CN104393524B - Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method - Google Patents

Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method Download PDF

Info

Publication number
CN104393524B
CN104393524B CN201410470546.3A CN201410470546A CN104393524B CN 104393524 B CN104393524 B CN 104393524B CN 201410470546 A CN201410470546 A CN 201410470546A CN 104393524 B CN104393524 B CN 104393524B
Authority
CN
China
Prior art keywords
ground
wire
insulation
insulation ropes
aerial earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410470546.3A
Other languages
Chinese (zh)
Other versions
CN104393524A (en
Inventor
李卫民
张凯
吕大勇
王军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410470546.3A priority Critical patent/CN104393524B/en
Publication of CN104393524A publication Critical patent/CN104393524A/en
Application granted granted Critical
Publication of CN104393524B publication Critical patent/CN104393524B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

A kind of construction is simple, safe operation, can shorten engineering time and power off time, time saving and energy saving, and the utilization aerial earth wire for saving operating expenses is hung pulley group job and avoids setting up and crosses over frame construction method.Its step is as follows:On the shaft tower needed across near, rod-rising tower hangs over three axle assembly pulleys on aerial earth wire to scheduling job personnel first;Insulation ropes two ends are hung down to ground, Ground Operation personnel are slid into assembly pulley at scissors crossing thing from trolley line using the insulation ropes hung down to ground;Ground Operation personnel will ask line wheel to tie up, the two ends of two insulation ropeses are drawn from the collar of support line wheel both sides respectively, support line wheel is promoted to below wire at 100mm 200mm, by conductor loop around, the two ends of two insulation ropeses are tied up using temporary ground anchor simultaneously, when declining wire, certain height can be kept with ground, reach safe distance;Recycle insulation ropes pilot to swing, beat, prevent from touching the powered side wire of parallel erected on same tower.

Description

Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method
Technical field
The present invention relates to a kind of avoiding setting up using aerial earth wire extension pulley group job crosses over frame construction method.
Background technology
At present, power system is developed rapidly, so as to bring many transmission line of electricity improvement projects, most importantly in order to Meet customer charge, carry out replacing transmission line wire, and change aerial condutor, be related to scissors crossing below many circuits Problem, such as:Span transmission line, low-voltage distribution wire, highway, river, building construction etc. below circuit.The ground of these leaps Side, then need to set up the crossing frames of many, and these crossing frames must before restringing is constructed, need many manpowers and Time completes.
Content of the invention
The technical problem to be solved in the present invention is to provide a kind of simple construction, safe operation, can shorten the engineering time and stop The electric time, time saving and energy saving, the utilization aerial earth wire extension pulley group job of saving operating expenses avoids setting up crosses over frame construction method.
Utilization aerial earth wire extension pulley group job according to the present invention avoids setting up crosses over frame construction method, and its step is such as Under:
1st, scheduling job personnel first are on the shaft tower needed across near, and three axle assembly pulleys are hung over built on stilts ground by rod-rising tower On line, the three axles assembly pulley is by top sheave frame, the top sheave being arranged on top sheave frame, gliding wheel carrier and is arranged on lower sheave Two lower sheaves being arranged in juxtaposition on frame are constituted, and mutually can be rotated between upper and lower pulley yoke;The aerial earth wire is by three axle pulleys The top sheave of group is passed through;Two lower sheaves of the assembly pulley lower parallel of extension aerial earth wire are made to pass through insulation ropes across in wire On, insulation ropes two ends to be hung down to ground, Ground Operation personnel are using the insulation ropes hung down to ground by assembly pulley from trolley line On slide at scissors crossing thing;
2nd, Ground Operation personnel will ask line wheel to tie up, and the support line wheel is made up of wheel body and wheel shaft with inner concave, and two Side axle end is provided with two mutually in 90 ° and the position identical collar, and using the insulation ropes as index rope, ground is made The two ends of a piece insulation ropes are drawn from corresponding two collars in the position of support line wheel both sides by industry personnel, by another eradication edge The two ends of rope are drawn from corresponding another two collars in the position of support line wheel both sides, line wheel will be ask to be promoted to uniform speed Below wire at 100mm 200mm, by conductor loop around while using temporary ground anchor by the two ends of two insulation ropeses Tie up, when declining wire, certain height can be kept with ground, reach safe distance;
3rd, recycle insulation ropes pilot to swing, beat, prevent touching to be located on same tower bar and frame cloth The powered side wire that puts.
The invention has the beneficial effects as follows:
1st, can arbitrarily be slid on the aerial earth wire between two bars using three axle assembly pulleys any between two shaft towers At scissors crossing;When declining wire using the support line wheel controlled by insulation ropes, can with ground keep certain safety away from From, make restringing and pitch certain hitch point wire when or play a part of crossing frame during unwrapping wire or stringing, it is to avoid Crossing frame is set up at circuit scissors crossing.
2nd, avoid and set up many cumbersome process of crossing frame, it also avoid acrossing highway, high-speed railway etc. important across Closed channel is needed more, the construction operation time is saved, while also saving many man power and materials.
3rd, this method of operating operating personnel is easy to grasp, simple to operate.
When the 4th, avoiding double-circuit line one and rewinding electricity, a thread-changing, swing because of wire, bounce easily touches powered side Wire, causes earth fault (accident), can efficiently control swinging for wire, make job safety be protected.
5th, the method can be operated in physical features environment complex ground again, overcome because many because of factors such as physical features environment not The construction difficult problem of crossing frame can be set up.
Save construction operation expense fund.
Description of the drawings
Fig. 1 is the three axle pulley block structure schematic diagrames of the present invention;
Fig. 2 is lower sheave structural representation in Fig. 1;
Fig. 3 is the support line wheel structural representation of the present invention;
Fig. 4 is the left view of Fig. 3.
Specific embodiment
The step of the present invention is as follows:
1st, scheduling job personnel first are on the shaft tower needed across near, and three axle assembly pulleys are hung over built on stilts ground by rod-rising tower On line, the three axles assembly pulley is by top sheave frame, the top sheave being arranged on top sheave frame, gliding wheel carrier and is arranged on lower sheave Two lower sheaves being arranged in juxtaposition on frame are constituted, and mutually can be rotated between upper and lower pulley yoke, as depicted in figs. 1 and 2, described three Axle assembly pulley includes that rectangular ring support 1, rotating shaft 2, pulley 3, bearing pin 4, baffle plate 5, closing piece 6, annular support 1 have 11 He of side plate Base plate 12, concrete structure and Patent No. " ZL201320399382.0 " " " a kind of three axles assembly pulley " identical;Described built on stiltsly Line is passed through by the top sheave of three axle assembly pulleys;Two lower sheaves of the assembly pulley lower parallel of extension aerial earth wire are made to pass through insulating cord Rope hangs down insulation ropes two ends to ground across on wire, and Ground Operation personnel will be slided using the insulation ropes hung down to ground Wheel group is slid at scissors crossing thing from trolley line;
2nd, Ground Operation personnel will ask line wheel to tie up, and the support line wheel is made up of wheel body and wheel shaft with inner concave, and two Side axle end is provided with two mutually in 90 ° and the position identical collar, sees Fig. 3 and Fig. 4.Using the insulation ropes as index The two ends of a piece insulation ropes are drawn from corresponding two collars in the position of support line wheel both sides by rope, Ground Operation personnel, The two ends of another insulation ropes are drawn from corresponding another two collars in the position of support line wheel both sides, will with uniform speed Support line wheel is promoted to below wire at 100mm 200mm, by conductor loop around while being thoroughly done away with two using temporary ground anchor The two ends of edge rope tie up, and when declining wire, can keep certain height with ground, reach safe distance;
3rd, recycle insulation ropes pilot to swing, beat, prevent touching to be located on same tower bar and frame cloth The powered side wire that puts.

Claims (1)

1. avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method, it is characterized in that, step is as follows:
1), scheduling job personnel first on the shaft tower needed across near, three axle assembly pulleys are hung over aerial earth wire by rod-rising tower On, the three axles assembly pulley by top sheave frame, the top sheave being arranged on top sheave frame, downslide wheel carrier and is arranged on downslide wheel carrier On two lower sheaves being arranged in juxtaposition constitute, mutually can rotate between upper and lower pulley yoke;The aerial earth wire is by three axle assembly pulleys Top sheave pass through;Two lower sheaves of the assembly pulley lower parallel of extension aerial earth wire are made to pass through insulation ropes across in wire On, insulation ropes two ends to be hung down to ground, Ground Operation personnel are using the insulation ropes hung down to ground by assembly pulley from trolley line On slide at scissors crossing thing;
2), Ground Operation personnel will ask line wheel to tie up, and the support line wheel is made up of wheel body and wheel shaft with inner concave, two side axles End is provided with two mutually in 90 ° and the position identical collar, using the insulation ropes as index rope, Ground Operation people The two ends of a piece insulation ropes are drawn from corresponding two collars in the position of support line wheel both sides by member, by another insulation ropes Two ends draw from corresponding another two collars in the position of support line wheel both sides, line wheel will be ask to be promoted to away from leading with uniform speed Below line at 100mm 200mm, by conductor loop around, while the two ends of two insulation ropeses are tied up using temporary ground anchor, When declining wire, certain height can be kept with ground, reach safe distance;
3), recycle insulation ropes pilot to swing, beat, prevent from touching be located on same tower bar and frame arrangement Powered side wire.
CN201410470546.3A 2014-09-16 2014-09-16 Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method Active CN104393524B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410470546.3A CN104393524B (en) 2014-09-16 2014-09-16 Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410470546.3A CN104393524B (en) 2014-09-16 2014-09-16 Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method

Publications (2)

Publication Number Publication Date
CN104393524A CN104393524A (en) 2015-03-04
CN104393524B true CN104393524B (en) 2017-03-15

Family

ID=52611380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410470546.3A Active CN104393524B (en) 2014-09-16 2014-09-16 Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method

Country Status (1)

Country Link
CN (1) CN104393524B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105186378A (en) * 2015-10-19 2015-12-23 江苏省电力公司南京供电公司 Power transmission line channel crossing protection mechanism
CN106848932B (en) * 2017-04-10 2018-08-17 国网辽宁省电力有限公司辽阳供电公司 It is a kind of to insulate across line machine

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101442194A (en) * 2008-09-11 2009-05-27 山西省电力公司送变电工程公司 Spanning method for ultra, extra high voltage line construction without crossover frame
CN203342236U (en) * 2013-07-06 2013-12-18 国家电网公司 Three-shaft pulley block

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2850207B2 (en) * 1995-04-14 1999-01-27 岩田 収平 Hall prefabricated wiring method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101442194A (en) * 2008-09-11 2009-05-27 山西省电力公司送变电工程公司 Spanning method for ultra, extra high voltage line construction without crossover frame
CN203342236U (en) * 2013-07-06 2013-12-18 国家电网公司 Three-shaft pulley block

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
昌平500kV 变电站内带电跨越220kV 母线施工;姚 翔等;《电 网 技 术》;20060831;第30卷;120-124 *

Also Published As

Publication number Publication date
CN104393524A (en) 2015-03-04

Similar Documents

Publication Publication Date Title
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN103872622B (en) Built on stilts cable laying tractor and Special-purpose lifting instrument thereof
CN105186378A (en) Power transmission line channel crossing protection mechanism
CN104993421A (en) Movable line laying crossing structure
CN104393524B (en) Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method
CN106099768A (en) Outdoor complicated piping lane cable laying of bridge frame method
CN105337218B (en) A kind of transmission line of electricity lowering or hoisting gear
CN105565146A (en) Lifting hook maintaining structure, crane and lifting hook fixing method
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN202544476U (en) Tower crane type holding rod
CN104362544A (en) Pulley type tower head clamp
CN205355673U (en) High -speed railway of not stopping transport across device's span beam rotary mechanism
CN106532557B (en) Across 10KV line construction platform tools devices
CN204376311U (en) The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device
CN103274310B (en) Self-lifting type cableway transporting device
CN105484155B (en) Crossing floor system for on-line high-speed railway crossing equipment
CN203445520U (en) Live spanning device
CN205429673U (en) Cable draw gear
CN105470862B (en) High ferro of not stopping transport crossing construction equipment
CN207918270U (en) A kind of straight thread reinforced bar handling apparatus
CN104377591A (en) Method for replacing overhead wire of crossing electrified railway without building crossing frame
CN105207119B (en) Electrified span construction method for high-voltage wires and protective device of construction
CN204497669U (en) A kind of running type transport vehicle on transmission line
CN204020928U (en) Distribution transformer movable trailer
CN204607534U (en) Electric force pole tower or line bar machinery climbing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant