CN2412301Y - Four-column bridge live-wire work crossing rack - Google Patents

Four-column bridge live-wire work crossing rack Download PDF

Info

Publication number
CN2412301Y
CN2412301Y CN 00226069 CN00226069U CN2412301Y CN 2412301 Y CN2412301 Y CN 2412301Y CN 00226069 CN00226069 CN 00226069 CN 00226069 U CN00226069 U CN 00226069U CN 2412301 Y CN2412301 Y CN 2412301Y
Authority
CN
China
Prior art keywords
crossing
brachium pontis
telescopic
live
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 00226069
Other languages
Chinese (zh)
Inventor
郑彦杰
张松林
张步秀
侯树新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
STATE-RUN QUNFENG MACHINERY PLANT
Original Assignee
STATE-RUN QUNFENG MACHINERY PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE-RUN QUNFENG MACHINERY PLANT filed Critical STATE-RUN QUNFENG MACHINERY PLANT
Priority to CN 00226069 priority Critical patent/CN2412301Y/en
Application granted granted Critical
Publication of CN2412301Y publication Critical patent/CN2412301Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Gates (AREA)

Abstract

The utility model discloses a four-column bridge live work crossing rack. The main body of the four-column bridge live-wire work crossing rack is composed of four columns, four pairs of telescopic bridge arms, two carrying cables, two net sealing ropes, an insulation safety net, a spherical nest and a base, the four pairs of telescopic bridge arms on the four columns can be respectively assembled into two sets of door-type bridges after butted in the air. The carrying cable, the net sealing rope and the insulation safety net arranged between the bridges cause two sets of door-type bridges to be mutually connected to form the entirety of a four-column live crossing rack. The crossing rack solves the problem of crossing the 10 kv-330 kv live circuit in conductor developing construction and the ground line developing construction in the transmission engineering, and successfully realizes crossing the live circuit without power failure. The function of the utility model can be completely expanded to the degree of crossing the highway and the electrified railway.

Description

Four-column bridge live line working crossing frame
The utility model belongs to tools for live working, is specifically related to a kind of crossing frame of live line working.
Domestic existing crossing frame has twin columns composite type aluminium alloy crossing frame at present, there are the upright two groups of twin columns of group or three groups of twin columns aluminium alloy crossing frames in the job site, lay respectively at the unwrapping wire passage below of newly-built circuit, after binding with nylon wire in the crossing frame top, can come payingoff construction with tension stringing and manual stringing's method.The queen post crossing frame exists following deficiency: (1) sets up three-phase conducting wire needs three groups of queen post crossing frames, Work tool cost and construction cost height that span line needs; (2) can not charged or live line working fully; (3) in the unwrapping wire process as broken string, or accident conditions such as lead and drafting tool slippage can not guarantee that crossed line is perfectly safe.
Task of the present utility model is a kind of four-column bridge crossing frame of design, realizes not having a power failure crossing live-line when it can make power construction department payingoff construction.
For finishing above-mentioned task, the utility model has designed a kind of four-column bridge live across frame, and the main body of this crossing frame is made up of four root posts, the telescopic brachium pontis of fourth officer, insulation safety net, two ropeway carrying-ropes, two block ropes, ball cup 2 and bases 1.Its central post is made up of aluminium alloy epimere 29, hypomere 3, brachium pontis flange 7, goat's horn 26, aluminum alloy frame posture straightway 4, and stand is on ball cup 2 and base 1; Telescopic brachium pontis is made up of twisted wire wheel operation device 13, principal arm 14, telescopic arm 17, aerial docking facilities 18, and the twisted wire wheel operation device 13 of telescopic brachium pontis is twisted together with an end of brachium pontis flange 7; Brachium pontis flange 7 is between the aluminum alloy frame posture straightway 4 and aluminium alloy epimere 29 of column, and its opposite side and weight arm 5 are twisted together; Be furnished with ace's spanner 12 at twisted wire wheel operation device 13 coaxial ends, its other end has a ratchet 9; After docking, the telescopic brachium pontis of fourth officer on four root posts can be assembled into two groups of gate-type crane span structures respectively aloft, the ropeway carrying-rope 23 that is provided with between two groups of gate-type crane span structures, block rope 10 and insulation safety net 11 are implicative of each other two groups of gate-type crane span structures, form a four-column bridge live across frame integral body.
The difficult problem of the leap 10kv-330kv alive circuit that the utility model has run into when having solved spreading conducting wire, ground wire construction in the power transmission engineering has successfully realized the crossing live-line that do not have a power failure.Function of the present utility model can expand to acrossing highway, electric railway fully, brings huge economic benefit for sending power transformation construction unit and society.
Below in conjunction with accompanying drawing structure of the present utility model is described further:
Fig. 1 is the utility model overall structure schematic diagram.
As shown in Figure 1, four root posts of four-column bridge aluminium alloy crossing frame are made up of aluminium alloy epimere (29) and hypomere (3), brachium pontis flange (7), goat's horn (26), aluminum alloy frame posture straightway (4) respectively, each aluminum alloy frame posture straightway connects by bolt, stand is on ball cup (2) and base (1), by the backguy system firmly on the ground.The telescopic brachium pontis of fourth officer aluminium alloy is made up of twisted wire wheel operation device (13), principal arm (14), telescopic arm (17), aerial docking facilities (18) respectively, it is twisted together with brachium pontis flange (7) by wearing pin (8), fourth officer weight arm (5) is twisted together by wearing pin (6) with the opposite side of brachium pontis flange (7), and fixing by backguy (27).
Found four root posts according to the span size groups when erectting crossing frame, put down the telescopic brachium pontis of aluminium alloy, accomplish fluently backguy (24), cooperate with pawl assembly (9) with ace's wrench (12), twisted wire wheel operation device (13) drives backguy (15) by pulley (16) elongation, telescopic arm (17) skids off on roller (20), roating sphere headstock (2) when aloft docking, adjust backguy (24), (25), make two telescopic brachium pontis of aluminium alloy on same horizontal plane, guarantee aerial docking facilities (18) butt joint smoothly, then telescopic arm (17) locking is adjusted backguy (25) again, make it stressed evenly, at last telescopic arm (17) two ends are connected with nut, so just be assembled into two groups of gate-type crane span structures respectively.
After two groups of gate-type crane span structures are established, two ropeway carrying-ropes (23) are hung on the same column of two groups of gate-type crane span structures by manpower traction's mode, outer hoop assembly (28) through the column upper end is anchored on the default earth anchor, install cabling dolly (22) in the same way, its pulley (21) can be gone up evenly at ropeway carrying-rope (23) slide.Mode by the manpower traction again, block rope (10)) be anchored on the default earth anchor through the block coaster that is fixed on the column.By carrying the net coaster insulation safety net (11) is hung on the cable in the same way then, the operating personnel just can finish on the gate-type crane span structure safely and lay insulation safety net (11) this moment, the extradition pull line arrives by the crossing live-line sky, realize aerial live across, the escape way the when safety net that lays becomes stringing.

Claims (1)

1. four-column bridge live line working crossing frame, its main body is by four root posts, the telescopic brachium pontis of fourth officer, two ropeway carrying-ropes, two block ropes, insulation safety net and ball cup (2) and base (1) are formed, its central post is by aluminium alloy epimere (29), hypomere (3), brachium pontis flange (7), goat's horn (26), aluminum alloy frame posture straightway (4) is formed, stand is on ball cup (2) and base (1), the telescopic brachium pontis that it is characterized in that this crossing frame is by twisted wire wheel operation device (13), principal arm (14), telescopic arm (17), aerial docking facilities (18) is formed, the twisted wire wheel operation device (13) of telescopic brachium pontis is twisted together with an end of brachium pontis flange (7), brachium pontis flange (7) is between the aluminum alloy frame posture straightway (4) and aluminium alloy epimere (29) of column, its other end and weight arm (5) are twisted together, at the coaxial end of twisted wire wheel operation device (13) ace's spanner (12) is arranged, its other end has a ratchet (9), after docking, the telescopic brachium pontis of fourth officer on four root posts can be assembled into two groups of gate-type crane span structures respectively aloft, the ropeway carrying-rope that between two groups of gate-type crane span structures, is provided with (23), block rope (10) and insulation safety net (11) are implicative of each other two groups of gate-type crane span structures, form a four-column bridge live across frame integral body.
CN 00226069 2000-01-19 2000-01-19 Four-column bridge live-wire work crossing rack Expired - Fee Related CN2412301Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 00226069 CN2412301Y (en) 2000-01-19 2000-01-19 Four-column bridge live-wire work crossing rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 00226069 CN2412301Y (en) 2000-01-19 2000-01-19 Four-column bridge live-wire work crossing rack

Publications (1)

Publication Number Publication Date
CN2412301Y true CN2412301Y (en) 2000-12-27

Family

ID=33590010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 00226069 Expired - Fee Related CN2412301Y (en) 2000-01-19 2000-01-19 Four-column bridge live-wire work crossing rack

Country Status (1)

Country Link
CN (1) CN2412301Y (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100446366C (en) * 2007-01-05 2008-12-24 宁波天弘电力器具有限公司 Lifting Mechanism for Gate Type Emergency Repair Tower Conductor
CN101343861B (en) * 2008-08-22 2010-06-02 中铁六局集团有限公司 Construction method for replacing old frame bridge by new frame bridge in existing railway lines
CN103236656A (en) * 2013-04-08 2013-08-07 国家电网公司 Column suspension type crossing structure and operating method thereof
CN105470862A (en) * 2015-12-30 2016-04-06 国网山西供电工程承装公司 Span construction equipment of high-speed rail under operation
CN105480873A (en) * 2016-01-06 2016-04-13 扬州市振东电力器材有限公司 Support bar amplitude variation rotating mechanism of non-shutdown high-speed rail spanning device
CN105529648A (en) * 2016-01-18 2016-04-27 国家电网公司 Hydraulic fabricated crossing structure
CN105552776A (en) * 2015-12-30 2016-05-04 国网山西省电力公司 Novel construction method crossing high-speed rail without interruption
CN106368493A (en) * 2016-11-04 2017-02-01 上海送变电工程公司 Two-arm hydraulic drive-in type hard capping lattice type crossing frame
CN107317290A (en) * 2017-06-19 2017-11-03 天津送变电工程公司 A kind of stay cable type block structure
CN107332153A (en) * 2017-06-19 2017-11-07 天津送变电工程公司 A kind of block single-column live crossing frame
CN107346873A (en) * 2017-09-15 2017-11-14 国网四川省电力公司眉山供电公司 A kind of New insulated crossing frame
CN107394678A (en) * 2017-06-27 2017-11-24 国家电网公司 A kind of telescopic arm block crossing frame
CN108598999A (en) * 2018-06-01 2018-09-28 中国电力科学研究院有限公司 A kind of crossing frame docking facilities and crossing frame
CN108649486A (en) * 2018-06-01 2018-10-12 中国电力科学研究院有限公司 A kind of crossing frame docking facilities and crossing frame
CN108808543A (en) * 2018-06-01 2018-11-13 中国电力科学研究院有限公司 A kind of crossing frame docking facilities and crossing frame
CN109236013A (en) * 2018-11-13 2019-01-18 四川电力送变电建设有限公司 Lattice column crossing frame and erection method
CN110137849A (en) * 2019-05-27 2019-08-16 广东电网有限责任公司 A kind of docking facilities for block crossing frame
CN110401164A (en) * 2019-07-16 2019-11-01 国网河北省电力有限公司行唐县供电分公司 A kind of cross-wired device and its stringing method
CN110492423A (en) * 2019-07-03 2019-11-22 翁琦 A kind of high-tension transmission line spanning block equipment
CN110912025A (en) * 2019-12-11 2020-03-24 国网北京市电力公司 A net sealing device
CN117039720A (en) * 2023-08-16 2023-11-10 广东电网有限责任公司阳江供电局 A self-propelled lifting and rotating span frame for transmission lines and its use method
CN117394206A (en) * 2023-12-13 2024-01-12 邯郸欣和电力建设有限公司 A kind of line sealing equipment

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100446366C (en) * 2007-01-05 2008-12-24 宁波天弘电力器具有限公司 Lifting Mechanism for Gate Type Emergency Repair Tower Conductor
CN101343861B (en) * 2008-08-22 2010-06-02 中铁六局集团有限公司 Construction method for replacing old frame bridge by new frame bridge in existing railway lines
CN103236656B (en) * 2013-04-08 2017-02-08 国家电网公司 Column suspension type crossing structure and operating method thereof
CN103236656A (en) * 2013-04-08 2013-08-07 国家电网公司 Column suspension type crossing structure and operating method thereof
CN105470862A (en) * 2015-12-30 2016-04-06 国网山西供电工程承装公司 Span construction equipment of high-speed rail under operation
CN105552776B (en) * 2015-12-30 2018-03-30 国网山西省电力公司 New across high-speed rail construction method of not stopping transport
CN105552776A (en) * 2015-12-30 2016-05-04 国网山西省电力公司 Novel construction method crossing high-speed rail without interruption
CN105470862B (en) * 2015-12-30 2018-03-09 国网山西供电工程承装有限公司 High ferro of not stopping transport crossing construction equipment
CN105480873A (en) * 2016-01-06 2016-04-13 扬州市振东电力器材有限公司 Support bar amplitude variation rotating mechanism of non-shutdown high-speed rail spanning device
CN105529648A (en) * 2016-01-18 2016-04-27 国家电网公司 Hydraulic fabricated crossing structure
CN106368493A (en) * 2016-11-04 2017-02-01 上海送变电工程公司 Two-arm hydraulic drive-in type hard capping lattice type crossing frame
CN106368493B (en) * 2016-11-04 2018-09-14 上海送变电工程公司 A kind of Double-arm hydraulic drive-in binds lattice crossing frame firmly
CN107317290A (en) * 2017-06-19 2017-11-03 天津送变电工程公司 A kind of stay cable type block structure
CN107332153A (en) * 2017-06-19 2017-11-07 天津送变电工程公司 A kind of block single-column live crossing frame
CN107394678A (en) * 2017-06-27 2017-11-24 国家电网公司 A kind of telescopic arm block crossing frame
CN107394678B (en) * 2017-06-27 2019-09-20 国家电网公司 A telescopic arm sealing net spanning frame
CN107346873A (en) * 2017-09-15 2017-11-14 国网四川省电力公司眉山供电公司 A kind of New insulated crossing frame
CN108598999A (en) * 2018-06-01 2018-09-28 中国电力科学研究院有限公司 A kind of crossing frame docking facilities and crossing frame
CN108649486A (en) * 2018-06-01 2018-10-12 中国电力科学研究院有限公司 A kind of crossing frame docking facilities and crossing frame
CN108808543A (en) * 2018-06-01 2018-11-13 中国电力科学研究院有限公司 A kind of crossing frame docking facilities and crossing frame
CN108649486B (en) * 2018-06-01 2022-06-10 中国电力科学研究院有限公司 Crossing structure interfacing apparatus and crossing structure
CN108808543B (en) * 2018-06-01 2022-06-21 中国电力科学研究院有限公司 Crossing structure interfacing apparatus and crossing structure
CN109236013A (en) * 2018-11-13 2019-01-18 四川电力送变电建设有限公司 Lattice column crossing frame and erection method
CN110137849B (en) * 2019-05-27 2024-04-30 广东电网有限责任公司 Butt joint device for net sealing crossing frame
CN110137849A (en) * 2019-05-27 2019-08-16 广东电网有限责任公司 A kind of docking facilities for block crossing frame
CN110492423A (en) * 2019-07-03 2019-11-22 翁琦 A kind of high-tension transmission line spanning block equipment
CN110401164A (en) * 2019-07-16 2019-11-01 国网河北省电力有限公司行唐县供电分公司 A kind of cross-wired device and its stringing method
CN110912025A (en) * 2019-12-11 2020-03-24 国网北京市电力公司 A net sealing device
CN117039720A (en) * 2023-08-16 2023-11-10 广东电网有限责任公司阳江供电局 A self-propelled lifting and rotating span frame for transmission lines and its use method
CN117039720B (en) * 2023-08-16 2024-05-28 广东电网有限责任公司阳江供电局 A self-propelled lifting and rotating crossing frame for power transmission lines and its use method
CN117394206A (en) * 2023-12-13 2024-01-12 邯郸欣和电力建设有限公司 A kind of line sealing equipment
CN117394206B (en) * 2023-12-13 2024-09-06 邯郸欣和电力建设有限公司 A line blocking device

Similar Documents

Publication Publication Date Title
CN2412301Y (en) Four-column bridge live-wire work crossing rack
CN102290742B (en) Tension stringing construction technology
CN103227431B (en) 220kV long span super high town suspension insulator charged for replacement method
CN102354926A (en) Large-section conductor tension stringing construction method
CN109687349B (en) Bypass cable wiring method and special equipment thereof
CN106409085A (en) Power transmission and transformation live working practical-training simulation stand
CN210829048U (en) 110kV-220kV Tension Pole Tower Jumper Overhaul Special Ladder
CN209913456U (en) Anti-drop device based on overhead line
CN109441203A (en) It is a kind of for power network line construction from perpendicular positioning standing device
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN112271632B (en) Standing type high-voltage cable operation device
CN203722136U (en) Insulation rope net apparatus for railway crossing tension stringing construction
CN201332236Y (en) Transmission line lead repairing manned tackle
CN106373467A (en) Power transmission and transformation live line work training simulation platform training method
CN202383915U (en) Purler type holding pole integrally raising aluminium alloy multifunctional repair tower simulation teaching sand table
CN216794475U (en) Supplementary hanging wire device in high altitude
CN205265148U (en) Construction equipment is crossed over to high -speed railway of not stopping transport
CN206976942U (en) A kind of power construction wire-sending device
CN1288276A (en) Method and equipment of stride across construction utilizing overhead cableway
CN105470862A (en) Span construction equipment of high-speed rail under operation
WO2016134602A1 (en) Solar-tracking photovoltaic power-generating apparatus
CN216240042U (en) A pole holding device
CN203802994U (en) Combined type safety belt with double protection functions
CN210166414U (en) A test line high-altitude wiring device
CN210723967U (en) Auxiliary tool for replacing 35-110kV strain single-string insulator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee