu Corp 建物の建替工法
JP2004044223A (ja) * 2002-07-11 2004-02-12 Kajima Corp 既存地下躯体を利用した解体および新築工法
CN1900467A (zh) * 2006-07-20 2007-01-24 上海市第一建筑有限公司 用于地下建筑物改造的水平力转换方法
CN101939492A (zh) * 2008-02-01 2011-01-05 斯博泰科有限公司 预浇制临时设施结构及其建造方法
CN101748758A (zh) * 2008-12-04 2010-06-23 中国二十冶建设有限公司 厂房内在线设备基础改造基坑支护方法
JP2011163074A (ja) * 2010-02-15 2011-08-25 Toda Constr Co Ltd 山留め工法
CN102966108A (zh) * 2012-11-23 2013-03-13 中铁四局集团建筑工程有限公司 紧临既有建筑物以地下结构为内支撑的深基坑施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397660A (zh) * 2013-08-05 2013-11-20 中国建筑股份有限公司 一种装配施工的地下建筑及其施工方法
CN103397660B (zh) * 2013-08-05 2015-07-15 中国建筑股份有限公司 一种地下建筑的装配施工方法
CN111335669A (zh) * 2020-04-17 2020-06-26 中国建筑第四工程局有限公司 一种地下室结构梁后做的植筋加固结构
CN111810202A (zh) * 2020-07-20 2020-10-23 武汉市市政建设集团有限公司 一种地下联络通道接口施工方法
CN111810202B (zh) * 2020-07-20 2022-04-15 武汉市市政建设集团有限公司 一种地下联络通道接口施工方法

Also Published As

Publication number Publication date
CN103205983B (zh) 2014-12-10

Similar Documents

Publication Publication Date Title
CN206467667U (zh) 一种采用膨胀式固定钢筋网片的桩间挂网喷锚围护结构
CN109322241A (zh) 栈桥结构及施工方法
CN104131704A (zh) 一种钢管柱混凝土的侧浇方法及所用的钢管柱结构
CN203238780U (zh) 梁柱核心区预制钢筋箍笼
CN104295003A (zh) 一种构造柱施工方法
CN105525753A (zh) 一种构造柱与主体结构同时施工的方法及结构
CN105696800A (zh) 防钢结构地脚锚栓施工产生相对位移临时固定套架
KR101793037B1 (ko) Phc 파일과 강관 파일을 혼용한 흙막이 겸 영구벽체의 시공 방법
CN103205983B (zh) 一种地下室后支撑体系的施工方法
CN206768570U (zh) 一种基坑装配式钢栈桥
CN106760851A (zh) 既有砖混结构新增隔震层的施工方法
CN203741996U (zh) 一种用于逆作法基坑工程中梁柱节点
CN206245763U (zh) 预制结构中现场绑扎钢筋的定位装置
CN206768833U (zh) 一种混凝土支撑与钢格柱连接结构
CN204825945U (zh) 一种用于固定预埋螺栓的卡具
CN102493488A (zh) 基坑工程逆梁顺板施工方法
CN108775086A (zh) 附加闭合连接钢筋的装配整体式梁柱节点结构及施工方法
CN209412681U (zh) 栈桥结构
CN103132531A (zh) 基坑支护体系施工方法
CN204715764U (zh) 一种构造柱与主体结构同时施工的结构
CN203834809U (zh) 一种用于钢管柱混凝土侧浇方法的钢管柱结构
CN204898710U (zh) 一种新型钢结构挡土墙
CN203531010U (zh) 热力管沟跨越预留地铁车站的承托平台
CN206599994U (zh) 一种免洞穿式模板支撑体系支顶件
CN207314523U (zh) 一种新型钢-混梁柱节点施工结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221207

Address after: Room 2105, 21st Floor, Tongda Plaza, No. 111 Wenhua Avenue, Jiangxia District, Wuhan City, Hubei Province 430000

Patentee after: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU

Patentee after: China Construction Third Engineering Bureau Group (Jiangsu) Co.,Ltd.

Patentee after: China Construction Third Engineering Bureau second construction and installation Co.,Ltd.

Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd.

Address before: 430074 No. 306 Lu Lu, Hongshan District, Hubei, Wuhan

Patentee before: THE SECOND CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION THIRD ENGINEERING BUREAU