Info

Publication number
CN103147460A
CN103147460A CN2013101025355A CN201310102535A CN103147460A CN 103147460 A CN103147460 A CN 103147460A CN 2013101025355 A CN2013101025355 A CN 2013101025355A CN 201310102535 A CN201310102535 A CN 201310102535A CN 103147460 A CN103147460 A CN 103147460A
Authority
CN
China
Prior art keywords
pier
junction plate
stub body
pedestal
foundation structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101025355A
Other languages
Chinese (zh)
Other versions
CN103147460B (en
Inventor
李荣生
巩立辉
张文山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU DAFANG INDUSTRY Co Ltd
Original Assignee
ZHENGZHOU DAFANG INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU DAFANG INDUSTRY Co Ltd filed Critical ZHENGZHOU DAFANG INDUSTRY Co Ltd
Priority to CN201310102535.5A priority Critical patent/CN103147460B/en
Publication of CN103147460A publication Critical patent/CN103147460A/en
Application granted granted Critical
Publication of CN103147460B publication Critical patent/CN103147460B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to an integrated prefabricated pier and foundation structure, which comprises a column pier foundation and a column pier body, the column pier body is detachably mounted on the column pier foundation, the column pier foundation comprises a base, a first connecting plate and deformed bars, the base is preburied under the ground, and the deformed bars vertically pass through the first connecting plate, and are fixed on the base and extended out from the top of the first connecting plate for a certain distance; the bottom of the column pier body is connected with a second connecting plate, and when the column pier body is mounted on the column pier foundation, the parts of the deformed bars, which are extended out of the first connecting plate, are inserted into the second connecting plate. The integrated pier structure is adopted by the invention, the column pier body is produced in a specialized factory, the column pier foundation is constructed at a construction site, the column pier foundation and the column pier body are assembled at night, so that normal traffic on a road cannot be affected in the daytime, and the rapid construction of a pier is realized.

Description

A kind of integrated precast bridge pier and foundation structure
Technical field
The present invention relates to a kind of integrated precast bridge pier and foundation structure.
Background technology
Be accompanied by the high speed development of China's economic, domestic each big and medium-sized cities population, vehicle rapid growth cause the road traffic flow to increase severely, and the road imbalance between supply and demand is more sharp-pointed.Increase city existing road autos only ability and mainly change the measures such as grade separation, overhead and tunnel multilevel traffic by existing road widening upgrading, level crossing, construction method routinely, all there is long construction period in the civil engineering of above various measures, floor space is large, and traffic and surrounding enviroment are affected the series of problems such as large.As bridge pier, build bridge pier at the construction point of bridge, need road pavement to carry out shutoff and carry out, long construction period, the directly road passage capability of impact construction point.
Summary of the invention
The purpose of this invention is to provide integral prefabricated, the special-purpose integration of transporting and building car transportation of a kind of factory and integrated precast bridge pier and the foundation structure of on-the-spot Fast Installation.
For achieving the above object, the technical solution used in the present invention is:
A kind of integrated precast bridge pier and foundation structure, comprise pier base, stub body, described stub body can be arranged on described pier base with dismantling, described pier base comprises pedestal, the first junction plate and indented bars, described pedestal is embedded in underground, described indented bars vertically passes described the first junction plate, is fixed on described pedestal and stretches out described the first junction plate top one segment distance; Described stub body bottom is connected with the second junction plate, and when described stub body was arranged on described pier base, described indented bars stretched out the partial insertion of described the first junction plate to described the second junction plate.
Preferably, described pier base also comprises cover plate, and when described stub body was not installed, described cover plate covered on described the first junction plate, and the upper surface of described cover plate and ground flush.
Further preferably, described cover plate is rubber tile.
Preferably, described stub body is the steel column pier; Described the first junction plate, the second junction plate are steel plate.
A kind of integrated precast bridge pier and foundation structure, comprise pier base, stub body, described stub body can be arranged on described pier base with dismantling, described pier base comprises pedestal, indented bars, described pedestal is embedded in underground, described indented bars vertically is fixed on described pedestal and stretches out its top one segment distance, and the position of stretching out described indented bars on described pedestal offers groove; Described stub body bottom is connected with junction plate, offer porose on described junction plate, when described stub body is arranged on described pier base, the partial insertion that described indented bars stretches out described pedestal and is filled with mortar in described hole, groove to the hole of described junction plate.
Preferably, described pier base also comprises cover plate, and when described stub body was not installed, described cover plate covered on described pedestal, and the upper surface of described cover plate and ground flush.
Further preferably, described cover plate is the steel cushion block.
Preferably, described stub body is the concrete pier; Described junction plate is the concrete plate.
Because technique scheme is used, the present invention compared with prior art has following advantages:
Logical integrated precast bridge pier and the foundation structure of adopting of the present invention, the stub body carries out processing and manufacturing in specialized factory, and pier base carries out at the construction point, by complete both assemblings at night, do not affect normal road on daytime, realize the rapid construction of bridge pier.
Description of drawings
Accompanying drawing 1 is the structural representation front view of the present embodiment one;
Accompanying drawing 2 is the structural representation top view of the present embodiment one;
Accompanying drawing 3 is A section enlarged drawing in accompanying drawing 1;
Accompanying drawing 4 is the front view of pier base in the present embodiment one;
Accompanying drawing 5 is the top view of pier base in the present embodiment one;
Accompanying drawing 6 is installed schematic front view one for bridge pier structure;
Accompanying drawing 7 is installed diagrammatic top view one for bridge pier structure;
Accompanying drawing 8 is installed diagrammatic side view one for bridge pier structure;
Accompanying drawing 9 is installed schematic front view two for bridge pier structure;
Accompanying drawing 10 is installed diagrammatic top view two for bridge pier structure;
Accompanying drawing 11 is installed diagrammatic side view two for bridge pier structure;
Accompanying drawing 12 is installed schematic front view three for bridge pier structure;
Accompanying drawing 13 is installed diagrammatic top view three for bridge pier structure;
Accompanying drawing 14 is installed diagrammatic side view three for bridge pier structure;
Accompanying drawing 15 is the structural representation front view of the present embodiment two;
Accompanying drawing 16 is the structural representation top view of the present embodiment two;
Accompanying drawing 17 is the front view of pier base in the present embodiment two;
Accompanying drawing 18 is the top view of pier base in the present embodiment two
Wherein: 1, pier base; 10, pedestal; 11, the first junction plate; 12, indented bars; 13, cover plate; 14, groove; 2, stub body; 20, the second junction plate; 21, junction plate; 22, hole; 3, transport vehicle; 4, high-early-strength mortar.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples:
Embodiment one:
As shown in Figure 1, 2 a kind of integrated precast bridge pier and foundation structure comprise pier base 1, stub body 2, and stub body 2 can be arranged on pier base 1 with dismantling.Specifically:
As shown in Fig. 4,5: pier base 1 comprises pedestal 10, the first junction plate 11, indented bars 12 and cover plate 13, and wherein: pedestal 10 is embedded in underground; Indented bars 11 vertically passes the first junction plate 12, is fixed on pedestal 10 and stretches out the first junction plate 12 top one segment distances, and the extension of indented bars 11 is used for connecting stub body 1; Cover plate 13 covers on the first junction plate 12, and the upper surface of cover plate 13 and ground flush.In the present embodiment: indented bars 11 is fixed the first junction plate 12 along annular; The first junction plate 12 uses steel plate; 13 of cover plates use rubber tile.When stub body 1 was not installed, cover plate 13 covered on the first junction plate 12, did not affect the normal current of road surface.
Stub body 2 bottoms are connected with the second junction plate 20, and in the present embodiment: stub body 1 uses the steel column pier; The second junction plate 20 also uses steel plate.
Below concrete mounting method of setting forth lower the present embodiment:
3, two transport vehicles 3 of the special transport vehicle of use as shown in Fig. 6-14 lock and transport to pier base to be installed 1 with stub body 2; Transport vehicle 3 utilizes self steering, takes 90 ° of stub body 2 pivot studs and adjusts the installation site; Remove the cover plate 13 of pier base 1, transport vehicle 3 reduces, and stub body 2 is dropped on pier base 1; Indented bars 11 is stretched out in partial insertion to the second junction plate 20 of the first junction plate 12, and die jumping-up B(is carried out as shown in Figure 3 in the upper end of double thread reinforcing bar 11), stub body 2 is arranged on pier base 1; After stub body 2 installed, transport vehicle 3 was removed the locking of stub body 2 and is withdrawed from; Transport vehicle 3 turns to 90 ° separately, returns next time and transports.
Embodiment two:
A kind of integrated precast bridge pier and foundation structure as shown in Figure 15,16 comprise pier base 1, stub body 2, and stub body 2 can be arranged on pier base 1 with dismantling.Specifically:
As shown in Figure 17,18: pier base 1 comprises pedestal 10, indented bars 12 and cover plate 13, wherein: pedestal 10 is embedded in underground, indented bars 12 vertically is fixed on pedestal 10 and stretches out its top one segment distance, and the extension of indented bars 11 is used for connecting stub body 1; The position of stretching out indented bars 12 on pedestal 10 offers groove 14; Cover plate 13 covers on pedestal 10, and the upper surface of cover plate 13 and ground flush.In the present embodiment: indented bars 11 is along square annular spread; 13 of cover plates use the steel cushion block.When stub body 1 was not installed, cover plate 13 covered on pedestal 10, did not affect the normal current of road surface.
Stub body 2 bottoms are connected with junction plate 21, offer porosely 22 on junction plate 21, and in the present embodiment: stub body 2 uses the concrete piers; 21 of junction plates use the concrete plate.
When stub body 2 was arranged on pier base 1, indented bars 12 stretched out the partial insertion of pedestal 10 to the hole 22 of junction plate 21, and hole 22, the corresponding rear interior filling high-early-strength mortar of groove 14.
Above-described embodiment only is explanation technical conceive of the present invention and characteristics, and its purpose is to allow person skilled in the art scholar can understand content of the present invention and implement according to this, can not limit protection scope of the present invention with this.All equivalences that Spirit Essence is done according to the present invention change or modify, within all should being encompassed in protection scope of the present invention

