CN106532557B - Across 10KV line construction platform tools devices - Google Patents
Across 10KV line construction platform tools devices Download PDFInfo
- Publication number
- CN106532557B CN106532557B CN201611071236.XA CN201611071236A CN106532557B CN 106532557 B CN106532557 B CN 106532557B CN 201611071236 A CN201611071236 A CN 201611071236A CN 106532557 B CN106532557 B CN 106532557B
- Authority
- CN
- China
- Prior art keywords
- line
- platform
- plate
- cable hanger
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of present invention cross over 10KV line construction platform tools devices, is formed by upending frame, across platform and lifting rope, and two groups of upending frames are erected at crossed line side side by side, by lifting rope by hung across platform be located at crossed line be spanned section surface;It is made up of across platform cable hanger, support frame, spring hinge and slip device, cable hanger both sides are respectively equipped with mobilizable support frame, and slip device is fixedly mounted along position respectively for the front and rear side of cable hanger;Using spring hinge connection installation between support frame and cable hanger.Beneficial effect is:The artificial built construction cross unwrapping wire of script is become into Work tool the construction line-putting, set scene and demolishing process simple, the construction period of one week or so originally was shortened within one day and has been easily accomplished, construction speed is accelerated, saves cost of labor and support body cost depletions that built crosses over unwrapping wire.
Description
Technical field
The invention belongs to power engineering Work tool field, more particularly to a kind of platform tools across 10KV line constructions to fill
Put.
Background technology
10KV distribution lines are typically set up using cement pole, 8 meters of terrain clearance, 10 meters, 12 meters etc., and number of, lines is more, model
Enclose extensively, set up new line and restringing workload is very big.During construction operation, due to the intersection of different circuits,
The problem of workmen will be often faced across existing distribution line.Construction across existing distribution line is danger, again multiple
It is miscellaneous, it is often necessary to set up crossing frame in existing distribution line both sides, then the line laying work above crossing frame, the leap set up
The general wooden rack of top of the trellis, quantities is big, at one place set up work consuming funds all at 20,000 yuan or so, and to ask specially
Industry construction team, set special messenger's monitoring, it is necessary to write construction three and arrange, it is necessary to the work such as audit, ratify, the whole process 7 day time of needs, take
When it is laborious.
Construction across 10KV distribution lines belongs to work high above the ground, old in the construction of every new distribution line and every
The electric wire of circuit, which is changed, all can repeatedly run into, and the construction cost and progress to whole piece line construction bring significant impact.
The content of the invention
The invention aims to solve the problems, such as to waste time and energy across the construction of 10KV distribution lines, there is provided one kind does not have to
Crossing frame is set up, can quickly cross over the construction platform tool device of existing distribution line.
To achieve these goals, the technical solution adopted in the present invention is in 10KV distribution wires by two hoisting devices
Road Crossover phase lifting sets up a construction platform, and unwrapping wire is crossed over directly from construction platform;Lifting is provided with construction platform to draw
Frame and actinobacillus device are stretched, it is easily quick to transmit distribution line, the completion line laying work of fast power-saving.Package unit, erection are torn open
Except convenient and time-saving, operation is rapid, and cost is low.
The present invention crosses over 10KV line construction platform tools devices, is formed by upending frame, across platform and lifting rope, and two groups are risen
Suspension bracket is erected at crossed line side side by side, by lifting rope by across platform hang be located at crossed line be spanned section just on
Side;It is made up of across platform cable hanger, support frame, spring hinge and slip device, cable hanger both sides are respectively equipped with mobilizable
Slip device is fixedly mounted along position respectively for support, the front and rear side of cable hanger;Connected between support frame and cable hanger using spring hinge
Connect installation.
Described uses insulating materials across platform.
Described support frame is in triangle rack-like.
Described slip device is arranged to three groups of correspondence by span line.
Described slip device is made up of pulley, limiting plate and card line plate, and limiting plate is fixedly mounted on pulley both sides, pulley two
Card line plate is provided between the limiting plate of side;Card line plate is divided to or so two pieces, is separately positioned on the limiting plate at left and right sides of pulley;It is single
Block card line plate is hinged on limiting plate, and support spring is respectively arranged between two sides and limiting plate, makes card line plate and limiting plate
Plate face is vertical.
Described lifting rope is using insulation cord lock.
The beneficial effects of the present invention are:The artificial built construction cross unwrapping wire of script is become into Work toolization construction to put
Line, set scene and demolishing process simple, the construction period of one week or so originally was shortened within one day and has been easily accomplished, has been added
Fast construction speed, saves cost of labor and support body hiring cost that built crosses over unwrapping wire, eliminates construction waste, avoid
Destruction to ground vegetation.In a word, it is time saving and energy saving, securely and reliably, that is, efficiency of construction is improved, reduces construction cost again.
Brief description of the drawings
Accompanying drawing 1 is organigram of the invention.
Accompanying drawing 2 is slip device front organigram of the invention.
Accompanying drawing 3 overlooks organigram for the slip device of the present invention.
In figure:Upending frame 1, across platform 2, cable hanger 21, support frame 22, spring hinge 23, slip device 24, pulley 241,
Limiting plate 242, card line plate 243, support spring 244, lifting rope 3, span line 4, crossed line 5.
Embodiment
The present invention will be further described in detail below in conjunction with the accompanying drawings:
The present invention crosses over 10KV line construction platform tools devices, is formed by upending frame 1, across platform 2 and lifting rope 3, two
Group upending frame 1 is erected at the side of crossed line 5 side by side, the quilt for being located at crossed line 5 will be hung across platform 2 by lifting rope 3
Directly over Crossover phase;It is made up of across platform 2 cable hanger 21, support frame 22, spring hinge 23 and slip device 24,21 liang of cable hanger
Side is respectively equipped with mobilizable support frame 22, and slip device 24 is fixedly mounted along position respectively for the front and rear side of cable hanger 21;Support frame
Using the connection installation of spring hinge 23 between 22 and cable hanger 21.
Described uses insulating materials across platform 2.
Described support frame 22 is in triangle rack-like.
Described slip device 24 is arranged to three groups of correspondence by span line 4.
As shown in Figure 2, described slip device 24 is made up of pulley 241, limiting plate 242 and card line plate 243, limiting plate
242 are fixedly mounted on the both sides of pulley 241, and card line plate 243 is provided between the limiting plate 242 of the both sides of pulley 241;Card line plate 243 divides
Two pieces of left and right, it is separately positioned on the limiting plate 242 of the left and right sides of pulley 241;Monolithic card line plate 243 is hinged on limiting plate 242
On, support spring 244 is respectively arranged between two sides and limiting plate 242, makes card line plate 243 vertical with the plate face of limiting plate 242.
Described lifting rope 3 is using insulation cord lock.
Embodiment:
As shown in Figure 1, the present invention crosses over 10KV line construction platform tools devices, and its upending frame 1 can be directly using hanging
Car operates, and installs insulated sling 3 on suspension hook additional and then connects and crosses over platform 2.Support frame 22 across the left and right sides of platform 2 is stretchable
Open, lifting is connected by a upending frame 1 respectively, is opened after the stress of spring hinge 23 and entirely crosses over platform 2.Operation is move across
Platform 2 arrives the surface of crossed line 5, and span line 4 is pulled through from leap platform 2, so as to avoid and be spanned completely
Circuit 5 contacts, and does not influence the normal operation of crossed line 5 completely.10KV circuits are typically three lines, across platform 2 on set
Three groups of slip devices 24 of respective distances width are equipped with, across platform 2 when setting up, in advance respectively in the pulley of three groups of slip devices 24
Three ropes are set in 241 groove, three ropes is dragged to after the completion of being set up across platform 2 on ground both sides termination,
Workmen is dead with one end coupling bar of three ropes respectively by the end of a thread of three crossover tracks on ground, pulls the another of three ropes
One end, you can pass through three crossover tracks from the pulley 241 of three groups of slip devices 24, line laying work is crossed in completion.
24 1 pulley gears for carrying card line function of the slip device installed on across platform 2, can greatly save work
Personnel pull exerting oneself for electric wire, wire operation can be easily accomplished, manually with regard to stretchy.The cotton rope of span line 5 is in slip device
In the groove of 24 pulley 241, by the stop of both sides limiting plate 242, pulley 241, and the setting energy of card line plate 243 will not be deflected away from
Enough stop that cotton rope is jumped out, and the bidirectional stress of card line plate 243, when cotton rope loads, firmly pushes the groove that can be caught in pulley 241 automatically
In, pulley 241 can be departed from by, which up being pulled after cotton rope pulling, pulls out, easy to operate, it is not necessary to artificial input.
After the completion of span line construction, the span line 4 between two electric poles is exceptionally straight, with being disengaged across platform 2, also far
From crossed line 5, span line construction is completed.Operation upending frame 1 will hang the top of crossed line 5, behaviour across platform 2
Make upending frame 1 to put down lifting rope 3, make, across platform 2 to ground, then to untie lifting rope 3, pack up upending frame 1, platform 2 will be crossed over
Support frame 22 fold after pack up, and complete remove operation.
Claims (4)
1. one kind crosses over 10KV line construction platform tools devices, it is characterised in that:By upending frame (1), across platform (2) and hang
Rope (3) composition, two groups of upending frames (1) are erected at crossed line (5) side, will hung by lifting rope (3) across platform (2) side by side
It is located at being spanned directly over section for crossed line (5);Across platform (2) by cable hanger (21), support frame (22), spring hinge
(23) formed with slip device (24), cable hanger (21) both sides are respectively equipped with mobilizable support frame (22), before cable hanger (21)
Slip device (24) is fixedly mounted in back edge position respectively;Between support frame (22) and cable hanger (21) using spring hinge (23) even
Connect installation;Slip device (24) is arranged to three groups of correspondence by span line (4);Slip device (24) is by pulley (241), spacing
Plate (242) and card line plate (243) composition, limiting plate (242) are fixedly mounted on pulley (241) both sides, the limit of pulley (241) both sides
Card line plate (243) is provided between position plate (242);Card line plate (243) is divided to or so two pieces, is separately positioned on pulley (241) left and right two
On the limiting plate (242) of side;Monolithic card line plate (243) is hinged on limiting plate (242), between two sides and limiting plate (242)
Support spring (244) is respectively arranged with, makes card line plate (243) vertical with limiting plate (242) plate face.
2. cross over 10KV line construction platform tools devices as claimed in claim 1, it is characterised in that:Adopted across platform (2)
Use insulating materials.
3. cross over 10KV line construction platform tools devices as claimed in claim 1, it is characterised in that:Support frame (22) is in three
Corner bracket shape.
4. cross over 10KV line construction platform tools devices as claimed in claim 1, it is characterised in that:Lifting rope (3) is using exhausted
Edge cord lock.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611071236.XA CN106532557B (en) | 2016-11-29 | 2016-11-29 | Across 10KV line construction platform tools devices |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611071236.XA CN106532557B (en) | 2016-11-29 | 2016-11-29 | Across 10KV line construction platform tools devices |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106532557A CN106532557A (en) | 2017-03-22 |
CN106532557B true CN106532557B (en) | 2018-01-19 |
Family
ID=58353587
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611071236.XA Expired - Fee Related CN106532557B (en) | 2016-11-29 | 2016-11-29 | Across 10KV line construction platform tools devices |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106532557B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108483234A (en) * | 2018-06-12 | 2018-09-04 | 中国冶集团有限公司 | A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method |
CN111646321B (en) * | 2020-05-27 | 2021-10-01 | 国网江苏省电力有限公司东海县供电分公司 | A antiwind assistor that is used for distribution network line construction of 10kV and below |
CN112653018A (en) * | 2020-12-04 | 2021-04-13 | 国网辽宁省电力有限公司锦州供电公司 | Cross spanning line pay-off device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11355928A (en) * | 1998-06-09 | 1999-12-24 | Hitachi Cable Ltd | Drawing method for electric wire |
CN2865089Y (en) * | 2005-11-08 | 2007-01-31 | 江苏省电力公司无锡供电公司 | Pulley for cable and optical cable laying |
CN200973000Y (en) * | 2006-11-25 | 2007-11-07 | 郭红辉 | Power line crossing mounting frame |
CN201222628Y (en) * | 2008-06-27 | 2009-04-15 | 李文福 | Hack lever tool for distribution circuit spanning highway |
CN104836163B (en) * | 2015-05-29 | 2017-03-01 | 国网山东省电力公司昌邑市供电公司 | Across road unwrapping wire high-altitude support |
-
2016
- 2016-11-29 CN CN201611071236.XA patent/CN106532557B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106532557A (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106532557B (en) | Across 10KV line construction platform tools devices | |
CN207098456U (en) | A kind of crossover tower auxiliary cross-arm block component for being used to live across operation | |
CN206502579U (en) | Power pole hoisting device | |
CN104993421A (en) | Movable line laying crossing structure | |
CN203367865U (en) | Auxiliary bracket for maintaining power transmission line | |
CN205985947U (en) | Tower of london bridge type transmission line leap system that does not have a power failure | |
CN105932601B (en) | Disconnected strand of overhead grounding wire method for repairing and mending | |
CN204793847U (en) | Frame is strideed across to portable unwrapping wire | |
CN103138206A (en) | Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes | |
CN107247224B (en) | The device and test method of suspension insulator pressure resistance can quickly be tested | |
CN204349336U (en) | Overhead-groundwire lifter | |
CN206646424U (en) | A kind of express highway intelligent speed limit direction board | |
CN204858412U (en) | Distribution lines cable and wire tied in a bundle set up and pass through ware with sharp pole | |
CN209890101U (en) | Electric hoist convenient to fix | |
CN104393524B (en) | Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method | |
CN202214170U (en) | Extending-retracting and folding mechanism for horizontal single-rope double-lifting-point boom | |
CN203504070U (en) | Mechanical cable laying device | |
CN203086060U (en) | Device for replacing overhead ground wires of high-voltage overhead power transmission line by using PPR (polypropylene random) pipe suspension | |
CN202906291U (en) | Operation rope ladder hanging equipment | |
CN105207119B (en) | Electrified span construction method for high-voltage wires and protective device of construction | |
CN209011696U (en) | A kind of enclosing bracket | |
CN205034948U (en) | Rack formula hanging beam device | |
CN203445521U (en) | Draw gear for live spanning rack | |
CN205151577U (en) | Fix small -size hoisting machine on steel support of groove | |
CN204236626U (en) | Building site fortune bar car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180119 Termination date: 20191129 |