CN203445520U - Live spanning device - Google Patents
Live spanning device Download PDFInfo
- Publication number
- CN203445520U CN203445520U CN201320431334.5U CN201320431334U CN203445520U CN 203445520 U CN203445520 U CN 203445520U CN 201320431334 U CN201320431334 U CN 201320431334U CN 203445520 U CN203445520 U CN 203445520U
- Authority
- CN
- China
- Prior art keywords
- live
- arm
- cross
- temporary cross
- steel tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a live spanning device, wherein the live spanning device comprises a first iron tower and a second iron tower, and each iron tower is equipped with a cross-arm. Two first temporary cross-arms are hung under the first iron tower cross-arm, and two second temporary cross-arms are hung under the second iron tower cross-arm; a double-layer pulley is hung under the first temporary cross-arms, and another double-layer pulley is hung under the second temporary cross-arms; two bearing ropes form a cableway by respectively connecting the upper pulleys of the double-layer pulleys with ground anchors; and glass fiber reinforced plastic pipes are uniformly hung under the two bearing ropes via pulley suspension hooks, and are positioned over spanned power lines. The live spanning device has the advantages of simple structure, convenient operation, short time, high efficiency and safe and reliable performance, and can carry out electric wire erection in a live state.
Description
Technical field
The utility model relates to charged paying-off implement field in power circuit process of construction, relates in particular to a kind of live across device.
Background technology
In power circuit engineering construction, inevitably run into the power circuit that has some to be crossed over, the one, before stringing, first the power circuit of being crossed over is had a power failure, will cause a lot of potential safety hazards like this, and the personnel that use are more, not only inconvenience but also dangerous; The 2nd, there are some power circuits of being crossed over not have a power failure, must live across.In addition, along with the development of economic construction, newly-built superelevation electricity transmission line acrossing highway, railway, industrial crops and other barriers are also more and more.In above situation, the construction method of setting up crossing frame can not be gathered effect, must solve by new leap technology this new problem.
Summary of the invention
Not enough for solving prior art, the utility model aim to provide a kind of simple in structure, easy to operate, the time is short, efficiency is high, safe and reliable, can in charged situation, carry out the live across device that electric wire sets up.
The utility model is achieved by the following technical solution: live across device, comprise the first steel tower, the second steel tower, the first described steel tower, the second steel tower is all provided with cross-arm, it is characterized in that: under the first described steel tower cross-arm, hang two the first temporary cross arms, under the second described steel tower cross-arm, hang two the second temporary cross arms, the first temporary cross arm, under the second temporary cross arm, hang respectively double-deck coaster, two carrying ropes are connected to earth anchor formation cableway by the upper pulley of double-deck coaster respectively, under two carrying ropes, by pulley suspension hook, be hung with equally distributed glass reinforced plastic pipe, described glass reinforced plastic pipe is positioned at the top that is surmounted power line.
Every described glass reinforced plastic pipe two ends are wound around respectively a circle pull rope successively by the lower block connection sheave of double-deck coaster.
Described fiberglass pipe range 8m is 5 meters of arranged with intervals under carrying rope.
The horizontal level of the second described temporary cross arm sets high 5m than the horizontal position of the first temporary cross arm.
Described carrying rope is the Di Nima rope of diameter 22mm.
Described pull rope is the Di Nima rope of diameter 10mm.
The length of described pulley suspension hook is 0.5m.
The utility model live across device use principle: hang two groups of (4) temporary cross arms under steel tower under cross-arm, under temporary cross arm, hang double-deck coaster, to carry rope and form cableway by coaster, carrying rope arranged with interval glass reinforced plastic pipe, it hangs under carrying rope by pulley suspension hook, and pulley is Buddhist nun's gram material.
That the utility model live across device has advantages of is simple in structure, easy to operate, the unwrapping wire time is short, efficiency is high, safe and reliable, can in charged situation, carry out electric wire and set up.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure, each sequence number respectively: 1, the first temporary cross arm; 2, the second temporary cross arm; 3, double-deck coaster; 4, carrying rope; 5, earth anchor; 6, pulley suspension hook; 7, glass reinforced plastic pipe; 8, pull rope; 9, sheave.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is further described.
Referring to accompanying drawing 1, a kind of live across device, comprise the first steel tower, the second steel tower, the first described steel tower, the second steel tower is all provided with cross-arm, under the first described steel tower cross-arm, hang two the first temporary cross arms 1, under the second described steel tower cross-arm, hang two the second temporary cross arms 2, the first temporary cross arm 1, the second temporary cross arm 2 times hangs respectively double-deck coaster 3, the upper pulleys that two carrying rope difference 4 are passed through to double-deck coaster 3 connect earth anchors 5 and form cableway, two carrying ropes are hung with equally distributed glass reinforced plastic pipe 7 by pulley suspension hook 64 times, described glass reinforced plastic pipe 7 is positioned at the top that is surmounted power line, described every glass reinforced plastic pipe 7 two ends are wound around respectively a circle pull rope 8 successively by the lower block connection sheave 9 of double-deck coaster 3, the described long 8m of glass reinforced plastic pipe 7 is 5 meters of arranged with intervals under carrying rope, the horizontal level of the second described temporary cross arm 2 sets high 5m than the horizontal position of the first temporary cross arm 1, described carrying rope 4 is the Di Nima rope of diameter 22mm, described pull rope 8 is the Di Nima rope of diameter 10mm, the length of described pulley suspension hook 6 is 0.5m.
Embodiment is just for the ease of understanding the technical solution of the utility model; do not form the restriction to the utility model protection range; every interior any simple modification, equivalent variations and modification of perhaps according to technical spirit of the present utility model, above scheme being done that does not depart from technical solutions of the utility model, within all still belonging to the utility model protection range.
Claims (8)
1. live across device, comprise the first steel tower, the second steel tower, the first described steel tower, the second steel tower is all provided with cross-arm, it is characterized in that: under the first described steel tower cross-arm, hang two the first temporary cross arms (1), under the second described steel tower cross-arm, hang two the second temporary cross arms (2), the first temporary cross arm (1), (3) the second temporary cross arm hangs respectively double-deck coaster under (2), (4) two carrying ropes are connected to earth anchor by double-deck coaster upper pulley (3) respectively and (5) form cableway, (7) (6) two carryings be hung with equally distributed glass reinforced plastic pipe by pulley suspension hook under restricting (4), (7) described glass reinforced plastic pipe is positioned at the top that is surmounted power line.
2. live across device according to claim 1, is characterized in that: (8) by double-deck coaster lower block connection sheave (3) (9) every described glass reinforced plastic pipe (7) two ends is wound around respectively a circle pull rope successively.
3. live across device according to claim 1 and 2, is characterized in that: described glass reinforced plastic pipe is long 8m (7), under carrying rope, is 5 meters of arranged with intervals.
4. live across device according to claim 1 and 2, is characterized in that: the second described temporary cross arm horizontal level (2) sets high 5m than the first temporary cross arm horizontal position (1).
5. live across device according to claim 3, is characterized in that: the second described temporary cross arm horizontal level (2) sets high 5m than the first temporary cross arm horizontal position (1).
6. live across device according to claim 1, is characterized in that: described carrying rope is (4) for the Di Nima of diameter 22mm restricts.
7. live across device according to claim 2, is characterized in that: described pull rope is (8) for the Di Nima of diameter 10mm restricts.
8. live across device according to claim 1, is characterized in that: described pulley suspension hook length is (6) 0.5m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320431334.5U CN203445520U (en) | 2013-07-19 | 2013-07-19 | Live spanning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320431334.5U CN203445520U (en) | 2013-07-19 | 2013-07-19 | Live spanning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203445520U true CN203445520U (en) | 2014-02-19 |
Family
ID=50096539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320431334.5U Expired - Fee Related CN203445520U (en) | 2013-07-19 | 2013-07-19 | Live spanning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203445520U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104577875A (en) * | 2014-12-29 | 2015-04-29 | 国家电网公司 | Construction method of block crossover frame cable of power circuit |
CN108028517A (en) * | 2015-08-12 | 2018-05-11 | 量子联合有限合伙公司 | Live wire is set up, maintenance and repair method |
CN113629581A (en) * | 2021-08-16 | 2021-11-09 | 安徽宏源电力设计咨询有限责任公司 | Net sealing structure on temporary cross arm and net rope threading method thereof |
-
2013
- 2013-07-19 CN CN201320431334.5U patent/CN203445520U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104577875A (en) * | 2014-12-29 | 2015-04-29 | 国家电网公司 | Construction method of block crossover frame cable of power circuit |
CN108028517A (en) * | 2015-08-12 | 2018-05-11 | 量子联合有限合伙公司 | Live wire is set up, maintenance and repair method |
CN113629581A (en) * | 2021-08-16 | 2021-11-09 | 安徽宏源电力设计咨询有限责任公司 | Net sealing structure on temporary cross arm and net rope threading method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203645249U (en) | Hook-net-plane-type charged crossing device | |
CN103545751B (en) | Overhead transmission line ground wire optical fiber cable fitting changes support | |
CN102324712A (en) | Method for electrified spanning construction of high-voltage power transmission and transformation line | |
CN204316007U (en) | A kind of transmission line crossing construction device | |
CN203445520U (en) | Live spanning device | |
CN205791385U (en) | 10kV circuit anti-bird from building nest device | |
CN203367865U (en) | Auxiliary bracket for maintaining power transmission line | |
CN103362343A (en) | Same-tower six-loop tower | |
CN104577875A (en) | Construction method of block crossover frame cable of power circuit | |
CN103243963A (en) | Method for steel pipe pole segmental hoisting by aid of suspended holding pole | |
CN103138206A (en) | Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes | |
CN103236659A (en) | Near-pole maintenance hanging rack for power transmission line | |
CN201252365Y (en) | Construction charged crossover device of ultra-high and special-high voltage transmission line | |
CN102611057A (en) | Crossing mesh | |
CN206128808U (en) | Novel single loop cable dead end tower | |
CN101966823A (en) | Carrier cable crossing frame and erecting method thereof | |
CN104836156A (en) | Synthetic insulator simple ladder | |
CN203645252U (en) | 10kV insulation span frame | |
CN102277999B (en) | Large-section portal steel structure holding pole | |
CN104377591A (en) | Method for replacing overhead wire of crossing electrified railway without building crossing frame | |
CN203086060U (en) | Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension | |
CN202474756U (en) | Crossing net | |
CN203445521U (en) | Draw gear for live spanning rack | |
CN202395384U (en) | Operation tool for multiloop of 110-220kV electric transmission line | |
CN203911340U (en) | Safe and reliable crossing frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140219 Termination date: 20140719 |
|
EXPY | Termination of patent right or utility model |