CN108483234A - A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method - Google Patents

A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method Download PDF

Info

Publication number
CN108483234A
CN108483234A CN201810600618.XA CN201810600618A CN108483234A CN 108483234 A CN108483234 A CN 108483234A CN 201810600618 A CN201810600618 A CN 201810600618A CN 108483234 A CN108483234 A CN 108483234A
Authority
CN
China
Prior art keywords
lead
frame
suspender
current collection
wired
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810600618.XA
Other languages
Chinese (zh)
Inventor
任灿
张凌
李少祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201810600618.XA priority Critical patent/CN108483234A/en
Publication of CN108483234A publication Critical patent/CN108483234A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of existing line Poling Construction suspender of current collection line crossing and stringing construction methods, above-mentioned suspender includes two and is arranged in left and right interval and for guiding the lead-frame across conducting wire, connecting cross beam is equipped between lead-frame, the both ends of connecting cross beam are connected one to one respectively in two lead-frames, its width direction of lead-frame upper edge is equipped at intervals with multigroup guide wheel group, guide wheel group includes the guide pulley that multiple length directions along lead-frame are arranged at intervals in lead-frame, and multigroup lifting lug is arranged in two lead-frames.In the existing line Poling Construction suspender of current collection line crossing provided by the invention, by the way that rectangular-shaped lead-frame is arranged, and by guide wheel group thereon, conducting wire is passed through to guide and discharge, makes it that can smoothly cross over both wired.

Description

A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method
Technical field
Existing line erection construction structure more particularly to a kind of existing coil holder of current collection line crossing are crossed over the present invention relates to a kind of Line construction suspender and stringing construction method.
Background technology
With the fast development of power grid, wind power new energy project under construction is more and more, the work of booster stations electric transmission line erection Security reliability also higher therewith.At the scene during practice of construction, the construction across existing transmission line of electricity is often encountered, Scene is higher due to mounting height, it usually needs uses truck crane etc..But since present power supply enterprise controls scope of power outage It must compare and strictly result in working since safe distance is inadequate across both wired stringing in this way, cannot be made using crane Industry.It is generally constructed by the way of setting up a large amount of scaffolds at present, but this method is inconvenient, it is time-consuming and laborious, no It is well positioned to meet the requirement of site operation.
Invention content
For existing across the above problem present in existing line erection construction, a kind of simple operation, construction are now provided The existing line Poling Construction suspender of efficient current collection line crossing and stringing construction method.
Specific technical solution is as follows:
The first aspect of the invention is to provide a kind of existing line Poling Construction suspender of current collection line crossing, has in this way Feature, including two be arranged in left and right interval and for guide the lead-frame across conducting wire, connection cross be equipped between lead-frame The both ends of beam, connecting cross beam are connected one to one respectively in two lead-frames, its width direction of lead-frame upper edge is equipped at intervals with Multigroup guide wheel group, guide wheel group include the guide pulley that multiple length directions along lead-frame are arranged at intervals in lead-frame, It is arranged with multigroup lifting lug in two lead-frames.
The existing line Poling Construction suspender of above-mentioned current collection line crossing, also has the feature that, two lead-frame phases Mutually multigroup lifting lug is arranged in close side guiding framework.
The existing line Poling Construction suspender of above-mentioned current collection line crossing, also has the feature that, the two of connecting cross beam End is bolted in lead-frame respectively.
The existing line Poling Construction suspender of above-mentioned current collection line crossing, also has the feature that, lead-frame is rectangular Shape.
The second aspect of the invention is to provide a kind of above-mentioned existing line Poling Construction suspender of current collection line crossing of application Stringing construction method, have the feature that, include the following steps:
1) it, will be penetrated, and sequentially passed through in guide wheel group by one end of lead-frame length direction across the free end of conducting wire Multiple guide pulleys after the other end through lead-frame be pierced by and connect with clump weight;
2), using the boom hoisting hoisting sling positioned at both wired sides, the lifting of boom hoisting is coordinated during lifting Conducting wire is crossed in speed release, and when suspender is lifted to both wired tops and crosses over both wired, conducting wire is crossed in release, makes its free end Ground can be dropped under the action of clump weight;
3) both wired are installed on across conducting wire, will have been crossed over to be located in both transmission towers of wired both sides, moved after installation is complete Walk boom hoisting.
Above-mentioned stringing construction method, also has the feature that, also using positioned at lead-frame one end two in step 2) The swing of cable wind rope control suspender on side.
The advantageous effect of said program is:
In the existing line Poling Construction suspender of current collection line crossing provided by the invention, by the way that rectangular-shaped lead-frame is arranged, And by guide wheel group thereon, conducting wire is passed through to guide and discharge, makes it that can smoothly cross over both wired.Collection provided by the invention Electric line has the advantages that simple in structure, safe and reliable across existing line Poling Construction suspender;It is hung using provided by the invention The erection construction method of tool has the advantages that simple operation, construction efficiency are high, at low cost.
Description of the drawings
Fig. 1 is the structural representation of the existing line Poling Construction suspender of current collection line crossing provided in the embodiment of the present invention Figure.
In attached drawing:1, lead-frame;2, connecting cross beam;3, guide pulley;4, lifting lug.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of not making creative work it is all its His embodiment, shall fall within the protection scope of the present invention.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The invention will be further described in the following with reference to the drawings and specific embodiments, but not as limiting to the invention.
Fig. 1 is the structural representation of the existing line Poling Construction suspender of current collection line crossing provided in the embodiment of the present invention Figure.As shown in Figure 1, the existing line Poling Construction suspender of the current collection line crossing provided in the embodiment of the present invention, including:Two It is rectangular-shaped and be arranged in left and right interval and for guide the lead-frame 1 across conducting wire, equipped with connecting cross beam 2 between lead-frame 1, The both ends of connecting cross beam 2 are connected one to one by bolt respectively in two lead-frames 1, its width direction of 1 upper edge of lead-frame It is equipped at intervals with multigroup guide wheel group, guide wheel group includes that multiple length directions along lead-frame 1 are arranged at intervals in lead-frame 1 Guide pulley 3, two lead-frames 1 side close to each other guide and are arranged with multigroup lifting lug 4 in framework.
Connecting cross beam 2 is bolted in lead-frame 1 in the present invention so that operator can assemble in construction site and obtain Suspender is obtained, can be dismantled again after use in order to transport.
It is guided in framework in the present invention by the way that lifting lug 4 is set to two lead-frames 1 side close to each other, to avoid rising Interference across conducting wire of the suspender belt to both sides during hanging.
It is rectangular-shaped by the way that lead-frame 1 to be optimized in the present invention, have with the guiding framework using its length direction big Span structure is preferably realized across both wired leap action.
Suspender is monoblock type symmetrical structure in the present invention, with effective balance kept during lifting by crane.
Use the stringing construction method of the existing line Poling Construction suspender of current collection line crossing provided by the invention for:
1) it, will be penetrated, and sequentially passed through in guide wheel group by one end of 1 length direction of lead-frame across the free end of conducting wire Multiple guide pulleys 3 after the other end through lead-frame 1 be pierced by and connect with clump weight;
2) it, is hung on using the boom hoisting (can be truck crane) positioned at both wired sides and being risen by the lifting lug 4 on suspender State suspender, during lifting can side play the lifting speed of buttonhole selvage cooperation boom hoisting and gradually discharge across conducting wire and make across conducting wire Free end be slightly below lead-frame 1 always, to rise across conducting wire by the towing of lead-frame 1, when suspender is lifted on both wired When just and crossing over both wired, operator can gradually discharge under making its free end can be under the draw of clump weight across conducting wire It is down on the both ground of wired other side, can guide to cross over by guide pulley 3 in the process across the release of conducting wire in this step and lead Line, makes that it can smoothly be discharged and leap was both wired;
3) both wired both ends across conducting wire, will have been crossed over to be installed in both transmission towers of wired both sides, installed Boom hoisting is removed after.
It, can also be in 1 one end both sides tying-up cable wind rope of lead-frame, to utilize cable in step 2 on the basis of above-mentioned technical proposal The swing of suspender during wind rope controls lifting process and declines.
It these are only preferred embodiments of the present invention, be not intended to limit the implementation manners and the protection scope of the present invention, it is right For those skilled in the art, it should can appreciate that and all be replaced with being equal made by description of the invention and diagramatic content It changes and obviously changes obtained scheme, should all be included within the scope of the present invention.

Claims (6)

1. a kind of existing line Poling Construction suspender of current collection line crossing, which is characterized in that be arranged in left and right interval including two And for guiding the lead-frame (1) across conducting wire, connecting cross beam (2), the connecting cross beam are equipped between the lead-frame (1) (2) both ends are connected one to one respectively on two lead-frames (1), between described its width direction of lead-frame (1) upper edge Every equipped with multigroup guide wheel group, the guide wheel group includes that multiple length directions along the lead-frame (1) are arranged at intervals at institute The guide pulley (3) in lead-frame (1) is stated, multigroup lifting lug (4) is arranged on two lead-frames (1).
2. the existing line Poling Construction suspender of current collection line crossing according to claim 1, which is characterized in that described in two It is arranged with multigroup lifting lug (4) in lead-frame (1) guiding framework in side close to each other.
3. the existing line Poling Construction suspender of current collection line crossing according to claim 1 or 2, which is characterized in that described The both ends of connecting cross beam (2) are bolted to respectively in the lead-frame (1).
4. the existing line Poling Construction suspender of current collection line crossing according to claim 1 or 2, which is characterized in that described Lead-frame (1) is rectangular.
5. a kind of stringing using the existing line Poling Construction suspender of claim 1-4 any one of them current collection line crossings is applied Work method, which is characterized in that include the following steps:
1) it, will be penetrated, and sequentially passed through in guide wheel group by one end of lead-frame (1) length direction across the free end of conducting wire Multiple guide pulleys (3) are pierced by by the other end of the lead-frame (1) and are connect with clump weight;
2), using the boom hoisting hoisting sling positioned at both wired sides, the lifting of the boom hoisting is coordinated during lifting Speed release is described to cross over conducting wire, when the suspender is lifted to both wired tops and crosses over both wired, discharges described cross over and leads Line makes its free end that can drop to ground under the action of the clump weight;
3) both wired both ends across conducting wire, will have been crossed over and be respectively arranged in the transmission tower positioned at both wired both sides On, remove boom hoisting after installation is complete.
6. stringing construction method according to claim 5, which is characterized in that also using positioned at the guiding in step 2) Cable wind rope on frame (1) one end both sides controls the swing of the suspender.
CN201810600618.XA 2018-06-12 2018-06-12 A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method Pending CN108483234A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810600618.XA CN108483234A (en) 2018-06-12 2018-06-12 A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810600618.XA CN108483234A (en) 2018-06-12 2018-06-12 A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method

Publications (1)

Publication Number Publication Date
CN108483234A true CN108483234A (en) 2018-09-04

Family

ID=63342746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810600618.XA Pending CN108483234A (en) 2018-06-12 2018-06-12 A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method

Country Status (1)

Country Link
CN (1) CN108483234A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1023628A (en) * 1996-06-28 1998-01-23 Hitachi Cable Ltd A self-propelled aircraft that can ride over a steel tower using overhead lines
CN202872255U (en) * 2012-10-22 2013-04-10 董杰 Spanning support for traction cable
CN204012462U (en) * 2014-07-31 2014-12-10 李翔天 A kind of for setting up the suspender of wire
CN106532557A (en) * 2016-11-29 2017-03-22 李通 Crossing 10KV line construction platform tool apparatus
CN106809722A (en) * 2017-03-03 2017-06-09 凯迈(洛阳)航空防护装备有限公司 A kind of frame-type suspender and the combination pile suspender using the frame-type suspender

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1023628A (en) * 1996-06-28 1998-01-23 Hitachi Cable Ltd A self-propelled aircraft that can ride over a steel tower using overhead lines
CN202872255U (en) * 2012-10-22 2013-04-10 董杰 Spanning support for traction cable
CN204012462U (en) * 2014-07-31 2014-12-10 李翔天 A kind of for setting up the suspender of wire
CN106532557A (en) * 2016-11-29 2017-03-22 李通 Crossing 10KV line construction platform tool apparatus
CN106809722A (en) * 2017-03-03 2017-06-09 凯迈(洛阳)航空防护装备有限公司 A kind of frame-type suspender and the combination pile suspender using the frame-type suspender

Similar Documents

Publication Publication Date Title
CN203699606U (en) Lifter and iron tower
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN203367865U (en) Auxiliary bracket for maintaining power transmission line
CN204577983U (en) A kind of coaster setting up leads span net
CN106013924B (en) A kind of electric force pole tower
CN101966823B (en) Carrier cable crossing frame and erecting method thereof
CN106532557B (en) Across 10KV line construction platform tools devices
CN108483234A (en) A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method
CN106044580B (en) A kind of wet electrical dust precipitator body equipment integral hoisting method
CN203394011U (en) Aerial hanging platform for ball arm type roofs with grid structures
CN206298286U (en) A kind of wet electrical dust precipitator body equipment integral hoisting aids in hanging beam
CN203445520U (en) Live spanning device
CN102926329A (en) Device dedicated for lifting steel box beam of small and medium-sized long-span suspension bridge and lifting method
CN206289544U (en) A kind of simple electric nacelle device
CN201332246Y (en) Large-tonnage conducting wire lifter
CN205985948U (en) Tension formula line protection
CN103532052A (en) Live erection of simple crossing structure on ADSS (all-dielectric self-supporting optic fiber cable) and implementation method
CN218114849U (en) Curtain wall material hoisting device
CN215828215U (en) Self-balancing large-span net rack lifting structure
CN212127323U (en) Cableway with hoisting function
CN203333224U (en) Steel structural beam upward lifting tool
CN208966123U (en) A kind of big section lattice steel tube holding pole formal dress lifting device
CN101949117A (en) Safety insulating net structure of highway
CN201686458U (en) Movable operating platform used for quickly processing welding seam at end opening of steel box girder
CN201307730Y (en) Electric transmission line concrete pole safe device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180904