CN103122693A - 多层面超大面积钢筋混凝土地面无缝施工方法 - Google Patents

多层面超大面积钢筋混凝土地面无缝施工方法 Download PDF

Info

Publication number
CN103122693A
CN103122693A CN2011103676915A CN201110367691A CN103122693A CN 103122693 A CN103122693 A CN 103122693A CN 2011103676915 A CN2011103676915 A CN 2011103676915A CN 201110367691 A CN201110367691 A CN 201110367691A CN 103122693 A CN103122693 A CN 103122693A
Authority
CN
China
Prior art keywords
concrete
vibrating
construction
concreting
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103676915A
Other languages
English (en)
Inventor
黄延铮
张建新
张煜
候振国
李永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN2011103676915A priority Critical patent/CN103122693A/zh
Publication of CN103122693A publication Critical patent/CN103122693A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种多层面超大面积钢筋混凝土地面无缝施工方法,它包括以下步骤:钢筋绑扎、混凝土拌制、混凝土浇筑、混凝土振捣、混凝土养护等步骤。本发明的多层面超大面积钢筋混凝土地面无缝施工可显著缩短地面施工工期,减少管理费用,降低工程造价。且施工简单,无常规后浇带困难的打毛清理工作,适量添加粉煤灰,可减少水泥用量,降低凝土成本。

Description

多层面超大面积钢筋混凝土地面无缝施工方法
技术领域
本发明涉及一种多层面超大面积钢筋混凝土地面无缝施工方法。
背景技术
目前多层面超大面积钢筋混凝土地面无缝施工方法是采用传统的留置后浇带和伸缩缝的施工技术,
近年来,后浇带广泛用于处理因结构沉降差和结构混凝土体积收缩而产生的各种不利因素。由于使用伸缩后浇带有不破坏工程立面观感的优点,目前应用越来越广泛,有取代结构伸缩缝的趋势。根据多年实践,设置了伸缩后浇带的工程结构其细小的收缩裂缝开展现象还是比较多,盲目用伸缩后浇带代替伸缩缝,不利于防治混凝土结构出现裂缝的通病。混凝土体积变化是混凝土产生裂缝的主要原因之一。硬化混凝土的体积变化与下列因素有关:含水量变化、温度变化、外力的作用(弹性变形或徐变变形)等。因碳化而收缩主要是表面的现象,引起体积变化的关键是前两项。混凝土体积变化尤其是收缩受到周围条件阻碍时,混凝土就要发生裂缝。而建筑物留设的沉降缝和伸缩缝在使用过程中的老化和损坏问题一直困扰着用户,沉降缝和伸缩缝所带来的渗漏问题、沉降缝和伸缩缝老化并影响建筑的立面效果问题,以及无论采用什么方法来维修总是达不到原有的效果等问题。
发明内容
本发明目的在于提供一种步骤简单,便于施工,可大大缩短地面施工工期,显著增强地面结构的整体性,并可大大提高地面的使用性能的一种多层面超大面积钢筋混凝土地面无缝施工方法。
本发明是通过以下技术方案实现的:
一种多层面超大面积钢筋混凝土地面无缝施工方法,它包括以下步骤:
a、钢筋绑扎:钢筋为不截断连续绑扎,对预留搭接钢筋校正,控制钢筋保护层厚度,确保截面有效高度;
b、混凝土拌制:将水泥、骨料及掺合料按比例混合后进行搅拌,混凝土搅拌时间比普通混凝土长15-20秒;
c、混凝土浇筑:首先清理模板内的杂物,检查保护层垫块是否放好,浇筑时应保证混凝土连续浇筑,避免出现施工冷缝;
d、混凝土振捣:混凝土振捣应从中间向边缘振动,振点按梅花形布点,并使振捣棒在振捣过程中上下略有抽动,振捣棒移动间距为180-220毫米,对施工缝和预留空洞的薄弱环节,应充分振动,以确保混凝土密实;混凝土振捣时间控制在每个点15-20秒;为了减少内部裂缝,对施工缝处的薄弱部分采用二次振捣,当混凝土浇筑后即将凝固时再次振捣;
e、混凝土养护:首先加强混凝土地面的保湿养护,可采取覆盖塑料薄膜和麻袋与洒水养护相结合。
本发明的优点是:本发明的多层面超大面积钢筋混凝土地面无缝施工可显著缩短地面施工工期,减少管理费用,降低工程造价。且施工简单,无常规后浇带困难的打毛清理工作,适量添加粉煤灰,可减少水泥用量,降低凝土成本。
具体实施方式
实施例:多层面超大面积钢筋混凝土地面无缝施工方法,它包括以下步骤:
a、钢筋绑扎:钢筋为不截断连续绑扎,对预留搭接钢筋校正,控制钢筋保护层厚度,确保截面有效高度;
b、混凝土拌制:将水泥、骨料及掺合料按比例混合后进行搅拌,混凝土搅拌时间比普通混凝土长15-20秒。
其中水泥应选用质量稳定、水化热地、含碱量低、活性好、标准稠度用水量小、均匀性、安定性好。
粗骨料选用鹅卵石,选用的原则是:轻度高,连续级配好,含泥量控制在1%以内,大于5毫米的泥块的含量小于0.5%,骨针片状颗粒含量不大于10%,骨料不得带有杂物。细骨料选用中粗砂,细度模数在2.5以上,含泥量控制在3%以内,大于5毫米的泥块的含量小于1%。
根据“双掺技术”特点,混凝土拌合物中适量掺入Ⅱ级粉煤灰及减水剂,满足抗裂要求及对混凝土的各种施工性能要求。掺入粉煤灰不仅可以改善混凝土性能,而且还节约水泥,降低温度裂缝的形成。
c、混凝土浇筑:首先清理模板内的杂物,检查保护层垫块是否放好,浇筑时应保证混凝土连续浇筑,避免出现施工冷缝;
d、混凝土振捣:混凝土振捣应从中间向边缘振动,振点按梅花形布点,并使振捣棒在振捣过程中上下略有抽动,振捣棒移动间距为180-220毫米,对施工缝和预留空洞的薄弱环节,应充分振动,以确保混凝土密实;混凝土振捣时间控制在每个点15-20秒;为了减少内部裂缝,对施工缝处的薄弱部分采用二次振捣,当混凝土浇筑后即将凝固时再次振捣;
控制好混凝土浇筑之间的间歇时间,做到连续而有序的作业,在混凝土振捣中,不得碰撞各种埋件,不得振捣模板、钢筋等,粘在钢筋上的砂浆和混凝土,应轻轻碰落;
e、混凝土养护:首先加强混凝土地面的保湿养护,可采取覆盖塑料薄膜和麻袋与洒水养护相结合。
本方法适用于工业与民用建筑大面积楼地面的垫层、钢筋混凝土结构层、找平层的施工,特别适用于对楼面、地面使用性能要求高的工业厂房和大型公共建筑工程。

Claims (1)

1.一种多层面超大面积钢筋混凝土地面无缝施工方法,其特征是:它包括以下步骤:
a、钢筋绑扎:钢筋为不截断连续绑扎,对预留搭接钢筋校正,控制钢筋保护层厚度,确保截面有效高度;
b、混凝土拌制:将水泥、骨料及掺合料按比例混合后进行搅拌,混凝土搅拌时间比普通混凝土长15-20秒;
c、混凝土浇筑:首先清理模板内的杂物,检查保护层垫块是否放好,浇筑时应保证混凝土连续浇筑,避免出现施工冷缝;
d、混凝土振捣:混凝土振捣应从中间向边缘振动,振点按梅花形布点,并使振捣棒在振捣过程中上下略有抽动,振捣棒移动间距为180-220毫米,对施工缝和预留空洞的薄弱环节,应充分振动,以确保混凝土密实;混凝土振捣时间控制在每个点15-20秒;为了减少内部裂缝,对施工缝处的薄弱部分采用二次振捣,当混凝土浇筑后即将凝固时再次振捣;
控制好混凝土浇筑之间的间歇时间,做到连续而有序的作业,在混凝土振捣中,不得碰撞各种埋件,不得振捣模板、钢筋等,粘在钢筋上的砂浆和混凝土,应轻轻碰落;
e、混凝土养护:首先加强混凝土地面的保湿养护,可采取覆盖塑料薄膜和麻袋与洒水养护相结合。
CN2011103676915A 2011-11-18 2011-11-18 多层面超大面积钢筋混凝土地面无缝施工方法 Pending CN103122693A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103676915A CN103122693A (zh) 2011-11-18 2011-11-18 多层面超大面积钢筋混凝土地面无缝施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103676915A CN103122693A (zh) 2011-11-18 2011-11-18 多层面超大面积钢筋混凝土地面无缝施工方法

Publications (1)

Publication Number Publication Date
CN103122693A true CN103122693A (zh) 2013-05-29

Family

ID=48453814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103676915A Pending CN103122693A (zh) 2011-11-18 2011-11-18 多层面超大面积钢筋混凝土地面无缝施工方法

Country Status (1)

Country Link
CN (1) CN103122693A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966240A (zh) * 2012-11-30 2013-03-13 福建省第五建筑工程公司 一种高空钢筋混凝土外悬挑结构的施工方法
CN103470044A (zh) * 2013-07-03 2013-12-25 天津二十冶建设有限公司 一种控制混凝土地坪裂缝的施工方法
CN103615053A (zh) * 2013-11-27 2014-03-05 温州宏源水电建设有限公司 现浇钢筋混凝土结构后浇带施工工法
CN114908970A (zh) * 2022-06-15 2022-08-16 中交一公局第六工程有限公司 污水处理厂超高超厚池壁施工工艺

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1083887A (zh) * 1993-09-08 1994-03-16 中国建筑材料科学研究院 超长钢筋混凝土结构无缝设计施工方法
CN101638940A (zh) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 大板块、大体积混凝土无缝施工方法
CN201521128U (zh) * 2009-07-21 2010-07-07 中冶天工建设有限公司 无洞无缝施工装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1083887A (zh) * 1993-09-08 1994-03-16 中国建筑材料科学研究院 超长钢筋混凝土结构无缝设计施工方法
CN101638940A (zh) * 2009-05-26 2010-02-03 中冶集团华冶资源开发有限责任公司 大板块、大体积混凝土无缝施工方法
CN201521128U (zh) * 2009-07-21 2010-07-07 中冶天工建设有限公司 无洞无缝施工装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
罗刚: "超大面积混凝土地面结构无缝施工技术研究与应用", 《中国优秀硕士学位论文全文数据库工程科技II辑》, 28 February 2005 (2005-02-28) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102966240A (zh) * 2012-11-30 2013-03-13 福建省第五建筑工程公司 一种高空钢筋混凝土外悬挑结构的施工方法
CN103470044A (zh) * 2013-07-03 2013-12-25 天津二十冶建设有限公司 一种控制混凝土地坪裂缝的施工方法
CN103615053A (zh) * 2013-11-27 2014-03-05 温州宏源水电建设有限公司 现浇钢筋混凝土结构后浇带施工工法
CN103615053B (zh) * 2013-11-27 2016-09-28 温州宏源水电建设有限公司 现浇钢筋混凝土结构后浇带施工工法
CN114908970A (zh) * 2022-06-15 2022-08-16 中交一公局第六工程有限公司 污水处理厂超高超厚池壁施工工艺
CN114908970B (zh) * 2022-06-15 2024-03-26 中交一公局第六工程有限公司 污水处理厂超高超厚池壁施工工艺

Similar Documents

Publication Publication Date Title
CN103233520B (zh) 一种建筑外墙结构自防水施工方法
CN101096885A (zh) 钢-自密实混凝土组合结构加固方法
KR102078343B1 (ko) 칼슘알루미네이트계 비정질 환원슬래그를 활용한 아크릴라텍스 개질 초속경 콘크리트 조성물 및 이를 이용한 보수보강 공법
CN104762861A (zh) 一种基于沥青路面冷再生基体的半柔性路面及其施工方法
CN103122693A (zh) 多层面超大面积钢筋混凝土地面无缝施工方法
CN204000523U (zh) 一种新型钢筋混凝土预制路面
CN109440571A (zh) 一种预制板铺设临建道路的施工方法
CN104591649A (zh) 改性水泥砂浆路面修补材料及路面修补施工方法
CN102116092A (zh) 用于补偿混凝土收缩防止裂缝的加强带施工方法
CN206737210U (zh) 一种免拆模板
CN101503915A (zh) 超大面积、超薄无粘结预应力整体水池底板的施工方法
CN105544337A (zh) 一种道路施工方法
CN102373666A (zh) 一种混凝土缓凝冲水快速糙化方法
CN110424556A (zh) 一种地下室底板疏水板防水施工方法
CN104927759B (zh) 一种界面粘结材料和基于该材料的白改黑加铺结构及其施工工艺
KR101363895B1 (ko) 속경성 폴리머콘크리트 조성물, 속경성 폴리머콘크리트, 이의 제조방법 및 도로면 측구 시공공법
Vancura et al. Reappraisal of recycled concrete aggregate as coarse aggregate in concretes for rigid pavements
CN101498131B (zh) 深大基坑钢筋混凝土支撑的收缩补偿方法
CN204940039U (zh) 一种植石水泥混凝土桥面铺装结构
CN111549690A (zh) 一种低成本、高性能雨水箱涵组合结构及其施工方法
CN206956795U (zh) 混凝土预制散水
KR101279627B1 (ko) 사면 안정성 확보를 위한 보강토 옹벽 시공 공법
CN204551765U (zh) 房屋结构间缓冲隔离器
CN114319875A (zh) 一种超大面积混凝土地面无缝施工工艺
CN103967211B (zh) 免拆高性能水泥砂浆模板保温再生混凝土t形柱及作法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130529