CN106894346B - A kind of the continuous beam bridge construction method - Google Patents
A kind of the continuous beam bridge construction method Download PDFInfo
- Publication number
- CN106894346B CN106894346B CN201710290347.8A CN201710290347A CN106894346B CN 106894346 B CN106894346 B CN 106894346B CN 201710290347 A CN201710290347 A CN 201710290347A CN 106894346 B CN106894346 B CN 106894346B
- Authority
- CN
- China
- Prior art keywords
- jack
- precast beam
- continuous
- temporary support
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710290347.8A CN106894346B (en) | 2017-04-28 | 2017-04-28 | A kind of the continuous beam bridge construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710290347.8A CN106894346B (en) | 2017-04-28 | 2017-04-28 | A kind of the continuous beam bridge construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106894346A CN106894346A (en) | 2017-06-27 |
CN106894346B true CN106894346B (en) | 2019-10-11 |
Family
ID=59196603
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710290347.8A Active CN106894346B (en) | 2017-04-28 | 2017-04-28 | A kind of the continuous beam bridge construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106894346B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107245954B (en) * | 2017-07-28 | 2019-03-01 | 山西省交通科学研究院 | A kind of Mid and minor spans steel box girder bridge construction method |
CN108060636B (en) * | 2017-12-11 | 2019-09-17 | 重庆交通大学 | The construction method of overall assembled composite beam bridge |
CN110512795B (en) * | 2018-05-21 | 2021-12-21 | 深圳市建筑设计研究总院有限公司 | Method and device for fixing flexural member |
CN110512726B (en) * | 2018-05-21 | 2021-11-09 | 深圳市建筑设计研究总院有限公司 | Method and device for fixing concrete flexural member |
CN113073557B (en) * | 2021-03-19 | 2022-08-30 | 中铁大桥局集团第一工程有限公司 | Method for mounting concrete bridge deck of steel-concrete combined continuous steel truss bridge |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4040901B2 (en) * | 2002-04-25 | 2008-01-30 | 鹿島建設株式会社 | Three-dimensional intersection construction method and three-dimensional intersection |
JP4040900B2 (en) * | 2002-04-25 | 2008-01-30 | 鹿島建設株式会社 | 3D intersection construction method, 3D intersection and moving platform |
CN103774554B (en) * | 2013-10-30 | 2015-11-18 | 北京工业大学 | A kind of king-tower tractive erection method of self-anchored suspension bridge case beam |
CN103981808A (en) * | 2014-05-15 | 2014-08-13 | 宝鸡中铁宝桥天元实业发展有限公司 | Large steel tank beam depth bed position assembly walking-type pushing construction method and walking-type pushing equipment |
CN104032681A (en) * | 2014-06-30 | 2014-09-10 | 北京交通大学 | Linear adjustment method of track girder bridges of straddle-type monorail transportation simple-support-first rigid-framework-second system |
-
2017
- 2017-04-28 CN CN201710290347.8A patent/CN106894346B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106894346A (en) | 2017-06-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106894346B (en) | A kind of the continuous beam bridge construction method | |
CN101824800B (en) | Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam | |
CN103266574B (en) | Simply-supported box girder bridge strengthening method with oblique cables | |
CN207143733U (en) | A kind of simple-supported thencontinuous bridge system converting system | |
CN103938546A (en) | Simple-supported continuous construction method and structure thereof | |
CN103938533A (en) | Simple-supported continuous structure and construction method thereof | |
CN104153284A (en) | Partial filling type steel box concrete continuous composite girder bridge and construction method thereof | |
CN101446067B (en) | Construction method for Y-shaped frame of large-span steel box basket arch bridge | |
CN107988924B (en) | Steel-concrete composite girder bridge system conversion system and conversion method based on old bridge reconstruction | |
CN113550235A (en) | Cast-in-place bent cap support and construction method thereof | |
CN104831639A (en) | Consolidation and release construction method for 0# blocks of ultra-wide non-uniform continuous beam | |
CN201648978U (en) | Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam | |
CN111749133A (en) | Beam-arch combined rigid frame bridge and construction method of bridge pier thereof | |
CN103835238B (en) | A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing | |
CN210684430U (en) | Main bridge jacking system of large-span tied arch bridge | |
CN102493363B (en) | Quick construction method for segment No.0 of continuous beam | |
CN211815595U (en) | Lower tower column tension and compression structure for cable tower | |
CN215714684U (en) | Cast-in-situ bent cap support | |
CN209873553U (en) | Prefabricated assembled cylindricality pier | |
CN112482193A (en) | Method for applying compressive stress to concrete slab in hogging moment area of combination beam, main beam and cable-stayed bridge | |
CN113969538A (en) | Cable-stayed bridge construction system and construction method | |
CN107815976B (en) | A kind of construction method of multi-joint continuous beam or multi-joint rigid structure beam end bay straight line beam section | |
CN213233165U (en) | Bridge auxiliary pier support installation device | |
CN104929046A (en) | Method for unloading sandboxes of section pre-fabricated steel truss continuous beam bridge | |
CN212505806U (en) | Cable-stayed bridge construction system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Lei Inventor after: Guo Wenlong Inventor after: Wu Jiajia Inventor after: Liu Zhihua Inventor after: Han Zhijiang Inventor after: Wang Yongqiang Inventor after: Zhao Lei Inventor before: Wang Lei Inventor before: Han Zhijiang Inventor before: Wu Jiajia Inventor before: Liu Zhihua Inventor before: Zhao Lei Inventor before: Wang Yongqiang Inventor before: Guo Wenlong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |