CN103122636A CN2012103355251A CN201210335525A CN103122636A CN 103122636 A CN103122636 A CN 103122636A CN 2012103355251 A CN2012103355251 A CN 2012103355251A CN 201210335525 A CN201210335525 A CN 201210335525A CN 103122636 A CN103122636 A CN 103122636A
Authority
CN
China
Prior art keywords
wall
timber
guide wall
timber pile
underground continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103355251A
Other languages
English (en)
Other versions
CN103122636B (zh
Inventor
周冠南
崔涛
李有德
赵立华
朱瑶宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CN201210335525.1A priority Critical patent/CN103122636B/zh
Publication of CN103122636A publication Critical patent/CN103122636A/zh
Application granted granted Critical
Publication of CN103122636B publication Critical patent/CN103122636B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种软弱地层地下连续墙浅层槽壁加固方法,由木桩插入土体内,木桩顶端与导墙浇成一体的地下连续墙槽壁加固方式,木桩穿过导墙钢筋网片,与导墙浇注成一体;具体操作步骤为:步骤一:根据现场实际地质情况,拟定木桩长度、直径及平面布置;步骤二:对照木桩平面布置图,在设计位置,将底端削尖的木桩用挖机压入土体当中;步骤三:开挖导墙沟槽,绑扎导墙钢筋网片,使木桩顶端穿过钢筋网片的网眼;步骤四:模板安装,浇注导墙混凝土,使木桩与导墙成为一体。本发明优点:工艺简单,施工快,成本低。在导墙施工前,对地下连续墙两侧浅层槽壁进行加固,提高槽壁稳定性;木桩与导墙浇注一体后,提高导墙的承载力,为后续的顶拔作业提供有力的保障。

Description

一种软弱地层地下连续墙浅层槽壁加固方法
技术领域
本发明涉及基坑工程类施工工艺,具体是涉及地下连续墙施工中的一种槽壁加固方法,特别涉及了一种软弱地层地下连续墙浅层槽壁加固方法。 
背景技术
随着地下空间的不断开发利用,土建工程不断往纵深方向发展,出现了大量深基坑工程。围护结构是深基坑施工的重要组成部分,而地下连续墙是深基坑围护结构中较为常用的形式。地下连续墙施工中,成槽质量的好坏将直接影响地下连续墙整体质量,若槽壁出现塌方,甚至可能直接导致该幅地下连续墙无法继续施工。因此在地下连续墙成槽施工中,槽壁的稳定性显的异常重要。 
目前,在一般的地质条件下,采用调节泥浆比重和降水等方法提高地下连续墙槽壁的稳定性。在一些土质较差或者是被扰动过的土层中,采用旋喷桩、搅拌桩等方法进行地下连续墙槽壁加固。采用旋喷桩和搅拌桩进行地下连续墙槽壁加固,成本比较高,而且工期也相对较长,搅拌桩施工场地占用较大,安全风险较高。 
发明内容
本发明的目的是为了在导墙施工前,对地下连续墙两侧浅层槽壁进行加固,提高槽壁稳定性,特提供了一种软弱地层地下连续墙浅层槽壁加固方法。 
本发明提供了一种软弱地层地下连续墙浅层槽壁加固方法,其特征在于:所述的软弱地层地下连续墙浅层槽壁加固方法为,由木桩3插入土体内,木桩3的端与导墙2浇成一体的地下连续墙1槽壁加固方式,木桩3穿过导墙2钢筋网片,与导墙2浇注成一体; 
所用木桩3选用直径为10cm~15cm的松木桩为宜,长度应大于表层不稳定土层的厚度1m以上。 
木桩3的平面布置应根据现场不稳定土层的分布及地下连续墙导墙翼板宽度进行布置,间距宜控制在2d~3dd为木桩直径之间。 
所插入的木桩3与地下连续墙1槽壁之间的净距≥B+10cmB为导墙2侧壁厚度,木桩3顶端锚入导墙2H/2H为导墙2顶面厚度;误差控制在±3cm以内; 
所述的加固方法木桩3布置形式不仅仅局限于单排或双排,可根据现场实际随时调整。采用双排或多排形式时,可适当加宽导墙2翼板。 
具体操作步骤为: 
步骤一:根据现场实际地质情况,拟定木桩3长度、直径及平面布置; 
步骤二:对照木桩3平面布置图,在设计位置,将底端削尖的木桩3用挖机压入土体当中; 
步骤三:开挖导墙2沟槽,绑扎导墙2钢筋网片,使木桩3顶端穿过钢筋网片的网眼; 
步骤四:模板安装,浇注导墙2混凝土,使木桩3与导墙2成为一体。 
本发明的优点: 
本发明所述的软弱地层地下连续墙浅层槽壁加固方法,工艺简单,施工快,成本低。适用于浅层土质不稳定的基坑工程,主要目的是为了在导墙施工前,对地下连续墙两侧浅层槽壁进行加固,提高槽壁稳定性;木桩与导墙浇注一体后,也提高了导墙的承载力,为后续的顶拔作业提供有力的保障。 
附图说明
下面结合附图及实施方式对本发明作进一步详细的说明: 
图1是本发明中单排木桩形式横剖面图; 
图2是本发明中双排错位形式横剖面图; 
图3是本发明中单排木桩形式平面布置图; 
图4是本发明中双排错位形式平面布置图; 
图5是本发明中单排木桩形式纵剖面图; 
图6是本发明中双排错位形式纵剖面图; 
图7是本发明中浇注流程示意图。 
具体实施方式
实施例1 
本发明提供了一种软弱地层地下连续墙浅层槽壁加固方法,其特征在于:所述的软弱地层地下连续墙浅层槽壁加固方法为,由木桩3插入土体内,木桩3的端与导墙2浇成一体的地下连续墙1槽壁加固方式,木桩3穿过导墙2钢筋网片,与导墙2浇注成一体; 
所用木桩3选用直径为10cm~15cm的松木桩为宜,长度应大于表层不稳定土层的厚度1m以上。 
木桩3的平面布置应根据现场不稳定土层的分布及地下连续墙导墙翼板宽度进行布置,间距宜控制在2d~3dd为木桩直径之间。 
所插入的木桩3与地下连续墙1槽壁之间的净距≥B+10cmB为导墙2侧壁厚度,木桩3顶端锚入导墙2H/2H为导墙2顶面厚度;误差控制在±3cm以内; 
所述的加固方法木桩3布置形式不仅仅局限于单排或双排,可根据现场实际随时调整。采用双排或多排形式时,可适当加宽导墙2翼板。具体操作步骤为: 
步骤一:根据现场实际地质情况,拟定木桩3长度、直径及平面布置; 
步骤二:对照木桩3平面布置图,在设计位置,将底端削尖的木桩3用挖机压入土体当中; 
步骤三:开挖导墙2沟槽,绑扎导墙2钢筋网片,使木桩3顶端穿过钢筋网片的网眼; 
步骤四:模板安装,浇注导墙2混凝土,使木桩3与导墙2成为一体。 
具体试验: 
在实验中,在地连墙靠近重力坝一侧土体中插入一排或两排直径15cm,长为4m的木桩,木桩顶端与导墙浇注一体。经过该工法处理,后续施工中未出现塌方,取得了良好的效果。 
经济效益:该实例若采用传统加固方法,则需进行三轴搅拌桩加固,然后用高压旋喷桩对搅拌桩加固区域和重力坝之间进行补强。主要工程量为三轴搅拌桩1518m3,高压旋喷桩440m3;成本约为31万元。采用该工法处理,实际所用木桩180根;实际成本约为4.5万元。由 此可见,通过该工法大大的节省了成本。 

Claims (1)

1.一种软弱地层地下连续墙浅层槽壁加固方法,其特征在于:所述的软弱地层地下连续墙浅层槽壁加固方法为,由木桩(3)插入土体内,木桩(3)顶端与导墙(2)浇成一体的地下连续墙(1)槽壁加固方式,木桩(3)穿过导墙(2)钢筋网片,与导墙(2)浇注成一体;
所用木桩(3)选用直径为10cm~15cm的松木桩为宜,长度应大于表层不稳定土层的厚度1m以上。
木桩(3)的平面布置应根据现场不稳定土层的分布及地下连续墙导墙翼板宽度进行布置,间距宜控制在2d~3d(d为木桩直径)之间。
所插入的木桩(3)与地下连续墙(1)槽壁之间的净距≥B+10cm(B为导墙(2)侧壁厚度),木桩(3)顶端锚入导墙(2)H/2(H为导墙(2)顶面厚度);误差控制在±3cm以内;
具体操作步骤为:
步骤一:根据现场实际地质情况,拟定木桩(3)长度、直径及平面布置;
步骤二:对照木桩(3)平面布置图,在设计位置,将底端削尖的木桩(3)用挖机压入土体当中;
步骤三:开挖导墙(2)沟槽,绑扎导墙(2)钢筋网片,使木桩(3)顶端穿过钢筋网片的网眼;
步骤四:模板安装,浇注导墙(2)混凝土,使木桩(3)与导墙(2)成为一体。
CN201210335525.1A 2012-12-25 2012-12-25 一种软弱地层地下连续墙浅层槽壁加固方法 Active CN103122636B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210335525.1A CN103122636B (zh) 2012-12-25 2012-12-25 一种软弱地层地下连续墙浅层槽壁加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210335525.1A CN103122636B (zh) 2012-12-25 2012-12-25 一种软弱地层地下连续墙浅层槽壁加固方法

Publications (2)

Publication Number Publication Date
CN103122636A true CN103122636A (zh) 2013-05-29
CN103122636B CN103122636B (zh) 2015-08-19

Family

ID=48453761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210335525.1A Active CN103122636B (zh) 2012-12-25 2012-12-25 一种软弱地层地下连续墙浅层槽壁加固方法

Country Status (1)

Country Link
CN (1) CN103122636B (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321211A (zh) * 2013-07-08 2013-09-25 中铁第四勘察设计院集团有限公司 富水地层抗滑桩护壁加固结构
CN103469802A (zh) * 2013-09-29 2013-12-25 中国一冶集团有限公司 组合式格构钢架喷锚支护方法及其支护结构
CN105735236A (zh) * 2016-03-17 2016-07-06 中铁十六局集团北京轨道交通工程建设有限公司 一种厚淤泥层中地下连续墙成槽施工的土体预加固方法
CN105951711A (zh) * 2016-05-25 2016-09-21 中国能源建设集团安徽电力建设第工程有限公司 海边电站地下连续墙围护施工方法
CN107119691A (zh) * 2017-06-22 2017-09-01 中交二航局第四工程有限公司 一种适用于富水砂卵层高承压方形深基坑及其开挖方法
CN108179668A (zh) * 2017-12-22 2018-06-19 成都市市政工程设计研究院 一种非机动车道路面机构
CN109706915A (zh) * 2018-12-11 2019-05-03 北京建工土木工程有限公司 一种隧道内地下连续墙导墙的施工方法
CN111877315A (zh) * 2020-07-31 2020-11-03 山东大学 一种地下设施下局部预制地连墙导墙及施工方法
CN112281809A (zh) * 2020-09-27 2021-01-29 中铁一局集团有限公司 一种地下连续墙用的钢导墙及其施工方法
CN112411590A (zh) * 2020-11-25 2021-02-26 上海金鹿建设(集团)有限公司 一种地下连续墙结构及施工方法
CN113089645A (zh) * 2021-04-22 2021-07-09 安徽水安建设集团股份有限公司 穿越淤泥层加固混凝土防渗墙槽孔结构体系及施工方法
CN113202229A (zh) * 2021-05-11 2021-08-03 内蒙古工业大学 原位混凝土3-d打印水平承重构件的组合配件及制备方法
CN115142400A (zh) * 2022-08-03 2022-10-04 南京航空航天大学 一种地下连续墙槽壁稳固装置及施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5664014A (en) * 1979-10-31 1981-06-01 Raito Kogyo Kk Construction of underground continuous wall
CN102312445A (zh) * 2010-06-29 2012-01-11 中交第三航务工程勘察设计院有限公司 地下连续墙及其施工方法
CN102561361A (zh) * 2012-03-05 2012-07-11 中交第四航务工程局有限公司 用于上软下硬土层的超深t形槽壁桩及其成槽施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5664014A (en) * 1979-10-31 1981-06-01 Raito Kogyo Kk Construction of underground continuous wall
CN102312445A (zh) * 2010-06-29 2012-01-11 中交第三航务工程勘察设计院有限公司 地下连续墙及其施工方法
CN102561361A (zh) * 2012-03-05 2012-07-11 中交第四航务工程局有限公司 用于上软下硬土层的超深t形槽壁桩及其成槽施工方法

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321211A (zh) * 2013-07-08 2013-09-25 中铁第四勘察设计院集团有限公司 富水地层抗滑桩护壁加固结构
CN103469802A (zh) * 2013-09-29 2013-12-25 中国一冶集团有限公司 组合式格构钢架喷锚支护方法及其支护结构
CN105735236A (zh) * 2016-03-17 2016-07-06 中铁十六局集团北京轨道交通工程建设有限公司 一种厚淤泥层中地下连续墙成槽施工的土体预加固方法
CN105735236B (zh) * 2016-03-17 2018-05-04 中铁十六局集团北京轨道交通工程建设有限公司 一种厚淤泥层中地下连续墙成槽施工的土体预加固方法
CN105951711A (zh) * 2016-05-25 2016-09-21 中国能源建设集团安徽电力建设第工程有限公司 海边电站地下连续墙围护施工方法
CN107119691A (zh) * 2017-06-22 2017-09-01 中交二航局第四工程有限公司 一种适用于富水砂卵层高承压方形深基坑及其开挖方法
CN107119691B (zh) * 2017-06-22 2023-10-13 中交(南京)建设有限公司 一种适用于富水砂卵层高承压方形深基坑及其开挖方法
CN108179668B (zh) * 2017-12-22 2020-10-09 成都市市政工程设计研究院 一种非机动车道路面机构
CN108179668A (zh) * 2017-12-22 2018-06-19 成都市市政工程设计研究院 一种非机动车道路面机构
CN109706915A (zh) * 2018-12-11 2019-05-03 北京建工土木工程有限公司 一种隧道内地下连续墙导墙的施工方法
CN111877315A (zh) * 2020-07-31 2020-11-03 山东大学 一种地下设施下局部预制地连墙导墙及施工方法
CN112281809A (zh) * 2020-09-27 2021-01-29 中铁一局集团有限公司 一种地下连续墙用的钢导墙及其施工方法
CN112411590A (zh) * 2020-11-25 2021-02-26 上海金鹿建设(集团)有限公司 一种地下连续墙结构及施工方法
CN113089645A (zh) * 2021-04-22 2021-07-09 安徽水安建设集团股份有限公司 穿越淤泥层加固混凝土防渗墙槽孔结构体系及施工方法
CN113089645B (zh) * 2021-04-22 2022-11-22 安徽水安建设集团股份有限公司 穿越淤泥层加固混凝土防渗墙槽孔结构体系及施工方法
CN113202229A (zh) * 2021-05-11 2021-08-03 内蒙古工业大学 原位混凝土3-d打印水平承重构件的组合配件及制备方法
CN113202229B (zh) * 2021-05-11 2023-03-17 内蒙古工业大学 原位混凝土3-d打印水平承重构件的组合配件及制备方法
CN115142400A (zh) * 2022-08-03 2022-10-04 南京航空航天大学 一种地下连续墙槽壁稳固装置及施工方法
CN115142400B (zh) * 2022-08-03 2023-03-28 南京航空航天大学 一种地下连续墙槽壁稳固装置及施工方法

Also Published As

Publication number Publication date
CN103122636B (zh) 2015-08-19

Similar Documents

Publication Publication Date Title
CN103122636A (zh) 一种软弱地层地下连续墙浅层槽壁加固方法
CN108589718B (zh) 岩溶区桩基施工方法
CN107313431B (zh) 临近不等高基坑同步施工方法
EP3839149A1 (en) Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
CN103967031B (zh) 一种加固地基的沉箱与桩组合基础及其施工方法
CN204199335U (zh) 一种减小phc管桩施工挤土效应的泄压井
CN104947649A (zh) 顶管施工引起的沉井后背土体变形控制方法
CN108532586A (zh) 一种停车库用地下连续墙的施工方法
CN106320333A (zh) 一种联排式水上灌注桩装置及施工方法
CN107191001B (zh) 拆建房屋地基的基础加固施工方法
CN102561404A (zh) 一种型钢混凝土柱式接头及采用该接头的地下连续墙的施工方法
CN202466644U (zh) 一种型钢混凝土柱式接头
CN110984132B (zh) 复杂地质条件下地下连续墙成槽的施工方法
CN109487777A (zh) 一种采用压力注浆形成合抱桩加固深厚软土地基的方法
CN203213131U (zh) 一种排水下沉与不排水下沉相结合的沉井
CN110055973A (zh) 施工空间受限时的高铁桥下基坑围护结构与止水方法
JP2016041893A (ja) 杭基礎及び杭基礎の構築方法
CN105821887A (zh) 一种在卵石层中施工的立柱桩安装方法
CN206143760U (zh) 一种联排式水上灌注桩装置
CN106087996B (zh) 基于自我调平反压装置的人工挖孔桩施工方法
CN105696701B (zh) 一种顺坡剪力墙建筑开发平台及其施工方法
CN111119181A (zh) 一种水下混凝土桩施工的桩头切除方法
CN104110030B (zh) 钢护筒引孔栽桩施工工艺
CN206887984U (zh) 一种光伏发电支架用钢筋混凝土加固钢管桩基础
CN204875665U (zh) 用于中等厚度砂砾石基础上的电站尾水渠挡墙

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant