CN102290738B - Construction method for replacing 35kV line tension pole cross arm - Google Patents

Construction method for replacing 35kV line tension pole cross arm Download PDF

Info

Publication number
CN102290738B
CN102290738B CN 201110123696 CN201110123696A CN102290738B CN 102290738 B CN102290738 B CN 102290738B CN 201110123696 CN201110123696 CN 201110123696 CN 201110123696 A CN201110123696 A CN 201110123696A CN 102290738 B CN102290738 B CN 102290738B
Authority
CN
China
Prior art keywords
arm
wire
cross
shaft
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110123696
Other languages
Chinese (zh)
Other versions
CN102290738A (en
Inventor
王国骏
宋燕伶
赵强
罗刚
叶锋
李银桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MIANYANG ELECTRIC POWER BUREAU SICHUAN ELECTRIC POWER Corp
State Grid Corp of China SGCC
Original Assignee
Mianyang Power Bureau Sichuan Electric Power Co ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mianyang Power Bureau Sichuan Electric Power Co ltd, State Grid Corp of China SGCC filed Critical Mianyang Power Bureau Sichuan Electric Power Co ltd
Priority to CN 201110123696 priority Critical patent/CN102290738B/en
Publication of CN102290738A publication Critical patent/CN102290738A/en
Application granted granted Critical
Publication of CN102290738B publication Critical patent/CN102290738B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Insulators (AREA)

Abstract

The invention discloses a construction method for replacing a 35kV line rod cross arm. In construction, the method comprises the following steps of: adopting a tool to transfer four side phase lead wire hanging points of an old cross arm to a pole body safely and gradually so that the cross arm on the tension pole is emptied out completely, and then replacing the old cross arm with a new cross arm; and then reversing the operations in the above steps, transferring the four side phase lead wire hanging points from the pole body to the new cross arm, thus finishing the replacement construction of the cross arm. In the invention, the replacement of the 35kV line conventional type tension pole cross arm can be finished without placing the replaced lead wire on the ground, thus, the construction time is shortened, the work intensity of the operating personnel is reduced, and normal power supply to the spanned line is not affected.

Description

A kind of construction method of changing the 35kV line tension pole cross arm
Technical field
The present invention relates to the maintenance construction method of electric power transmission line, particularly change the construction method of cross-arm on the conventional tension-resistant rod of 35kV circuit in the belt tension situation.
Background technology
When the inventor (An County power transmission and distribution maintenance crew of power supply administration) changes for the serious tension pole cross arm of 35kV circuit pack corrosion in work many years ago, the method that adopts is that all span lines that will be replaced 35kV circuit below have a power failure, to be replaced again 35kV line conductor let-down to ground, carry out at last the replacing of the serious tension pole cross arm of 35kV circuit corrosion.If adopt old-fashioned method to construct, not only increased workload, and do not guaranteed user's electricity consumption reliability.
Summary of the invention
The construction method that the purpose of this invention is to provide a kind of 35kV of replacing line tension pole cross arm being subjected to changing tension pole cross arm in the tension force situation at wire, and does not cause the impact of power supply on the crossed line of transmission line below.
The object of the present invention is achieved like this: a kind of construction method of the 35kV of replacing line tension pole cross arm: it is characterized in that, carry out according to the following steps:
A), when entering the working site, confirm that at first whether complete circuit and inspection bracing wire, distaff and pole-footing have or not abnormal conditions, check individual Work tool and produce Work tool;
B), step on bar, electrical verification, installing earth connection after the work permit order that obtains dispatching;
C), untie the drainage thread of three-phase conducting wire, then two φ 12 steel wire ropes are installed as temporary guy in 1 meter above old cross-arm, these two temporary guys should be on the distaff of two wires at the fixing point on ground, should confirm to use in the situation of distaff non-corroding of wire, bury ground pomegranate wood underground otherwise can only excavate the hole, hole on wire is equidirectional; Two temporary guys utilize turnbuckle to make temporary guy fastening stressed; Lever Blocks on the tension-resistant rod shaft and the steel wire cover that is enclosed within on wire hang between temporary guy and old cross-arm, so that shaft is well stressed under the condition of both sides wire tension balance;
D), utilize 14 * 1.5 meters steel wires of two φ to overlap the whole old cross-arm that encases, put at these two steel wires respectively and respectively hang a 3T Lever Blocks, carry out stringing and loose ends when identical to two limits of the same phase of old cross-arm, come the tension force of the old cross-arm of balance with this, spin and be out of shape in order to avoid make the cross-arm discontinuity; Use again 12 * 2 meters steel wire covers of 2 φ wire is entangled and wire is played two pipe protection effects; Install respectively two chucks on every phase conductor, a chuck is used for hanging the Lever Blocks at old cross-arm place, hold concurrently simultaneously and hang the steel wire cover that is enclosed within step c) on wire, another chuck is used for hanging the steel wire cover of old cross-arm place wire, the peg Lever Blocks with it of holding concurrently simultaneously so just can guarantee that wire can not lose two pipe protection effects of wire during the transfer of hanging point place at any time on from old cross-arm hanging point to shaft;
E), between two temporary guys (4a, 4b) and old cross-arm, hang respectively the Lever Blocks of four 2T with the steel wire cover of 14 * 1.5 meters of four φ, 12 * 3 meters steel wire covers of four φ are installed again, to play two pipe protection effects to wire on the shaft between temporary guy and old cross-arm;
F), before taking off the insulator string hanging point, must carry out shock test to the Lever Blocks of its use, confirm the errorless rear hanging point bolt that just can take off insulator string, next just utilize to restrict back and forth insulator string is put to ground, reduce the weight of wire Lever Blocks when shifting one's position with this;
G), when carrying out stringing and loose ends, the work director must arrange the special messenger to guard the safe distance of the scissors crossing of temporary guy, shaft and circuit below at any time, completes smoothly to guarantee stringing and off-line working safety;
H), ease out the Lever Blocks that hangs on old cross-arm, hang over simultaneously that on shaft, Lever Blocks eases out speed and synchronously carries out fastening with the Lever Blocks on old cross-arm; When wire is transferred on shaft, the Lever Blocks on shaft slightly in the situation of belt tension, guarantees the safe distance to circuit below leap place simultaneously; At this moment the both sides of old cross-arm one side of tension-resistant rod are mutually with regard to successful moving on shaft;
I), on the opposite side of old cross-arm repeats step c~h, just four limits on old cross-arm are all moved on shaft mutually, at this moment the wire on old cross-arm all soars, the work of the mutually old cross-arm of thereupon more changing sides;
J), old cross-arm is removed, utilize coaster and restrict back and forth after new cross-arm installation, c~h is reversed by above-mentioned steps, just the wire on shaft is all moved to new cross-arm hanging point place;
K), recover the three-phase drainage thread of circuit, removes two temporary guys, utilize back and forth rope to put down all Work tools on electric pole, after the dismounting earth connection, on bar, staff's lower beam successively, complete whole operation process.
Above-mentioned tension-resistant rod is the 35kV line tension pole.
Compared with prior art, the invention has the beneficial effects as follows: construction method of the present invention is to be subjected to change in the tension force situation cross-arm of 35kV circuit conventional type (JS1--JS4, ZS2, ZS4 bar type) tension-resistant rod at wire, the method is safety, simple and feasible both, guaranteed the safety and reliability of operation, shorten again line maintenance operating time and staff's labour intensity, and reduced the 10kV of the 35kV circuit below leap of working and frequency of power cut and the interruption duration of 0.4kV power circuit, guaranteed the crossed line power supply reliability.The inventor has carried out changing the real work of conventional type tension pole cross arm on wire is the 35kV circuit of LGJ-120mm2, and due saving engineering time and the effect that reduces labor intensity have been received, simultaneously, do not affect the normal power supply of crossed line.
Description of drawings
Fig. 1 is the schematic diagram that belt tension of the present invention is changed tension pole cross arm.
Embodiment
Belt tension is changed tension pole cross arm:
Construction principle: be exactly being transferred on shaft of four limit phase conductor hanging point successes on old cross-arm soared its old cross-arm fully, and be replaced by new cross-arm.
Construction point: must satisfy in the process of work:
1, wire all must not lose " two pipe protections " of wire at any time;
2, must arrange the special messenger to fix a point at any time to monitor the stressing conditions of temporary guy and electric pole and the safe distance of the scissors crossing power circuit below circuit.
Work tool is prepared:
1,2,12 * 40 meters steel wire ropes of φ (temporary guy of electric pole);
2,3T Lever Blocks 2 is (on cross-arm, the degree of tightness wire uses);
3,2T Lever Blocks 4 is (on shaft, interim firm wire uses);
4,6,14 * 1.5 meters steel wire covers of φ (4 Lever Blocks that are used for 2T, 2 Lever Blocks that are used for 3T);
5,2,12 * 2 meters steel wire covers of φ (on cross-arm, the degree of tightness wire uses);
6,4,12 * 3 meters steel wire covers of φ (on shaft, interim firm wire uses);
7,1,1T aluminium coaster (rope uses back and forth);
8, φ 16 * 40 off-white coir rope is 1;
9, M28 * 2 of 650 flower basket bolts (temporary guy use);
10,4 of φ 14 wire clips (temporary guy use);
11,8, the U-shaped ring (6 " two pipe protections " that are used for wire, 2 flower basket bolts that are used for temporary guy) of U-7.
In Fig. 1, dotted line represents Lever Blocks, and chain-dotted line represents the steel wire cover as wire two pipe protections.
The present invention changes the construction method of 35kV line tension pole cross arm, carries out according to the following steps:
A), when entering the working site, confirm that at first whether complete circuit and inspection bracing wire, distaff and pole-footing have or not abnormal conditions, check individual Work tool and produce Work tool;
B), step on bar, electrical verification, installing earth connection after the work permit order that obtains dispatching;
C), untie the drainage thread of three-phase conducting wire, then two φ 12 steel wire ropes are installed as temporary guy in 1 meter above old cross-arm 2, these two temporary guys should be on the distaff of two wires at the fixing point on ground, should confirm to use in the situation of distaff non-corroding of wire, bury ground pomegranate wood underground otherwise can only excavate the hole, hole on wire is equidirectional; Two temporary guys utilize turnbuckle to make temporary guy fastening stressed; Lever Blocks on tension-resistant rod 1 shaft and the steel wire cover that is enclosed within on wire hang between temporary guy and old cross-arm, so that shaft is well stressed under the condition of both sides wire tension balance;
D), utilize 14 * 1.5 meters steel wires of two φ to overlap the whole old cross-arm that encases, put at these two steel wires respectively and respectively hang a 3T Lever Blocks, carry out stringing and loose ends when identical to two limits of the same phase of old cross-arm, come the tension force of the old cross-arm of balance with this, spin and be out of shape in order to avoid make the cross-arm discontinuity; Use again 12 * 2 meters steel wire covers of 2 φ wire is entangled and wire is played two pipe protection effects; Install respectively two chucks on every phase conductor, a chuck is used for hanging the Lever Blocks at old cross-arm place, double hanging up stated shaft and is enclosed within steel wire cover on wire simultaneously, another chuck is used for hanging the steel wire cover of old cross-arm place wire, the peg Lever Blocks with it of holding concurrently simultaneously so just can guarantee that wire can not lose two pipe protection effects of wire during the transfer of hanging point place at any time on from old cross-arm hanging point to shaft;
E), at two temporary guy 4a, 4b(to replace original two wire bracing wire 3a, 3b) and old cross-arm 2 between, hang respectively the Lever Blocks of four 2T with the steel wire cover of 14 * 1.5 meters of four φ, 12 * 3 meters steel wire covers of four φ are installed again, to play two pipe protection effects to wire on the shaft between temporary guy and old cross-arm;
F), before taking off insulator string 5 hanging points, must carry out shock test to the Lever Blocks of its use, confirm the errorless rear hanging point bolt that just can take off insulator string, next just utilize to restrict back and forth insulator string is put to ground, reduce the weight of wire Lever Blocks when shifting one's position with this;
G), when carrying out stringing and loose ends, the work director must arrange the special messenger to guard the safe distance of the scissors crossing of temporary guy, shaft and circuit below at any time, completes smoothly to guarantee stringing and off-line working safety;
H), ease out the Lever Blocks that hangs on old cross-arm, hang over simultaneously that on shaft, Lever Blocks eases out speed and synchronously carries out fastening with the Lever Blocks on old cross-arm; When wire is transferred on shaft, the Lever Blocks on shaft slightly in the situation of belt tension, guarantees the safe distance to circuit below leap place simultaneously; At this moment the both sides of old cross-arm one side of tension-resistant rod 1 are mutually with regard to successful moving on shaft;
I), on the opposite side of old cross-arm repeats step c~h, just four limits on old cross-arm are all moved on shaft mutually, at this moment the wire on old cross-arm all soars, the work of the mutually old cross-arm of thereupon more changing sides;
J), old cross-arm is removed, utilize coaster and restrict back and forth after new cross-arm installation, c~h is reversed by above-mentioned steps, just the wire on shaft is all moved to new cross-arm hanging point place;
K), recover the three-phase drainage thread of circuit, removes two temporary guys, utilize back and forth rope to put down all Work tools on electric pole, after the dismounting earth connection, on bar, staff's lower beam successively, complete whole operation process.
Construction method of the present invention is exclusively used in the cross-arm that belt tension is changed 35kV circuit conventional type tension-resistant rod.When using this method construction, do not need a wire let-down that is replaced circuit on ground, just can complete the replacing of 35kV circuit conventional type tension pole cross arm.

Claims (1)

1. construction method of changing the 35kV line tension pole cross arm: it is characterized in that, carry out according to the following steps:
A), when entering the working site, confirm that at first whether complete circuit and inspection bracing wire, distaff and pole-footing have or not abnormal conditions, check individual Work tool and produce Work tool;
B), step on bar, electrical verification, installing earth connection after the work permit order that obtains dispatching;
C), untie the drainage thread of three-phase conducting wire, then install two φ 12 steel wire ropes as temporary guy at 1 meter, old cross-arm (2) top, these two temporary guys should be on the distaff of two wires at the fixing point on ground, should confirm to use in the situation of distaff non-corroding of wire, bury ground pomegranate wood underground otherwise can only excavate the hole, hole on wire is equidirectional; Two temporary guys utilize turnbuckle to make temporary guy fastening stressed; Lever Blocks on tension-resistant rod (1) shaft and the steel wire cover that is enclosed within on wire hang between temporary guy and old cross-arm, so that shaft is well stressed under the condition of both sides wire tension balance;
D), utilize 14 * 1.5 meters steel wires of two φ to overlap the whole old cross-arm that encases, put at these two steel wires respectively and respectively hang a 3T Lever Blocks, carry out stringing and loose ends when identical to two limits of the same phase of old cross-arm, come the tension force of the old cross-arm of balance with this, spin and be out of shape in order to avoid make the cross-arm discontinuity; Use again 12 * 2 meters steel wire covers of 2 φ wire is entangled and wire is played two pipe protection effects; Install respectively two chucks on every phase conductor, a chuck is used for hanging the Lever Blocks at old cross-arm place, hold concurrently simultaneously and hang the steel wire cover that is enclosed within step c) on wire, another chuck is used for hanging the steel wire cover of old cross-arm place wire, the peg Lever Blocks with it of holding concurrently simultaneously so just can guarantee that wire can not lose two pipe protection effects of wire during the transfer of hanging point place at any time on from old cross-arm hanging point to shaft;
E), between two temporary guys (4a, 4b) and old cross-arm (2), hang respectively the Lever Blocks of four 2T with the steel wire cover of 14 * 1.5 meters of four φ, 12 * 3 meters steel wire covers of four φ are installed again, to play two pipe protection effects to wire on the shaft between temporary guy and old cross-arm;
F), before taking off insulator string (5) hanging point, must carry out shock test to the Lever Blocks of its use, confirm the errorless rear hanging point bolt that just can take off insulator string, next just utilize to restrict back and forth insulator string is put to ground, reduce the weight of wire Lever Blocks when shifting one's position with this;
G), when carrying out stringing and loose ends, the work director must arrange the special messenger to guard the safe distance of the scissors crossing of temporary guy, shaft and circuit below at any time, completes smoothly to guarantee stringing and off-line working safety;
H), ease out the Lever Blocks that hangs on old cross-arm, hang over simultaneously that on shaft, Lever Blocks eases out speed and synchronously carries out fastening with the Lever Blocks on old cross-arm; When wire is transferred on shaft, the Lever Blocks on shaft slightly in the situation of belt tension, guarantees the safe distance to circuit below leap place simultaneously; At this moment the both sides of old cross-arm one side of tension-resistant rod (1) are mutually with regard to successful moving on shaft;
I), on the opposite side of old cross-arm repeats step c-h, just four limits on old cross-arm are all moved on shaft mutually, at this moment the wire on old cross-arm all soars, the work of the mutually old cross-arm of thereupon more changing sides;
J), old cross-arm is removed, utilize coaster and restrict back and forth after new cross-arm installation, c~h is reversed by above-mentioned steps, just the wire on shaft is all moved to new cross-arm hanging point place;
K), recover the three-phase drainage thread of circuit, removes two temporary guys, utilize back and forth rope to put down all Work tools on electric pole, after the dismounting earth connection, on bar, staff's lower beam successively, complete whole operation process.
CN 201110123696 2011-05-13 2011-05-13 Construction method for replacing 35kV line tension pole cross arm Active CN102290738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110123696 CN102290738B (en) 2011-05-13 2011-05-13 Construction method for replacing 35kV line tension pole cross arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110123696 CN102290738B (en) 2011-05-13 2011-05-13 Construction method for replacing 35kV line tension pole cross arm

Publications (2)

Publication Number Publication Date
CN102290738A CN102290738A (en) 2011-12-21
CN102290738B true CN102290738B (en) 2013-06-19

Family

ID=45336931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110123696 Active CN102290738B (en) 2011-05-13 2011-05-13 Construction method for replacing 35kV line tension pole cross arm

Country Status (1)

Country Link
CN (1) CN102290738B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104218496A (en) * 2014-09-16 2014-12-17 国家电网公司 Method for inverse climbing cross arm replacement for live line
CN106786134B (en) * 2016-11-30 2018-03-20 国网上海市电力公司 Electrodynamic type jacks the construction method of do not have a power failure resistance to opening and closing and cross-arm equipment
CN113889900A (en) * 2021-08-30 2022-01-04 国网浙江省电力有限公司嘉兴供电公司 Construction method for live migration strain tower and wire of distribution network

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201113303Y (en) * 2007-03-23 2008-09-10 上海市电力公司超高压输变电公司 Electriferous replacing device of strain-resisting insulator bunch for high-voltage transmission line
US7589640B2 (en) * 2005-01-28 2009-09-15 Dennis Lee Bell Utility pole and tower safety and protection device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7589640B2 (en) * 2005-01-28 2009-09-15 Dennis Lee Bell Utility pole and tower safety and protection device
CN201113303Y (en) * 2007-03-23 2008-09-10 上海市电力公司超高压输变电公司 Electriferous replacing device of strain-resisting insulator bunch for high-voltage transmission line

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
不松导线法更换腐蚀横担新法;肖金桂;《安全与健康》;20051225(第23期);第35-36页 *
带电更换横担的新工具和新方法-玻璃钢绝缘横担替换法;胡定超;《高电压技术》;19850320(第01期);第81-83页 *
肖金桂.不松导线法更换腐蚀横担新法.《安全与健康》.2005,(第23期),第35-36页.
胡定超.带电更换横担的新工具和新方法-玻璃钢绝缘横担替换法.《高电压技术》.1985,(第01期),第81-83页.

Also Published As

Publication number Publication date
CN102290738A (en) 2011-12-21

Similar Documents

Publication Publication Date Title
CN102185265B (en) Construction method for replacing cross arm of 35kV line linear rod
CN101174761B (en) High-voltage power line tension insulator string forward spin live-wire altering method
CN207098456U (en) A kind of crossover tower auxiliary cross-arm block component for being used to live across operation
CN108512115B (en) Screen sealing system crossing power line by auxiliary cross arm and mounting and dismounting method thereof
CN102290738B (en) Construction method for replacing 35kV line tension pole cross arm
CN105186378A (en) Power transmission line channel crossing protection mechanism
WO2016023141A1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN107240889A (en) A kind of long range multiple fission conductor replacing options
CN105186338A (en) Construction method of employing insulation bucket arm vehicle insulating gloves with load to change pole top switch device
CN205985947U (en) Tower of london bridge type transmission line leap system that does not have a power failure
CN205791385U (en) 10kV circuit anti-bird from building nest device
CN104868397A (en) Tumbling pulley used for crossing horizontally-arranged double-bundled conductor spacer
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN201146346Y (en) Portable insulation maintenance gap bridge
CN202231361U (en) 10kV multifunctional safe tool
CN103618245A (en) Electrified strain opening operation method on distribution network
CN108390311A (en) A kind of V-type insulator chain charged for replacement method of electric power line pole tower
CN106532557B (en) Across 10KV line construction platform tools devices
CN201466574U (en) Device for isoelectrically replacing insulator and accessory of iron tower of transmission line
CN103001141A (en) Method for mounting anti-waving spacers on 66-kilovolt power transmission hot-line
CN102611057A (en) Crossing mesh
CN203445520U (en) Live spanning device
CN206685794U (en) A kind of device of 10kV circuits earth potential live replacing tension-resistant rod insulator
CN102738732A (en) Construction method for 500kV line to span highly intensive high-voltage live lines
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121219

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121219

Address after: 621000 Mianyang city of Sichuan Province sword South Road West No. 16

Applicant after: Mianyang Electric Power Bureau, Sichuan Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 621000 Mianyang city of Sichuan Province sword South Road West No. 16

Applicant before: Mianyang Electric Power Bureau, Sichuan Electric Power Corporation

C14 Grant of patent or utility model
GR01 Patent grant