CN106532557A - Crossing 10KV line construction platform tool apparatus - Google Patents
Crossing 10KV line construction platform tool apparatus Download PDFInfo
- Publication number
- CN106532557A CN106532557A CN201611071236.XA CN201611071236A CN106532557A CN 106532557 A CN106532557 A CN 106532557A CN 201611071236 A CN201611071236 A CN 201611071236A CN 106532557 A CN106532557 A CN 106532557A
- Authority
- CN
- China
- Prior art keywords
- line
- platform
- crossing
- plate
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 37
- 239000011810 insulating material Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- 239000000725 suspension Substances 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 229920000742 Cotton Polymers 0.000 description 4
- 238000009413 insulation Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 241000606750 Actinobacillus Species 0.000 description 1
- 238000012550 audit Methods 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Disclosed is a crossing 10KV line construction platform tool apparatus. The crossing 10KV line construction platform tool apparatus consists of lifting frames, a crossing platform and lifting ropes, wherein the two groups of lifting frames are vertically arranged on the side edge of a crossed line side by side, and the crossing platform is arranged above a crossed section of the crossed line by the lifting ropes; the crossing platform consists of a wire suspension frame, supporting frames, spring hinges and wire sliding devices; the movable supporting frames are arranged on the two sides of the wire suspension frame respectively; the wire sliding devices are fixedly mounted on the front and back edges of the wire suspension frame respectively; and the supporting frames and the wire suspension frame are connected and mounted through the spring hinges. The crossing 10KV line construction platform tool apparatus has the beneficial effects as follows: an original artificial putting-up construction, crossing and payoff process is changed into the construction payoff by the tool, so that the field setting and detaching process becomes simple; and the original about one-week construction period is shortened to be one day, so that the construction progress is accelerated, the manpower cost for putting-up, crossing and payoff and the frame loss cost are saved.
Description
Technical field
The invention belongs to power engineering Work tool field, more particularly to a kind of platform tools dress of leap 10KV line constructions
Put.
Background technology
10KV distribution lines are typically set up using cement pole, 8 meters of terrain clearance, 10 meters, 12 meters etc., and number of, lines is more, model
Enclose wide, set up new line and restringing workload is very big.During construction operation, due to the intersection of different circuits,
Workmen Jing will often face the problem across existing distribution line.Construction across existing distribution line is danger, again multiple
It is miscellaneous, it is often necessary to set up crossing frame in existing distribution line both sides, then the line laying work from above crossing frame, the leap set up
The general wooden rack of top of the trellis, quantities are big, and at one, work consuming funds are set up all at 20,000 yuan or so in place, and will ask specially
Industry construction team, set special messenger's monitoring, it is necessary to write construction and three arrange, the work such as need to audit, ratify, the whole process 7 day time of needs, taking
When it is laborious.
Construction across 10KV distribution lines belongs to work high above the ground, in the construction of the distribution line new per bar and old per bar
The electric wire of circuit is changed and all repeatedly can be run into, and brings significant impact to the construction cost and progress of whole piece line construction.
The content of the invention
The invention aims to solve the problems, such as across the construction of 10KV distribution lines to waste time and energy, there is provided it is a kind of without
Crossing frame is set up, can quickly across the operation platform tool device of existing distribution line.
To achieve these goals, the technical solution adopted in the present invention is in 10KV distribution wires by two hoisting devices
Road Crossover phase lifting sets up an operation platform, directly from operation platform across unwrapping wire;It is provided with lifting to draw on operation platform
Frame and actinobacillus device are stretched, easily quick transmission distribution line, fast power-saving completes line laying work.Package unit, erection are torn open
Except convenient and time-saving, operation is rapid, and cost is low.
The present invention crosses over 10KV line construction platform tools devices, constitutes by upending frame, across platform and lifting rope, and two groups are risen
Suspension bracket is erected at crossed line side side by side, is just gone up the section that is spanned for being located at crossed line is hung across platform by lifting rope
Side;It is made up of across platform cable hanger, bracing frame, spring hinge and slip device, cable hanger is respectively provided on two sides with mobilizable
Support, the front and rear side of cable hanger fixedly mount slip device respectively along position;Connected using spring hinge between bracing frame and cable hanger
Connect installation.
Described leap platform adopts insulating materials.
Described bracing frame is in triangle rack-like.
Described slip device is set to corresponding three groups in front and back by span line.
Described slip device is made up of pulley, limiting plate and card line plate, and limiting plate is fixedly mounted on pulley both sides, pulley two
Card line plate is provided between the limiting plate of side;Card line plate is divided to or so two pieces, is separately positioned on the limiting plate of the pulley left and right sides;It is single
Block card line plate is hinged on limiting plate, and support spring is respectively arranged between two sides and limiting plate, makes card line plate and limiting plate
Plate face is vertical.
Described lifting rope is using insulation cord lock.
The beneficial effects of the present invention is:The artificial built construction cross unwrapping wire of script is become Work toolization construction to put
Line, arranges scene and demolishing process is simple, and the construction period of one week or so originally has been shortened to be easily accomplished within one day, plus
Fast construction speed, saves built across the cost of labor and support body hiring cost of unwrapping wire, eliminates construction waste, it is to avoid
Destruction to ground vegetation.In a word, it is time saving and energy saving, it is safe and reliable, that is, efficiency of construction is improve, construction cost is reduced again.
Description of the drawings
Organigram of the accompanying drawing 1 for the present invention.
Slip device front organigram of the accompanying drawing 2 for the present invention.
Accompanying drawing 3 overlooks organigram for the slip device of the present invention.
In figure:Upending frame 1, across platform 2, cable hanger 21, bracing frame 22, spring hinge 23, slip device 24, pulley 241,
Limiting plate 242, card line plate 243, support spring 244, lifting rope 3, span line 4, crossed line 5.
Specific embodiment
The present invention will be further described in detail below in conjunction with the accompanying drawings:
The present invention crosses over 10KV line construction platform tools devices, constitutes by upending frame 1, across platform 2 and lifting rope 3, two
Group upending frame 1 is erected at 5 side of crossed line side by side, the quilt for being located at crossed line 5 will be hung across platform 2 by lifting rope 3
Directly over Crossover phase;It is made up of across platform 2 cable hanger 21, bracing frame 22, spring hinge 23 and slip device 24,21 liang of cable hanger
Side is respectively equipped with mobilizable bracing frame 22, and the front and rear side of cable hanger 21 fixedly mounts slip device 24 respectively along position;Bracing frame
Installed using the connection of spring hinge 23 between 22 and cable hanger 21.
Described leap platform 2 adopts insulating materials.
Described bracing frame 22 is in triangle rack-like.
Described slip device 24 is set to corresponding three groups in front and back by span line 4.
As shown in Figure 2, described slip device 24 is made up of pulley 241, limiting plate 242 and card line plate 243, limiting plate
242 are fixedly mounted on 241 both sides of pulley, are provided with card line plate 243 between the limiting plate 242 of 241 both sides of pulley;243 points of card line plate
Two pieces of left and right, is separately positioned on the limiting plate 242 of 241 left and right sides of pulley;Monolithic card line plate 243 is hinged on limiting plate 242
On, support spring 244 is respectively arranged between two sides and limiting plate 242, makes card line plate 243 vertical with 242 plate face of limiting plate.
Described lifting rope 3 is using insulation cord lock.
Embodiment:
As shown in Figure 1, the present invention crosses over 10KV line construction platform tools devices, and its upending frame 1 can directly using hanging
Car is operated, and installs insulated sling 3 and then connection additional across platform 2 on suspension hook.Bracing frame 22 across 2 left and right sides of platform is stretchable
Open, lifting is connected by a upending frame 1 respectively, open after 23 stress of spring hinge.Operation is move across
Platform 2 to crossed line 5 surface, span line 4 from being pulled through across on platform 2, so as to avoiding completely and being spanned
Circuit 5 is contacted, and does not affect the normal operation of crossed line 5 completely.10KV circuits are typically three lines, set across on platform 2
Three groups of slip devices 24 of respective distances width are equipped with, across platform 2 when setting up, in advance respectively in the pulley of three groups of slip devices 24
Three ropes are set in 241 groove, three ropes is dragged on ground both sides termination after the completion of setting up across platform 2,
Workmen is dead with one end coupling bar of three ropes respectively by the end of a thread of three crossover tracks on ground, pulls the another of three ropes
One end, you can three crossover tracks are passed through from the pulley 241 of three groups of slip devices 24, completes to cross over line laying work.
24 1 pulley gears with card line function of the slip device installed across on platform 2, can greatly save work
Personnel pull exerting oneself for electric wire, can be easily accomplished wire operation, manually with regard to stretchy.The cotton rope of span line 5 is in slip device
In the groove of 24 pulley 241, stopped by both sides limiting plate 242, pulley 241, and the setting energy of card line plate 243 will not be deflected away from
Enough stop that cotton rope is jumped out, 243 bidirectional stress of card line plate, when cotton rope loads, snaps in the groove of pulley 241 automatically by firmly pushing
In, cotton rope pulls disengaging pulley 241 by up pulling after finishing and pulls out, easy to operate, it is not necessary to artificial to put into.
After the completion of span line construction, the span line 4 between two electric poles is exceptionally straight, and disengages across platform 2, also far
From crossed line 5, span line construction is completed.Operation upending frame 1 will be hung above crossed line 5 across platform 2, be grasped
Make upending frame 1 to put down lifting rope 3, make, across platform 2 to ground, then to untie lifting rope 3, pack up upending frame 1, will be across platform 2
Bracing frame 22 fold after pack up, and complete remove operation.
Claims (6)
- It is 1. a kind of to cross over 10KV line construction platform tools devices, it is characterised in that:By upending frame (1), across platform (2) and hang Rope (3) composition, two groups of upending frames (1) are erected at crossed line (5) side side by side, will be hung across platform (2) by lifting rope (3) It is located at being spanned directly over section for crossed line (5);Across platform (2) by cable hanger (21), bracing frame (22), spring hinge (23) constitute with slip device (24), cable hanger (21) is respectively provided on two sides with mobilizable bracing frame (22), before cable hanger (21) Back edge position fixedly mounts slip device (24) respectively;Between bracing frame (22) and cable hanger (21) using spring hinge (23) even Connect installation.
- 2. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Adopt across platform (2) Use insulating materials.
- 3. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Bracing frame (22) is in three Corner bracket shape.
- 4. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Slip device (24) by across More circuit (4) is set to corresponding three groups in front and back.
- 5. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Slip device (24) is by sliding Wheel (241), limiting plate (242) and card line plate (243) composition, limiting plate (242) are fixedly mounted on pulley (241) both sides, pulley (241) card line plate (243) is provided between the limiting plate (242) of both sides;Card line plate (243) is divided to or so two pieces, is separately positioned on cunning On the limiting plate (242) of wheel (241) left and right sides;Monolithic card line plate (243) is hinged on limiting plate (242), two sides with limit Support spring (244) is respectively arranged between position plate (242), makes card line plate (243) vertical with limiting plate (242) plate face.
- 6. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Lifting rope (3) is using exhausted Edge cord lock.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611071236.XA CN106532557B (en) | 2016-11-29 | 2016-11-29 | Across 10KV line construction platform tools devices |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201611071236.XA CN106532557B (en) | 2016-11-29 | 2016-11-29 | Across 10KV line construction platform tools devices |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106532557A true CN106532557A (en) | 2017-03-22 |
| CN106532557B CN106532557B (en) | 2018-01-19 |
Family
ID=58353587
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201611071236.XA Expired - Fee Related CN106532557B (en) | 2016-11-29 | 2016-11-29 | Across 10KV line construction platform tools devices |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106532557B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108483234A (en) * | 2018-06-12 | 2018-09-04 | 中国冶集团有限公司 | A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method |
| CN111646321A (en) * | 2020-05-27 | 2020-09-11 | 吴正委 | An anti-winding aid for the construction of distribution network lines of 10kV and below |
| CN112653018A (en) * | 2020-12-04 | 2021-04-13 | 国网辽宁省电力有限公司锦州供电公司 | Cross spanning line pay-off device |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11355928A (en) * | 1998-06-09 | 1999-12-24 | Hitachi Cable Ltd | Wire drawing method |
| CN2865089Y (en) * | 2005-11-08 | 2007-01-31 | 江苏省电力公司无锡供电公司 | Pulley for cable and optical cable laying |
| CN200973000Y (en) * | 2006-11-25 | 2007-11-07 | 郭红辉 | Power line crossing mounting frame |
| CN201222628Y (en) * | 2008-06-27 | 2009-04-15 | 李文福 | Hack lever tool for distribution circuit spanning highway |
| CN104836163A (en) * | 2015-05-29 | 2015-08-12 | 国网山东昌邑市供电公司 | Trans-road paying-off high-altitude support |
-
2016
- 2016-11-29 CN CN201611071236.XA patent/CN106532557B/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11355928A (en) * | 1998-06-09 | 1999-12-24 | Hitachi Cable Ltd | Wire drawing method |
| CN2865089Y (en) * | 2005-11-08 | 2007-01-31 | 江苏省电力公司无锡供电公司 | Pulley for cable and optical cable laying |
| CN200973000Y (en) * | 2006-11-25 | 2007-11-07 | 郭红辉 | Power line crossing mounting frame |
| CN201222628Y (en) * | 2008-06-27 | 2009-04-15 | 李文福 | Hack lever tool for distribution circuit spanning highway |
| CN104836163A (en) * | 2015-05-29 | 2015-08-12 | 国网山东昌邑市供电公司 | Trans-road paying-off high-altitude support |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108483234A (en) * | 2018-06-12 | 2018-09-04 | 中国冶集团有限公司 | A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method |
| CN111646321A (en) * | 2020-05-27 | 2020-09-11 | 吴正委 | An anti-winding aid for the construction of distribution network lines of 10kV and below |
| CN111646321B (en) * | 2020-05-27 | 2021-10-01 | 国网江苏省电力有限公司东海县供电分公司 | A antiwind assistor that is used for distribution network line construction of 10kV and below |
| CN112653018A (en) * | 2020-12-04 | 2021-04-13 | 国网辽宁省电力有限公司锦州供电公司 | Cross spanning line pay-off device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106532557B (en) | 2018-01-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206502579U (en) | Power pole hoisting device | |
| CN203531496U (en) | Falling type double-holding-rod pole erecting device | |
| CN207098456U (en) | A kind of crossover tower auxiliary cross-arm block component for being used to live across operation | |
| CN205992697U (en) | Transmission line high-altitude livewire work hoisting tool | |
| CN106532557B (en) | Across 10KV line construction platform tools devices | |
| CN201188519Y (en) | 10KV overhead line maintenance special support | |
| CN101908739B (en) | Trolley used for maintenance of electricity overhead power transmission line | |
| CN201742028U (en) | Pulley used for overhaul of overhead power transmission lines | |
| CN204407790U (en) | A kind of insulation gin pole for getting out wire jumper | |
| CN101378153A (en) | Diverter for grounding wire | |
| CN103199461B (en) | Transmission line lightning conducter elevating method | |
| CN207211918U (en) | Internally lifting pole | |
| CN103683098A (en) | Method of replacing strain poles without laying down lines | |
| CN206646424U (en) | A kind of express highway intelligent speed limit direction board | |
| CN202529735U (en) | Assembled type electric screen lifting device | |
| CN206712336U (en) | Shaft tower cable platform work protective cradle | |
| CN103532052A (en) | Live erection of simple crossing structure on ADSS (all-dielectric self-supporting optic fiber cable) and implementation method | |
| CN203504070U (en) | Mechanical cable laying device | |
| CN202906291U (en) | Operation rope ladder hanging equipment | |
| CN210885083U (en) | Cable trench cover carrying device | |
| CN203441350U (en) | Electrical power emergency repair ladder | |
| CN206611160U (en) | A kind of mobile service cable suspension arrangement | |
| CN206407839U (en) | A kind of Fluorspar Powder processing device for lifting drug | |
| CN204559000U (en) | Ground anchor type cross-line coaster | |
| CN203536864U (en) | Simple spanning rack of ADSS optical cable capable of being erected in live-line manner |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180119 Termination date: 20191129 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |