CN105552776A - Novel construction method crossing high-speed rail without interruption - Google Patents
Novel construction method crossing high-speed rail without interruption Download PDFInfo
- Publication number
- CN105552776A CN105552776A CN201511007306.0A CN201511007306A CN105552776A CN 105552776 A CN105552776 A CN 105552776A CN 201511007306 A CN201511007306 A CN 201511007306A CN 105552776 A CN105552776 A CN 105552776A
- Authority
- CN
- China
- Prior art keywords
- head
- high ferro
- speed rail
- horizontal pivoted
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Railway Tracks (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511007306.0A CN105552776B (en) | 2015-12-30 | 2015-12-30 | New across high-speed rail construction method of not stopping transport |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511007306.0A CN105552776B (en) | 2015-12-30 | 2015-12-30 | New across high-speed rail construction method of not stopping transport |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105552776A true CN105552776A (en) | 2016-05-04 |
CN105552776B CN105552776B (en) | 2018-03-30 |
Family
ID=55831797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511007306.0A Expired - Fee Related CN105552776B (en) | 2015-12-30 | 2015-12-30 | New across high-speed rail construction method of not stopping transport |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105552776B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105625795A (en) * | 2016-03-23 | 2016-06-01 | 国家电网公司 | Adjustable leading rope spreading arm frame |
CN107947017A (en) * | 2017-12-11 | 2018-04-20 | 国网甘肃省电力公司经济技术研究院 | ± 1100kV line constructions alive circuit crossing frame and its erection method |
CN108155599A (en) * | 2018-02-22 | 2018-06-12 | 国网甘肃省电力公司经济技术研究院 | The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2412301Y (en) * | 2000-01-19 | 2000-12-27 | 国营群峰机械厂 | Four-column bridge live-wire work crossing rack |
JP2005333789A (en) * | 2004-05-20 | 2005-12-02 | Kawakita Electrical Construction Engineering Co Ltd | Construction method of hanging sheave type line shifting by forming net |
CN203645249U (en) * | 2014-01-10 | 2014-06-11 | 葛洲坝集团电力有限责任公司 | Hook-net-plane-type charged crossing device |
CN203967625U (en) * | 2014-07-14 | 2014-11-26 | 国网上海市电力公司 | A kind of overhead facility crossing frame |
-
2015
- 2015-12-30 CN CN201511007306.0A patent/CN105552776B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2412301Y (en) * | 2000-01-19 | 2000-12-27 | 国营群峰机械厂 | Four-column bridge live-wire work crossing rack |
JP2005333789A (en) * | 2004-05-20 | 2005-12-02 | Kawakita Electrical Construction Engineering Co Ltd | Construction method of hanging sheave type line shifting by forming net |
CN203645249U (en) * | 2014-01-10 | 2014-06-11 | 葛洲坝集团电力有限责任公司 | Hook-net-plane-type charged crossing device |
CN203967625U (en) * | 2014-07-14 | 2014-11-26 | 国网上海市电力公司 | A kind of overhead facility crossing frame |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105625795A (en) * | 2016-03-23 | 2016-06-01 | 国家电网公司 | Adjustable leading rope spreading arm frame |
CN105625795B (en) * | 2016-03-23 | 2018-03-09 | 国家电网公司 | A kind of adjustable messenger unfolding arm support |
CN107947017A (en) * | 2017-12-11 | 2018-04-20 | 国网甘肃省电力公司经济技术研究院 | ± 1100kV line constructions alive circuit crossing frame and its erection method |
CN108155599A (en) * | 2018-02-22 | 2018-06-12 | 国网甘肃省电力公司经济技术研究院 | The round-the-clock unfolding device of guide rope is crossed over above overhead transmission line |
CN108155599B (en) * | 2018-02-22 | 2024-05-31 | 国网甘肃省电力公司经济技术研究院 | All-weather spreading device for crossing guide rope above overhead transmission line |
Also Published As
Publication number | Publication date |
---|---|
CN105552776B (en) | 2018-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103882812B (en) | Across the construction method of girder in stayed-cable bridge | |
CN105552776A (en) | Novel construction method crossing high-speed rail without interruption | |
CN101442194A (en) | Spanning method for ultra, extra high voltage line construction without crossover frame | |
CN103911956A (en) | Long-span cable stayed bridge steel truss girder mounting method | |
CN105470862B (en) | High ferro of not stopping transport crossing construction equipment | |
CN103643640A (en) | Jacking-first and line-reinforcement-second jacking construction method for frame bridge | |
CN102561204B (en) | Construction method for inserting super-long steel stranded wires before pouring of bridge body | |
CN205265148U (en) | Construction equipment is crossed over to high -speed railway of not stopping transport | |
CN106400670B (en) | A kind of secondary sunpender combined type long-span bridge structure of suspension cable oblique pull | |
CN103103930A (en) | Post-added pre-stress cable strengthening method | |
CN104362544A (en) | Pulley type tower head clamp | |
CN103311844A (en) | Method for erecting mountainous-terrain cross charged high-voltage lines | |
CN204651779U (en) | A kind of anti-hopping releasing pulley being applicable to transmission line construction | |
CN103138206A (en) | Device and method to replace overhead ground wire of high-voltage overhead power transmission line by means of suspending of PPR pipes | |
CN106586921B (en) | It is a kind of to cross over block device | |
CN204992417U (en) | Mechanized leap from overhead door type is put up | |
CN105587114A (en) | Improved construction ascending and descending platform | |
CN105048726B (en) | A kind of equipment removed for power station stator bar | |
CN105484155A (en) | Crossing floor system for on-line high-speed railway crossing equipment | |
CN204919488U (en) | A damping formula block a river line for blocking superelevation ship | |
CN204118374U (en) | The earth lead point protection device in succession of earth connection | |
CN208055772U (en) | Rail reinforcement device | |
CN203255879U (en) | Longitudinal movement drive mechanism for crown block of railway bridge erecting machine | |
CN106564799B (en) | A kind of crossing frame with guide rail lifting system | |
CN203361016U (en) | Bridge inspection car capable of passing through tensile anchor seat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 030001 No. 169 East Street, Taiyuan, Shanxi Applicant after: STATE GRID SHANXI ELECTRIC POWER CO., LTD. Applicant after: Shanxi Power Supply Engineering Co., Ltd. Applicant after: Yangzhou Zhendong Power Devices & Tools Co., Ltd. Address before: 030001 No. 169 East Street, Taiyuan, Shanxi Applicant before: STATE GRID SHANXI ELECTRIC POWER CO., LTD. Applicant before: STATE GRID SHANXI POWER GRID ENGINEERING CONSTRUCTION COMPANY Applicant before: Yangzhou Zhendong Power Devices & Tools Co., Ltd. |
|
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Lu Ziqiang Inventor after: Li Guofeng Inventor after: Wang Guoxuan Inventor after: Yang Xiaojing Inventor after: Lu Ziying Inventor after: Wu Han Inventor after: Song Shuting Inventor after: Zhao Wanshun Inventor after: Liu Zhendong Inventor after: Xu Zhongren Inventor after: Qiao Linjie Inventor after: Pan Xiubao Inventor after: Li Shaojie Inventor after: Zhang Wenbing Inventor after: Jia Yanlong Inventor after: Zhang Anzhi Inventor after: Liu Ruxing Inventor after: Wang Chengyi Inventor after: Li Qiang Inventor after: Han Xiaobin Inventor before: Pan Xiubao Inventor before: Xu Zhongren Inventor before: Han Xiaobin Inventor before: Li Guofeng Inventor before: Lu Ziqiang Inventor before: Wang Guoxuan Inventor before: Yang Xiaojing Inventor before: Lu Ziying Inventor before: Wu Han Inventor before: Li Shaojie Inventor before: Qiao Linjie Inventor before: Jia Yanlong Inventor before: Zhang Wenbing Inventor before: Zhang Anzhi Inventor before: Liu Ruxing Inventor before: Wang Chengyi Inventor before: Li Qiang Inventor before: Song Shuting Inventor before: Liu Zhendong |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180330 Termination date: 20201230 |