CN202559251U - Anchorage structure of vertical-rotating movable bridge bearing seat - Google Patents
Anchorage structure of vertical-rotating movable bridge bearing seat Download PDFInfo
- Publication number
- CN202559251U CN202559251U CN2012201202219U CN201220120221U CN202559251U CN 202559251 U CN202559251 U CN 202559251U CN 2012201202219 U CN2012201202219 U CN 2012201202219U CN 201220120221 U CN201220120221 U CN 201220120221U CN 202559251 U CN202559251 U CN 202559251U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- anchorage
- bearing support
- bearing seat
- movable bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses an anchorage structure of a vertical-rotating movable bridge bearing seat. The anchorage structure comprises a main pier and a bearing seat fixing steel plate, and an anchorage is arranged between the main pier and the bearing seat fixing steel plate. The anchorage comprises an anchorage steel plate, a vibration-free micro expansive concrete connecting part, a plurality of adjusting threaded rods, and a plurality of T head bolts provided with steel pipes in a sleeved mode, wherein the anchorage steel plate is arranged inside the main pier and parallel to the bearing seat fixing steel plate, a plurality of adjusting threaded rod pre-bury steel plates are disposed on the periphery of the anchorage of the main pier. The adjusting threaded rods are connected to the bearing seat fixing steel plate and the adjusting threaded rod pre-bury steel plates, the head portion of each T head bolt is positioned at the anchorage steel plate end, and the other end of each T head bolt passes through the bearing seat fixing steel plate and stretches out the anchorage. The anchorage structure of the vertical-rotating movable bridge bearing seat enables absolute error of the anchorage and a plurality of relative errors to meet requirements of a mechanical system, cutting blocks can meet the requirements of horizontal stress, the T head bolts sleeved inside the steel pipes can meet the requirements of vertical stress, and the anchorage structure can be accurately positioned in the construction process and can withstand the horizontal and the vertical load.
Description
Technical field
The utility model relates to the anchorage style in a kind of movable bridge, relates in particular to a kind of vertical transfer movable bridge bearing support anchor structure that is used for.
Background technology
Movable bridge is meant and is navigation needs, the bridge of mode foldings such as superstructure can be revolved perpendicularly to revolve, to put down, lifting.Busy when land transport, ship's navigation is arranged on the river and fixed bridge can not be built in navigational clearance when above, just need to build movable bridge, thereby to solve land and water transportation.Movable bridge commonly used has: the 1. upright bridge that changes.The bridge of the rotatable folding on facade of the bridge span structure above the navigation channel.The whole title list Ye Shili that strides bascule changes movable bridge from an end folding; Folding is divided into the upright movable bridge that changes of title double-valve type of two parts bascule from two ends.Bascule is provided with mechanical device and electrical equipments such as hinge and balance weight.2. lift bridge.The spanning of navigation part is made liftable structure movable bridge two ends respectively has a pylon, places with mechanical, electrical device and balance weight.3. swing bridge.Bridge span structure is around the movable bridge of a vertical pivot rotation.No matter be the movable bridge which kind of opens form; All can relate to the anchoring of different modes; Require to be satisfied its peripheral shearing and resistance by the bearing capacity of anchoring body after the anchoring; Especially to the anchoring of bearing support, the absolute error of requirement itself and a plurality of relative errors need satisfy outside the mechanical system requirement, can bear level and vertical load simultaneously.At present, direct pre-buried steel member is adopted in the anchoring in to movable bridge between the bearing support of block bearing and the main pier usually, because concrete need vibrate; Add the concrete shrinkage reason; The position of steel member is difficult to guarantee, therefore, can not reaches the job requirement of mechanical system.
The utility model content
To above-mentioned prior art, the utility model provides a kind of anchor structure of vertical transfer movable bridge bearing support, and this anchor structure can make the absolute error of itself and a plurality of relative errors need satisfy outside the mechanical system requirement, can bear level and vertical load simultaneously.
In order to solve the problems of the technologies described above, the technical scheme that the anchor structure of the utility model vertical transfer movable bridge bearing support is achieved is: this anchor structure comprises main pier and bearing support fixation steel plate, anchoring between said main pier and the said bearing support fixation steel plate; Said anchoring comprises anchor plate, little swollen concrete connecting portion of exempting to shake, a plurality of adjusting screw(rod), a plurality of T hook bolt that is set with steel pipe; Said anchor plate is arranged in the said main pier and is parallel with said bearing support fixation steel plate; In said main pier, be positioned on the periphery of anchoring and be provided with a plurality of adjusting screw(rod) pre-embedded steel slabs; Said adjusting screw(rod) is connected in said bearing support fixation steel plate and said adjusting screw(rod) pre-embedded steel slab; The head of said T hook bolt is positioned at said anchor plate end, and the other end of said T hook bolt stretches out anchoring after passing said bearing support fixation steel plate.
The anchor structure of the utility model vertical transfer movable bridge bearing support wherein, has the gap between said T hook bolt and the suit steel pipe above that.Be provided with a cutout with said bearing support fixation steel plate contact jaw on said little swollen concrete connecting portion of exempting to shake.Said a plurality of T hook bolt that is set with steel pipe is covered with on described bearing support fixation steel plate according to array.
Compared with prior art the utlity model has following beneficial effect: bearing support fixation steel plate horizontal tilt angle is not more than 1 '; Two bearing support fixation steel plates of same main pier discrepancy in elevation is not more than 2mm, and four bearing support fixation steel plate discrepancy in elevation of two main piers are not more than 3mm.If construction error has expansion slightly, will cause equipment attrition, reduce service life of equipment.In the technology of anchoring, comprise the little swollen concrete part of shaking of exempting from that first phase concreting part and second phase build.Wherein, in the first phase concreting, vibrate because of needs adopt machinery, if directly imbed steel member group wherein, construction error only can reach ± 20mm, is 10 times that mechanical system requires.And be to come regulating shaft bearing fixation steel plate through adjusting screw(rod) in the utility model, can satisfy the mechanical system requirement; In exempting from of building of second phase shaken little swollen concrete, because of little swollen concrete of exempting to shake need not vibrate, and anti-contracility can be superior, the plan-position precision that makes the bearing support fixation steel plate within ± 2mm, thereby effectively control construction error.In addition, the cutout in the utility model can satisfy horizontal force request, and the T hook bolt that is enclosed within the steel pipe can satisfy the vertical applied force requirement.
Description of drawings
Fig. 1 is the plan view of the anchor structure of the utility model vertical transfer movable bridge bearing support;
Fig. 2 is the facade view of the anchor structure of the utility model vertical transfer movable bridge bearing support;
Fig. 3 is the side sectional view of the anchor structure of the utility model vertical transfer movable bridge bearing support.
Among the figure:
1---main pier 2---bearing support fixation steel plate
3---anchor plate 4---cutout
31---little swollen concrete connecting portion 32 of exempting to shake---adjusting screw(rod)
33---adjusting screw(rod) pre-embedded steel slabs 34---are set with the T hook bolt of steel pipe
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done to describe in further detail.
Like Fig. 1, Fig. 2 and shown in Figure 3, the anchor structure of the utility model vertical transfer movable bridge bearing support comprises main pier 1 and bearing support fixation steel plate 2, anchoring between said main pier 1 and the said bearing support fixation steel plate 2; Said anchoring comprises anchor plate 3, exempt to shake little swollen concrete connecting portion 31, a plurality of adjusting screw(rod) 32, a plurality of T hook bolt 34 that is set with steel pipe; Said a plurality of T hook bolt 34 that is set with steel pipe is covered with on described bearing support fixation steel plate 2 according to array; Have the gap between said T hook bolt 34 and the suit steel pipe above that, said anchor plate 3 is arranged in the said main pier 1 and is parallel with said bearing support fixation steel plate 2; In said main pier 1, be positioned on the periphery of anchoring and be provided with a plurality of adjusting screw(rod) pre-embedded steel slabs 33; Said adjusting screw(rod) 32 is connected in said bearing support fixation steel plate 2 and said adjusting screw(rod) pre-embedded steel slab 33; The head of said T hook bolt 34 is positioned at said anchor plate 3 ends, and the other end of said T hook bolt 34 stretches out anchoring after passing said bearing support fixation steel plate 2.Be provided with a cutout 4 with said bearing support fixation steel plate 2 contact jaws on said little swollen concrete connecting portion 31 of exempting to shake.Said cutout 4 is used for resisting shearing, and wherein cutout 4 is provided with in order to satisfy force request, is enclosed within T hook bolt 34 in the steel pipe and can in steel pipe, swing and can not bear shearing, but can bear the pulling force that makes progress, and can satisfy the vertical applied force requirement with this.
The technology that realizes the utility model is: use the ordinary concrete material main pier 1 of constructing, first pre-buried adjusting screw(rod) pre-embedded steel slab 33 before the main pier 1 of construction.Be fixed on bearing support fixation steel plate that assembles in advance 2 and cutout 4 on the adjusting screw(rod) pre-embedded steel slab 33 through adjusting screw(rod) 32 then.The length of adjustment adjusting screw(rod) 32 realizes through rotating its top nut, and then the position of adjustment bearing support fixation steel plate 2, is enclosed within the interior T hook bolt 34 of steel pipe because of being enclosed within the steel pipe, can swing.After its position is met the demands, build again and exempt to shake little swollen concrete.Because of little swollen concrete of exempting to shake need not vibrate, and anti-contracility can be superior, and the positional precision that makes the bearing support fixation steel plate is within the scope that mechanical system requires.
In the utility model mentioned to the little swollen concrete that shakes of exempting from of exempting to shake that little swollen concrete connecting portion adopted belong to the known technology in the present technique field; Be meant: improve concrete flowability and shrinkage through proportioning; Do not need machinery to vibrate when building and just can reach self-compaction, and shrinkage factor is lower.
Although top combination figure is described the utility model, the utility model is not limited to the above-mentioned specific embodiment, and the above-mentioned specific embodiment only is schematically, rather than restrictive.
Claims (4)
1. the anchor structure of a vertical transfer movable bridge bearing support comprises main pier (1) and bearing support fixation steel plate (2), it is characterized in that anchoring between said main pier (1) and the said bearing support fixation steel plate (2);
Said anchoring comprises anchor plate (3), the little swollen concrete connecting portion (31) of exempting to shake, a plurality of adjusting screw(rod) (32), a plurality of T hook bolt (34) that is set with steel pipe; Said anchor plate (3) is arranged in the said main pier (1) and is parallel with said bearing support fixation steel plate (2); In said main pier (1), be positioned on the periphery of anchoring and be provided with a plurality of adjusting screw(rod) pre-embedded steel slabs (33);
Said adjusting screw(rod) (32) is connected in said bearing support fixation steel plate (2) and said adjusting screw(rod) pre-embedded steel slab (33); The head of said T hook bolt (34) is positioned at said anchor plate (3) end, and the other end of said T hook bolt (34) stretches out anchoring after passing said bearing support fixation steel plate (2).
2. according to the anchor structure of the said vertical transfer movable bridge of claim 1 bearing support, it is characterized in that having the gap between said T hook bolt (34) and the suit steel pipe above that.
3. according to the anchor structure of the said vertical transfer movable bridge of claim 1 bearing support, it is characterized in that the said little swollen concrete connecting portion (31) of exempting to shake is gone up and is being provided with a cutout (4) with said bearing support fixation steel plate (2) contact jaw.
4. according to the anchor structure of the said vertical transfer movable bridge of claim 1 bearing support, it is characterized in that said a plurality of T hook bolts (34) that are set with steel pipe are covered with on described bearing support fixation steel plate (2) according to array.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201202219U CN202559251U (en) | 2012-03-27 | 2012-03-27 | Anchorage structure of vertical-rotating movable bridge bearing seat |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012201202219U CN202559251U (en) | 2012-03-27 | 2012-03-27 | Anchorage structure of vertical-rotating movable bridge bearing seat |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202559251U true CN202559251U (en) | 2012-11-28 |
Family
ID=47208921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012201202219U Expired - Fee Related CN202559251U (en) | 2012-03-27 | 2012-03-27 | Anchorage structure of vertical-rotating movable bridge bearing seat |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202559251U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147460A (en) * | 2013-03-27 | 2013-06-12 | 郑州市大方实业有限公司 | Integrated prefabricated pier and foundation structure |
-
2012
- 2012-03-27 CN CN2012201202219U patent/CN202559251U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147460A (en) * | 2013-03-27 | 2013-06-12 | 郑州市大方实业有限公司 | Integrated prefabricated pier and foundation structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7996944B2 (en) | Tilt-lift method for erecting a bridge | |
CN104746422A (en) | Bridge prefabricated hollow pier column post-poured connecting structure and construction method | |
CN108374352B (en) | A kind of the pier bottom rotation swivel construction method and system of wide-plate bridge pier | |
CN101525871B (en) | Multifunctional complete cantilever form and concrete pouring method thereby | |
CN104153303A (en) | Method for replacing self-balancing backpressure type bridge single-support | |
CN106894346B (en) | A kind of the continuous beam bridge construction method | |
CN213233158U (en) | Swivel beam arrangement for crossing compound routes | |
CN109989330A (en) | Continous way track and its erection method | |
CN202559251U (en) | Anchorage structure of vertical-rotating movable bridge bearing seat | |
CN102094393B (en) | Construction process of steel-concrete joint for steel and concrete mixed continuous steel structure bridge | |
CN202559252U (en) | Anchoring structure for opening bridge pin rack rail through vertical rotation | |
CN109537472B (en) | Precast beam end bottom die rotating hinge device and application method thereof | |
CN102758405B (en) | Technology for integrally jacking steel box girder and concrete beam | |
CN210684430U (en) | Main bridge jacking system of large-span tied arch bridge | |
CN110565537B (en) | Swivel bridge with shock insulation function and construction method thereof | |
CN111910533A (en) | Swivel beam device for cross compound route, construction method and application of swivel beam device | |
CN107214826A (en) | The steel die device and its construction method of a kind of hollow slab girder prefabricated construction | |
CN110700122A (en) | A antidumping reinforced structure for rectangle single-column mound bridge | |
CN108517786B (en) | Replaceable swivel spherical hinge and installation method thereof | |
CN110820529A (en) | Tower cable-stayed bridge with openable bridge deck | |
CN207597264U (en) | Leg structure in a kind of upstroke movable framework | |
CN113235400A (en) | Adjustable slot-in type prefabricated pier stud and bearing platform connecting structure and construction method | |
CN202170474U (en) | Support system mixing type combined beam cable-stayed bridge | |
CN113235402A (en) | Connection structure of layered pouring bearing platform and prefabricated pier stud and construction method | |
CN211735114U (en) | A antidumping reinforced structure for rectangle single-column mound bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121128 Termination date: 20160327 |
|
CF01 | Termination of patent right due to non-payment of annual fee |