CN103138206A - Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes - Google Patents

Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes Download PDF

Info

Publication number
CN103138206A
CN103138206A CN2013100874932A CN201310087493A CN103138206A CN 103138206 A CN103138206 A CN 103138206A CN 2013100874932 A CN2013100874932 A CN 2013100874932A CN 201310087493 A CN201310087493 A CN 201310087493A CN 103138206 A CN103138206 A CN 103138206A
Authority
CN
China
Prior art keywords
ground wire
ppr
power transmission
overhead ground
overhead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100874932A
Other languages
Chinese (zh)
Inventor
张啸
许超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIHE ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Original Assignee
BEIHE ELECTRIC POWER BUREAU
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIHE ELECTRIC POWER BUREAU, State Grid Corp of China SGCC filed Critical BEIHE ELECTRIC POWER BUREAU
Priority to CN2013100874932A priority Critical patent/CN103138206A/en
Publication of CN103138206A publication Critical patent/CN103138206A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a device and a method to replace an overhead ground wire of a high-voltage overhead power transmission line by means of suspending of PPR pipes, and relates to the device and the method to replace the overhead ground wire of the high-voltage overhead power transmission line, in particular to the device and the method to replace the overhead ground wire of the high-voltage overhead power transmission line by means of the suspending of the PPR pipes. The device and the method solve the problems that in the construction process of replacement of the overhead ground wire in the prior art, construction time is long, the number of needed workers is large, and investments are large. The device comprises the two PPR pipes, two insulated ropes and four steel chisel ground anchors, the middle of each insulated rope is respectively provided with one PPR pipe in a sleeved mode, and one end of each insulated rope is connected with one steel chisel ground anchor. The device and the method are used for the replacement of the overhead ground wire.

Description

Utilize the hanging of PPR pipe to carry out the high voltage overhead power transmission sequence and change the overhead ground wire device and method
Technical field
The present invention relates to the high voltage overhead power transmission sequence and change the overhead ground wire device and method, be specifically related to utilize the hanging of PPR pipe to carry out the high voltage overhead power transmission sequence and change the overhead ground wire device and method.
Background technology
Along with the lifting of china's overall national strength and the development of power network, especially after the principles and policies appearance that pulls domestic demand of stabilizing the economy, drop into huge fund aspect the infrastructure construction of railway, high-grade highway and power circuit, radiating surface spreads all over all parts of the country.High voltage circuit overhead ground wire replacing rebuilding construction often runs into the problem with railway, highway and power circuit scissors crossing.Usually change in overhead ground wire thread-changing construction the methods of taking crossing frame or using crane colligation goat's horn bar and tension stringing that adopt more.The weak point of taking the method for crossing frame is to prepare material complexity, length consuming time, and required personnel are many, transportation difficulty, time and effort consuming; Use the method for crane colligation goat's horn bar, although easy, also exist and be subjected to the influence of topography large, meet that crossover point is many, construction time, when longer, crane used platform, machine-team excessive cost fund to pay too high shortcoming; The tension stringing requires plant equipment advanced, invests hugely, and landform also will be fit to the expansion of plant equipment.When running into special location leap railway, highway, power line, crossed over by crane that landform limits and to use and can not set up fully crossing frame and use tension line tightening method crossing construction.And railway transportation is frequent, can not stop transport because of crossing construction; Traffic counting is large, seals road construction infection traffic and is difficult to and realize; Had a power failure across power circuit, directly affected user's productive life, also reduced the reliability of power supply simultaneously, affected the economic benefit of power supply enterprise.
Summary of the invention
The present invention existingly changes the problem that in overhead ground wire thread-changing construction, the engineering time is long, required personnel are many, investment is huge for solving, and then proposes to utilize the hanging of PPR pipe to carry out high voltage overhead power transmission sequence replacing overhead ground wire device and method.
The present invention addresses the above problem the technical scheme of taking to be: device of the present invention comprises two PPR pipes, two insulating cords and four drill rod earth anchors, the middle part of every insulating cord is set with respectively a PPR pipe, and often the end with insulating cord respectively is connected with a drill rod earth anchor respectively.
The concrete steps of the method for the invention are as follows:
Step 1, crossed over thing both sides above parallel wire on respectively hang respectively a PPR pipe;
The two ends of step 2, every insulating cord of traction make two PPR pipes parallel;
Step 3, with the tension of every insulating cord, and will every the drill rod earth anchor at insulating cord two ends ram ground, each drill rod earth anchor is apart from being 10 meters by the distance of leap thing;
The replacing of namely completing overhead ground wire after thing both sides shaft tower wire clamp installs is crossed in step 4, the unwrapping wire that carries out overhead ground wire on two PPR pipes and stringing operation;
Step 5, will change the overhead ground wire device and remove.
The invention has the beneficial effects as follows: using the present invention to change overhead ground wire only needs two people to get final product, and has reduced labour's input, has saved the engineering time, and the present invention is simple in structure, and is easy to operate, and fund input is few, has saved a large amount of costs; Reduced the resident living that causes because of long-time power failure constant, and factory and enterprise etc. is with the economic loss of electric unit, can also improve the power supply reliability of power supply enterprise, when also having reduced simultaneously because of construction to trip and the security implication of the traffic routes such as highway, railway.
Description of drawings
Fig. 1 is work schematic diagram of the present invention.
Embodiment
Embodiment one: present embodiment is described in conjunction with Fig. 1, the hanging of the described PPR of the utilization pipe of present embodiment is carried out high voltage overhead power transmission sequence replacing overhead ground wire device and is comprised two PPR 1, two insulating cords 2 of pipe and four drill rod earth anchors 3, the middle part of every insulating cord 2 is set with respectively a PPR pipe 1, and often the end with insulating cord 2 respectively is connected with a drill rod earth anchor 3 respectively.
Embodiment two: in conjunction with Fig. 1, present embodiment is described, the hanging of the described PPR of utilization of present embodiment pipe is carried out the high voltage overhead power transmission sequence and is changed on the insulating cord 2 at two ends of each PPR pipe 1 of overhead ground wire device and respectively be provided with respectively a knot 2-1.
The technique effect of present embodiment is: the knot 2-1 on each PPR pipe 1 two ends insulating cord 2 can prevent PPR pipe 1 play on insulating cord 2, avoids changing ground wire occurs in the overhead ground wire process coming off and injuring the staff.
Other composition and annexation are identical with embodiment one.
Embodiment three: in conjunction with Fig. 1, present embodiment is described, each drill rod earth anchor 3 that high voltage overhead power transmission sequence replacing overhead ground wire device is carried out in the hanging of the described PPR of the utilization pipe of present embodiment is that diameter is the drill rod earth anchor 3 of the screw thread drill rod making of 22mm.Other composition and annexation are identical with embodiment one.
Embodiment four: combination Fig. 1 illustrates present embodiment, and the diameter that the every insulating cord 2 of high voltage overhead power transmission sequence replacing overhead ground wire device is carried out in the hanging of the described PPR of the utilization pipe of present embodiment is 16mm~20mm.Other composition and annexation are identical with embodiment one.
Embodiment five: in conjunction with Fig. 1, present embodiment is described, the wall thickness that each PPR pipe 1 of high voltage overhead power transmission sequence replacing overhead ground wire device is carried out in the hanging of the described PPR of the utilization pipe of present embodiment is 10mm~14mm.Other composition and annexation are identical with embodiment one.
Embodiment six: in conjunction with Fig. 1, present embodiment is described, present embodiment described a kind of utilize the described device of embodiment one to carry out the high voltage overhead power transmission sequence to change the concrete steps of method of overhead ground wire as follows:
Step 1, crossed over thing both sides above parallel wire on respectively hang respectively a PPR pipe 1;
The two ends of step 2, every insulating cord 2 of traction make two PPR pipes 1 parallel;
Step 3, with every insulating cord 2 tension, and will every insulating cord the drill rod earth anchor 3 at 2 two ends ram ground, each drill rod earth anchor 3 distance is 10 meters by the distance of leap things;
The replacing of namely completing overhead ground wire after thing both sides shaft tower wire clamp installs is crossed in step 4, the unwrapping wire that carries out overhead ground wire on two PPR pipe 1 and stringing operation;
Step 5, will change the overhead ground wire device and remove.

Claims (6)

1. utilize the hanging of PPR pipe to carry out the high voltage overhead power transmission sequence and change the overhead ground wire device: it is characterized in that: the hanging of the described PPR of utilization pipe is carried out high voltage overhead power transmission sequence replacing overhead ground wire device and is comprised two PPR pipes (1), two insulating cords (2) and four drill rod earth anchors (3), the middle part of every insulating cord (2) is set with respectively a PPR pipe (1), and often the end with insulating cord (2) respectively is connected with a drill rod earth anchor (3) respectively.
2. utilize according to claim 1 the hanging of PPR pipe to carry out the high voltage overhead power transmission sequence and change the overhead ground wire device, it is characterized in that: respectively be provided with respectively a knot (2-1) on the insulating cord (2) at the two ends of each PPR pipe (1).
3. utilize according to claim 1 the hanging of PPR pipe to carry out the high voltage overhead power transmission sequence and change the overhead ground wire device, it is characterized in that: each drill rod earth anchor (3) is that diameter is the drill rod earth anchor (3) of the screw thread drill rod making of 22mm.
4. utilize according to claim 1 the hanging of PPR pipe to carry out the high voltage overhead power transmission sequence and change the overhead ground wire device, it is characterized in that: the diameter of every insulating cord (2) is 16mm~20mm.
5. utilize according to claim 1 the hanging of PPR pipe to carry out the high voltage overhead power transmission sequence and change the overhead ground wire device, it is characterized in that: the wall thickness of each PPR pipe (1) is 10mm~14mm.
6. one kind is utilized the described device of claim 1 to carry out the method that the high voltage overhead power transmission sequence is changed overhead ground wire, it is characterized in that: the high voltage overhead power transmission sequence is carried out in the hanging of the described PPR of utilization pipe, and to change the concrete steps of method of overhead ground wire as follows:
Step 1, crossed over thing both sides above parallel wire on respectively hang respectively a PPR pipe (1);
The two ends of step 2, every insulating cord of traction (2) make two PPR pipes (1) parallel;
Step 3, with every insulating cord (2) tension, and will every insulating cord (2) the drill rod earth anchor (3) at two ends ram ground, each drill rod earth anchor (3) distance is 10 meters by the distance of leap thing;
The replacing of namely completing overhead ground wire after thing both sides shaft tower wire clamp installs is crossed in step 4, the unwrapping wire that carries out overhead ground wire on two PPR pipes (1) and stringing operation;
Step 5, will change the overhead ground wire device and remove.
CN2013100874932A 2013-03-19 2013-03-19 Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes Pending CN103138206A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100874932A CN103138206A (en) 2013-03-19 2013-03-19 Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100874932A CN103138206A (en) 2013-03-19 2013-03-19 Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes

Publications (1)

Publication Number Publication Date
CN103138206A true CN103138206A (en) 2013-06-05

Family

ID=48497683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100874932A Pending CN103138206A (en) 2013-03-19 2013-03-19 Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes

Country Status (1)

Country Link
CN (1) CN103138206A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104377591A (en) * 2014-11-20 2015-02-25 国家电网公司 Method for replacing overhead wire of crossing electrified railway without building crossing frame
CN104410005B (en) * 2014-10-24 2017-08-04 国家电网公司 A kind of replacing aerial condutor, the operational method of ground wire
CN107196229A (en) * 2017-05-15 2017-09-22 天津送变电工程公司 Application process of the PVC protection pipes in extra-high voltage crossing construction
CN112242666A (en) * 2020-09-29 2021-01-19 浙江大有实业有限公司带电作业分公司 Method for replacing outgoing cable of line with radial structure
CN113572117A (en) * 2021-06-11 2021-10-29 国网山东省电力公司烟台供电公司 Device and method for realizing overhead drilling by adopting single-loop-trunk-shaped terminal tower

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2765352Y (en) * 2005-01-22 2006-03-15 广西送变电建设公司 Double-post combined suspension cable type crossover rack
CN2927428Y (en) * 2006-04-24 2007-07-25 俞云飞 Assembled insulated spanning rack
JP2008154438A (en) * 2006-12-15 2008-07-03 Michio Takaoka Removal of snow and ice accretion on overhead transmission line
CN202285309U (en) * 2011-10-28 2012-06-27 湖北省输变电工程公司 Lifting energized spanning frame
CN203086060U (en) * 2013-03-19 2013-07-24 黑河电业局 Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2765352Y (en) * 2005-01-22 2006-03-15 广西送变电建设公司 Double-post combined suspension cable type crossover rack
CN2927428Y (en) * 2006-04-24 2007-07-25 俞云飞 Assembled insulated spanning rack
JP2008154438A (en) * 2006-12-15 2008-07-03 Michio Takaoka Removal of snow and ice accretion on overhead transmission line
CN202285309U (en) * 2011-10-28 2012-06-27 湖北省输变电工程公司 Lifting energized spanning frame
CN203086060U (en) * 2013-03-19 2013-07-24 黑河电业局 Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104410005B (en) * 2014-10-24 2017-08-04 国家电网公司 A kind of replacing aerial condutor, the operational method of ground wire
CN104377591A (en) * 2014-11-20 2015-02-25 国家电网公司 Method for replacing overhead wire of crossing electrified railway without building crossing frame
CN107196229A (en) * 2017-05-15 2017-09-22 天津送变电工程公司 Application process of the PVC protection pipes in extra-high voltage crossing construction
CN112242666A (en) * 2020-09-29 2021-01-19 浙江大有实业有限公司带电作业分公司 Method for replacing outgoing cable of line with radial structure
CN112242666B (en) * 2020-09-29 2022-04-19 浙江大有实业有限公司带电作业分公司 Method for replacing outgoing cable of line with radial structure
CN113572117A (en) * 2021-06-11 2021-10-29 国网山东省电力公司烟台供电公司 Device and method for realizing overhead drilling by adopting single-loop-trunk-shaped terminal tower

Similar Documents

Publication Publication Date Title
CN103138206A (en) Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN207098456U (en) A kind of crossover tower auxiliary cross-arm block component for being used to live across operation
CN101442194A (en) Spanning method for ultra, extra high voltage line construction without crossover frame
CN102290742B (en) Tension stringing construction technology
CN102324712A (en) Method for electrified spanning construction of high-voltage power transmission and transformation line
CN204424793U (en) A kind of block crossing frame of power circuit
CN204068054U (en) A kind of many division large-section leads stretching field construction under tension stringing system altogether
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN104133976A (en) Stress calculation method for cableway type crossing structure bearing rope
CN203086060U (en) Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension
CN207079477U (en) A kind of mobile formwork bottom web reinforcement skeleton pricks hanging apparatus in advance
CN104868397A (en) Tumbling pulley used for crossing horizontally-arranged double-bundled conductor spacer
CN106532557B (en) Across 10KV line construction platform tools devices
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN203445520U (en) Live spanning device
CN201252365Y (en) Construction charged crossover device of ultra-high and special-high voltage transmission line
CN106836000A (en) Curve via holes Summarized Account of Bridge Erection Construction method based on DJ series Bridge Erectors
CN205265148U (en) Construction equipment is crossed over to high -speed railway of not stopping transport
CN105552776A (en) Novel construction method crossing high-speed rail without interruption
CN104377591A (en) Method for replacing overhead wire of crossing electrified railway without building crossing frame
CN102290738B (en) Construction method for replacing 35kV line tension pole cross arm
CN206128793U (en) Multi -functional low tension wire pole guard circle
CN104393524B (en) Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method
CN206506249U (en) Outdoor track movable hoisting equipment power line wire tensioning device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130605