CN101509259A - Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge - Google Patents

Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge Download PDF

Info

Publication number
CN101509259A
CN101509259A CNA2009100614036A CN200910061403A CN101509259A CN 101509259 A CN101509259 A CN 101509259A CN A2009100614036 A CNA2009100614036 A CN A2009100614036A CN 200910061403 A CN200910061403 A CN 200910061403A CN 101509259 A CN101509259 A CN 101509259A
Authority
CN
China
Prior art keywords
pier shaft
prefabricated pier
cushion cap
prefabricated
durability
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100614036A
Other languages
Chinese (zh)
Inventor
黄燕庆
梅新咏
张必准
王军炜
陈宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CNA2009100614036A priority Critical patent/CN101509259A/en
Publication of CN101509259A publication Critical patent/CN101509259A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A high-durability connecting method of a prefabricated pier shaft with a cushion cap of a bridge spanning the sea, relates to a big bridge pier with high-durability connecting between the prefabricated pier shaft and foundation in the sea corrosion environment; wherein, the prefabricated pier shaft, the cushion cap are connected with wet connector concrete in the middle, the under-part of the prefabricated pier shaft is provided with a flaring transition section and a straight line section, the reservation steel bars of the prefabricated pier shaft in the middle of the wet connector concrete are connected with the reservation steel bars of the cushion cap by double side welding, and a water-seal rubber strip is arranged between the prefabricated pier shaft and the cushion cap. The wet connector concrete is isolated with the sea corrosion environment by a prefabricated pier shaft wall, which puts an end to the situation that the injurious ingredient in the sea invades into the inner of the wet connector; the body of the prefabricated pier shaft is prefabricated in a land factory, therefore, the quality can be controlled effectively and the probability of the surface crack occurrence is lowered; employing the corrosion prevention system can greatly improve the self-durability of structure and effectively block corrosion channels, therefore, the service life of structure can be extended.

Description

The high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea and cushion cap
Technical field
The present invention relates to a kind of at the bridge bridge pier that the high-durability connected mode is arranged between bridge prefabrication pier shaft and the basis under the marine corrosion environment.
Background technology
Along with the development of economic society, the construction of bridge spanning the sea is in the ascendant.Consider that the non-navigation bridge of general bridge spanning the sea accounts for the overwhelming majority and is in the marine site, specific bridge construction conditions such as construction operation zone apparent wind is big, wave is high, stream is anxious, the frequent generation of typhoon natural calamity weather, for reducing marine cast-in-place workload, reduce the offshore construction operating risk, guaranteeing construction quality, accelerating construction progress, the integral prefabricated lifting of the general employing of the non-navigation bridge of bridge spanning the sea pier construction is again with cushion cap basis ways of connecting.
Domesticly built and all occurred external crack in various degree, influenced presentation quality at the prefabricated pier shaft of building bridge spanning the sea and basic connecting portion; Simultaneously under marine environment, chlorion etc. corrode works inside by face crack easily to the harmful material of works, form the corrosion passage, reduce works application life.
Summary of the invention
The objective of the invention is at above-mentioned present situation, aim to provide and a kind ofly can effectively reduce even stop external crack, effectively blocking-up corrosion passage improves the works durability, thus the prefabricated pier shaft of a kind of bridge spanning the sea in extending structure thing application life and the high-durability connected mode of cushion cap.
The implementation of the object of the invention is, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea and cushion cap, prefabricated pier shaft, cushion cap are connected with the wet joint concrete of centre, enlarging transition section, straightway are arranged at prefabricated pier shaft bottom, adopt two-sided being welded to connect between the reserved steel bar of the prefabricated pier shaft in the middle of the wet joint concrete and the reserved steel bar of cushion cap, bury the watertight rubber bar between prefabricated pier shaft and the cushion cap underground.
The present invention has the following advantages:
(1) prefabricated pier shaft wall is isolated with wet joint concrete and marine corrosion environment, stopped the situation that harmful components are invaded wet joint inside in the seawater at all, prefabricated pier shaft itself is because in the land prefabrication, quality can be effectively controlled, and the face crack probability of occurrence is less;
(2) employing of anticorrosive protection system has improved works self durability greatly under the marine corrosion environment, and has effectively blocked the corrosion passage, thereby has prolonged works application life.
Description of drawings
Fig. 1 is a structural front view of the present invention,
Fig. 2 is a upright cross-sectional view of the present invention,
Fig. 3 is that the watertight rubber bar is buried schematic diagram underground,
Fig. 4 is a sealing rubber strip drawing,
Fig. 5 is provided with schematic diagram for the prefabricated pier shaft of cushion cap end face outside weathering.
The specific embodiment
With reference to Fig. 1, prefabricated pier shaft 1 of the present invention, cushion cap 2 are connected with the wet joint concrete 3 of centre.Wet joint concrete 3 adopts the high-durability maritime concrete,
With reference to Fig. 2, prefabricated pier shaft 1 bottom is an enlarging transition section 12+ straightway 11.Prefabricated pier shaft 1 bottom enlarging transition section 12 height 〉=75cm, straightway 11 height 〉=50cm; Adopt two-sided being welded to connect between the reserved steel bar 4 of prefabricated pier shaft 1 and the reserved steel bar 5 of cushion cap 2; Bury twice watertight rubber bar 6 between prefabricated pier shaft 1 and the cushion cap 2 underground, be perfused with epoxy mortar between the twice watertight rubber bar.
When the present invention constructed, prefabricated pier shaft bottom enlarging transition section inboard was provided with shaped steel supporting leg 7 and supports as construction is interim.When building wet joint concrete 3, prefabricated pier shaft 1 is supported on the cushion cap 2 by steel leg 7 temporarily, all adopts flat filled weld in front and back to connect in succession between the pre-embedded steel slab 13 of steel leg 7 and prefabricated pier shaft 1 and the pre-embedded steel slab 14 of cushion cap 2.
With reference to Fig. 3, bury twice watertight rubber bar 6, two track pitch 20cm between prefabricated pier shaft 1 and the cushion cap 2 underground, construction finishes and utilizes Grouting Pipe 8 perfusion epoxy mortars between the inside and outside twice watertight rubber bar in back.
With reference to Fig. 4, the end band U type of the imbedding opening of watertight rubber bar, exposed junction band circular opening, such structure is easy to compression, and it is strong to adapt to deformability, and installs easily.
With reference to Fig. 5, cushion cap 2 end faces in the outside of prefabricated pier shaft 1 are provided with weathering 9, and there is the long straightway of 30cm on the top, slope, the gradient of weathering 9 〉=1.5%, and prefabricated pier shaft 1 seals with epoxy mortar with the contact surface of weathering 9.

Claims (8)

1, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea and cushion cap, it is characterized in that prefabricated pier shaft, cushion cap are connected with the wet joint concrete of centre, enlarging transition section, straightway are arranged at prefabricated pier shaft bottom, adopt two-sided being welded to connect between the reserved steel bar of the prefabricated pier shaft in the middle of the wet joint concrete and the reserved steel bar of cushion cap, bury the watertight rubber bar between prefabricated pier shaft and the cushion cap underground.
2, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea according to claim 1 and cushion cap is characterized in that prefabricated pier shaft (1) bottom is enlarging transition section (12)+straightway (11).
3, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea according to claim 1 and cushion cap is characterized in that prefabricated pier shaft bottom enlarging transition section inboard is provided with shaped steel supporting leg (7).
4, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea according to claim 3 and cushion cap is characterized in that adopting flat filled weld in front and back to connect in succession between the pre-embedded steel slab (14) of the pre-embedded steel slab (13) of steel leg (7) and prefabricated pier shaft (1) and cushion cap (2).
5, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea according to claim 1 and cushion cap, it is characterized in that burying twice watertight rubber bar (6) underground between prefabricated pier shaft (1) and the cushion cap (2), be perfused with epoxy mortar between the twice watertight rubber bar.
6, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea according to claim 1 and cushion cap is characterized in that the end of imbedding of watertight rubber bar is with U type opening, exposed junction band circular opening.
7, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea according to claim 1 and cushion cap is characterized in that cushion cap (2) end face in the outside of prefabricated pier shaft (1) is provided with weathering (9).
8, the high-durability connected mode of prefabricated pier shaft of a kind of bridge spanning the sea according to claim 7 and cushion cap is characterized in that the prefabricated pier shaft (1) and the contact surface of weathering (9) seal with epoxy mortar.
CNA2009100614036A 2009-04-03 2009-04-03 Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge Pending CN101509259A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100614036A CN101509259A (en) 2009-04-03 2009-04-03 Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100614036A CN101509259A (en) 2009-04-03 2009-04-03 Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge

Publications (1)

Publication Number Publication Date
CN101509259A true CN101509259A (en) 2009-08-19

Family

ID=41001780

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100614036A Pending CN101509259A (en) 2009-04-03 2009-04-03 Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge

Country Status (1)

Country Link
CN (1) CN101509259A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147460A (en) * 2013-03-27 2013-06-12 郑州市大方实业有限公司 Integrated prefabricated pier and foundation structure
CN104746422A (en) * 2014-09-19 2015-07-01 杭州江润科技有限公司 Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN106587855A (en) * 2017-01-05 2017-04-26 蔡中元 Anti-microbial and anti-corrosion concrete material for marine ecological engineering and preparation method for concrete material
CN106625998A (en) * 2017-01-05 2017-05-10 周文婧 Corrosion-resistant concrete prefabricated part for marine ecological engineering and preparation method thereof
CN107237253A (en) * 2017-07-06 2017-10-10 苏交科集团股份有限公司 Steel reinforced concrete combined bridge durability lifting construction and construction method
CN109440633A (en) * 2018-11-20 2019-03-08 湖南工业大学 Can positioning posture precast pier and cushion cap connecting structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147460A (en) * 2013-03-27 2013-06-12 郑州市大方实业有限公司 Integrated prefabricated pier and foundation structure
CN104746422A (en) * 2014-09-19 2015-07-01 杭州江润科技有限公司 Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN106587855A (en) * 2017-01-05 2017-04-26 蔡中元 Anti-microbial and anti-corrosion concrete material for marine ecological engineering and preparation method for concrete material
CN106625998A (en) * 2017-01-05 2017-05-10 周文婧 Corrosion-resistant concrete prefabricated part for marine ecological engineering and preparation method thereof
CN107237253A (en) * 2017-07-06 2017-10-10 苏交科集团股份有限公司 Steel reinforced concrete combined bridge durability lifting construction and construction method
CN109440633A (en) * 2018-11-20 2019-03-08 湖南工业大学 Can positioning posture precast pier and cushion cap connecting structure

Similar Documents

Publication Publication Date Title
CN101509259A (en) Highly-permanent connection mode for prefabricated pier body and cushion cap of cross-sea bridge
US7942607B2 (en) Underwater tunnel
US9238896B2 (en) Floating structure for supporting a wind turbine
CN111254984B (en) Pipe joint connecting structure of underwater cable-stayed suspension tunnel
CN102619227B (en) Grouting device, assembly and grouting method for single pipe pile foundation of offshore wind turbine generating set
CN111305282A (en) Subway station anti-floating system in weak water-rich stratum and construction method thereof
CN105507346A (en) Prefabricated underground pipe gallery
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN105714819A (en) Novel prestressed anchor cable outer anchor head multiple protection device and fixing method thereof
CN203654309U (en) Pile-caisson hydraulic structure
US20140311058A1 (en) Precast concrete floating structure for supporting a wind turbine
CN101575859A (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN101532386A (en) Method and device for underpinning antifriction separator for shallow underground space construction
CN103572770A (en) Pile box hydraulic structure object and building method thereof
CN205100244U (en) Underground structure inwall and underground continuous wall coincide face structure
CN212104151U (en) Assembled reinforced concrete caisson
CN206015717U (en) The underground pipe gallery of soft soil foundation
CN201292528Y (en) Grouting machine
CN205348225U (en) Prefabricated assembled underground pipe gallery
CN208844617U (en) Half floatation type immersed tube tunnel of underwater support
CN207092141U (en) Pre-stress system for FS final spice
CN106120958A (en) Combined steel case pedestal water intake structure
CN201362844Y (en) Hole-drilling construction platform suitable for circumstance without covering layer at sea
CN105317021A (en) Connection method and structure for variable-section continuous rigid frame aqueducts
CN211057851U (en) Assembled steel-concrete combined square culvert structure based on gyro pile raft plate foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication