prestressing force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721106339.5U
Other languages
Chinese (zh)
Inventor
李毅
刘晓东
杨红
游川
苏怀平
王晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Highway Consultants Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Original Assignee
CCCC Highway Consultants Co Ltd
China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Highway Consultants Co Ltd, China Communications 2nd Navigational Bureau 2nd Engineering Co Ltd filed Critical CCCC Highway Consultants Co Ltd
Priority to CN201721106339.5U priority Critical patent/CN207092141U/en
Application granted granted Critical
Publication of CN207092141U publication Critical patent/CN207092141U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses the pre-stress system for FS final spice, FS final spice includes joint one and joint two, the faying face of joint one and joint two is provided with a circle closed circular waterstop, along joint about one inwall be uniformly arranged several connection members, the connection member of joint setting identical quantity in inwall corresponding position about two, each connection member connection member corresponding with joint two on joint one forms a connector group, and at least one prestressed strand is connected between each connector group.With the pre-stress system, realized by prestressed strand and provide continued compression to waterstop, ensure in FS final spice installation process and waterstop is in the state compressed all the time after installation, prevent water from entering inside FS final spice, waterstop uniform force simultaneously, prevent that impact causes Water stop structure to destroy when external seawater pressure persistently increases during FS final spice sinking, the pre-stress system is simple in construction, it is convenient to set, and works well.

Description

Pre-stress system for FS final spice
Technical field
It the utility model is related to immersed tube tunnel field, more particularly to a kind of pre-stress system for FS final spice.
Background technology
Immersed tunnelling method constructing tunnel, exactly partly latent refute or dry-docking in prefabricated tunnel immersed tube difference transportation by driving to making a reservation for The docking of position sinking, is longer than the metric space of the pipeline section to make the sinking of final section pipeline section smoothly to leave, the remainder away from Pipeline section from the sinking docking of space institute is considered as the equal Immersed tunnel in both ends of FS final spice, i.e. tunnel connection, and in marine docking Close up, the last pipeline section that closes up is FS final spice.The immersed tube tunnel final joint is the key of immersed tube tunnel construction, particularly Off-lying sea overlength immersed tube tunnel construction, job site operating condition is difficult, is faced with the marine environment bars such as wave and the ocean current of complexity Part and meteorological condition.
When immersed tube FS final spice immersed tube is installed, it is easy to control position and posture, reduces and installation to be connected The risk of collision of adjacent immersed tube, convenient to enter installation station, some FS final spices are designed to by joint one and joint 2 two Part is formed by connecting, and the faying face of joint one and joint two is provided with the waterstop of a circle closed circular, it is necessary to paste waterstop Together in two basic change face and compressive state is in, seawater enters inside FS final spice during preventing immersed tube;Due to joint one and connect First two be super large component, it is ensured that waterstop forced compression is uniform, prevents that external seawater pressure continues during FS final spice sinking Impact causes Water stop structure to destroy during increase.
Utility model content
The purpose of this utility model is that it is super large component to solve joint one and joint two, it is ensured that waterstop is forced Contracting is uniform, prevents the problem of impact causes Water stop structure to destroy when external seawater pressure persistently increases during FS final spice sinking, A kind of pre-stress system for FS final spice is provided.
In order to realize above-mentioned purpose of utility model, the utility model provides following technical scheme:
A kind of pre-stress system for FS final spice, FS final spice include joint one and joint two, and the joint one is used A circle closed circular waterstop is provided with the faying face for connecting the joint two, the waterstop is used to fit in the joint Two faying face, along the joint about one inwall be uniformly arranged several connection members, the joint about two inwall it is corresponding Place sets the connection member of identical quantity, and each connection member on the joint one is corresponding with the joint two The connection member form a connector group, connect at least one prestressed strand between each connector group.
Using the pre-stress system described in the utility model for FS final spice, after the waterstop precommpression, Several prestressed strands are connected between the joint one and the joint two, utilize all prestressed strand tensioning Compression to the waterstop between the joint one and the joint two provides lasting supporting, ensures the FS final spice Waterstop all the time in the state compressed, prevents water from entering inside the FS final spice, simultaneously in installation process and after installation All prestressed strand tensioning positioned at FS final spice inner cavity top and bottom make the waterstop uniform force, prevent from sinking The impact of the pressure difference of external seawater pressure and internal air pressure causes the Water stop structure to destroy during pipe, the pre-stress system knot Structure is simple, and it is convenient to set, and works well.
Preferably, the joint one and the joint two are steel-shelled concrete structure, and all connection members are steel Structural member, all connection members are welded on the box hat of the joint one and the joint two.
Preferably, each connection member includes prestressing force bearing plate, web, the first stiffener and anchorage, described pre- Stress bearing plate and the web are vertically connected at the FS final spice inwall, described in the prestressing force bearing plate vertical connection Web, what the web was set is oriented parallel to the prestressed strand axis direction, and first stiffener is parallel to described FS final spice inwall, first stiffener are connected to the prestressing force bearing plate and the web, the prestress steel simultaneously Beam is anchored through the prestressing force bearing plate and by the anchorage.
Using this structure setting so that the connection member intensity is high, is advantageous to prestressed strand described in anchor simultaneously The joint one and the joint two are formed by an entirety by tensioning, ensure the pressure to the waterstop.
Preferably, each connection member also includes girder steel bearing plate, and the girder steel bearing plate pre- is answered parallel to described Power bearing plate, and it is vertically connected at the FS final spice inwall, the web is connected to described through the prestressing force bearing plate Girder steel bearing plate, is connected with the second stiffener between the girder steel bearing plate and the web, second stiffener parallel to The FS final spice inwall, the girder steel bearing plate connects the girder steel of the FS final spice end seal door, for supporting under water pressure The FS final spice end seal door.
Preferably, the girder steel of the girder steel bearing plate and the end seal door is bolted.
Preferably, each connection member is including described in a prestressing force bearing plate, three webs, four First stiffener and two anchorages, two webs are located at the prestressing force bearing plate both ends, and a web is located at institute State in the middle part of prestressing force bearing plate, two prestressed strands are connected to the prestressing force bearing plate, and are located at middle part institute respectively State the both sides of web and anchored by an anchorage, each first stiffener is connected to the two neighboring web and institute Between stating prestressing force bearing plate, both sides respectively set first stiffener to each prestressed strand up and down.
Preferably, each first stiffener is right-angled trapezium, during the longer right-angle side of the right-angled trapezium is connected to The web in portion, shorter right-angle side are connected to the web of end, and height is connected to the prestressing force bearing plate.
Preferably, three webs both pass through the prestressing force bearing plate and are connected to a girder steel bearing plate, and four In individual second stiffener each second stiffener be connected to the two neighboring web and the girder steel bearing plate it Between.
Preferably, each second stiffener is rectangle, and the relative both sides of the rectangle are connected to adjacent two The individual web, another side are connected to the girder steel bearing plate.
Preferably, the waterstop is Gina waterstops.
The utility model additionally provides a kind of construction method of the pre-stress system for FS final spice, using such as to take up an official post The pre-stress system for FS final spice described in one, comprises the following steps:
A, the prefabricated joint one and the joint two, institute is set on the faying face of the joint one and the joint two State waterstop;
B, several connection members are uniformly arranged in the inwall up and down of the joint one and the joint two, and every At least one steel beam is set between the individual connector group, and all described steel beam identical one end are fixedly connected on corresponding described Connection member;
C, uniformly opened the free end for all steel beams being pointed on the FS final spice cross section at four angles Draw and anchor;
D, the uniform tensioning of identical is carried out to the free end of remaining all steel beam and anchored, complete construction.
It is pre- to the waterstop using the construction method of the pre-stress system described in the utility model for FS final spice After compression, several described prestressed strands are connected between the joint one and the joint two, using it is all it is described it is pre- should Compressions of the power steel Shu Zhangla to the waterstop between the joint one and the joint two provides lasting supporting, ensures institute State in FS final spice installation process and waterstop all the time in the state compressed, prevents water from entering the FS final spice after installation Inside, while make the waterstop stress equal positioned at all prestressed strand tensioning of FS final spice inner cavity top and bottom It is even, prevent that the impact of the pressure difference of external seawater pressure and internal air pressure causes the Water stop structure to destroy during immersed tube, this is pre- The construction method step of stress system is simple, easy to operate, works well.
Preferably, after the FS final spice docks with remaining immersed tube and completes draining, into pipe in the construction stage, remove The pre-stress system, avoid influenceing runway construction.
In summary, by adopting the above-described technical solution, the beneficial effects of the utility model are:
1st, with the pre-stress system described in the utility model for FS final spice, after the waterstop precommpression, Several described prestressed strands are connected between the joint one and the joint two, utilize all prestressed strands The compression to the waterstop between the joint one and the joint two is drawn to provide lasting supporting, most terminating described in guarantee Waterstop all the time in the state compressed, prevents water from entering inside the FS final spice, together in head installation process and after installation When all prestressed strand tensioning positioned at FS final spice inner cavity top and bottom make the waterstop uniform force, prevent The impact of the pressure difference of external seawater pressure and internal air pressure causes the Water stop structure to destroy during immersed tube, the pre-stress system Simple in construction, it is convenient to set, and works well;
2nd, with the construction method of the pre-stress system described in the utility model for FS final spice, to the waterstop After precommpression, several described prestressed strands are connected between the joint one and the joint two, using all described pre- Compressions of the stress steel Shu Zhangla to the waterstop between the joint one and the joint two provides lasting supporting, ensures Waterstop all the time in the state compressed, prevents most terminating described in water entrance in the FS final spice installation process and after installation Head is internal, while makes the waterstop stress positioned at all prestressed strand tensioning of FS final spice inner cavity top and bottom Uniformly, prevent that the impact of the pressure difference of external seawater pressure and internal air pressure causes the Water stop structure to destroy during immersed tube, should The construction method step of pre-stress system is simple, easy to operate, works well.
Brief description of the drawings
Fig. 1 is the structural representation of the pre-stress system for FS final spice shown in the utility model;
Fig. 2 is Fig. 1 side view;
Fig. 3 is Fig. 2 partial top view;
Fig. 4 is Fig. 3 partial enlarged drawing;
Fig. 5 is Fig. 4 sectional side view.
Marked in figure:1- joints one, 2- joints two, 3- waterstops, 4- connection members, 41- prestressing force bearing plates, 42- abdomens Plate, the stiffeners of 43- first, 44- anchorages, 45- girder steel bearing plates, the stiffeners of 46- second, 5- prestressed strands, 6- end seal doors.
Embodiment
The utility model is described in further detail with reference to test example and embodiment.But should not be by this The scope for being interpreted as the above-mentioned theme of the utility model is only limitted to following embodiment, all to be realized based on the utility model content Technology belongs to the scope of the utility model.
Embodiment 1
As Figure 1-5, a kind of pre-stress system for FS final spice described in the utility model, FS final spice include Joint 1 and joint 22.
The faying face that the joint 1 is used to connect the joint 22 is provided with a circle closed circular waterstop 3, described Waterstop 3 is used to fit in the faying face of the joint 22, along the joint about one 1 inwall be uniformly arranged several connections Part 4, the joint set the connection member 4 of identical quantity in inwall corresponding position about 22, every on the joint 1 The individual connection member 4 connection member 4 corresponding with the joint 22 forms a connector group, each company At least one prestressed strand 5 is connected between fitting group.
As a preferred scheme of the present embodiment, the joint 1 and the joint 22 are steel-shelled concrete structure, All connection members 4 are steel construction piece, and all connection members 4 are welded in the joint 1 and the joint 22 Box hat on, the waterstop 3 is Gina waterstops.
As a preferred scheme of the present embodiment, each connection member 4 includes prestressing force bearing plate 41, web 42nd, the first stiffener 43 and anchorage 44, the prestressing force bearing plate 41 and the web 42 are vertically connected at the most terminating Head inwall, web 42 described in the vertical connection of prestressing force bearing plate 41, what the web 42 was set is oriented parallel to described pre- The axis direction of stress steel beam 5, first stiffener 43 is parallel to the FS final spice inwall, and first stiffener 43 is simultaneously The prestressing force bearing plate 41 and the web 42 are connected to, the prestressed strand 5 passes through the prestressing force bearing plate 41 simultaneously Anchored by the anchorage 44, using this structure setting so that the connection member semi-finals degree is high, is advantageous to pre- described in anchor The joint 1 and the joint 22 are simultaneously formed an entirety by stress steel beam 5 by tensioning, are ensured to the waterstop 3 Pressure.Each connection member 4 includes a web 42, four described first of prestressing force bearing plate 41, three Stiffener 43 and two anchorages 44, two webs 42 are located at the both ends of prestressing force bearing plate 41, a web 42 Positioned at the middle part of prestressing force bearing plate 41, two prestressed strands 5 are connected to the prestressing force bearing plate 41, and respectively Anchored positioned at the both sides of the middle part web 42 and by an anchorage 44, each first stiffener 43 is connected to adjacent Between two webs 42 and the prestressing force bearing plate 41, each prestressed strand respectively sets one in both sides about 5 First stiffener 43, each first stiffener 43 are right-angled trapezium, and the longer right-angle side of the right-angled trapezium connects The web 42 in middle part, shorter right-angle side are connected to the web 42 of end, and height is connected to the prestressing force pressure-bearing Plate 41.
As a preferred scheme of the present embodiment, each connection member 4 also includes girder steel bearing plate 45, the steel Joist support pressing plate 45 is vertically connected at the FS final spice inwall parallel to the prestressing force bearing plate 41, and the web 42 is worn Cross the prestressing force bearing plate 41 and be connected to the girder steel bearing plate 45, connect between the girder steel bearing plate 45 and the web 42 The second stiffener 46 is connected to, second stiffener 46 connects parallel to the FS final spice inwall, the girder steel bearing plate 45 The girder steel of the FS final spice end seal door 6, for supporting the end seal door 6 of the FS final spice under water pressure.The girder steel is held The girder steel of pressing plate 45 and the end seal door 6 is bolted.Three webs 42 both pass through the prestressing force bearing plate 41 A girder steel bearing plate 45 is connected to, each second stiffener 46 is connected to phase in four second stiffeners 46 Between adjacent two webs 42 and the girder steel bearing plate 45, each second stiffener 46 is rectangle, the rectangle phase To both sides be connected to the web 42 of adjacent two, another side is connected to the girder steel bearing plate 45.
With the pre-stress system described in the utility model for FS final spice, after the precommpression of waterstop 3, Several described prestressed strands 5 are connected between the joint 1 and the joint 22, utilize all prestressed strands 5 Tensioning provides lasting supporting to compressing for the waterstop 3 between the joint 1 and the joint 22, described in guarantee Waterstop 3 all the time in the state compressed, prevents water from entering the FS final spice in FS final spice installation process and after installation Inside, while make the stress of waterstop 3 positioned at all tensioning of prestressed strand 5 of FS final spice inner cavity top and bottom Uniformly, prevent that the impact of the pressure difference of external seawater pressure and internal air pressure causes the structure of waterstop 3 to destroy during immersed tube, should Pre-stress system is simple in construction, and it is convenient to set, and works well.
Embodiment 2
As Figure 1-5, the construction method of a kind of pre-stress system for FS final spice described in the utility model, should With the pre-stress system for being used for FS final spice as described in Example 1, comprise the following steps:
A, the prefabricated joint 1 and the joint 22, set on the faying face of the joint 1 and the joint 22 Put the waterstop 3;
B, several connection members 4 are uniformly arranged in the inwall up and down of the joint 1 and the joint 22, and At least one steel beam is set between each connector group, and all described steel beam identical one end are fixedly connected on corresponding The connection member 4;
C, uniformly opened the free end for all steel beams being pointed on the FS final spice cross section at four angles Draw and anchor;
D, the uniform tensioning of identical is carried out to the free end of remaining all steel beam and anchored, complete construction.
As a preferred scheme of the present embodiment, after the FS final spice docks with remaining immersed tube and completes draining, Construction stage in into pipe, the pre-stress system at inwall on the FS final spice is removed, avoid influenceing runway construction, it is lower interior Pre-stress system at wall retains, construct road surface when cover.
With the construction method of the pre-stress system described in the utility model for FS final spice, to the waterstop 3 After precommpression, several prestressed strands 5 are connected between the joint 1 and the joint 22, using all described Compression of the tensioning of prestressed strand 5 to the waterstop 3 between the joint 1 and the joint 22 provides lasting branch Hold, ensure in the FS final spice installation process and waterstop 3 all the time in the state compressed, prevents water from entering institute after installation State inside FS final spice, at the same all tensioning of prestressed strand 5 positioned at FS final spice inner cavity top and bottom make it is described The uniform force of waterstop 3, prevent that the impact of the pressure difference of external seawater pressure and internal air pressure causes the waterstop 3 during immersed tube Structure is destroyed, and the construction method step of the pre-stress system is simple, easy to operate, works well.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (10)

