CN104393524B - Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method - Google Patents
Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method Download PDFInfo
- Publication number
- CN104393524B CN104393524B CN201410470546.3A CN201410470546A CN104393524B CN 104393524 B CN104393524 B CN 104393524B CN 201410470546 A CN201410470546 A CN 201410470546A CN 104393524 B CN104393524 B CN 104393524B
- Authority
- CN
- China
- Prior art keywords
- ground
- wire
- insulation
- insulation ropes
- aerial earth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 238000009413 insulation Methods 0.000 claims abstract description 27
- 239000004020 conductor Substances 0.000 claims abstract description 4
- 230000005540 biological transmission Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 241000272165 Charadriidae Species 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008029 eradication Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Electric Cable Installation (AREA)
Abstract
A kind of construction is simple, safe operation, can shorten engineering time and power off time, time saving and energy saving, and the utilization aerial earth wire for saving operating expenses is hung pulley group job and avoids setting up and crosses over frame construction method.Its step is as follows:On the shaft tower needed across near, rod-rising tower hangs over three axle assembly pulleys on aerial earth wire to scheduling job personnel first;Insulation ropes two ends are hung down to ground, Ground Operation personnel are slid into assembly pulley at scissors crossing thing from trolley line using the insulation ropes hung down to ground;Ground Operation personnel will ask line wheel to tie up, the two ends of two insulation ropeses are drawn from the collar of support line wheel both sides respectively, support line wheel is promoted to below wire at 100mm 200mm, by conductor loop around, the two ends of two insulation ropeses are tied up using temporary ground anchor simultaneously, when declining wire, certain height can be kept with ground, reach safe distance;Recycle insulation ropes pilot to swing, beat, prevent from touching the powered side wire of parallel erected on same tower.
Description
Technical field
The present invention relates to a kind of avoiding setting up using aerial earth wire extension pulley group job crosses over frame construction method.
Background technology
At present, power system is developed rapidly, so as to bring many transmission line of electricity improvement projects, most importantly in order to
Meet customer charge, carry out replacing transmission line wire, and change aerial condutor, be related to scissors crossing below many circuits
Problem, such as:Span transmission line, low-voltage distribution wire, highway, river, building construction etc. below circuit.The ground of these leaps
Side, then need to set up the crossing frames of many, and these crossing frames must before restringing is constructed, need many manpowers and
Time completes.
Content of the invention
The technical problem to be solved in the present invention is to provide a kind of simple construction, safe operation, can shorten the engineering time and stop
The electric time, time saving and energy saving, the utilization aerial earth wire extension pulley group job of saving operating expenses avoids setting up crosses over frame construction method.
Utilization aerial earth wire extension pulley group job according to the present invention avoids setting up crosses over frame construction method, and its step is such as
Under:
1st, scheduling job personnel first are on the shaft tower needed across near, and three axle assembly pulleys are hung over built on stilts ground by rod-rising tower
On line, the three axles assembly pulley is by top sheave frame, the top sheave being arranged on top sheave frame, gliding wheel carrier and is arranged on lower sheave
Two lower sheaves being arranged in juxtaposition on frame are constituted, and mutually can be rotated between upper and lower pulley yoke;The aerial earth wire is by three axle pulleys
The top sheave of group is passed through;Two lower sheaves of the assembly pulley lower parallel of extension aerial earth wire are made to pass through insulation ropes across in wire
On, insulation ropes two ends to be hung down to ground, Ground Operation personnel are using the insulation ropes hung down to ground by assembly pulley from trolley line
On slide at scissors crossing thing;
2nd, Ground Operation personnel will ask line wheel to tie up, and the support line wheel is made up of wheel body and wheel shaft with inner concave, and two
Side axle end is provided with two mutually in 90 ° and the position identical collar, and using the insulation ropes as index rope, ground is made
The two ends of a piece insulation ropes are drawn from corresponding two collars in the position of support line wheel both sides by industry personnel, by another eradication edge
The two ends of rope are drawn from corresponding another two collars in the position of support line wheel both sides, line wheel will be ask to be promoted to uniform speed
Below wire at 100mm 200mm, by conductor loop around while using temporary ground anchor by the two ends of two insulation ropeses
Tie up, when declining wire, certain height can be kept with ground, reach safe distance;
3rd, recycle insulation ropes pilot to swing, beat, prevent touching to be located on same tower bar and frame cloth
The powered side wire that puts.
The invention has the beneficial effects as follows:
1st, can arbitrarily be slid on the aerial earth wire between two bars using three axle assembly pulleys any between two shaft towers
At scissors crossing;When declining wire using the support line wheel controlled by insulation ropes, can with ground keep certain safety away from
From, make restringing and pitch certain hitch point wire when or play a part of crossing frame during unwrapping wire or stringing, it is to avoid
Crossing frame is set up at circuit scissors crossing.
2nd, avoid and set up many cumbersome process of crossing frame, it also avoid acrossing highway, high-speed railway etc. important across
Closed channel is needed more, the construction operation time is saved, while also saving many man power and materials.
3rd, this method of operating operating personnel is easy to grasp, simple to operate.
When the 4th, avoiding double-circuit line one and rewinding electricity, a thread-changing, swing because of wire, bounce easily touches powered side
Wire, causes earth fault (accident), can efficiently control swinging for wire, make job safety be protected.
5th, the method can be operated in physical features environment complex ground again, overcome because many because of factors such as physical features environment not
The construction difficult problem of crossing frame can be set up.
Save construction operation expense fund.
Description of the drawings
Fig. 1 is the three axle pulley block structure schematic diagrames of the present invention;
Fig. 2 is lower sheave structural representation in Fig. 1;
Fig. 3 is the support line wheel structural representation of the present invention;
Fig. 4 is the left view of Fig. 3.
Specific embodiment
The step of the present invention is as follows:
1st, scheduling job personnel first are on the shaft tower needed across near, and three axle assembly pulleys are hung over built on stilts ground by rod-rising tower
On line, the three axles assembly pulley is by top sheave frame, the top sheave being arranged on top sheave frame, gliding wheel carrier and is arranged on lower sheave
Two lower sheaves being arranged in juxtaposition on frame are constituted, and mutually can be rotated between upper and lower pulley yoke, as depicted in figs. 1 and 2, described three
Axle assembly pulley includes that rectangular ring support 1, rotating shaft 2, pulley 3, bearing pin 4, baffle plate 5, closing piece 6, annular support 1 have 11 He of side plate
Base plate 12, concrete structure and Patent No. " ZL201320399382.0 " " " a kind of three axles assembly pulley " identical;Described built on stiltsly
Line is passed through by the top sheave of three axle assembly pulleys;Two lower sheaves of the assembly pulley lower parallel of extension aerial earth wire are made to pass through insulating cord
Rope hangs down insulation ropes two ends to ground across on wire, and Ground Operation personnel will be slided using the insulation ropes hung down to ground
Wheel group is slid at scissors crossing thing from trolley line;
2nd, Ground Operation personnel will ask line wheel to tie up, and the support line wheel is made up of wheel body and wheel shaft with inner concave, and two
Side axle end is provided with two mutually in 90 ° and the position identical collar, sees Fig. 3 and Fig. 4.Using the insulation ropes as index
The two ends of a piece insulation ropes are drawn from corresponding two collars in the position of support line wheel both sides by rope, Ground Operation personnel,
The two ends of another insulation ropes are drawn from corresponding another two collars in the position of support line wheel both sides, will with uniform speed
Support line wheel is promoted to below wire at 100mm 200mm, by conductor loop around while being thoroughly done away with two using temporary ground anchor
The two ends of edge rope tie up, and when declining wire, can keep certain height with ground, reach safe distance;
3rd, recycle insulation ropes pilot to swing, beat, prevent touching to be located on same tower bar and frame cloth
The powered side wire that puts.
