CN106532557A - Crossing 10KV line construction platform tool apparatus - Google Patents

Crossing 10KV line construction platform tool apparatus Download PDF

Info

Publication number
CN106532557A
CN106532557A CN201611071236.XA CN201611071236A CN106532557A CN 106532557 A CN106532557 A CN 106532557A CN 201611071236 A CN201611071236 A CN 201611071236A CN 106532557 A CN106532557 A CN 106532557A
Authority
CN
China
Prior art keywords
line
platform
crossing
plate
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611071236.XA
Other languages
Chinese (zh)
Other versions
CN106532557B (en
Inventor
李通
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201611071236.XA priority Critical patent/CN106532557B/en
Publication of CN106532557A publication Critical patent/CN106532557A/en
Application granted granted Critical
Publication of CN106532557B publication Critical patent/CN106532557B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Electric Cable Installation (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Disclosed is a crossing 10KV line construction platform tool apparatus. The crossing 10KV line construction platform tool apparatus consists of lifting frames, a crossing platform and lifting ropes, wherein the two groups of lifting frames are vertically arranged on the side edge of a crossed line side by side, and the crossing platform is arranged above a crossed section of the crossed line by the lifting ropes; the crossing platform consists of a wire suspension frame, supporting frames, spring hinges and wire sliding devices; the movable supporting frames are arranged on the two sides of the wire suspension frame respectively; the wire sliding devices are fixedly mounted on the front and back edges of the wire suspension frame respectively; and the supporting frames and the wire suspension frame are connected and mounted through the spring hinges. The crossing 10KV line construction platform tool apparatus has the beneficial effects as follows: an original artificial putting-up construction, crossing and payoff process is changed into the construction payoff by the tool, so that the field setting and detaching process becomes simple; and the original about one-week construction period is shortened to be one day, so that the construction progress is accelerated, the manpower cost for putting-up, crossing and payoff and the frame loss cost are saved.

Description

Across 10KV line construction platform tools devices
Technical field
The invention belongs to power engineering Work tool field, more particularly to a kind of platform tools dress of leap 10KV line constructions Put.
Background technology
10KV distribution lines are typically set up using cement pole, 8 meters of terrain clearance, 10 meters, 12 meters etc., and number of, lines is more, model Enclose wide, set up new line and restringing workload is very big.During construction operation, due to the intersection of different circuits, Workmen Jing will often face the problem across existing distribution line.Construction across existing distribution line is danger, again multiple It is miscellaneous, it is often necessary to set up crossing frame in existing distribution line both sides, then the line laying work from above crossing frame, the leap set up The general wooden rack of top of the trellis, quantities are big, and at one, work consuming funds are set up all at 20,000 yuan or so in place, and will ask specially Industry construction team, set special messenger's monitoring, it is necessary to write construction and three arrange, the work such as need to audit, ratify, the whole process 7 day time of needs, taking When it is laborious.
Construction across 10KV distribution lines belongs to work high above the ground, in the construction of the distribution line new per bar and old per bar The electric wire of circuit is changed and all repeatedly can be run into, and brings significant impact to the construction cost and progress of whole piece line construction.
The content of the invention
The invention aims to solve the problems, such as across the construction of 10KV distribution lines to waste time and energy, there is provided it is a kind of without Crossing frame is set up, can quickly across the operation platform tool device of existing distribution line.
To achieve these goals, the technical solution adopted in the present invention is in 10KV distribution wires by two hoisting devices Road Crossover phase lifting sets up an operation platform, directly from operation platform across unwrapping wire;It is provided with lifting to draw on operation platform Frame and actinobacillus device are stretched, easily quick transmission distribution line, fast power-saving completes line laying work.Package unit, erection are torn open Except convenient and time-saving, operation is rapid, and cost is low.
The present invention crosses over 10KV line construction platform tools devices, constitutes by upending frame, across platform and lifting rope, and two groups are risen Suspension bracket is erected at crossed line side side by side, is just gone up the section that is spanned for being located at crossed line is hung across platform by lifting rope Side;It is made up of across platform cable hanger, bracing frame, spring hinge and slip device, cable hanger is respectively provided on two sides with mobilizable Support, the front and rear side of cable hanger fixedly mount slip device respectively along position;Connected using spring hinge between bracing frame and cable hanger Connect installation.
Described leap platform adopts insulating materials.
Described bracing frame is in triangle rack-like.
Described slip device is set to corresponding three groups in front and back by span line.
Described slip device is made up of pulley, limiting plate and card line plate, and limiting plate is fixedly mounted on pulley both sides, pulley two Card line plate is provided between the limiting plate of side;Card line plate is divided to or so two pieces, is separately positioned on the limiting plate of the pulley left and right sides;It is single Block card line plate is hinged on limiting plate, and support spring is respectively arranged between two sides and limiting plate, makes card line plate and limiting plate Plate face is vertical.
Described lifting rope is using insulation cord lock.
The beneficial effects of the present invention is:The artificial built construction cross unwrapping wire of script is become Work toolization construction to put Line, arranges scene and demolishing process is simple, and the construction period of one week or so originally has been shortened to be easily accomplished within one day, plus Fast construction speed, saves built across the cost of labor and support body hiring cost of unwrapping wire, eliminates construction waste, it is to avoid Destruction to ground vegetation.In a word, it is time saving and energy saving, it is safe and reliable, that is, efficiency of construction is improve, construction cost is reduced again.
Description of the drawings
Organigram of the accompanying drawing 1 for the present invention.
Slip device front organigram of the accompanying drawing 2 for the present invention.
Accompanying drawing 3 overlooks organigram for the slip device of the present invention.
In figure:Upending frame 1, across platform 2, cable hanger 21, bracing frame 22, spring hinge 23, slip device 24, pulley 241, Limiting plate 242, card line plate 243, support spring 244, lifting rope 3, span line 4, crossed line 5.
Specific embodiment
The present invention will be further described in detail below in conjunction with the accompanying drawings:
The present invention crosses over 10KV line construction platform tools devices, constitutes by upending frame 1, across platform 2 and lifting rope 3, two Group upending frame 1 is erected at 5 side of crossed line side by side, the quilt for being located at crossed line 5 will be hung across platform 2 by lifting rope 3 Directly over Crossover phase;It is made up of across platform 2 cable hanger 21, bracing frame 22, spring hinge 23 and slip device 24,21 liang of cable hanger Side is respectively equipped with mobilizable bracing frame 22, and the front and rear side of cable hanger 21 fixedly mounts slip device 24 respectively along position;Bracing frame Installed using the connection of spring hinge 23 between 22 and cable hanger 21.
Described leap platform 2 adopts insulating materials.
Described bracing frame 22 is in triangle rack-like.
Described slip device 24 is set to corresponding three groups in front and back by span line 4.
As shown in Figure 2, described slip device 24 is made up of pulley 241, limiting plate 242 and card line plate 243, limiting plate 242 are fixedly mounted on 241 both sides of pulley, are provided with card line plate 243 between the limiting plate 242 of 241 both sides of pulley;243 points of card line plate Two pieces of left and right, is separately positioned on the limiting plate 242 of 241 left and right sides of pulley;Monolithic card line plate 243 is hinged on limiting plate 242 On, support spring 244 is respectively arranged between two sides and limiting plate 242, makes card line plate 243 vertical with 242 plate face of limiting plate.
Described lifting rope 3 is using insulation cord lock.
Embodiment:
As shown in Figure 1, the present invention crosses over 10KV line construction platform tools devices, and its upending frame 1 can directly using hanging Car is operated, and installs insulated sling 3 and then connection additional across platform 2 on suspension hook.Bracing frame 22 across 2 left and right sides of platform is stretchable Open, lifting is connected by a upending frame 1 respectively, open after 23 stress of spring hinge.Operation is move across Platform 2 to crossed line 5 surface, span line 4 from being pulled through across on platform 2, so as to avoiding completely and being spanned Circuit 5 is contacted, and does not affect the normal operation of crossed line 5 completely.10KV circuits are typically three lines, set across on platform 2 Three groups of slip devices 24 of respective distances width are equipped with, across platform 2 when setting up, in advance respectively in the pulley of three groups of slip devices 24 Three ropes are set in 241 groove, three ropes is dragged on ground both sides termination after the completion of setting up across platform 2, Workmen is dead with one end coupling bar of three ropes respectively by the end of a thread of three crossover tracks on ground, pulls the another of three ropes One end, you can three crossover tracks are passed through from the pulley 241 of three groups of slip devices 24, completes to cross over line laying work.
24 1 pulley gears with card line function of the slip device installed across on platform 2, can greatly save work Personnel pull exerting oneself for electric wire, can be easily accomplished wire operation, manually with regard to stretchy.The cotton rope of span line 5 is in slip device In the groove of 24 pulley 241, stopped by both sides limiting plate 242, pulley 241, and the setting energy of card line plate 243 will not be deflected away from Enough stop that cotton rope is jumped out, 243 bidirectional stress of card line plate, when cotton rope loads, snaps in the groove of pulley 241 automatically by firmly pushing In, cotton rope pulls disengaging pulley 241 by up pulling after finishing and pulls out, easy to operate, it is not necessary to artificial to put into.
After the completion of span line construction, the span line 4 between two electric poles is exceptionally straight, and disengages across platform 2, also far From crossed line 5, span line construction is completed.Operation upending frame 1 will be hung above crossed line 5 across platform 2, be grasped Make upending frame 1 to put down lifting rope 3, make, across platform 2 to ground, then to untie lifting rope 3, pack up upending frame 1, will be across platform 2 Bracing frame 22 fold after pack up, and complete remove operation.

Claims (6)

  1. It is 1. a kind of to cross over 10KV line construction platform tools devices, it is characterised in that:By upending frame (1), across platform (2) and hang Rope (3) composition, two groups of upending frames (1) are erected at crossed line (5) side side by side, will be hung across platform (2) by lifting rope (3) It is located at being spanned directly over section for crossed line (5);Across platform (2) by cable hanger (21), bracing frame (22), spring hinge (23) constitute with slip device (24), cable hanger (21) is respectively provided on two sides with mobilizable bracing frame (22), before cable hanger (21) Back edge position fixedly mounts slip device (24) respectively;Between bracing frame (22) and cable hanger (21) using spring hinge (23) even Connect installation.
  2. 2. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Adopt across platform (2) Use insulating materials.
  3. 3. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Bracing frame (22) is in three Corner bracket shape.
  4. 4. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Slip device (24) by across More circuit (4) is set to corresponding three groups in front and back.
  5. 5. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Slip device (24) is by sliding Wheel (241), limiting plate (242) and card line plate (243) composition, limiting plate (242) are fixedly mounted on pulley (241) both sides, pulley (241) card line plate (243) is provided between the limiting plate (242) of both sides;Card line plate (243) is divided to or so two pieces, is separately positioned on cunning On the limiting plate (242) of wheel (241) left and right sides;Monolithic card line plate (243) is hinged on limiting plate (242), two sides with limit Support spring (244) is respectively arranged between position plate (242), makes card line plate (243) vertical with limiting plate (242) plate face.
  6. 6. 10KV line construction platform tools devices are crossed over as claimed in claim 1, it is characterised in that:Lifting rope (3) is using exhausted Edge cord lock.
CN201611071236.XA 2016-11-29 2016-11-29 Across 10KV line construction platform tools devices Expired - Fee Related CN106532557B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611071236.XA CN106532557B (en) 2016-11-29 2016-11-29 Across 10KV line construction platform tools devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611071236.XA CN106532557B (en) 2016-11-29 2016-11-29 Across 10KV line construction platform tools devices

Publications (2)

Publication Number Publication Date
CN106532557A true CN106532557A (en) 2017-03-22
CN106532557B CN106532557B (en) 2018-01-19

Family

ID=58353587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611071236.XA Expired - Fee Related CN106532557B (en) 2016-11-29 2016-11-29 Across 10KV line construction platform tools devices

Country Status (1)