1. a kind of pre-stress system for FS final spice, it is characterised in that FS final spice includes joint one (1) and joint two (2) faying face that, the joint one (1) is used to connect the joint two (2) is provided with a circle closed circular waterstop (3), institute The faying face that waterstop (3) is used to fit in the joint two (2) is stated, several formation are provided with the inside of waterstop (3) ring The connector group of one circle, each connector group include two connection members (4), are connected between each connector group Lack a prestressed strand (5), each a connection member (4) in the connector group is located at the joint one (1) On, another described connection member (4) is on the joint two (2).
2. the pre-stress system according to claim 1 for FS final spice, it is characterised in that the joint one (1) and The joint two (2) is steel-shelled concrete structure, and all connection members (4) are steel construction piece, all connecting portions Part (4) is welded on the box hat of the joint one (1) and the joint two (2).
3. the pre-stress system according to claim 1 for FS final spice, it is characterised in that each connection member (4) prestressing force bearing plate (41), web (42), the first stiffener (43) and anchorage (44), the prestressing force bearing plate are included (41) and the web (42) is vertically connected at the FS final spice inwall, prestressing force bearing plate (41) the vertical connection institute Web (42) is stated, what the web (42) was set is oriented parallel to the prestressed strand (5) axis direction, and described first puts more energy into Plate (43) first stiffener (43) while is connected to the prestressing force bearing plate (41) parallel to the FS final spice inwall With the web (42), the prestressed strand (5) anchors through the prestressing force bearing plate (41) and by the anchorage (44).
4. the pre-stress system according to claim 3 for FS final spice, it is characterised in that each connection member (4) girder steel bearing plate (45) is also included, the girder steel bearing plate (45) vertically connects parallel to the prestressing force bearing plate (41) The FS final spice inwall is connected to, the web (42) is connected to the girder steel bearing plate through the prestressing force bearing plate (41) (45) the second stiffener (46), second stiffener, are connected between the girder steel bearing plate (45) and the web (42) (46) girder steel of the FS final spice end seal door (6) is connected parallel to the FS final spice inwall, the girder steel bearing plate (45), For supporting the end seal door (6) of the FS final spice under water pressure.
5. the pre-stress system according to claim 4 for FS final spice, it is characterised in that the girder steel bearing plate (45) girder steel with the end seal door (6) is bolted.
6. the pre-stress system according to claim 4 for FS final spice, it is characterised in that each connection member (4) including a prestressing force bearing plate (41), three webs (42), four first stiffeners (43) and two Anchorage (44), two webs (42) are located at prestressing force bearing plate (41) both ends, and a web (42) is located at institute To state in the middle part of prestressing force bearing plate (41), two prestressed strands (5) are connected to the prestressing force bearing plate (41), and respectively Anchored positioned at the both sides of the middle part web (42) and by an anchorage (44), each first stiffener (43) connection Between the two neighboring web (42) and the prestressing force bearing plate (41), each prestressed strand (5) up and down two Side respectively sets first stiffener (43).
7. the pre-stress system according to claim 6 for FS final spice, it is characterised in that each described first puts more energy into Plate (43) is right-angled trapezium, and the longer right-angle side of the right-angled trapezium is connected to the web (42) at middle part, shorter right angle While being connected to the web (42) of end, height is connected to the prestressing force bearing plate (41).
8. the pre-stress system according to claim 6 for FS final spice, it is characterised in that three webs (42) Both pass through the prestressing force bearing plate (41) and be connected to a girder steel bearing plate (45), four second stiffeners (46) In each second stiffener (46) be connected between the two neighboring web (42) and the girder steel bearing plate (45).
9. the pre-stress system according to claim 8 for FS final spice, it is characterised in that each described second puts more energy into Plate (46) is rectangle, and the relative both sides of the rectangle are connected to the web (42) of adjacent two, and another side is connected to The girder steel bearing plate (45).
10. according to the pre-stress system for FS final spice described in claim any one of 1-9, it is characterised in that described to stop Water band (3) is Gina waterstops.
CN201721106339.5U 2017-08-30 2017-08-30 Pre-stress system for FS final spice Expired - Fee Related CN207092141U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721106339.5U CN207092141U (en) 2017-08-30 2017-08-30 Pre-stress system for FS final spice

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721106339.5U CN207092141U (en) 2017-08-30 2017-08-30 Pre-stress system for FS final spice

Publications (1)

Publication Number Publication Date
CN207092141U true CN207092141U (en) 2018-03-13

Family

ID=61540382

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721106339.5U Expired - Fee Related CN207092141U (en) 2017-08-30 2017-08-30 Pre-stress system for FS final spice

Country Status (1)

Country Link
CN (1) CN207092141U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524165A (en) * 2017-08-30 2017-12-29 中交公路规划设计院有限公司 Pre-stress system and construction method for FS final spice

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107524165A (en) * 2017-08-30 2017-12-29 中交公路规划设计院有限公司 Pre-stress system and construction method for FS final spice
CN107524165B (en) * 2017-08-30 2019-08-23 中交公路规划设计院有限公司 Pre-stress system and construction method for FS final spice

Similar Documents

Publication Publication Date Title
CN106988346B (en) Immersed tube tunnel final joint, prefabricating method and mounting method
CN106401018B (en) A kind of assembled self-resetting swinging steel plate wall structural system
CN207144538U (en) A kind of underground structure top board reserving hole temporary plugging structure
CN106382041B (en) A kind of assembled waves Self-resetting steel support structure system
CN106522382A (en) Fabricated concrete-filled steel tube column-H type steel beam self-resetting energy consumption connection joint
CN105908856B (en) The prefabricated anti-buckling steel plate seismic structural wall, earthquake resistant wall of the T-shaped rib of armored concrete block
CN207160226U (en) A kind of steel concrete combined joint of concrete frame
CN106545472A (en) The antifatigue combination steel construction wind tower of omnidirectional's prestressing force and its installation method
CN107386432A (en) The steel concrete combined joint and its construction method of a kind of concrete frame
CN107605038A (en) A kind of assembled steel and concrete frame space modular structure and system and construction method
CN114622481A (en) Double-column type self-resetting pier structure with buckling-restrained brace and construction method thereof
CN109653350A (en) A kind of hybrid reinforcement built-in type lower-prestressed dry type bean column node and method
CN112942151A (en) Carbon fiber cable net wind-resistant reinforced structure system of ultra-large span suspension bridge and construction method thereof
CN206267356U (en) A kind of assembled self-resetting swinging steel plate wall structural system
CN207092141U (en) Pre-stress system for FS final spice
CN207727803U (en) A kind of prefabricated assembled anti-buckling steel plate shear force wall
CN207582460U (en) A kind of super-large diameter splices hollow pile
CN206143933U (en) Assembled steel core concrete column H shaped steel roof beam is from power consumption connected node that restores to throne
CN107524165A (en) Pre-stress system and construction method for FS final spice
CN110735394B (en) Cable tower structure and construction method thereof
CN111155643A (en) Assembly type mixed frame structure and construction method
CN208518137U (en) A kind of closed-section steel deck combined concrete shear wall connecting node
CN214883050U (en) Carbon fiber cable net wind-resistant reinforced structure system of oversized span suspension bridge
CN110565680B (en) Steel grating ring type wind power tower foundation ring facility and construction method
CN109056739A (en) The retaining piles of support pile and composition

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180313

Termination date: 20200830

CF01 Termination of patent right due to non-payment of annual fee