CN107191001B - 拆建房屋地基的基础加固施工方法 - Google Patents

拆建房屋地基的基础加固施工方法 Download PDF

Info

Publication number
CN107191001B
CN107191001B CN201710436016.0A CN201710436016A CN107191001B CN 107191001 B CN107191001 B CN 107191001B CN 201710436016 A CN201710436016 A CN 201710436016A CN 107191001 B CN107191001 B CN 107191001B
Authority
CN
China
Prior art keywords
steel
foundation
pile
cement mixing
bearing capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710436016.0A
Other languages
English (en)
Other versions
CN107191001A (zh
Inventor
叶香菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Jianlin Reinforcement Engineering Co.,Ltd.
Original Assignee
叶香菲
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶香菲 filed Critical 叶香菲
Priority to CN201710436016.0A priority Critical patent/CN107191001B/zh
Publication of CN107191001A publication Critical patent/CN107191001A/zh
Application granted granted Critical
Publication of CN107191001B publication Critical patent/CN107191001B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0229Increasing or restoring the load-bearing capacity of building construction elements of foundations or foundation walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D37/00Repair of damaged foundations or foundation structures

Abstract

本发明公开了一种拆建房屋地基的基础加固施工方法,其特征是改造后房屋的基础采用筏板基础,筏板基础厚度为600~800mm,筏板基础由削低后承台和新浇基础构成,承台和新浇基础通过连接筋连成整体,承台内设置后浇孔,后浇孔直径与混凝土桩相同。在承台之外布置小直径混凝土桩,小直径混凝土桩直径为150~300mm,顶部混凝土桩削除100~150mm,并在桩顶设置橡胶块,橡胶块厚度为100~150mm;小直径混凝土桩桩头设置预制混凝土管箍,小直径混凝土桩桩顶铺设碎石砂垫层。

Description

拆建房屋地基的基础加固施工方法
技术领域
本发明涉及一种基础加固结构,特别涉及一种拆建房屋地基的基础加固施工方法。
背景技术
随着城市建设的发展,一些危旧房屋需要改造,原有危旧房屋通常层数比较低,传递给地基的荷载较小,所以地基处理后的承载力相对较低。而改造后房屋的层数可能会比原有危旧房屋要高得多,传递给地基的荷载也会较大,地基必须重新处理才能满足承载力要求。由于原有危旧房屋的桩基和改造后房屋的桩基具有较大的不同,如果处理不妥当容易造成局部地基变形不均匀,造成不均匀沉降。
发明内容
针对现有技术中存在的不足,本发明的目的在于提供一种拆建房屋地基的基础基础加固施工方法来确保房屋沉降和承载性能达到要求。
危旧房屋的地基处理有两种形式:一是采用刚性桩如混凝土桩进行加固,基础型式通常为承台基础;二是采用柔性桩如水泥搅拌桩进行加固,基础型式通常为筏板基础。本发明针对第二种地基处理形式采用相应技术方案。
对于采用柔性桩如水泥搅拌桩进行加固的基础,采用以下技术方案:
改造后房屋的基础采用筏板基础,筏板基础厚度为600~800mm。为了提升地基承载力和抗变形能力,在部分水泥搅拌桩中插入工字钢,工字钢长度为水泥搅拌桩长度的1.8~2.5倍。工字钢设置部位设置后浇孔,后浇孔直径与水泥搅拌桩直径相同。为了避免在受力过程中应力集中,在工字钢铺设橡胶块,橡胶块厚度为150~200mm。工字钢承载后后浇孔部位所受到的抗冲切力会较大,故在后浇孔部位设置加强筋,加强筋为4根直径为25mm的钢筋,同时设置间距为200mm的箍筋,箍筋直径为8mm。
工字钢数量根据承载力要求和沉降控制要求双重控制,工字钢数量先根据承载力初步确定,工字钢数量G根据下式确定,G=m2gAz/Ap2g,Az为筏板基础底部面积,m2g为工字钢置换率,即桩总截面积与筏板基础底部面积的比值,Ap2g为工字钢截面积,工字钢置换率m2g根据下式确定,
f=m1sR1s/Ap1s+(Ec2g/Ec1s)m2gR2g/Ap2g+β(Es/Ec1s)fs,式中m1s为未插入工字钢的水泥搅拌桩置换率,即未插入工字钢的水泥搅拌桩总截面积与筏板基础底部面积的比值,R1s为水泥搅拌桩承载力,Ap1s为水泥搅拌桩截面积,Ec1s为水泥搅拌桩弹性模量,Ec2g为工字钢弹性模量,m2g为工字钢置换率,R2g为工字钢承载力,Ap2g为工字钢截面积,β为折减系数,取0.7~0.8,Es为土弹性模量,fs为土地基承载力。
根据承载力要求初步确定工字钢数量后进行沉降复核。沉降计算公式采用如下:式中p是上部传递给地基的应力,Esi是复合模量,Zi和Zi-i为基础底面分别至第i层和第i-1层底面范围内的深度,为基础底面分别至第i层和第i-1层底面范围内的平均附加应力系数,根据《建筑地基处理技术规范》(JGJ-79-91)来确定,整个地基的复合模量沿深度方向可分为三部分,第一部分为水泥搅拌桩、工字钢和土形成的地基,第二部分为工字钢和土形成的地基,第三部分为下卧层土形成的地基。
第一部分复合模量Es1s计算公式采用如下:Es1s=m1sEc1s+m2gEc2g+(1-m1s-m2g)Es,第二部分复合模量Es2s计算公式采用如下:Es2s=m2gEc2g+(1-m2g)Es
如果沉降超过100mm,则增加工字钢长度和数量进行重新沉降复核,直至沉降达到要求为止。
施工步骤包括:
(1)将安装工字钢部位的筏板混凝土凿除出后浇孔,并割除上部多余的钢筋;
(2)钻机钻具穿过后浇孔在水泥搅拌桩桩身钻设工字槽,钻机头部安装工字刀具来切削水泥土,采用吊机吊起工字钢,工字钢插入工字槽过程中通过定位钢板来保证垂直度;
(3)工字钢插入完毕后注入水玻璃封闭工字钢与工字槽的空隙,水玻璃注入压力为1~1.2MPa,以保证注浆效果。
(4)在工字钢顶部铺设橡胶块;
(5)待房屋达到三层以后再在后浇孔放入由加强筋和箍筋组成的钢筋笼;由于工字钢刚度明显比水泥搅拌桩刚度或者土刚度要大得多,在上部荷载作用下容易先承载,水泥搅拌桩承载能力特别是土承载能力难以获得发挥,后浇孔待房屋达到三层以后再封闭目的是让水泥搅拌桩和土先参与承载,待层数增加水泥搅拌桩、工字钢和土协同承载的能力会进一步增强。
(6)浇筑后浇孔,后浇孔采用膨胀混凝土;后浇孔浇筑顺序为先周边后中间,并尽量采用对称封闭的方式,使工字钢承载时比较均匀。
本发明施工操作方便,安全可靠。
附图说明
图1为带柔性桩基础形式的筏板基础平面示意图。
1、橡胶块,2、后浇孔,3、水泥搅拌桩,4、工字钢。
具体实施方式
实施例
本实施例中对于采用柔性桩如水泥搅拌桩3进行加固的基础,采用以下技术方案:
改造后房屋的基础采用筏板基础,筏板基础厚度为700mm,水泥搅拌桩3长度为15m,在部分水泥搅拌桩3中插入工字钢4,工字钢4长度为30m。工字钢4设置部位筏板基础设置后浇孔2,后浇孔2直径与水泥搅拌桩3直径相同。在工字钢4铺设橡胶块1,橡胶块1厚度为180mm。在后浇孔2部位设置加强筋,加强筋为4根直径为25mm的钢筋,同时设置间距为200mm的箍筋,箍筋直径为8mm。
工字钢4数量根据承载力要求和沉降控制要求双重控制,工字钢4数量先根据承载力初步确定,工字钢4数量G根据下式确定,G=m2gAz/Ap2g,Az为筏板基础底部面积,m2g为工字钢4置换率,即桩总截面积与筏板基础底部面积的比值,Ap2g为工字钢4截面积,工字钢4置换率m2g根据下式确定,
f=m1sR1s/Ap1s+(Ec2g/Ec1s)m2gR2g/Ap2g+β(Es/Ec1s)fs,式中m1s为未插入工字钢4的水泥搅拌桩3置换率,即未插入工字钢4的水泥搅拌桩3总截面积与筏板基础底部面积的比值,R1s为水泥搅拌桩3承载力,Ap1s为水泥搅拌桩3截面积,Ec1s为水泥搅拌桩3弹性模量,Ec2g为工字钢4弹性模量,m2g为工字钢4置换率,R2g为工字钢4承载力,Ap2g为工字钢4截面积,β为折减系数,取0.75,Es为土弹性模量,fs为土地基承载力;
根据承载力要求初步确定工字钢4数量后进行沉降复核。沉降计算公式采用如下:式中p是上部传递给地基的应力,Esi是复合模量,Zi和Zi-1为基础底面分别至第i层和第i-1层底面范围内的深度,为基础底面分别至第i层和第i-1层底面范围内的平均附加应力系数,根据《建筑地基处理技术规范》(JGJ-79-91)来确定,整个地基的复合模量沿深度方向可分为三部分,第一部分为水泥搅拌桩3、工字钢4和土形成的地基,第二部分为工字钢4和土形成的地基,第三部分为下卧层土形成的地基。
第一部分复合模量Es1s计算公式采用如下:Es1s=m1sEc1s+m2gEc2g+(1-m1s-m2g)Es,第二部分复合模量Es2s计算公式采用如下:Es2s=m2gEc2g+(1-m2g)Es
如果沉降超过100mm,则增加工字钢4长度和数量进行重新沉降复核,直至沉降达到要求为止。根据上述步骤,工字钢4数量确定为76根。
施工步骤包括:
(1)将安装工字钢4部位的筏板混凝土凿除出后浇孔2,并割除上部多余的钢筋;
(2)钻机钻具穿过后浇孔2在水泥搅拌桩3桩身钻设工字槽,钻机头部安装工字刀具来切削水泥土,采用吊机吊起工字钢4,工字钢4插入工字槽过程中通过定位钢板来保证垂直度;
(3)工字钢4插入完毕后注入水玻璃封闭工字钢4与工字槽的空隙,水玻璃注入压力为1~1.2MPa,以保证注浆效果。
(4)在工字钢4顶部铺设橡胶块1;
(5)待房屋达到三层以后再在后浇孔2放入由加强筋和箍筋组成的钢筋笼;
(6)浇筑后浇孔2,后浇孔2采用膨胀混凝土;后浇孔2浇筑顺序为先周边后中间,并尽量采用对称封闭的方式。

Claims (1)

1.一种拆建房屋地基的基础加固施工方法,其特征是对于采用柔性桩如水泥搅拌桩进行加固的基础,采用以下技术方案:
改造后房屋的基础采用筏板基础,筏板基础厚度为600~800mm,在部分水泥搅拌桩中插入工字钢,工字钢长度为水泥搅拌桩长度的1.8~2.5倍;工字钢设置部位设置后浇孔,后浇孔直径与水泥搅拌桩直径相同;在工字钢铺设橡胶块,橡胶块厚度为150~200mm;在后浇孔部位设置加强筋,加强筋为4根直径为25mm的钢筋,同时设置间距为200mm的箍筋,箍筋直径为8mm;
工字钢数量根据承载力要求和沉降控制要求双重控制,工字钢数量先根据承载力初步确定,工字钢数量G根据下式确定,G=m2gAz/Ap2g,Az为筏板基础底部面积,m2g为工字钢置换率,即桩总截面积与筏板基础底部面积的比值,Ap2g为工字钢截面积,工字钢置换率m2g根据下式确定,
f=m1sR1s/Ap1s+(Ec2g/Ec1s)m2gR2g/Ap2g+β(Es/Ec1s)fs,式中m1s为未插入工字钢的水泥搅拌桩置换率,即未插入工字钢的水泥搅拌桩总截面积与筏板基础底部面积的比值,R1s为水泥搅拌桩承载力,Ap1s为水泥搅拌桩截面积,Ec1s为水泥搅拌桩弹性模量,Ec2g为工字钢弹性模量,m2g为工字钢置换率,R2g为工字钢承载力,Ap2g为工字钢截面积,β为折减系数,取0.7~0.8,Es为土弹性模量,fs为土地基承载力;
根据承载力要求初步确定工字钢数量后进行沉降复核;沉降计算公式采用如下:,式中p是上部传递给地基的应力,Esi是复合模量,为基础底面分别至第i层和第i-1层底面范围内的深度,为基础底面分别至第i层和第i-1层底面范围内的平均附加应力系数,根据《建筑地基处理技术规范》(JGJ-79-91)来确定,整个地基的复合模量沿深度方向可分为三部分,第一部分为水泥搅拌桩、工字钢和土形成的地基,第二部分为工字钢和土形成的地基,第三部分为下卧层土形成的地基;
第一部分复合模量Es1s计算公式采用如下:Es1s=m1sEc1s+m2gEc2g+(1-m1s-m2g)Es,第二部分复合模量Es2s计算公式采用如下:Es2s=m2gEc2g+(1-m2g)Es
如果沉降超过100mm,则增加工字钢长度和数量进行重新沉降复核,直至沉降达到要求为止。
CN201710436016.0A 2016-11-22 2016-11-22 拆建房屋地基的基础加固施工方法 Active CN107191001B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710436016.0A CN107191001B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础加固施工方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710436016.0A CN107191001B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础加固施工方法
CN201611089336.5A CN106592658B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础施工方法

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201611089336.5A Division CN106592658B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础施工方法

Publications (2)

Publication Number Publication Date
CN107191001A CN107191001A (zh) 2017-09-22
CN107191001B true CN107191001B (zh) 2019-05-03

Family

ID=58594627

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201611089336.5A Active CN106592658B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础施工方法
CN201810325126.4A Active CN108425387B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础加固施工技术
CN201810323695.5A Active CN108547337B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础施工技术
CN201710436016.0A Active CN107191001B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础加固施工方法

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201611089336.5A Active CN106592658B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础施工方法
CN201810325126.4A Active CN108425387B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础加固施工技术
CN201810323695.5A Active CN108547337B (zh) 2016-11-22 2016-11-22 拆建房屋地基的基础施工技术

Country Status (1)

Country Link
CN (4) CN106592658B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532624B (zh) * 2018-05-31 2020-05-19 广东工业大学 一种化学品罐筏板基础加固结构
CN111173052A (zh) * 2019-04-04 2020-05-19 中建二局第三建筑工程有限公司 筏板结构及用该结构进行木结构基础下沉修复的施工方法
CN110359475A (zh) * 2019-07-25 2019-10-22 广东庆余堂建筑科技有限公司 免开挖加固筏板基础的结构及其施工方法
CN111576920B (zh) * 2020-06-03 2021-09-10 中天建设集团有限公司 一种拆建房屋地基的加固基础及其施工方法
CN114215380A (zh) * 2021-12-25 2022-03-22 金瀚建设有限公司 既有建筑筏板基础接长施工方法

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005027107A1 (de) * 2005-06-10 2006-12-14 Sedra Gmbh Schottergleis mit Betondecke
CN1970897A (zh) * 2005-11-23 2007-05-30 张准胜 既有建筑物及公共用地下构筑地下空间结构的方法与装置
CN101294396A (zh) * 2008-06-13 2008-10-29 朱奎 不同刚度组合桩复合地基及其处理方法
CN201554047U (zh) * 2009-11-20 2010-08-18 高振伟 用于灌浆法修补地下建筑帷幕缺陷的灌浆管
CN101935986B (zh) * 2010-10-09 2011-12-28 中铁八局集团第一工程有限公司 一种水上大跨度钢管桩现浇支架及其搭建方法
CN103205979B (zh) * 2013-03-15 2015-04-08 中国十七冶集团有限公司 高温环境下大型筏基施工方法
CN103195114B (zh) * 2013-03-29 2015-07-08 中国建筑第八工程局有限公司 一种软弱地质条件下高层建筑基础加固施工方法
CN103321118B (zh) * 2013-07-09 2015-07-08 中铁第四勘察设计院集团有限公司 一种深厚层松软土地区的桥路过渡段路基结构
CN203795451U (zh) * 2014-02-19 2014-08-27 中铁第四勘察设计院集团有限公司 缺陷预制打入桩地基的补强加固结构
CN104912067A (zh) * 2014-03-15 2015-09-16 温州荣强海洋科技有限公司 一种高压旋喷螺纹桩
US9290957B1 (en) * 2014-12-31 2016-03-22 Fortress Stabilization Systems Structure reinforcement system and method
US9903085B2 (en) * 2015-03-11 2018-02-27 4D Tech Solutions, Inc. Pile repair clamp

Also Published As

Publication number Publication date
CN106592658B (zh) 2018-11-09
CN108425387A (zh) 2018-08-21
CN107191001A (zh) 2017-09-22
CN108547337A (zh) 2018-09-18
CN108547337B (zh) 2020-02-28
CN106592658A (zh) 2017-04-26
CN108425387B (zh) 2020-02-04

Similar Documents

Publication Publication Date Title
CN107191001B (zh) 拆建房屋地基的基础加固施工方法
CN100572683C (zh) 大直径超深入岩钻孔扩底灌注桩施工方法
EP3839149A1 (en) Grouting consolidation method for full casing borehole guide prefabricated pile and prefabricated pile therefor
CN102444142B (zh) 一种群桩改柱扩建地下室及其施工工法
CN101358453A (zh) 复合型套箱围堰及其建造方法
CN104631438B (zh) 长螺旋钻孔压灌混凝土抗拔桩施工方法
CN110331992A (zh) 一种洞口大管棚施工方法
CN108442395A (zh) 锁扣钢管桩围堰施工方法
CN103422510B (zh) 钢管框架式围堰结构及施工方法
CN102121251A (zh) 一种在深水倾斜河床上浇筑桥梁主塔墩基础的施工方法
CN108166483A (zh) 钻孔灌注桩施工方法
CN102653945A (zh) 基础托换结构及其施工方法
CN111608210A (zh) 一种饱水粉砂地层承压型抗浮锚杆施工方法
CN206971247U (zh) 一种置于卸荷岩体上的混凝土趾板基础加固结构
CN106400807B (zh) 海工驳船灌浆方法及其设备
CN108179759A (zh) 导向井水下钻芯掏槽无封底方法
CN207109804U (zh) 一种软土地基灌注桩快速接长结构配置
CN106400745B (zh) 一种海工驳船作业方法及设备
CN205062809U (zh) 一种端承型螺纹芯组合桩
CN107476293A (zh) 一种软土地基灌注桩快速接长结构配置及其接长方法
CN110144978B (zh) 一种抗浮锚杆施工方法
CN207659988U (zh) 地下厂房岩壁吊车梁现状基础加固结构
CN106400860B (zh) 海工块石基床加固方法及设备
CN201172826Y (zh) 深基坑围护墙挡土加固结构
CN109629587A (zh) 用于库岸陡坡的钢沉箱桩体结构及施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 245400 building 3, Yaoshun Avenue, Haiyang Town, Xiuning County, Huangshan City, Anhui Province

Patentee after: Ye Xiangfei

Address before: 325000 Zhejiang city of Wenzhou Province Economic and Technological Development Zone Shacheng five a Street Street No. 30

Patentee before: Ye Xiangfei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201230

Address after: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee after: Guangxi Xin Bin Cheng Machinery Co.,Ltd.

Address before: 245400 building 3, Yaoshun Avenue, Haiyang Town, Xiuning County, Huangshan City, Anhui Province

Patentee before: Ye Xiangfei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211223

Address after: 410000 room 1410, Shangcheng Constellation Building, No. 1, Renmin Middle Road, Yuhua District, Changsha City, Hunan Province

Patentee after: Changsha Jianlin Reinforcement Engineering Co.,Ltd.

Address before: 537100 Comprehensive Economic Development Zone of Three-invested Enterprises in Gangnan District, Guigang City, Guangxi Zhuang Autonomous Region (near the traffic lights of Jiangnan Industrial Zone)

Patentee before: Guangxi Xin Bin Cheng Machinery Co.,Ltd.