Country Link
CN (1) CN106532557B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108483234A (en) * 2018-06-12 2018-09-04 中国冶集团有限公司 A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method
CN111646321A (en) * 2020-05-27 2020-09-11 吴正委 An anti-winding aid for the construction of distribution network lines of 10kV and below
CN112653018A (en) * 2020-12-04 2021-04-13 国网辽宁省电力有限公司锦州供电公司 Cross spanning line pay-off device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11355928A (en) * 1998-06-09 1999-12-24 Hitachi Cable Ltd Wire drawing method
CN2865089Y (en) * 2005-11-08 2007-01-31 江苏省电力公司无锡供电公司 Pulley for cable and optical cable laying
CN200973000Y (en) * 2006-11-25 2007-11-07 郭红辉 Power line crossing mounting frame
CN201222628Y (en) * 2008-06-27 2009-04-15 李文福 Hack lever tool for distribution circuit spanning highway
CN104836163A (en) * 2015-05-29 2015-08-12 国网山东昌邑市供电公司 Trans-road paying-off high-altitude support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11355928A (en) * 1998-06-09 1999-12-24 Hitachi Cable Ltd Wire drawing method
CN2865089Y (en) * 2005-11-08 2007-01-31 江苏省电力公司无锡供电公司 Pulley for cable and optical cable laying
CN200973000Y (en) * 2006-11-25 2007-11-07 郭红辉 Power line crossing mounting frame
CN201222628Y (en) * 2008-06-27 2009-04-15 李文福 Hack lever tool for distribution circuit spanning highway
CN104836163A (en) * 2015-05-29 2015-08-12 国网山东昌邑市供电公司 Trans-road paying-off high-altitude support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108483234A (en) * 2018-06-12 2018-09-04 中国冶集团有限公司 A kind of existing line Poling Construction suspender of current collection line crossing and stringing construction method
CN111646321A (en) * 2020-05-27 2020-09-11 吴正委 An anti-winding aid for the construction of distribution network lines of 10kV and below
CN111646321B (en) * 2020-05-27 2021-10-01 国网江苏省电力有限公司东海县供电分公司 A antiwind assistor that is used for distribution network line construction of 10kV and below
CN112653018A (en) * 2020-12-04 2021-04-13 国网辽宁省电力有限公司锦州供电公司 Cross spanning line pay-off device

Also Published As

Publication number Publication date
CN106532557B (en) 2018-01-19

Similar Documents

Publication Publication Date Title
CN206502579U (en) Power pole hoisting device
CN203531496U (en) Falling type double-holding-rod pole erecting device
CN207098456U (en) A kind of crossover tower auxiliary cross-arm block component for being used to live across operation
CN205992697U (en) Transmission line high-altitude livewire work hoisting tool
CN106532557B (en) Across 10KV line construction platform tools devices
CN201188519Y (en) 10KV overhead line maintenance special support
CN101908739B (en) Trolley used for maintenance of electricity overhead power transmission line
CN201742028U (en) Pulley used for overhaul of overhead power transmission lines
CN204407790U (en) A kind of insulation gin pole for getting out wire jumper
CN101378153A (en) Diverter for grounding wire
CN103199461B (en) Transmission line lightning conducter elevating method
CN207211918U (en) Internally lifting pole
CN103683098A (en) Method of replacing strain poles without laying down lines
CN206646424U (en) A kind of express highway intelligent speed limit direction board
CN202529735U (en) Assembled type electric screen lifting device
CN206712336U (en) Shaft tower cable platform work protective cradle
CN103532052A (en) Live erection of simple crossing structure on ADSS (all-dielectric self-supporting optic fiber cable) and implementation method
CN203504070U (en) Mechanical cable laying device
CN202906291U (en) Operation rope ladder hanging equipment
CN210885083U (en) Cable trench cover carrying device
CN203441350U (en) Electrical power emergency repair ladder
CN206611160U (en) A kind of mobile service cable suspension arrangement
CN206407839U (en) A kind of Fluorspar Powder processing device for lifting drug
CN204559000U (en) Ground anchor type cross-line coaster
CN203536864U (en) Simple spanning rack of ADSS optical cable capable of being erected in live-line manner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180119

Termination date: 20191129

CF01 Termination of patent right due to non-payment of annual fee