Claims (1)
1. avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method, it is characterized in that, step is as follows:
1), scheduling job personnel first on the shaft tower needed across near, three axle assembly pulleys are hung over aerial earth wire by rod-rising tower
On, the three axles assembly pulley by top sheave frame, the top sheave being arranged on top sheave frame, downslide wheel carrier and is arranged on downslide wheel carrier
On two lower sheaves being arranged in juxtaposition constitute, mutually can rotate between upper and lower pulley yoke;The aerial earth wire is by three axle assembly pulleys
Top sheave pass through;Two lower sheaves of the assembly pulley lower parallel of extension aerial earth wire are made to pass through insulation ropes across in wire
On, insulation ropes two ends to be hung down to ground, Ground Operation personnel are using the insulation ropes hung down to ground by assembly pulley from trolley line
On slide at scissors crossing thing;
2), Ground Operation personnel will ask line wheel to tie up, and the support line wheel is made up of wheel body and wheel shaft with inner concave, two side axles
End is provided with two mutually in 90 ° and the position identical collar, using the insulation ropes as index rope, Ground Operation people
The two ends of a piece insulation ropes are drawn from corresponding two collars in the position of support line wheel both sides by member, by another insulation ropes
Two ends draw from corresponding another two collars in the position of support line wheel both sides, line wheel will be ask to be promoted to away from leading with uniform speed
Below line at 100mm 200mm, by conductor loop around, while the two ends of two insulation ropeses are tied up using temporary ground anchor,
When declining wire, certain height can be kept with ground, reach safe distance;
3), recycle insulation ropes pilot to swing, beat, prevent from touching be located on same tower bar and frame arrangement
Powered side wire.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410470546.3A CN104393524B (en) | 2014-09-16 | 2014-09-16 | Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410470546.3A CN104393524B (en) | 2014-09-16 | 2014-09-16 | Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104393524A CN104393524A (en) | 2015-03-04 |
CN104393524B true CN104393524B (en) | 2017-03-15 |
Family
ID=52611380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410470546.3A Active CN104393524B (en) | 2014-09-16 | 2014-09-16 | Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104393524B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105186378A (en) * | 2015-10-19 | 2015-12-23 | 江苏省电力公司南京供电公司 | Power transmission line channel crossing protection mechanism |
CN106848932B (en) * | 2017-04-10 | 2018-08-17 | 国网辽宁省电力有限公司辽阳供电公司 | It is a kind of to insulate across line machine |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101442194A (en) * | 2008-09-11 | 2009-05-27 | 山西省电力公司送变电工程公司 | Spanning method for ultra, extra high voltage line construction without crossover frame |
CN203342236U (en) * | 2013-07-06 | 2013-12-18 | 国家电网公司 | Three-shaft pulley block |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2850207B2 (en) * | 1995-04-14 | 1999-01-27 | 岩田 収平 | Hall prefabricated wiring method |
-
2014
- 2014-09-16 CN CN201410470546.3A patent/CN104393524B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101442194A (en) * | 2008-09-11 | 2009-05-27 | 山西省电力公司送变电工程公司 | Spanning method for ultra, extra high voltage line construction without crossover frame |
CN203342236U (en) * | 2013-07-06 | 2013-12-18 | 国家电网公司 | Three-shaft pulley block |
Non-Patent Citations (1)
Title |
---|
昌平500kV 变电站内带电跨越220kV 母线施工;姚 翔等;《电 网 技 术》;20060831;第30卷;120-124 * |
Also Published As
Publication number | Publication date |
---|---|
CN104393524A (en) | 2015-03-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204316006U (en) | A kind of electric transmission line hot-line crosses over block device | |
CN103872622B (en) | Built on stilts cable laying tractor and Special-purpose lifting instrument thereof | |
CN105186378A (en) | Power transmission line channel crossing protection mechanism | |
CN104993421A (en) | Movable line laying crossing structure | |
CN104393524B (en) | Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method | |
CN106099768A (en) | Outdoor complicated piping lane cable laying of bridge frame method | |
CN105337218B (en) | A kind of transmission line of electricity lowering or hoisting gear | |
CN105565146A (en) | Lifting hook maintaining structure, crane and lifting hook fixing method | |
CN105932601B (en) | Disconnected strand of overhead grounding wire method for repairing and mending | |
CN202544476U (en) | Tower crane type holding rod | |
CN104362544A (en) | Pulley type tower head clamp | |
CN205355673U (en) | High -speed railway of not stopping transport across device's span beam rotary mechanism | |
CN106532557B (en) | Across 10KV line construction platform tools devices | |
CN204376311U (en) | The heavy electric power cable high-altitude of lifting formula is handed over across unfolding device | |
CN103274310B (en) | Self-lifting type cableway transporting device | |
CN105484155B (en) | Crossing floor system for on-line high-speed railway crossing equipment | |
CN203445520U (en) | Live spanning device | |
CN205429673U (en) | Cable draw gear | |
CN105470862B (en) | High ferro of not stopping transport crossing construction equipment | |
CN207918270U (en) | A kind of straight thread reinforced bar handling apparatus | |
CN104377591A (en) | Method for replacing overhead wire of crossing electrified railway without building crossing frame | |
CN105207119B (en) | Electrified span construction method for high-voltage wires and protective device of construction | |
CN204497669U (en) | A kind of running type transport vehicle on transmission line | |
CN204020928U (en) | Distribution transformer movable trailer | |
CN204607534U (en) | Electric force pole tower or line bar machinery climbing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |