CN104264688B - 人工挖孔变截面桩支护施工工艺 - Google Patents
人工挖孔变截面桩支护施工工艺 Download PDFInfo
- Publication number
- CN104264688B CN104264688B CN201410564814.8A CN201410564814A CN104264688B CN 104264688 B CN104264688 B CN 104264688B CN 201410564814 A CN201410564814 A CN 201410564814A CN 104264688 B CN104264688 B CN 104264688B
- Authority
- CN
- China
- Prior art keywords
- pile
- hole
- manually digging
- construction
- digging hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 77
- 238000000034 method Methods 0.000 title claims abstract description 13
- 230000002787 reinforcement Effects 0.000 claims abstract description 26
- 239000004567 concrete Substances 0.000 claims abstract description 19
- 230000003014 reinforcing Effects 0.000 claims abstract description 14
- 238000009412 basement excavation Methods 0.000 claims abstract description 13
- 238000007667 floating Methods 0.000 claims abstract description 5
- 238000004078 waterproofing Methods 0.000 claims abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 239000004576 sand Substances 0.000 claims description 7
- 238000005452 bending Methods 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 6
- 238000009415 formwork Methods 0.000 claims description 6
- 238000002955 isolation Methods 0.000 claims description 6
- 230000005641 tunneling Effects 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,PD94bWwgdmVyc2lvbj0nMS4wJyBlbmNvZGluZz0naXNvLTg4NTktMSc/Pgo8c3ZnIHZlcnNpb249JzEuMScgYmFzZVByb2ZpbGU9J2Z1bGwnCiAgICAgICAgICAgICAgeG1sbnM9J2h0dHA6Ly93d3cudzMub3JnLzIwMDAvc3ZnJwogICAgICAgICAgICAgICAgICAgICAgeG1sbnM6cmRraXQ9J2h0dHA6Ly93d3cucmRraXQub3JnL3htbCcKICAgICAgICAgICAgICAgICAgICAgIHhtbG5zOnhsaW5rPSdodHRwOi8vd3d3LnczLm9yZy8xOTk5L3hsaW5rJwogICAgICAgICAgICAgICAgICB4bWw6c3BhY2U9J3ByZXNlcnZlJwp3aWR0aD0nODVweCcgaGVpZ2h0PSc4NXB4JyB2aWV3Qm94PScwIDAgODUgODUnPgo8IS0tIEVORCBPRiBIRUFERVIgLS0+CjxyZWN0IHN0eWxlPSdvcGFjaXR5OjEuMDtmaWxsOiNGRkZGRkY7c3Ryb2tlOm5vbmUnIHdpZHRoPSc4NS4wJyBoZWlnaHQ9Jzg1LjAnIHg9JzAuMCcgeT0nMC4wJz4gPC9yZWN0Pgo8dGV4dCB4PScxMy4zJyB5PSc1My42JyBjbGFzcz0nYXRvbS0wJyBzdHlsZT0nZm9udC1zaXplOjIzcHg7Zm9udC1zdHlsZTpub3JtYWw7Zm9udC13ZWlnaHQ6bm9ybWFsO2ZpbGwtb3BhY2l0eToxO3N0cm9rZTpub25lO2ZvbnQtZmFtaWx5OnNhbnMtc2VyaWY7dGV4dC1hbmNob3I6c3RhcnQ7ZmlsbDojRTg0MjM1JyA+SDwvdGV4dD4KPHRleHQgeD0nMjguMicgeT0nNjIuOScgY2xhc3M9J2F0b20tMCcgc3R5bGU9J2ZvbnQtc2l6ZToxNXB4O2ZvbnQtc3R5bGU6bm9ybWFsO2ZvbnQtd2VpZ2h0Om5vcm1hbDtmaWxsLW9wYWNpdHk6MTtzdHJva2U6bm9uZTtmb250LWZhbWlseTpzYW5zLXNlcmlmO3RleHQtYW5jaG9yOnN0YXJ0O2ZpbGw6I0U4NDIzNScgPjI8L3RleHQ+Cjx0ZXh0IHg9JzM1LjAnIHk9JzUzLjYnIGNsYXNzPSdhdG9tLTAnIHN0eWxlPSdmb250LXNpemU6MjNweDtmb250LXN0eWxlOm5vcm1hbDtmb250LXdlaWdodDpub3JtYWw7ZmlsbC1vcGFjaXR5OjE7c3Ryb2tlOm5vbmU7Zm9udC1mYW1pbHk6c2Fucy1zZXJpZjt0ZXh0LWFuY2hvcjpzdGFydDtmaWxsOiNFODQyMzUnID5PPC90ZXh0Pgo8L3N2Zz4K O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 6
- 241000209202 Bromus secalinus Species 0.000 claims description 4
- 238000010008 shearing Methods 0.000 claims description 4
- -1 more than the end Substances 0.000 claims description 3
- 210000001624 Hip Anatomy 0.000 abstract description 10
- 239000002689 soil Substances 0.000 description 18
- 238000007596 consolidation process Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 238000005728 strengthening Methods 0.000 description 4
- 239000002131 composite material Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000004927 clay Substances 0.000 description 2
- 229910052570 clay Inorganic materials 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 238000005755 formation reaction Methods 0.000 description 2
- 230000036536 Cave Effects 0.000 description 1
- 210000002745 Epiphyses Anatomy 0.000 description 1
- 241000731961 Juncaceae Species 0.000 description 1
- 210000003800 Pharynx Anatomy 0.000 description 1
- 239000005092 Ruthenium Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
- KJTLSVCANCCWHF-UHFFFAOYSA-N ruthenium Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [Ru] KJTLSVCANCCWHF-UHFFFAOYSA-N 0.000 description 1
- 229910052707 ruthenium Inorganic materials 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000001502 supplementation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
- E02D31/12—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/36—Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/48—Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Abstract
一种人工挖孔变截面桩支护施工工艺,沿原有支护结构内侧施工,施工步骤:(1)按照隔三挖一的工序依次开挖第一序、第二序、第三序挖孔桩(2)于桩顶设置冠梁以增强支护结构整体刚度,按设计计算要求分层施工水平支撑或锚索,待达到设计强度要求后,开挖基坑内基坑土方至坑底;(3)将坑底以上人工挖孔变截面桩找平,做好内防水,施工地下室底板,并将底板混凝土与原支护桩紧贴浇注;(4)拆除第二道加固锚索或拆除支撑,向上施工完成地下室结构;(5)坑底以上人工挖孔桩空置部分钢筋伸入地下室底板,兼作地下室结构桩和抗浮桩。解决因原支护桩与地下室外边线间余留施工空间小,或上部存在内支撑、腰梁外凸等导致大直径加固支护桩施工机械摆放不下难以施工的问题。
Description
技术领域
[0001]本发明涉及基坑加固技术,尤其是一种人工挖孔变截面异型粧在基坑内狭窄空间中进行基坑支护加固的技术。
背景技术
[0002]随着社会经济的快捷发展,城市建设规模扩大,城市用地紧张的矛盾日益突出,人们开始更多地开发利用地下空间。为保证基坑周边建(构)筑物、地下管线、道路的安全和正常使用,同时为地下室结构提供施工空间。开挖深度较大(一般大于1m)且地质条件差的深基坑开挖,普遍采用Φ 800〜1200mm大直径钢筋混凝土粧或Φ 800〜100mm厚地下连续墙结合锚索(或支撑)进行挡土支护。必要时补充止水措施,目前基坑支护设计方法和施工技术较成熟。
[0003]但由于建筑设计方案变更,增加地下室层数,需加大开挖深度,基坑超挖出现吊脚粧,原支护结构不能满足挡土要求或因施工质量原因导致坑底上支护粧断裂,原按正常使用极限状态设计的支护结构超过自身承载能力极限状态,出现支护结构破坏,需回填反压稳定后再进行加固处理的不良案例时有发生,处理不当将产生严重后果。
[0004]针对上述基坑开挖加深出现吊脚粧、或断粧的加固处理,目前多采用在基坑内密排直径Φ 180〜300mm钢管粧、密扣钢板粧或Φ 800〜1200mm大直径钢筋混凝土粧+锚索(或内支撑)进行加固处理。该加固方法支护结构受力明确,相对安全可靠,且变形较小。对工程地质条件较优良、基坑下部岩土自稳能力较好的场地,也采用复合土钉墙加固处理。但是一般情况下,已施工支护粧内边线与地下室外边线余留空间仅有800〜1200mm,且支护粧内侧上部多已施工锚索(或内支撑),腰梁外凸将进一步限制缩小加固施工空间,大型施工机械摆放空间不够,导致加固施工无法开展,坑内施工大直径支护粧或钢管粧难度较大。即使能施工,将占用地下室空间影响其功能。特别是对已出现险情,经回填反压的基坑,原支护粧与现加固支护结构之间存在软弱夹层,两者不能有效紧贴,将加大下部变形,可能导致支护结构破坏或变形过大而影响周边环境。另外对开挖深度较大的基坑,坑底开挖加深,侧向土压力成倍加大,因钢管粧直径小,或钢板粧自身刚度不大,控制粧后土体变形能力较差,需增加多道水平支撑或锚索来满足钢管粧(或钢板粧)抗弯、抗剪刚度小的缺点,工程造价增加,施工时间加长,使用受到限制。
[0005]基坑加深或加固处理如采用复合土钉墙,该加固支护形式需要分层开挖,逐层施工土钉(锚杆)。土体外露,如其自稳能力较差,增加土体坍塌破坏的风险。另外土钉(锚索)抗拔承载力小,不能满足整体稳定要求,特别是在地下水埋藏较浅的砂层场地,锚杆成孔困难,打穿已有止水帷幕,孔口涌水涌砂将导致周边不均匀沉降或坍塌。对已出现险情经回填反压的基坑加固,分层大范围竖向开挖,形成较大临空面将增加原支护结构变形的风险,或出现突发性破坏,严重限制复合土钉墙的使用。
发明内容
[0006]本发明所要解决的技术问题是提供一种人工挖孔变截面粧支护施工工艺,解决因原支护粧与地下室外边线间余留施工空间小,或上部存在内支撑、腰梁外凸等导致大直径加固支护粧施工机械摆放不下难以施工,或已出现险情经回填反压需严格控制原支护结构变形,或土质条件较差的基坑加深支护或加固的问题。
[0007]为解决上述技术问题,本发明的技术方案是:一种人工挖孔变截面粧支护施工工艺,沿原有支护结构内侧施工人工挖孔变截面粧支护,所述人工挖孔变截面粧支护由多个人工挖孔变截面粧一字排列形成,与原有支护结构之间紧密接触,其具体包括以施工步骤:
[0008] (I)间隔施工第一序挖孔粧,相邻挖孔粧之间为三个挖孔粧的直径之和,挖至坑底后,在孔内绑扎钢筋笼或整体吊装钢筋笼;坑底以下全断面浇筑砼,坑底以上按设计要求采用模板隔离浇筑成半截面粧;
[0009] (2)第一序挖孔粧达到初凝后,在相邻挖孔粧之间的中心位置施工第二序挖孔粧,然后饶筑混凝土 ;
[0010] (3)最后施工第三序挖孔粧,第三序挖孔粧位于第一序挖孔粧与第二序挖孔粧之间,施工时应挖除与其紧临的第一、二序挖孔粧的护壁;
[0011] (4)于粧顶设置冠梁以增强支护结构整体刚度,按设计计算要求分层施工水平支撑和/或锚索,待达到设计强度要求后,开挖基坑内基坑土方至坑底;
[0012] (5)将坑底以上人工挖孔变截面粧找平,做好内防水,施工地下室底板,并将底板混凝土与原支护粧紧贴浇注;
[0013] (6)拆除第二道加固锚索或拆除支撑,向上施工完成地下室结构;
[0014] (7)坑底以上人工挖孔粧空置部分钢筋伸入地下室底板,兼作地下室结构粧和抗浮粧。
[0015]作为改进,施工前,首先确定原支护结构外边线到地下室外边线之间现可使用空间大小,计算确定坑底以上人工挖孔变截面粧的宽度、配筋、所需水平向支撑或锚索间距和规格、坑底以下的支护粧嵌固深度和配筋及挖孔粧平面布置,需满足支护结构抗弯、抗剪和整体稳定及变形控制要求。
[0016]作为改进,人工挖孔粧直径一般不宜小于1200mm,第一和第二序挖孔粧粧体开挖时临空面不应全部覆盖原单根支护粧;挖孔粧现浇护壁厚150〜200mm,单节挖孔深度800〜1000mm;在粧孔内绑扎钢筋笼,坑底以下粧体全断面灌注混凝土,坑底以上按设计宽度用模板隔离浇筑混凝土,兼做地下室外墙支模,既满足加固支护要求又不影响地下室结构。
[0017]作为改进,坑底以上按设计要求采用模板隔离浇筑成半截面粧后,纵向连结成为变截面墙,空心部分回填中粗砂、振实。
[0018]本发明与现有技术相比所带来的有益效果是:
[0019] 1、人工挖孔变截面粧(墙)施工方便,不受外部条件限制,不影响已设计地下室的建设;
[0020] 2、人工挖孔粧自身刚度大,抗弯和抗剪能力强,与水平支撑或锚索相结合,能有效控制支护结构变形,特别是土质条件较差、周边环境条件复杂的超深基坑加深或加固处理;
[0021] 3、挖孔粧护壁可紧贴原支护粧,保证加固支护结构与原支护结构构成一整体,有效控制变形,特别是对已出现险情经回填反压或土质条件较差的基坑内加固;
[0022] 4、挖孔粧施工方便,坑底上下分别采用不同截面,施工方便、质量可控、工期短,节省造价;
[0023] 5、坑底以上半截面粧(墙)面找平后铺贴防水材料,兼作地下室外墙外侧支模,临时支护和永久使用相结合,既利用狭窄空间,又节省工程造价;
[0024] 6、人工挖孔变截面粧坑底以下部分空置部分钢筋伸入地下室底板,可兼作地下室主体结构粧和抗拔粧,减少抗浮工程量,节省造价,可取得最佳经济效益。
附图说明
[0025]图1人工挖孔变截面粧平面布置图。
[0026]图2变截面粧加固支护(锚索)剖面图。
[0027]图3变截面粧加固支护(内支撑)剖面图。
[0028]图4变截面粧加固支护(锁脚锚索)剖面图。
[0029]图5变截面粧竖向大样图。
[0030]图6变截面粧横断面大样图。
[0031]图7宏宇大厦人工挖孔变截面粧加固支护剖面图。
具体实施方式
[0032]下面结合说明书附图对本发明作进一步说明。
[0033]如图1至5所示,人工挖孔变截面粧支护体系由新增人工挖孔变截面支护粧、锚索和/或支撑和冠梁、腰梁组成。应用于原有支护结构承载力不足的情况下,对原有支护结构进行加固。
[0034]施工前,首先确定原支护结构外边线11到地下室外边线I之间现可使用空间大小,计算确定坑底以上人工挖孔变截面粧的宽度、配筋、所需水平向支撑或锚索间距和规格、坑底以下的支护粧嵌固深度和配筋及挖孔粧平面布置,需满足支护结构抗弯、抗剪和整体稳定及变形控制要求。
[0035] 人工挖孔粧直径一般不宜小于1200mm,粧间距根据原支护粧间距调整,原则上新设人工挖孔粧位于原支护粧之间,第一和第二序粧粧体开挖时临空面不应全部覆盖原单根支护粧。挖孔粧直径可大小不同,相间分布,挖孔粧现浇护壁厚150〜200mm,单节挖孔深度800〜1000mm,可根据土质条件适当调整。可在粧孔内绑扎钢筋笼,坑底以下粧体全断面灌注混凝土,坑底以上按设计宽度用模板隔离浇筑混凝土,兼做地下室外墙支模,既满足加固支护要求又不影响地下室结构。
[0036]计算时,应充分利用现有剩余空间,尽量加大坑底以上变截面墙体宽度,确保支护墙刚度。如侧向土压力较大,可于挖孔粧顶部加设支撑或锚索,必要时可自上而下布置多道支撑或锚索。对原支护粧配筋不够或已出现险情的深基坑,第一道加固锚索应位于粧已出现裂缝以上不小于Im处,或直接加设一道锚索锁脚。
[0037] 如图1所示,平整场地后,开展人工挖孔粧施工,应采用“隔三挖一”的施工方式,沿原有支护结构内侧施工人工挖孔变截面粧支护,所述人工挖孔变截面粧支护由多个人工挖孔变截面粧4 一字排列形成,与原有支护结构之间紧密接触,以下以锚索12加固方式进行说明,具体包括以施工步骤:
[0038] (I)间隔施工第一序挖孔粧,相邻挖孔粧之间为三个挖孔粧的直径之和,挖至坑底后,在孔内绑扎钢筋笼或整体吊装钢筋笼;坑底以下全断面浇筑砼,坑底以上按设计要求采用模板隔离浇筑成半截面粧4;纵向连结成为变截面墙,如图6所示,空心部分41回填中粗砂、振实;
[0039] (2)第一序挖孔粧达到初凝后,在相邻挖孔粧之间的中心位置施工第二序挖孔粧,然后饶筑混凝土 ;
[0040] (3)最后施工第三序挖孔粧,第三序挖孔粧位于第一序挖孔粧与第二序挖孔粧之间,施工时应挖除与其紧临的第一、二序挖孔粧的护壁3;
[0041] (4)如图2所示,凿除粧顶浮浆,施工第一道加固锚索12和冠梁8,待达到设计强度要求后,将锚索12张拉锁定;
[0042] (5)开挖土方至第二道加固锚索13于腰梁9处,施工锚索13和腰梁9,待达到设计强度要求后,将锚索13张拉锁定;
[0043] (6)开挖土方至坑底14,将坑底14以上人工挖孔变截面粧4找平,做好内防水,施工地下室底板,并将底板混凝土与原支护粧10紧贴浇注;
[0044] (7)拆除第二道加固锚索13,向上施工完成地下室5结构;
[0045] (8)坑底14以上人工挖孔粧空置部分钢筋伸入地下室5底板,兼作地下室5结构粧和抗浮粧。
[0046]如图3、4所示,上述锚索与水平支撑的施工原理一样,本实施例不在详细叙述。
[0047] 工程实例
[0048]广州宏宇大厦项目位于广州市白云区云城东路,拟建建筑物为31层塔楼及5~7层裙楼组成,地下3层,基坑周长约470米,基坑开挖深度13.9〜17.4m。基坑开挖范围土层从上至下依次为:人工填土、冲洪积成因可塑状粉质粘土和砂土、残积成因可塑局部硬塑状粉质粘土。基坑周边环境复杂,毗邻市政道路,根据开挖深度及场地地质条件,基坑选用Φ 100i1300〜1400旋挖钻孔粧+2〜3道扩大头锚索进行支护,双排Φ 5500400水泥搅拌粧止水。
[0049]基坑东侧开挖深度约13.9m,采用Φ 100001300旋挖钻孔粧+2道扩大头锚索支护。基坑土方开挖到底后,发现东北角14条粧在第二道腰梁以下相对标高-12.5m处出现连续裂缝,呈“V”字型张开,支护粧已断裂,变形不断扩大,经检测裂缝以下无配筋或配筋不够。即刻回填至第二道腰梁下,并需进行加固。但地下室外墙至原支护粧边仅剩750mm。上部已施工锚索腰梁外凸,限制了大型机械使用;已回填土质较差,如在基坑内布置大直径粧将占用地下室空间,影响其功能。采用钢板粧或钢管粧难以施工且造价高,工期较长。如图7所示,综合对比分析,采用人工挖孔变截面粧加固技术,经计算确定采用Φ 1200mm大直径挖孔粧,粧嵌固深度4m,坑底以上变截面墙厚度750mm,设置一道预应力锚索,间距2.6m,设计抗拔力720kN,锁定值600kN。粧墙抗弯、抗剪需满足规范要求,考虑到原支护粧施工凹凸不平,变截面墙的计算宽度取650mm;考虑到原支护粧已断裂且变形较大,裂缝位置水平位移已达到32mm,在标高-10.0Om位置先施工一道锁脚扩大头锚索,间距2.6m,增强原支护体系的稳定性。
[0050] 整平填土至-9.50m处,施工锁脚锚索和腰梁YM2,待其达到设计要求强度后,张拉锁定。向下开挖至-11.50m,按次序施工第一、二、三序人工挖孔粧,坑底以上采用模板支模隔离后再浇注砼。空粧部分用中粗砂(或粘性土)回填,确保粧身裂缝位于挖孔粧粧顶以下。凿除粧顶浮浆施工锚索和冠梁,待其达到设计强度后,张拉锁定,向下开挖土方至坑底,施工地下室底板,并将人工挖孔变截面墙找平,做好内防水,将底板与挖孔粧紧贴浇筑,变截面粧兼作地下室外支模,向上施工完成地下室结构。坑底以下挖孔粧预留钢筋伸入地下室底板,和原支护粧结合兼作抗浮粧。目前,地下室已施工至±0.00标高并回填,后期变形小于20_,在可控范围之内O
Claims (4)
1.一种人工挖孔变截面粧支护施工工艺,其特征在于:沿原有支护结构内侧施工人工挖孔变截面粧支护,所述人工挖孔变截面粧支护由多个人工挖孔变截面粧一字排列形成,与原有支护结构之间紧密接触,其具体包括以下施工步骤: (1)间隔施工第一序人工挖孔变截面粧,相邻人工挖孔变截面粧之间为三个人工挖孔变截面粧的直径之和,挖至坑底后,在孔内绑扎钢筋笼或整体吊装钢筋笼;坑底以下全断面浇筑砼,坑底以上按设计要求采用模板隔离浇筑成变截面粧; (2)第一序人工挖孔变截面粧达到初凝后,在相邻人工挖孔变截面粧之间的中心位置施工第二序人工挖孔变截面粧,然后浇筑混凝土 ; (3)最后施工第三序人工挖孔变截面粧,第三序人工挖孔变截面粧位于第一序人工挖孔变截面粧与第二序人工挖孔变截面粧之间,施工时应挖除与其紧临的第一、二序人工挖孔变截面粧的护壁; (4)于粧顶设置冠梁以增强支护结构整体刚度,按设计计算要求分层施工水平支撑和/或锚索,待达到设计强度要求后,开挖基坑内基坑土方至坑底; (5)将坑底以上人工挖孔变截面粧找平,做好内防水,施工地下室底板,并将底板混凝土与原支护结构紧贴浇注; (6)拆除第二道加固锚索或拆除支撑,向上施工完成地下室结构; (7)坑底以上人工挖孔变截面粧空置部分钢筋伸入地下室底板,兼作地下室结构粧和抗浮粧。
2.根据权利要求1所述的人工挖孔变截面粧支护施工工艺,其特征在于:施工前,首先确定原支护结构外边线到地下室外边线之间可使用空间大小,计算确定坑底以上人工挖孔变截面粧的宽度、配筋、所需水平向支撑或锚索间距和规格、坑底以下的人工挖孔变截面粧嵌固深度和配筋及人工挖孔变截面粧平面布置,需满足支护结构抗弯、抗剪和整体稳定及变形控制要求。
3.根据权利要求1所述的人工挖孔变截面粧支护施工工艺,其特征在于:人工挖孔变截面粧直径不小于1200mm,第一和第二序人工挖孔变截面粧粧体开挖时临空面不应全部覆盖原单根支护粧;人工挖孔变截面粧现浇护壁厚150〜200mm,单节挖孔深度800〜1000mm;在粧孔内绑扎钢筋笼,坑底以下粧体全断面灌注混凝土,坑底以上按设计宽度用模板隔离浇筑混凝土,兼做地下室外墙支模,既满足加固支护要求又不影响地下室结构。
4.根据权利要求1所述的人工挖孔变截面粧支护施工工艺,其特征在于:坑底以上按设计要求采用模板隔离浇筑成变截面粧后,纵向连接成为变截面墙,空心部分回填中粗砂、振实。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410564814.8A CN104264688B (zh) | 2014-10-22 | 2014-10-22 | 人工挖孔变截面桩支护施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410564814.8A CN104264688B (zh) | 2014-10-22 | 2014-10-22 | 人工挖孔变截面桩支护施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104264688A CN104264688A (zh) | 2015-01-07 |
CN104264688B true CN104264688B (zh) | 2016-06-08 |
Family
ID=52156252
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410564814.8A Active CN104264688B (zh) | 2014-10-22 | 2014-10-22 | 人工挖孔变截面桩支护施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104264688B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106894420B (zh) * | 2015-05-22 | 2018-08-10 | 朱奎 | 地下室支护施工方法 |
CN104947686B (zh) * | 2015-06-11 | 2016-11-30 | 叶长青 | 软土地区地下室支护结构 |
CN105421468B (zh) * | 2015-11-24 | 2017-10-10 | 叶长青 | 无混凝土对撑的地下室支护 |
CN105970972A (zh) * | 2016-06-21 | 2016-09-28 | 中铁第四勘察设计院集团有限公司 | 一种新型咬合桩支护结构及其施工方法 |
CN106780723A (zh) * | 2016-12-16 | 2017-05-31 | 上海岩土工程勘察设计研究院有限公司 | 一种利用bim技术实现基坑快速参数化三维建模的方法 |
CN107460882B (zh) * | 2017-06-20 | 2019-11-26 | 中冶天工集团有限公司 | 一种深基坑封闭止水的支护排桩施工方法 |
CN107514003A (zh) * | 2017-10-23 | 2017-12-26 | 上海市城市建设设计研究总院(集团)有限公司 | 变截面钻孔灌注支护桩结构及其施工方法 |
CN109190323B (zh) * | 2018-11-09 | 2019-05-28 | 广东省建筑设计研究院 | 一种适用于狭窄基坑单层支撑条件下的嵌固稳定性分析方法 |
CN112177010A (zh) * | 2020-09-02 | 2021-01-05 | 中冶天工集团有限公司 | 一种混合型冠梁模板预制外骨架及其施工方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101591914B (zh) * | 2009-06-25 | 2010-12-29 | 江苏华东建设基础工程有限公司 | 一种用灌注桩和搅拌桩咬合的基坑支护结构的施工方法 |
KR101241566B1 (ko) * | 2010-08-06 | 2013-03-11 | 이상헌 | 띠장 겸용 캡 빔을 이용한 흙막이 가시설의 시공방법 |
CN103669369B (zh) * | 2013-12-23 | 2015-11-04 | 中国建筑第八工程局有限公司 | 基坑的支护结构及支护方法 |
CN103938637B (zh) * | 2014-04-14 | 2016-04-06 | 叶长青 | 夹硬层软土地质刚柔组合桩基坑支护施工方法 |
-
2014
- 2014-10-22 CN CN201410564814.8A patent/CN104264688B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104264688A (zh) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104264688B (zh) | 人工挖孔变截面桩支护施工工艺 | |
CN105672348A (zh) | 一种深水区砂卵石地层截除桥梁桩基的施工方法 | |
CN103774675B (zh) | 组合双排桩联合竖向预应力锚杆支护体系的施工方法 | |
CN102660955B (zh) | 一种基坑边坡支护的快速施工方法 | |
CN104612143A (zh) | 一种溶洞/土洞地质条件下的钻孔复合桩结构 | |
CN107503754A (zh) | 一种ⅵ级围岩富水浅埋大断面隧道的施工方法 | |
CN105178327A (zh) | 一种基坑工程的复合围护结构及其施工方法 | |
CN108532586A (zh) | 一种停车库用地下连续墙的施工方法 | |
CN110284885A (zh) | 盾构检修井施工方法 | |
CN111560962A (zh) | 一种回填区基坑支护结构及其施工方法 | |
CN106930321B (zh) | 一种大直径顶管结合洞桩修建地下结构的施工方法 | |
CN105714748A (zh) | 一种碎石沙土层中的调压井开挖施工方法 | |
CN205013013U (zh) | 适用于上软下硬地层的暗挖车站支护结构 | |
CN204311456U (zh) | 基坑加固结构 | |
CN110159294A (zh) | 一种高陡地形桥隧相接段接长明洞施工方法 | |
CN103696784A (zh) | 一种浅埋大跨隧道下穿建构筑物的大直径长管幕施工方法 | |
CN203729309U (zh) | 组合双排桩联合竖向预应力锚杆支护体系 | |
CN109610473A (zh) | 一种市政大型池体构筑物基坑支护体系的施工方法 | |
CN212642730U (zh) | 一种湿陷性黄土地区隧道穿越人防结构 | |
CN106087996B (zh) | 基于自我调平反压装置的人工挖孔桩施工方法 | |
CN107700519A (zh) | 一种举升塔吊基础安装方法 | |
KR101021913B1 (ko) | 흙막이 공사용 차수 가시설 시공방법 | |
CN109653193B (zh) | 逆作地下连续墙施工方法 | |
CN105350547A (zh) | 一种用于护坡桩桩间土支护的方法 | |
CN206368375U (zh) | 一种输电铁塔用基础 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |