CN211897677U CN201922437622.1U CN201922437622U CN211897677U CN 211897677 U CN211897677 U CN 211897677U CN 201922437622 U CN201922437622 U CN 201922437622U CN 211897677 U CN211897677 U CN 211897677U
Authority
CN
China
Prior art keywords
curb
cell body
kerbstone
road surface
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922437622.1U
Other languages
Chinese (zh)
Inventor
马义超
樊海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Shengtian Environmental Protection Regeneration Resource Utilization Co ltd
Original Assignee
Henan Shengtian Environmental Protection Regeneration Resource Utilization Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Shengtian Environmental Protection Regeneration Resource Utilization Co ltd filed Critical Henan Shengtian Environmental Protection Regeneration Resource Utilization Co ltd
Priority to CN201922437622.1U priority Critical patent/CN211897677U/en
Application granted granted Critical
Publication of CN211897677U publication Critical patent/CN211897677U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an inlay crowded formula building rubbish curb, it includes the curb body, has seted up the cell body at the curb body towards a side on road surface along its length direction, sets up the shutoff body at the both ends of cell body, and the shape of cross section of cell body is isosceles trapezoid, and the outside width of cell body is greater than inboard width, transversely is provided with the transverse reinforcement who stretches out the cell body along in the cell body. The utility model discloses not only can realize building rubbish's resource recycling and recycle, through the transverse reinforcement that sets up in the cell body, pour cement or concrete towards road surface one side when laying moreover to can strengthen the joint strength on curb and road surface.

Description

Embedded-extruded type construction waste kerbstone
Technical Field
The utility model relates to a material technical field is used in the capital construction, concretely relates to inlay crowded formula building rubbish curb.
Background
At present, the construction waste has good water permeability characteristics of no freezing expansion and no shrinkage when meeting water, larger particles, less water containing film, small specific surface area and no plasticity, and compared with other construction materials, the construction waste has the excellent characteristics of good quality, large quantity and low cost, so the construction waste is applied to construction of projects such as squares, urban roads and the like. Wherein, it is very good choice to make the construction waste into the curb.
However, the existing kerbstone structure adopts a common strip-shaped structure, the connection strength of the kerbstone and the road surface is not high, the kerbstone is easy to incline under the action of external force, the enclosing effect of the kerbstone is influenced, and the kerbstone structure is not attractive.
Therefore, there is a need for an embedded and extruded type construction waste kerbstone structure which can recycle the resources of construction waste and enhance the connection strength between the kerbstones and the road surface.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model provides an inlay crowded formula building rubbish curb not only can realize building rubbish's resource recycling, through the transverse reinforcement that sets up in the cell body in addition, pours cement or concrete towards road surface one side when laying to can strengthen the joint strength on curb and road surface.
In order to realize the above-mentioned purpose, the utility model provides an inlay crowded formula building rubbish curb, including the curb body, the cell body has been seted up towards a side on road surface along its length direction to the curb body, the both ends of cell body set up the shutoff body, the shape of cross section of cell body is isosceles trapezoid, just the outside width of cell body is greater than inboard width, transversely be provided with along in the cell body and stretch out the transverse reinforcement of cell body.
Further, a vertical steel bar is arranged between the top wall and the bottom wall of the groove body.
Further, the number of the transverse reinforcing steel bars is one row or two rows or three rows.
Further, an arc-shaped through groove is formed in the bottom of the kerbstone body along the length direction of the kerbstone body.
Furthermore, a drainage channel is formed in the kerbstone body along the length direction of the kerbstone body and located above the groove body, and a row of water diversion holes communicated with the drainage channel are formed in one side face, facing the road surface, of the kerbstone body.
Furthermore, the diversion hole is that the outer end is higher than the inner slope setting and is in on the curb body is towards a side on the road surface.
Further, one side of the kerbstone body facing the road surface is provided with an installation groove along the length direction of the kerbstone body, and a fluorescent warning signboard is arranged in the installation groove.
Further, the number of the vertical steel bars is one row or two rows or three rows.
The utility model discloses an above-mentioned technical scheme's beneficial effect as follows:
the utility model discloses adopt ordinary bar-type texture to present curb structure, the curb is not high with road surface joint strength, take place the slope easily under the exogenic action, not only influence the enclosure of curb, and the problem of unattractive appearance, an inlay crowded formula building rubbish curb is provided, it includes the curb body, the cell body has been seted up to a side along its length direction on road surface at the curb body, set up the shutoff body at the both ends of cell body, and the shape of cross section of cell body is isosceles trapezoid, and the outside width of cell body is greater than inboard width, transversely be provided with the horizontal reinforcing bar that stretches out the cell body along in the cell body. Like this, this curb when laying, can pour together with the concrete or the cement mortar on road surface in the cell body to utilize the skeleton effect of transverse reinforcement, strengthen the joint strength on this curb and road surface greatly, the same packing has concrete or cement mortar in the cell body moreover, and concrete or cement mortar in the cell body can further fix this curb after the sclerosis, avoid it to take place the slope.
In addition, in order to increase the strength of the tank body and avoid the tank body from being broken under the action of external force, vertical steel bars are arranged between the top wall and the bottom wall of the tank body 2, the number of the vertical steel bars can be one row or two or three rows, and the vertical steel bars are reasonably arranged according to the volume of the kerbstone and the diameter of the vertical steel bars.
In addition, for the convenience of this curb of not very smooth ground installation in ground curb body bottom has seted up the arc and has led to the groove along its length direction, like this, can reduce the planar area of curb body bottom surface, is convenient for more at this curb of subaerial installation of unevenness, and the setting of arc passageway can reduce the use amount of building rubbish reclaimed materials simultaneously, alleviates holistic weight simultaneously.
In addition, in order to facilitate the drainage of rainwater, a drainage channel is formed in the kerbstone body along the length direction of the kerbstone body and is located above the groove body, one side face, facing the road surface, of the kerbstone body is provided with a row of water diversion holes communicated with the drainage channel, so that the drained rainwater on the road surface can enter the drainage channel along the water diversion holes, and the rainwater is drained along the drainage channel.
Drawings
FIG. 1 is a schematic view of the structure of an embedded and extruded type construction waste kerbstone of the present invention;
FIG. 2 is a left side view of the structure of the embedded and extruded type construction waste kerbstone of the present invention;
the attached drawings are as follows:
a curb body 1;
a tank body 2;
a plugging body 3;
transverse reinforcing steel bars 4;
vertical reinforcing steel bars 5;
an arc-shaped through groove 6;
a drainage channel 7;
a water diversion hole 8;
a mounting groove 9;
a fluorescent warning sign 10.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to fig. 1-2 of the embodiments of the present invention. It is to be understood that the embodiments described are only some of the embodiments of the present invention, and not all of them. All other embodiments, which can be derived from the description of the embodiments of the present invention by a person skilled in the art, are within the scope of the present invention.
As shown in fig. 1-2: the utility model provides an inlay crowded formula building rubbish curb, includes the curb body, the cell body has been seted up towards a side on road surface along its length direction to the curb body, the both ends of cell body set up the shutoff body, transversely be provided with along in the cell body and stretch out the horizontal reinforcing bar of cell body.
Particularly, an inlay crowded formula building rubbish curb, including curb body 1, cell body 2 has been seted up towards a side on road surface along its length direction to curb body 1, the both ends of cell body 2 set up shutoff body 3, the shape of cross section of cell body 2 is isosceles trapezoid, just the outside width of cell body 2 is greater than inboard width, transversely be provided with along in the cell body 2 and stretch out the horizontal reinforcing bar 4 of cell body 2.
According to the utility model discloses an embodiment, in order to increase the intensity of cell body 2, avoids cell body 2 fracture be provided with vertical reinforcing bar 5 between the roof of cell body 2 and the diapire.
According to the utility model discloses an embodiment, the quantity of horizontal reinforcing bar 4 is three rows, and horizontal reinforcing bar 4's effect is the intensity of reinforcing cell body 2, avoids cell body 2 to take place the fracture, and of course, horizontal reinforcing bar 4's quantity also can set to other quantity, for example one row or two rows.
According to the utility model discloses an embodiment, for the convenience of installing this curb on ground not very smooth this curb 1 bottom of curb body has seted up the arc and has led to groove 6 along its length direction, like this, can reduce the planar area of 1 bottom surface of curb body, is convenient for more install this curb at the subaerial of unevenness, and the setting up of arc passageway 6 can reduce the use amount of construction waste reclaimed materials simultaneously, alleviates holistic weight.
According to the utility model discloses an embodiment, for the convenience of the drainage of rainwater the drainage channel 7 has been seted up along its length direction on the curb body 1, drainage channel 7 is located the top of cell body 2, curb body 1 towards the side on road surface seted up one row with drainage hole 8 that drainage channel 7 is linked together, the rainwater that not only discharges on the road surface like this can enter into drainage channel 7 along drainage hole 8 in to drain away the rainwater along drainage channel 7.
According to the utility model discloses an embodiment, in for the convenience of rainwater enters into drainage channel 7 through diversion hole 8, diversion hole 8 is that the outer end is higher than inner slope setting and is in 1 curb body is towards on the side on road surface, the rainwater of being convenient for like this more enters into drainage channel 7 along diversion hole 8 in to drain away the rainwater along drainage channel 7.
According to the utility model discloses an embodiment, for the convenience of going on a journey at night driver and pedestrian curb body 1 set up along its length direction with mounting groove 9 towards a side on road surface, set up fluorescence warning signboard 10 in the mounting groove 9, like this, fluorescence warning signboard 10 can independently give out light, can also reflect external light source, makes things convenient for driver and pedestrian to go on a journey at night.
According to an embodiment of the present invention, the number of the vertical steel bars 5 is two rows, and may be set to other numbers, such as one row or three rows.
The utility model discloses a use method: at first will lay the curb the roadside of curb level, later arrange this curb at the roadside, later carry out the packing of concrete or cement mortar to the space between road surface and the curb, this concrete or cement mortar fill the cell body completely, utilize the combining action of horizontal reinforcing bar and concrete or cement mortar like this for the road surface combines together with this curb organically, strengthens the joint strength on curb and road surface greatly, avoids it to take place the slope.
The foregoing is a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.

Claims (8)

1. The utility model provides an inlay crowded formula building rubbish curb which characterized in that: including curb body (1), cell body (2) have been seted up towards a side on road surface along its length direction in curb body (1), the both ends of cell body (2) set up shutoff body (3), the cross sectional shape of cell body (2) is isosceles trapezoid, just the outside width of cell body (2) is greater than inboard width, transversely be provided with along stretching out in cell body (2) the transverse reinforcement (4) of cell body (2).
2. The embedded and extruded type construction waste kerb of claim 1, wherein: vertical steel bars (5) are arranged between the top wall and the bottom wall of the tank body (2).
3. The embedded and extruded type construction waste kerb of claim 1, wherein: the number of the transverse reinforcing steel bars (4) is one row or two rows or three rows.
4. The building rubbish curb of any one of claims 1 to 3, characterized in that: an arc-shaped through groove (6) is formed in the bottom of the kerbstone body (1) along the length direction of the kerbstone body.
5. The building rubbish curb of any one of claims 1 to 3, characterized in that: the kerbstone is characterized in that a drainage channel (7) is formed in the kerbstone body (1) along the length direction of the kerbstone body, the drainage channel (7) is located above the groove body (2), and a row of water diversion holes (8) communicated with the drainage channel (7) are formed in the kerbstone body (1) towards one side face of the road surface.
6. The embedded and extruded type construction waste kerb of claim 5, wherein: the outer end of the diversion hole (8) is higher than the inner end of the diversion hole, and the diversion hole is obliquely arranged on one side surface, facing the road surface, of the kerbstone body (1).
7. The embedded and extruded type construction waste kerb of claim 1, wherein: curb body (1) is seted up and mounting groove (9) along its length direction towards the side on road surface, set up fluorescence warning signboard (10) in mounting groove (9).
8. The embedded and extruded type construction waste kerb of claim 2, wherein: the number of the vertical steel bars (5) is one row or two rows or three rows.
CN201922437622.1U 2019-12-30 2019-12-30 Embedded-extruded type construction waste kerbstone Expired - Fee Related CN211897677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922437622.1U CN211897677U (en) 2019-12-30 2019-12-30 Embedded-extruded type construction waste kerbstone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922437622.1U CN211897677U (en) 2019-12-30 2019-12-30 Embedded-extruded type construction waste kerbstone

Publications (1)

Publication Number Publication Date
CN211897677U true CN211897677U (en) 2020-11-10

Family

ID=73295861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922437622.1U Expired - Fee Related CN211897677U (en) 2019-12-30 2019-12-30 Embedded-extruded type construction waste kerbstone

Country Status (1)

Country Link
CN (1) CN211897677U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341431A (en) * 2022-06-02 2022-11-15 南通天承光电科技有限公司 Curb stone and paving method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341431A (en) * 2022-06-02 2022-11-15 南通天承光电科技有限公司 Curb stone and paving method thereof

Similar Documents

Publication Publication Date Title
CN202898938U (en) Seepage and drainage combined pavement structure for urban road and landscape road
CN211897677U (en) Embedded-extruded type construction waste kerbstone
KR100935790B1 (en) The reclamation style street lamp fundamental unit and the street lamp establishment method which uses this
KR100659768B1 (en) Drain apparatus of elastic pavement mixed
CN111395088A (en) Light-emitting floor tile burying structure and method adapting to concrete pavement deformation
CN208965355U (en) A kind of Novel kerb for roads
CN212426608U (en) non-Newtonian fluid road vertical kerb
CN107268368A (en) Latch gap water-permeable brick
KR101243583B1 (en) Water permeable flagstone for sidewalk
CN203200773U (en) Integral type prefabricated bridge pier and foundation structure
KR101950585B1 (en) Assembly type road support structure having rainwater reserving function
CN211256527U (en) Road drainage brick and road drainage system
CN220224803U (en) Permeable brick for roadbed paving
CN215051715U (en) Compound ecological environmental protection brick that permeates water
CN211368245U (en) Town road reinforced structure
CN205474684U (en) Connect firm curb that permeates water
CN212000455U (en) Fluorescent curb with drainage and warning effects
CN205115951U (en) Porous pavement that can be used to driveway
CN220394651U (en) Well lid structure of riding and striding roadway side line
CN2871623Y (en) L-shaped curb with arc drain
CN214883743U (en) Slope antiskid
CN216891828U (en) Town road constructed based on prestressed concrete sheet pile
CN218373098U (en) Old cement concrete pavement regeneration adds pavements structure
CN204370545U (en) A kind of Esso modified bitumen structural member
KR20110015772A (en) A block for construction of a bicycle lane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201110

Termination date: 20211230