Claims (8)

1. an integrated precast bridge pier and foundation structure, it is characterized in that: comprise pier base, stub body, described stub body can be arranged on described pier base with dismantling, described pier base comprises pedestal, the first junction plate and indented bars, described pedestal is embedded in underground, described indented bars vertically passes described the first junction plate, is fixed on described pedestal and stretches out described the first junction plate top one segment distance; Described stub body bottom is connected with the second junction plate, and when described stub body was arranged on described pier base, described indented bars stretched out the partial insertion of described the first junction plate to described the second junction plate.
2. a kind of integrated precast bridge pier according to claim 1 and foundation structure, it is characterized in that: described pier base also comprises cover plate, when described stub body is not installed, described cover plate covers on described the first junction plate, and the upper surface of described cover plate and ground flush.
3. a kind of integrated precast bridge pier according to claim 2 and foundation structure, it is characterized in that: described cover plate is rubber tile with holes.
4. a kind of integrated precast bridge pier according to claim 1 and foundation structure, it is characterized in that: described stub body is the steel column pier; Described the first junction plate, the second junction plate are steel plate.
5. an integrated precast bridge pier and foundation structure, it is characterized in that: comprise pier base, stub body, described stub body can be arranged on described pier base with dismantling, described pier base comprises pedestal, indented bars, described pedestal is embedded in underground, described indented bars vertically is fixed on described pedestal and stretches out its top one segment distance, and the position of stretching out described indented bars on described pedestal offers groove; Described stub body bottom is connected with junction plate, offer porose on described junction plate, when described stub body is arranged on described pier base, the partial insertion that described indented bars stretches out described pedestal and is filled with mortar in described hole, groove to the hole of described junction plate.
6. a kind of integrated precast bridge pier according to claim 5 and foundation structure, it is characterized in that: described pier base also comprises cover plate, when described stub body was not installed, described cover plate covered on described pedestal, and the upper surface of described cover plate and ground flush.
7. a kind of integrated precast bridge pier according to claim 6 and foundation structure, it is characterized in that: described cover plate is concrete or steel cushion block with holes.
8. a kind of integrated precast bridge pier according to claim 5 and foundation structure, it is characterized in that: described stub body is the concrete pier; Described junction plate is the concrete plate.
CN201310102535.5A 2013-03-27 2013-03-27 Integrated prefabricated pier and foundation structure Active CN103147460B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310102535.5A CN103147460B (en) 2013-03-27 2013-03-27 Integrated prefabricated pier and foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310102535.5A CN103147460B (en) 2013-03-27 2013-03-27 Integrated prefabricated pier and foundation structure

Publications (2)

Publication Number Publication Date
CN103147460A true CN103147460A (en) 2013-06-12
CN103147460B CN103147460B (en) 2015-07-22

Family

ID=48545753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310102535.5A Active CN103147460B (en) 2013-03-27 2013-03-27 Integrated prefabricated pier and foundation structure

Country Status (1)

Country Link
CN (1) CN103147460B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258333A (en) * 2019-04-30 2019-09-20 中国一冶集团有限公司 The jig structure and its application method of leveling connection are quickly positioned for Precast Pier Columns
CN112195961A (en) * 2020-09-29 2021-01-08 中国建筑一局(集团)有限公司 Supporting foundation conversion structure in limited space and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2205502C (en) * 1994-11-23 2001-09-11 Allan P. Henderson Tensionless pier foundation
CN101509259A (en) * 2009-04-03 2009-08-19 中铁大桥勘测设计院有限公司 Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge
CN101818478A (en) * 2010-03-09 2010-09-01 河海大学 Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN202031369U (en) * 2010-08-06 2011-11-09 山东中能杆塔有限公司 Communication pole tower with steel concrete structure
CN202380475U (en) * 2011-12-14 2012-08-15 河南省电力勘测设计院 Device for connecting reinforced concrete rod with foundation
CN202559251U (en) * 2012-03-27 2012-11-28 天津海河下游开发有限公司 Anchorage structure of vertical-rotating movable bridge bearing seat
CN203200773U (en) * 2013-03-27 2013-09-18 郑州市大方实业有限公司 Integral type prefabricated bridge pier and foundation structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2205502C (en) * 1994-11-23 2001-09-11 Allan P. Henderson Tensionless pier foundation
CN101509259A (en) * 2009-04-03 2009-08-19 中铁大桥勘测设计院有限公司 Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge
CN101818478A (en) * 2010-03-09 2010-09-01 河海大学 Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam
CN202031369U (en) * 2010-08-06 2011-11-09 山东中能杆塔有限公司 Communication pole tower with steel concrete structure
CN202380475U (en) * 2011-12-14 2012-08-15 河南省电力勘测设计院 Device for connecting reinforced concrete rod with foundation
CN202559251U (en) * 2012-03-27 2012-11-28 天津海河下游开发有限公司 Anchorage structure of vertical-rotating movable bridge bearing seat
CN203200773U (en) * 2013-03-27 2013-09-18 郑州市大方实业有限公司 Integral type prefabricated bridge pier and foundation structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258333A (en) * 2019-04-30 2019-09-20 中国一冶集团有限公司 The jig structure and its application method of leveling connection are quickly positioned for Precast Pier Columns
CN112195961A (en) * 2020-09-29 2021-01-08 中国建筑一局(集团)有限公司 Supporting foundation conversion structure in limited space and construction method

Also Published As

Publication number Publication date
CN103147460B (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN107558494B (en) Underground station structure for rail transit and construction method thereof
CN103452130B (en) The deformed bar net board-like barricade of reinforcement earth pillar
CN106168053A (en) Y shape pillar is used to be combined the structure at design large span deep buried metro station with uplift pile
CN203729324U (en) Anchor rod lattice type retaining wall structure
CN104153311B (en) A kind of highway barrier bracing means and reinforcement means thereof
CN204125872U (en) A kind of highway barrier bracing means
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN102146676A (en) High-steep side slope subgrade structure for mountain area
CN105926391A (en) Method for widening shoulder of existing railway subgrade
CN105926422A (en) Bridge and underground pipe gallery integral structure and method for constructing same
CN203200773U (en) Integral type prefabricated bridge pier and foundation structure
CN202148907U (en) Non-isoparametric initial-stage supporting structure of four-lane large-span tunnel
CN103147460B (en) Integrated prefabricated pier and foundation structure
CN204753261U (en) Light -duty road bed of a doublestage shelves structure
KR101326574B1 (en) Foundation structure for pillar
CN206070724U (en) The structure at design large span deep buried metro station is combined using Y shape pillar with uplift pile
CN103147386B (en) Approach bridge vehicle
CN103088734B (en) Three-dimensional transportation system for urban main road
CN203654194U (en) Quick construction structure for bridge
KR20110137644A (en) A fixing structure of pillar and construction method thereof
CN202989942U (en) Wall foundation structure for soft soil or high backfill soil area
CN203654193U (en) Quick bridge construction structure
CN103696370B (en) A kind of Quick bridge construction method and structure
CN211897677U (en) Embedded-extruded type construction waste kerbstone
WO2013063862A1 (en) Ultimate structural method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant