CN204316007U - A kind of transmission line crossing construction device - Google Patents

A kind of transmission line crossing construction device Download PDF

Info

Publication number
CN204316007U
CN204316007U CN201420859229.6U CN201420859229U CN204316007U CN 204316007 U CN204316007 U CN 204316007U CN 201420859229 U CN201420859229 U CN 201420859229U CN 204316007 U CN204316007 U CN 204316007U
Authority
CN
China
Prior art keywords
coaster
pulley
hanging
rope
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420859229.6U
Other languages
Chinese (zh)
Inventor
陈建社
江义勇
叶文虎
汪宏春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Anhui Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Anhui Power Transmission and Transformation Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420859229.6U priority Critical patent/CN204316007U/en
Application granted granted Critical
Publication of CN204316007U publication Critical patent/CN204316007U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of transmission line crossing construction device.This device comprises and is hung on bearing rope between two crossover towers be oppositely arranged and at least one hanging stringing unit, and any one hanging stringing unit is formed by hanging tackle pulley, wires-erecting pulley and coaster tricing line; The hanging of hanging tackle pulley also can be moved along the rope length direction of bearing rope on described bearing rope, one end of coaster tricing line and ground or base surface are fixedly connected, and are fixedly connected after the other end of the coaster tricing line race through a pulley in hanging tackle pulley with wires-erecting pulley.The utility model has simple to operate, and personnel are few for process crossing construction, and labour intensity is low, process spanning operation amount is few, engineering time is short, and construction cost is low, and efficiency of construction is high, not by advantages such as landform restrictions, also there is coefficient of safety high, good economy performance, highly versatile, the advantages such as various leap thing crossing constructions can be adapted to, can realize that overall process does not have a power failure, do not close a road to traffic, not iceound transmission line crossing construction.

Description

A kind of transmission line crossing construction device
Technical field
The utility model belongs to transmission line construction field, is specifically related to a kind of transmission line crossing construction device.
Background technology
Along with greatly developing of nationwide integrated power grid, high-tension line gets more and more, and the leap of newly-built circuit becomes increasingly complex, and fail safe, the reliability requirement of power supply are more and more higher, and line outage difficulty is increasing.If on being carried out the reliability that power cut construction greatly will affect power supply by cross-line road during newly-built circuit, also heavy losses will be brought to user.
Be there is larger security risk by the charged crossing frame of setting up in cross-line road, special in higher by cross-line road (more than 30 meters), the difficulty that crossing frame is set up will enlarge markedly, and security risk grade is also higher.When adopting crossing frame erection scheme, need to drop into a large amount of material (mao bamboon, bracing wire, brill stake, insulating cord, safety net, iron wire etc.), manpower, costly, the time of setting up is also long, as for cross over 35kV, 110kV and height the crossing frame of about 30 meters, the time of setting up needs a week.Therefore adopt and set up the fail safe of crossing frame scheme, economy, progress are all poor.
From the above, existing line level crossing method and apparatus, also exists line level crossing complexity, and process is crossed over operating personnel and ascended a height often, and poor stability, the deficiencies such as the engineering time is long, poor universality, therefore urgently improve.
Summary of the invention
The purpose of this utility model is for above-mentioned the deficiencies in the prior art, there is provided a kind of structure simple and service-strong transmission line crossing construction device, this device construction tool is few, and line level crossing is easy, efficiency of construction is high and fail safe good, has good economic benefit and social benefit.
For achieving the above object, the utility model have employed following technical scheme:
A kind of transmission line crossing construction device, comprise the bearing rope be hung between two crossover towers be oppositely arranged, also be provided with at least one hanging stringing unit in this device, any one hanging stringing unit is formed by hanging tackle pulley, wires-erecting pulley and coaster tricing line; Described hanging tackle pulley hanging also can be moved along the rope length direction of bearing rope on described bearing rope, one end of coaster tricing line and ground or base surface are fixedly connected, and are fixedly connected after the other end of the coaster tricing line race through a pulley in hanging tackle pulley with wires-erecting pulley.
Preferably, described hanging tackle pulley comprises the first coaster being arranged on upside and the second coaster being arranged on downside, and described first coaster and the second coaster are and unload button-type coaster; Described first coaster reversal of the natural order of things is on bearing rope, and the shackle of the first coaster is overhang downwards and is fixedly connected by steel wire rope with the shackle of the second coaster; Described coaster tricing line is fixedly connected with wires-erecting pulley through after the race of the second coaster middle pulley.
Preferably, described bearing rope is ground wire or wire.
Preferably, described coaster tricing line is the insulation Du Pont rope of φ 13 × 100m, and rope diameter units is mm, and coaster tricing line fixes on the ground by boring stake.
Preferably, described wires-erecting pulley is nylon coaster.
Further, also comprise the suspension bracket taken a seat for people in this device, described suspension bracket is hung on the wire of described bearing rope or close span line, and suspension bracket can move along bearing rope or near the rope length direction of the wire of span line; Described suspension bracket is connected with suspension bracket tricing line.
The beneficial effects of the utility model are:
1), the utility model have employed at least one ground wire be erected between two crossover towers, this earth wire rack is located at by above leap thing, this device hangs hanging tackle pulley on this overhead ground wire, then coaster tricing line is adopted to walk around the pulley race in hanging tackle pulley and suspend wires-erecting pulley, coaster tricing line now can be utilized to control height and the position of wires-erecting pulley, then utilize guide rope, pull rope to take out line crossing construction to wire or optical cable.
Compared to prior art, the utility model has simple to operate, and personnel are few for process crossing construction, labour intensity is low, and process spanning operation amount is few, and the engineering time is short, construction cost is low, efficiency of construction is high, and not by advantages such as landform restrictions, it is high that the utility model also has coefficient of safety, good economy performance, highly versatile, can adapt to the advantages such as various leap thing crossing constructions, can realize that overall process does not have a power failure, do not close a road to traffic, not iceound transmission line crossing construction.
2) wires-erecting pulley, in the utility model is nylon coaster, thus can effectively prevent wire or optical cable to be worn because of friction when crossing construction.
3), the suspension bracket taken a seat for people and suspension bracket tricing line is also provided with in the utility model, suspension bracket is hung on the wire of span line, during work, workmen rides on suspension bracket, then utilize suspension bracket tricing line to control suspension bracket to rise and fall, by the workmen on suspension bracket, pull rope is successively passed each wires-erecting pulley, thus guarantee carrying out smoothly of line level crossing.It is pointed out that the use of suspension bracket is specially adapted to by construction that to cross over thing be alive circuit.
Accompanying drawing explanation
Fig. 1 is perspective view of the present utility model.
Fig. 2 is the perspective view of the present utility model with suspension bracket.
Fig. 3 is the structural representation of hanging tackle pulley and wires-erecting pulley.
Illustrate each Reference numeral implication as follows:
10-crossover tower, 20-bearing rope, 30-hanging tackle pulley 31-the first coaster
32-the second coaster 33-coaster tricing line 34-lever hoist 35-brill stake
40-wires-erecting pulley, 50-optical cable, 60-suspension bracket, 61-suspension bracket tricing line
Embodiment
For ease of understanding, below in conjunction with accompanying drawing, concrete structure of the present utility model is elaborated.
The utility model is made up of parts such as bearing rope 20, hanging tackle pulley 30, coaster tricing line 33, wires-erecting pulley 40, suspension bracket 60 and suspension bracket tricing lines 31, is described below:
1. bearing rope 20
As shown in Figure 1, 2, the bearing rope 20 in the utility model is be erected at original place line GJ-50/GJ-80 on crossover tower 10 or wire.
2. hang tackle pulley 30 and coaster tricing line 33
As shown in Figure 1, 2, 3, the hanging tackle pulley 30 in the utility model comprises the first coaster 31 and the second coaster 32, and described first coaster 31 is arranged on upside, and the second coaster 32 is arranged on downside, and described first coaster 31 and the second coaster 32 are and unload button-type coaster; Described first coaster 31 hangs upside down on bearing rope 20, and the shackle of the first coaster 31 overhangs downwards and is fixedly connected by being with φ 15.5 × 1.5m steel wire rope of wire clips with the shackle of the second coaster 32.
As shown in accompanying drawing 1 ~ 3, one end of described coaster tricing line 33 is fixedly connected with wires-erecting pulley 50 through after the race of the second coaster 32 middle pulley, and the other end of coaster tricing line 33 fixes on the ground by boring stake 35.Described coaster tricing line 33 is the insulation Du Pont rope of φ 13 × 100m, thus just can the height of regulable control wires-erecting pulley 40 and position when regulating the length of coaster tricing line 33, with meet span line to by the safe distance of leap thing requirement.
3. wires-erecting pulley 40
Wires-erecting pulley 40 is nylon coaster, is worn when constructing to prevent wire or optical cable 50.
4. suspension bracket 60 and suspension bracket tricing line 31
It is pointed out that suspension bracket 60 is not required in this device, when being alive circuit by leap thing, suspension bracket 60 is comparatively suitable for.Suspension bracket 60 can be suspension bracket set square, and during construction, suspension bracket 60 is hung on the nearer ground wire of distance span line or wire; Same, suspension bracket tricing line 31, for the height of regulable control suspension bracket 60 and position, is beneficial to construction.
Below in conjunction with accompanying drawing 1,2,3, the course of work of the present utility model is described further.
As shown in Figure 1,3, for spanning overhead line, first crossed by impelling rifle in crossed line side and discharge an optical cable, ground wire is connected as bearing rope 20 in optical cable one end, by tower bar traction optical cable simultaneously over the ground drum slightly brake, make ground wire stressed unsettled by crossed line, until ground wire arrives tower bar, stop traction.Unclasp ground wire to ground, ground wire hangs upside down the first coaster 31, the first coaster 31 mounts the second coaster 32, penetrate coaster tricing line 33, tighten up ground wire in the race of the second coaster 32, now the first coaster 31 and the second coaster 32 are all raised in the air.Coaster tricing line 33 one end is connected with wires-erecting pulley 40, and the other end of coaster tricing line 33 is connected with brill stake 35.The pulley of simultaneously wires-erecting pulley 40 is placed with guide rope, pulls coaster tricing line 33 until wires-erecting pulley 40 is higher than crossed line, and keep enough safe distances, fixed block tricing line 33, keep wires-erecting pulley 40 suspention to be positioned above crossed line.Pull guide rope to be replaced with pull rope, pull rope makes optical cable 50 across crossed line, until the leap completing optical cable 50 is discharged.
Repeat to pull coaster tricing line 33, put down wires-erecting pulley 40, the pulley of wires-erecting pulley 40 discharges guide rope, discharge another root wire, until all leads span stringings all terminate.
As shown in Figure 2,3, when crossed line is alive circuit, guide rope is not placed with when wires-erecting pulley 40 is raised to aerial under the effect of hanging tackle pulley 30, but by the workmen on suspension bracket 60, guide rope is passed each wires-erecting pulley 40 successively, thus complete discharging of guide rope, then pull guide rope to be replaced with pull rope, pull rope makes optical cable 50 across crossed line, until the leap completing optical cable 50 is discharged.

Claims (6)

1. a transmission line crossing construction device, comprise the bearing rope (20) be hung between two crossover towers be oppositely arranged (10), it is characterized in that: be also provided with at least one hanging stringing unit in this device, any one hanging stringing unit is formed by hanging tackle pulley (30), wires-erecting pulley (50) and coaster tricing line (33); Described hanging tackle pulley (30) hanging above also can be moved along the rope length direction of bearing rope (20) at described bearing rope (20), one end of coaster tricing line (33) and ground or base surface are fixedly connected, and are fixedly connected after the other end of coaster tricing line (33) race through a pulley in hanging tackle pulley (30) with wires-erecting pulley (50).
2. a kind of transmission line crossing construction device according to claim 1, it is characterized in that: described hanging tackle pulley (30) comprises the first coaster (31) being arranged on upside and the second coaster (32) being arranged on downside, and described first coaster (31) and the second coaster (32) are and unload button-type coaster; Described first coaster (31) reversal of the natural order of things is on bearing rope (20), and the shackle of the first coaster (31) is overhang downwards and is fixedly connected by steel wire rope with the shackle of the second coaster (32); Described coaster tricing line (33) is fixedly connected with wires-erecting pulley (50) through after the race of the second coaster (32) middle pulley.
3. a kind of transmission line crossing construction device according to claim 1, is characterized in that: described bearing rope (20) is ground wire or wire.
4. a kind of transmission line crossing construction device according to claim 1, it is characterized in that: the insulation Du Pont that described coaster tricing line (33) is φ 13 × 100m restricts, rope diameter units is mm, and coaster tricing line (33) fixes on the ground by boring stake (35).
5. a kind of transmission line crossing construction device according to claim 2, is characterized in that: described wires-erecting pulley (50) is nylon coaster.
6. a kind of transmission line crossing construction device according to any one of Claims 1 to 5, it is characterized in that: in this device, also comprise the suspension bracket (60) taken a seat for people, described suspension bracket (60) is hung on the wire of described bearing rope (20) or close span line, and suspension bracket (60) can move along bearing rope (20) or near the rope length direction of the wire of span line; Described suspension bracket (60) is connected with suspension bracket tricing line (61).
CN201420859229.6U 2014-12-30 2014-12-30 A kind of transmission line crossing construction device Active CN204316007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420859229.6U CN204316007U (en) 2014-12-30 2014-12-30 A kind of transmission line crossing construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420859229.6U CN204316007U (en) 2014-12-30 2014-12-30 A kind of transmission line crossing construction device

Publications (1)

Publication Number Publication Date
CN204316007U true CN204316007U (en) 2015-05-06

Family

ID=53138302

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420859229.6U Active CN204316007U (en) 2014-12-30 2014-12-30 A kind of transmission line crossing construction device

Country Status (1)

Country Link
CN (1) CN204316007U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490214A (en) * 2015-12-29 2016-04-13 国网冀北电力有限公司唐山供电公司 Cross-span wire-traversing method and cross-span wire-traversing structure
CN109038366A (en) * 2018-08-14 2018-12-18 上海送变电工程有限公司 A kind of pre- block device of crossing frame
CN110690664A (en) * 2019-10-10 2020-01-14 国网冀北电力有限公司唐山供电公司 Cross-road pay-off structure and pay-off method for power distribution network
CN111750775A (en) * 2019-03-28 2020-10-09 丰田自动车株式会社 Detection system and detection method
CN112271640A (en) * 2020-11-26 2021-01-26 中国南方电网有限责任公司超高压输电公司百色局 Protection pulley for repairing large-span overhead ground wire and repairing method
CN113371629A (en) * 2021-07-06 2021-09-10 余一霖 Method for replacing mutual-bearing steel wire rope

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105490214A (en) * 2015-12-29 2016-04-13 国网冀北电力有限公司唐山供电公司 Cross-span wire-traversing method and cross-span wire-traversing structure
CN109038366A (en) * 2018-08-14 2018-12-18 上海送变电工程有限公司 A kind of pre- block device of crossing frame
CN111750775A (en) * 2019-03-28 2020-10-09 丰田自动车株式会社 Detection system and detection method
CN110690664A (en) * 2019-10-10 2020-01-14 国网冀北电力有限公司唐山供电公司 Cross-road pay-off structure and pay-off method for power distribution network
CN112271640A (en) * 2020-11-26 2021-01-26 中国南方电网有限责任公司超高压输电公司百色局 Protection pulley for repairing large-span overhead ground wire and repairing method
CN112271640B (en) * 2020-11-26 2022-05-17 中国南方电网有限责任公司超高压输电公司百色局 Protection pulley for repairing large-span overhead ground wire and repairing method
CN113371629A (en) * 2021-07-06 2021-09-10 余一霖 Method for replacing mutual-bearing steel wire rope

Similar Documents

Publication Publication Date Title
CN204316007U (en) A kind of transmission line crossing construction device
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN203645249U (en) Hook-net-plane-type charged crossing device
CN201494438U (en) Simple and fast installation cableway for maintenance and rush repair of mountain pipeline
CN102324712A (en) Method for electrified spanning construction of high-voltage power transmission and transformation line
CN101442194A (en) Spanning method for ultra, extra high voltage line construction without crossover frame
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN103311844B (en) Alpine terrain crosses over the stringing method of live high voltage circuit
CN105586832A (en) Suspension type catwalk surface net mounting system
CN104638563A (en) High-voltage transmission line conveying device
CN204190260U (en) A kind of high pressure power transmission and distribution cable sets up facility across road
CN101966823A (en) Carrier cable crossing frame and erecting method thereof
CN203445520U (en) Live spanning device
CN201325826Y (en) Rock anchor beam hoisting device for underground power house
CN203722136U (en) Insulation rope net apparatus for railway crossing tension stringing construction
CN205846663U (en) A kind of height-adjustable overhead line structures
CN205681016U (en) A kind of cableway-type lives across net
CN206299205U (en) A kind of single-pipe tower
CN203188131U (en) Beam and slab erection construction independent derrick mast device
CN213418649U (en) Mine environment governance supervisory equipment
CN208966123U (en) A kind of big section lattice steel tube holding pole formal dress lifting device
CN104393524B (en) Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method
CN205591115U (en) Suspension type catwalk veil installing the system
CN115324416A (en) Integral hoisting construction process for iron tower
CN210041128U (en) Insulating rolling bar that electrified was strideed across

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant