CN203213131U - 一种排水下沉与不排水下沉相结合的沉井 - Google Patents
一种排水下沉与不排水下沉相结合的沉井 Download PDFInfo
- Publication number
- CN203213131U CN203213131U CN 201320186468 CN201320186468U CN203213131U CN 203213131 U CN203213131 U CN 203213131U CN 201320186468 CN201320186468 CN 201320186468 CN 201320186468 U CN201320186468 U CN 201320186468U CN 203213131 U CN203213131 U CN 203213131U
- Authority
- CN
- China
- Prior art keywords
- drainage
- water
- open caisson
- sinking
- caisson
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
本实用新型属于沉井结构技术领域,涉及一种沉井,尤其涉及一种排水下沉与不排水下沉相结合的沉井,包括井筒(1),井筒(1)上部为排水下沉部(2),井筒(1)下部为不排水下沉部(6),井筒(1)壁上设有预留孔(5),预留孔(5)上设有水泥砂浆的封堵块(4)。本实用新型提供了一种排水下沉与不排水下沉相结合的沉井,当不排水下沉深度对不稳定软土层地基可能产生涌土和出现涌土时,或排水深度超过不影响附近建(构)筑物的深度时,立即向井内灌水采用不排水下沉。这样不仅加快了施工进度,节约了施工成本,而且安全可靠,保证了施工质量。在沉井结构技术领域中有良好的应用前景。
Description
技术领域
本实用新型属于沉井结构技术领域,涉及一种沉井,尤其涉及一种排水下沉与不排水下沉相结合的沉井。
背景技术
目前,随着沉井在顶管、深基坑维护、地下室、泵房基础等工程中的广泛应用,沉井的规模越来越大,沉井的高度也越来越高。
排水挖土下沉具有施工简单,操作方便、经济效益较高的特点,是沉井下沉的常见结构。而当沉井穿过的土层不稳定,可能产生井内涌土,或防止由于沉井施工降水而影响附近建(构)筑物的稳定时,一般采用不排水下沉。
当沉井下沉较深,上部下沉由于土压力较小,虽然土层不稳定也不会出现涌土造成沉井整体失稳时,当上部降水较浅不会对附近建(构)筑物的稳定有影响时;选择排水下沉施工简单。而下部当采用排水下沉出现井内涌土可能造成整体失稳时,当下部降水较深会对附近建(构)筑物的稳定有影响时;采用不排水下沉能保证工程施工的安全和质量。两者之间有各自的优劣,因此对大型沉井采用排水下沉与不排水下沉相结合的沉井是不错的选择。
发明内容
本实用新型的目的是克服现有技术中的单独的排水下沉或不排水下沉的沉井有各自的缺陷,提供了一种排水下沉与不排水下沉相结合的沉井,结合两者的优点,互补两者的缺点,施工进度大大加快,节约了施工成本,而且安全可靠,保证了施工质量。
为了解决上述技术问题,本实用新型通过下述技术方案得以解决:
一种排水下沉与不排水下沉相结合的沉井,包括井筒,井筒上部为排水下沉部,井筒下部为不排水下沉部。
对于大型沉井,沉井高度一般在15m以上。对于不稳定软土层地基,采用瑞典条分法可计算出沉井在开挖过程中可能失稳的最大深度。一般情况下,下沉小于8m时不会产生涌土和失稳的情况,因此沉井上部可以采用排水下沉的结构。
对于附近有建(构)筑物的沉井,沉井降水造成井周围的地下水下降,形成一个以沉井为轴心的降落漏斗状的地下水位线。根据土质的渗透系数和距井轴线的距离,可以计算出建(构)筑物处地下水的埋深。在保证建(构)筑物处地下水的埋深不影响他们安全的降水深度范围,可采用不排水下沉。
当不排水下沉深度对不稳定软土层地基可能产生涌土和出现涌土时,或排水深度超过不影响附近建(构)筑物的深度时,立即向井内灌水采用不排水下沉。这样不仅加快了施工进度,节约了施工成本,而且安全可靠,保证了施工质量。
采用明沟排水或井点降水将地下水降到开挖面以下后进行井内挖土。井内挖土应从井孔中心向四周进行开挖,开挖采用分层挖掘,每层厚度约为30cm,中央部分的土面应始终低于四周30cm以上,形成锅底状,沿刃脚内壁应保留土台。沉井下沉时,按平面轴线的位置逐层沿四周挖去土台,当土台经不住沉井刃脚的挤压力时土体破坏塌落,沉井便均匀下沉。
不排水下沉为沉井下沉施工时,在沉井内、外均不降水,沉井内保持原有水位,在水中挖土,带水下沉,带水封底。
大型沉井水中除土一般采用水力吸泥机配合高压射水管。水力吸泥机包括吸泥器、吸泥管、扬泥管和高压水管等。施工时利用高压射水的高压水流冲刷沉井井底的土层,使其形成泥浆,冲出的泥浆用水力吸泥机抽至场外规划处存放。施工中随着泥面的下降和刃脚土台宽度的减少,当刃脚下土的承载能力经不住刃脚的挤压时土体破坏塌落,沉井便均匀下沉。
作为优选,井筒壁上设有预留孔,预留孔上设有水泥砂浆的封堵块。沉井下沉前,要封堵井壁全部预留洞,对较大的孔洞可用水泥砂浆砌砖封堵,并在靠土的一侧用水泥砂浆抹面。封堵孔洞的砂浆强度应满足下沉时抵抗土压力和水压力的要求,还要考虑便于拆除。
作为优选,井筒内设有测量系统,测量系统包括井筒壁上的垂线、垂线顶端悬挂的垂球、刃脚、刃脚上的标盘。设置观测、测量设施。沉井下沉前,先在内外井壁上各对称弹出4条垂线,在沉井内部4条垂线的顶端悬挂垂球,并在刃脚处设标盘,以便施工时随时观测沉井倾斜度及时纠偏。在沉井外壁沿4条垂线绘制水平测量标尺,并在基坑的相对位置设置水平指示标尺,以测定沉井的下沉量及下沉偏差。
作为优选,井筒内设有隔墙支撑模板、井孔模板、隔墙底面模板和刃脚模板。在混凝土强度达到2.5Mpa以上时,方可拆除直立的侧面模板,且应先内后外;当混凝土强度达到75%以上后,方可拆除隔墙底面、刃脚斜面的支撑与模板;拆模的顺序是:隔墙支撑模板、井孔模板、隔墙底面模板和刃脚模板一次拆模;拆除隔墙及刃脚下支撑应对称依次进行,宜从隔墙中部向两边拆除。拆除时可先挖去支撑架混凝土垫下面的砂,破混凝土垫抽出支撑架。当支撑排架设有楔形木时,可先打掉楔木,然后再拆除支撑;拆模后、下沉破垫前,仍需将刃脚下回填密实以防止产生不均匀下沉,保证正确的位置下沉。
本实用新型提供了一种排水下沉与不排水下沉相结合的沉井,当不排水下沉深度对不稳定软土层地基可能产生涌土和出现涌土时,或排水深度超过不影响附近建(构)筑物的深度时,立即向井内灌水采用不排水下沉。这样不仅加快了施工进度,节约了施工成本,而且安全可靠,保证了施工质量。在沉井结构技术领域中有良好的应用前景。
附图说明
图1为本实用新型所述一种排水下沉与不排水下沉相结合的沉井的结构示意图。
具体实施方式
下面结合附图与实施例对本实用新型作进一步详细描述。
实施例
一种排水下沉与不排水下沉相结合的沉井,如图1所示,包括井筒1,井筒1上部为排水下沉部2,井筒1下部为不排水下沉部6。
井筒1壁上设有预留孔5,预留孔5上设有水泥砂浆的封堵块4。
井筒1内设有测量系统,测量系统包括井筒1壁上的垂线13、垂线13顶端悬挂的垂球11、刃脚7、刃脚7上的标盘8。
井筒1内设有隔墙支撑模板12、井孔模板3、隔墙底面模板9和刃脚模板10。
总之,以上所述仅为本实用新型的较佳实施例,凡依本实用新型申请专利范围所作的均等变化与修饰,皆应属本实用新型专利的涵盖范围。
Claims (4)
1.一种排水下沉与不排水下沉相结合的沉井,包括井筒(1),其特征在于:井筒(1)上部为排水下沉部(2),井筒(1)下部为不排水下沉部(6)。
2.根据权利要求1所述的一种排水下沉与不排水下沉相结合的沉井,其特征在于:井筒(1)壁上设有预留孔(5),预留孔(5)上设有水泥砂浆的封堵块(4)。
3.根据权利要求1所述的一种排水下沉与不排水下沉相结合的沉井,其特征在于:井筒(1)内设有测量系统,测量系统包括井筒(1)壁上的垂线(13)、垂线(13)顶端悬挂的垂球(11)、刃脚(7)、刃脚(7)上的标盘(8)。
4.根据权利要求1所述的一种排水下沉与不排水下沉相结合的沉井,其特征在于:井筒(1)内设有隔墙支撑模板(12)、井孔模板(3)、隔墙底面模板(9)和刃脚模板(10)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320186468 CN203213131U (zh) | 2013-04-12 | 2013-04-12 | 一种排水下沉与不排水下沉相结合的沉井 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320186468 CN203213131U (zh) | 2013-04-12 | 2013-04-12 | 一种排水下沉与不排水下沉相结合的沉井 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203213131U true CN203213131U (zh) | 2013-09-25 |
Family
ID=49202679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320186468 Expired - Fee Related CN203213131U (zh) | 2013-04-12 | 2013-04-12 | 一种排水下沉与不排水下沉相结合的沉井 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203213131U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268650A (zh) * | 2017-07-28 | 2017-10-20 | 马鞍山钢铁建设集团有限公司 | 一种工业漩流沉淀池结构不排水法沉井方法 |
CN110565670A (zh) * | 2019-08-09 | 2019-12-13 | 中铁八局集团有限公司 | 一种沉井不排水下沉施工系统及其施工方法 |
CN111364489A (zh) * | 2020-03-23 | 2020-07-03 | 中国葛洲坝集团市政工程有限公司 | 一种河道治理顶管沉井在细沙地层下的不排水下沉施工方法 |
CN111501809A (zh) * | 2020-04-13 | 2020-08-07 | 中铁大桥勘测设计院集团有限公司 | 一种超大型沉井的下沉方法 |
CN115637721A (zh) * | 2022-10-09 | 2023-01-24 | 中交一公局集团有限公司 | 一种桥梁墩台沉井结构下沉主动控制方法 |
-
2013
- 2013-04-12 CN CN 201320186468 patent/CN203213131U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268650A (zh) * | 2017-07-28 | 2017-10-20 | 马鞍山钢铁建设集团有限公司 | 一种工业漩流沉淀池结构不排水法沉井方法 |
CN110565670A (zh) * | 2019-08-09 | 2019-12-13 | 中铁八局集团有限公司 | 一种沉井不排水下沉施工系统及其施工方法 |
CN111364489A (zh) * | 2020-03-23 | 2020-07-03 | 中国葛洲坝集团市政工程有限公司 | 一种河道治理顶管沉井在细沙地层下的不排水下沉施工方法 |
CN111501809A (zh) * | 2020-04-13 | 2020-08-07 | 中铁大桥勘测设计院集团有限公司 | 一种超大型沉井的下沉方法 |
CN111501809B (zh) * | 2020-04-13 | 2021-07-02 | 中铁大桥勘测设计院集团有限公司 | 一种超大型沉井的下沉方法 |
CN115637721A (zh) * | 2022-10-09 | 2023-01-24 | 中交一公局集团有限公司 | 一种桥梁墩台沉井结构下沉主动控制方法 |
CN115637721B (zh) * | 2022-10-09 | 2024-04-26 | 中交一公局集团有限公司 | 一种桥梁墩台沉井结构下沉主动控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108442382B (zh) | 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法 | |
CN107313431B (zh) | 临近不等高基坑同步施工方法 | |
CN104264688B (zh) | 人工挖孔变截面桩支护施工工艺 | |
CN102094425B (zh) | 采用浅埋深拉森钢板桩作为防护围堰的基坑施工方法 | |
CN104404974B (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺 | |
CN105569064B (zh) | 一种适用于深水裸岩的设置式沉井基础施工方法 | |
CN103696784B (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN203213131U (zh) | 一种排水下沉与不排水下沉相结合的沉井 | |
CN103422510B (zh) | 钢管框架式围堰结构及施工方法 | |
CN207003499U (zh) | 一种地铁隧道上方基坑开挖的抗浮起装置 | |
CN105442532A (zh) | 桩头扩大钻孔灌注桩施工方法 | |
CN108661073A (zh) | 一种挡墙结构及其施工方法 | |
CN108951641A (zh) | 一种用于过水河道内超深综合管廊基槽的复合支护方法 | |
CN110158630A (zh) | 一种深厚覆盖层地区大跨拱桥环形地下连续墙基础 | |
CN110700280A (zh) | 一种狭小地带基坑支护施工导流装置及施工方法 | |
CN111705786A (zh) | 一种复合地层地下连续墙与钻孔灌注桩竖向结合施工的方法 | |
CN110984132B (zh) | 复杂地质条件下地下连续墙成槽的施工方法 | |
CN109610473A (zh) | 一种市政大型池体构筑物基坑支护体系的施工方法 | |
CN208934002U (zh) | 一种挡墙结构 | |
CN107700519A (zh) | 一种举升塔吊基础安装方法 | |
CN111560964B (zh) | 一种基坑后防渗体系施工方法 | |
CN106087996B (zh) | 基于自我调平反压装置的人工挖孔桩施工方法 | |
CN103866787A (zh) | 一种敞挖逆筑法混凝土防渗墙建造施工工艺 | |
CN209227546U (zh) | 双排桩结合中心岛法的深基坑复合支护结构 | |
CN104763437B (zh) | 一种强透水地层隧道开挖方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130925 Termination date: 20200412 |
|
CF01 | Termination of patent right due to non-payment of annual fee |