CN103076636B - The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization - Google Patents

The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization Download PDF

Info

Publication number
CN103076636B
CN103076636B CN201210583138.XA CN201210583138A CN103076636B CN 103076636 B CN103076636 B CN 103076636B CN 201210583138 A CN201210583138 A CN 201210583138A CN 103076636 B CN103076636 B CN 103076636B
Authority
CN
China
Prior art keywords
electrode
induced polarization
real
pilot hole
directed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210583138.XA
Other languages
Chinese (zh)
Other versions
CN103076636A (en
Inventor
李术才
刘斌
王传武
聂利超
宋杰
刘征宇
孙怀凤
许新骥
徐磊
郝亭宇
周浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Bai20 Huitong Engineering Technology Co ltd
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201210583138.XA priority Critical patent/CN103076636B/en
Publication of CN103076636A publication Critical patent/CN103076636A/en
Application granted granted Critical
Publication of CN103076636B publication Critical patent/CN103076636B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses the real-time detecting water by pilot hole device of a kind of constructing tunnel orientation with drilling induced polarization, comprise drill bit, high-strength insulation with drill bushing cylinder and directed induced polarization exploration system, described drill bit connects high-strength insulation with drill bushing cylinder by connection bearing, lays directed induced polarization exploration system at high-strength insulation with drill bushing cylinder periphery.Present invention also offers a kind of corresponding real-time detecting water by pilot hole method of constructing tunnel orientation with drilling induced polarization.Present invention obviates the interference of construction environment, Effect on Detecting is better, improves the utilization ratio of advance borehole.The present invention realizes current oriention, breaks through hole wall place low-resistance, expands investigative range.The present invention also protects electrode, ensures electrode and the good coupling contact of Rock And Soil.

Description

The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization
Technical field
The present invention relates to a kind of orientation with drilling induced polarization exploration predictor and method in constructing tunnel process, specifically one relates in constructing tunnel process, while workplace drilling rod creeps into forward, do not affecting under the condition of creeping into, adopt directed induced polarization exploration system, the apparatus and method of real-time detection and forecast are made to the moisture situation in workplace front during constructing tunnel.
Background technology
Gushing water mud disaster of dashing forward is the significant challenge and a difficult problem that face in constructing tunnel, often causes serious economic loss and production safety problem.At Tunnel during Construction, the moisture situation verifying in face of construction working side in advance has vital role for avoiding gushing water mud disaster of dashing forward.Advanced levels probing is a kind of detecting water by pilot hole method conventional at present, by arranging 1-3 boring on tunnel front, carrying out Advance Drilling, detecting the moisture situation in front, tunnel front.Advanced levels probing is a kind of directly spy water method, if boring can directly disclose moisture tectonic structure, then can verify moisture situation accurately; If but the bore position chosen does not deposit region in moisture architectonic tax, then cannot disclose moisture tectonic structure, omit gushing water and to dash forward mud disaster source, cause wrong report.Therefore, bore detecting scope is less, only can make water content situation in boring aperture and detecting, and there is the problem of " a peephole view ".
In order to detect the moisture situation around boring in Rock And Soil, improve the investigative range of probing, in the probing of ground, people mainly adopt geophysical prospecting method in hole, as resistivity method in geological radar method, hole in seismic wave method, hole in hole etc., achieve good effect, for the problem solving tunnel front Advance Drilling provides reference.But tunnel front Advance Drilling is visited water and be there are some comparatively special problems, and the auxiliary geophysical prospecting method making ground drill cannot be applied directly in tunnel.A kind of detecting water by pilot hole predictor that the patent of application number 201210182857.0 proposes because investigation depth is low, by metallic drilling rod interference and affect relatively more serious, extensively promoted in actual applications.For the problems referred to above, the present invention proposes the real-time detecting water by pilot hole apparatus and method of the directed induced polarization of a kind of constructing tunnel.For the present invention, the particular challenge in tunnel is specific as follows: (1) constructing tunnel duration is general more urgent, keeps for the geophysical exploration time in probing and hole very limited, needs to propose a kind of real-time detection apparatus and method with boring; (2) drill bit and drilling rod are all that high-strength steel makes, very large to induced polarization exploration interference, and drill bit and drilling rod cannot directly install induced polarization exploration system, need the measurement while drilling device that design invention is special; (3) in one borehole, the induced polarization exploration degree of depth is limited, needs to propose a kind of detection form improving investigation depth; (4) data process and interpretation consuming time longer of general geophysical exploration, and Advance Drilling can provide result of detection in real time, in order to synchronous with Advance Drilling, needs to propose a kind of real time data processing and interpretation procedure.
Summary of the invention
The object of the invention is to overcome above-mentioned the deficiencies in the prior art, providing the induced polarization of a kind of constructing tunnel orientation with drilling real-time detecting water by pilot hole apparatus and method, these apparatus and method can make real-time continuous forecast to front, tunnel front water content situation.
To achieve these goals, the present invention adopts following technical scheme.
The real-time detecting water by pilot hole device of a kind of constructing tunnel orientation with drilling induced polarization, comprise drill bit, high-strength insulation with drill bushing cylinder and directed induced polarization exploration system, described drill bit connects high-strength insulation with drill bushing cylinder by connection bearing, directed induced polarization exploration system is laid with drill bushing cylinder periphery at high-strength insulation, realize Advance Drilling to carry out in real time with the synchronous of induced polarization exploration, the data gathered are by quick decomposition method, with apparent resistivity and apparent chargeability for parameter, real-time continuous forecast is made to the moisture situation in front, tunnel front.
Described directed induced polarization exploration system comprises directed transmitting electrode system and observation electrode system, and directed transmitting electrode system comprises transmitting electrode, two auxiliary power supply electrodes and plain metal electrode, and observation electrode system comprises two observation electrodes do not polarized; Described two auxiliary power supply electrodes are separately fixed at transmitting electrode both sides, and plain metal electrode is positioned at tunnel; Described observation electrode system is between transmitting electrode and an auxiliary power supply electrode, and all electrodes of directed induced polarization exploration system are all connected with on-the-spot main frame by cable.
Described two auxiliary power supply electrodes are equal with the distance of transmitting electrode.
Described observation electrode is equidistantly laid between transmitting electrode and an auxiliary power supply electrode.
When carrying out work, feed and the same sex electric current of the equal size of transmitting electrode auxiliary power supply electrode, in observation, electrode system place carries out data acquisition.Under general state, transmitting electrode transmitter current can drill directional divergence to parallel probing with vertical, and cause the linear electric current density on detection direction needed for induced polarization i.e. vertical probing direction little, investigation depth is restricted.In the present invention, auxiliary power supply electrode runs parallel is powered in probing direction, and orientable compressing transmitting electrode transmitter current is concentrated to vertical probing direction orientation, realizes current oriention, increases the strength of current on detection direction needed for induced polarization, increase investigation depth.
Described connection bearing rear end connects high-strength insulation with drill bushing cylinder with the form of draw-in groove.
Described high-strength insulation is with drill bushing cylinder, and entire body adopts high-strength PVC insulating material, and diameter is less than bore diameter, is connected with drill bit by connection bearing.Connection bearing is fixed on drill bit, rear end with draw-in groove form and high-strength insulation with boring sleeve connection.Directed induced polarization exploration system is laid in high-strength insulation with on drill bushing cylinder, and in drilling process, high-strength insulation only advances with drilling rod with drill bushing cylinder, but does not rotate with drilling rod, can ensure the stable operation of directed induced polarization exploration security of system.Metal drill pipe and directed induced polarization electrode isolation are opened with drill bushing cylinder by high-strength insulation, make induced polarization exploration by metallic drilling rod interference and affect, achieve the synchronous of Advance Drilling and directed induced polarization exploration simultaneously and carry out in real time.
In directed induced polarization exploration system, except plain metal electrode, all the other all electrodes are all for being laid in high-strength insulation with the elastic annular roller electrode on drill bushing cylinder.
Described elastic annular roller electrode, comprises elastic sheet and ball, and elastic annular roller electrode most peripheral diameter is slightly larger than bore diameter.Elastic sheet arranges groove, lays ball, frictional resistance when induced polarization exploration system is advanced can be reduced, exploring electrode is shielded.Under elastic sheet uncompressed state, elastic annular roller electrode most peripheral diameter is slightly larger than bore diameter, and after electrode enters boring, elastic sheet plays elastic reaction immediately, ensures that electrode and Rock And Soil realize good coupling contact.Set elastic annular roller electrode realizes the communication with on-the-spot main frame by cable.
In observation electrode, elastic sheet outside surface, groove and ball surface all scribble solid electrolyte, and cable tail is located in solid electrolyte.Directed transmitting electrode system does not then need to smear solid electrolyte, and cable tail directly draws own elasticity thin slice.
Present invention also offers the real-time detecting water by pilot hole method of a kind of constructing tunnel orientation with drilling induced polarization, comprise the steps:
(1) on the drill bit carrying out advanced levels probing, install connection bearing, connection bearing rear end connects high-strength insulation with drill bushing cylinder.
(2) lay directed transmitting electrode system and observation electrode system at high-strength insulation with drill bushing cylinder periphery, in described directed transmitting electrode system, two auxiliary power supply electrodes are separately fixed at transmitting electrode both sides, and plain metal electrode is positioned at tunnel; Described observation electrode system is between transmitting electrode and an auxiliary power supply electrode, and all electrodes of directed induced polarization exploration system are all connected with on-the-spot main frame by cable.
(3) carry out advanced levels probing, drill the certain depth that often advances, namely implement directed induced polarization forward probe.When not stopping creeping into, feeding the same sex electric current of equal size to transmitting electrode, auxiliary power supply electrode, forming loop with plain metal electrode, simultaneously at observation electrode place collection signal.
(4) on-the-spot main frame carries out real-time detection decipher to observation electrode collection signal, obtains visual apparent resistivity and apparent chargeability result of detection.In conjunction with results of drilling, forecast is made to front, tunnel front water content situation.
Described is carry out decipher in real time fast by signal collected for scene with brill real-time detection decomposition method, and obtain the visual apparent resistivity of investigative range and apparent chargeability: apparent resistivity is low, during apparent chargeability height, the Rock And Soil property of water-bearing of detection is strong; Apparent resistivity is high, and apparent chargeability is low, and the Rock And Soil property of water-bearing of detection is weak.In conjunction with Advance Drilling result, forecast is made to front, tunnel front water content situation.
Beneficial effect of the present invention: 1. Advance Drilling combines with directed induced polarization forward probe by the present invention, directed induced polarization exploration carries out in boring, avoids the interference of construction environment, and Effect on Detecting is better, improves the utilization ratio of advance borehole.Directed advanced induced polarization forward probe can carry out in real time with drilling process, does not need to extract drilling rod out, even do not need stopping to creep into, improve the work efficiency of front, tunnel front water content being carried out to advanced prediction in detection process.
2. the present invention uses high-strength insulation with drill bushing cylinder, directed induced polarization forward probe with drilling process is separated with Advance Drilling, high-strength insulation is connected with drill bit with connection bearing with drill bushing cylinder, in drilling process, high-strength insulation only moves forward with drill bushing cylinder and does not rotate, two kinds of methods are carried out simultaneously, but concrete operations are implemented to be separated completely, really realize the real-time detecting water by pilot hole of orientation with drilling induced polarization.
3. the present invention adopts directed induced polarization forward probe, be provided with the directed transmitting electrode system being parallel to drilling direction, transmitting electrode and auxiliary power supply electrode feed the same sex electric current of equal size simultaneously, make current convergence in vertical drilling direction, realize current oriention, break through hole wall place low-resistance, expand investigative range, effectively solve the problem of Advance Drilling " a peephole view ".Directed induced polarization exploration system uses elastic annular roller electrode, and ball can reduce the friction force in electrode advance process, plays the effect of guard electrode, and elastic sheet can ensure that electrode and Rock And Soil realize good coupling contact.
4. the present invention carries out decipher in real time fast to directed induced polarization forward probe is signal collected, according to the parameter such as apparent chargeability and apparent resistivity, in conjunction with Advance Drilling result, front, tunnel front water content is made to the advanced prediction of real-time continuous.
Accompanying drawing explanation
Fig. 1 is mounting structure schematic diagram of the present invention.
Fig. 2 is structural representation of the present invention.
Fig. 3 is drill bit of the present invention and the high-strength insulation structural representation with drill bushing cylinder.
Fig. 4 is elastic annular roller electrode three-dimensional structure diagram of the present invention.
Fig. 5 is the elastic annular roller electrode sectional view that the present invention polarizes.
Fig. 6 is the elastic annular roller electrode sectional view that the present invention does not polarize.
Fig. 7 is detection method process flow diagram of the present invention.
Fig. 8 is apparent resistivity and the apparent chargeability data plot in certain tunnel in the embodiment of the present invention.
In figure: 1. drill bit, 2. connection bearing, 3. high-strength insulation is with drill bushing cylinder, 4. elastic annular roller electrode, 5. elastic sheet, 6. ball, 7. solid electrolyte, 8. cable.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the invention will be further described.
For certain tunnel, tunnel cross-section is arch, span 12m height 10m, and constructing tunnel proceeds near mileage YK15+533, and front may exist water content.In order to verify front geological condition, for construction provides foundation and guidance, adopt the real-time detecting water by pilot hole forecasting procedure of orientation with drilling to detect, method flow diagram as shown in Figure 7.
(1) on the drill bit 1 carrying out advanced levels probing, install connection bearing 2, connection bearing 2 rear end connects high-strength insulation with drill bushing cylinder 3 with the form of draw-in groove, as shown in Figure 3.
(2) lay elastic annular roller electrode 4 at high-strength insulation with drill bushing cylinder 3 periphery, wherein have electrodes of A, be positioned at the centre position of high-strength insulation with drill bushing cylinder 3, auxiliary power supply electrode A 1, auxiliary power supply electrode A 2, be located at the two ends place of high-strength insulation with drill bushing cylinder 3 respectively, and with electrodes of A apart from equal, the observation electrode M do not polarized, the observation electrode N that do not polarize are in electrodes of A, auxiliary power supply electrode A 1between equidistantly lay.Plain metal electrode B is laid in infinite point in tunnel.All electrodes all pass through cable 8 and are connected with on-the-spot main frame; As depicted in figs. 1 and 2.
(3) carry out advanced levels probing, drill the certain depth that often advances, namely implement directed induced polarization forward probe.When not stopping creeping into, to electrodes of A, auxiliary power supply electrode A 1, auxiliary power supply electrode A 2feed the same sex electric current of equal size, form loop with plain metal electrode B, simultaneously at observation electrode M, observation electrode N place collection signal.
(4) on-the-spot main frame carries out real-time detection decipher to observation electrode M, observation electrode N collection signal, and obtain visual apparent resistivity and apparent chargeability result of detection: apparent resistivity is low, during apparent chargeability height, the Rock And Soil property of water-bearing of detection is strong; Apparent resistivity is high, and apparent chargeability is low, and the Rock And Soil property of water-bearing of detection is weak.In conjunction with results of drilling, forecast is made to front, tunnel front water content situation.Fig. 8 is apparent resistivity and the apparent chargeability data plot in certain tunnel in the present embodiment, and wherein the property of water-bearing at 545m-548m place is strong.
Described elastic annular roller electrode 4, be made up of elastic sheet 5 and ball 6, the diameter of elastic annular roller electrode 4 is greater than bore diameter, and elastic sheet 4 arranges groove, lays ball 6, as Figure 4-Figure 6.
In observation electrode M and observation electrode N, elastic sheet 5 outside surface, groove and ball 6 surface all scribble solid electrolyte 7, and cable tail is located in solid electrolyte 7.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection scope of the present invention.

Claims (9)

1. the real-time detecting water by pilot hole device of constructing tunnel orientation with drilling induced polarization, it is characterized in that, comprise drill bit, high-strength insulation with drill bushing cylinder and directed induced polarization exploration system, described drill bit connects high-strength insulation with drill bushing cylinder by connection bearing, lays directed induced polarization exploration system at high-strength insulation with drill bushing cylinder periphery; Described directed induced polarization exploration system comprises directed transmitting electrode system and observation electrode system, and directed transmitting electrode system comprises transmitting electrode, two auxiliary power supply electrodes and plain metal electrode, and observation electrode system comprises two observation electrodes do not polarized; Described two auxiliary power supply electrodes are separately fixed at transmitting electrode both sides, and plain metal electrode is positioned at tunnel; Described observation electrode system is between transmitting electrode and an auxiliary power supply electrode, and directed induced polarization exploration system is connected with on-the-spot main frame by cable; In described directed induced polarization exploration system, except plain metal electrode, be the elastic annular roller electrode be laid on high-strength insulation sleeve; Described elastic annular roller electrode, comprises elastic sheet and ball, and the diameter of elastic annular roller electrode is greater than bore diameter; Elastic sheet arranges groove, lays ball.
2. the real-time detecting water by pilot hole device of constructing tunnel orientation with drilling induced polarization as claimed in claim 1, it is characterized in that, described two auxiliary power supply electrodes are equal with the distance of transmitting electrode.
3. the real-time detecting water by pilot hole device of constructing tunnel orientation with drilling induced polarization as claimed in claim 1, it is characterized in that, described observation electrode is equidistantly laid between transmitting electrode and an auxiliary power supply electrode.
4. the real-time detecting water by pilot hole device of constructing tunnel orientation with drilling induced polarization as claimed in claim 1, is characterized in that, described connection bearing rear end connects high-strength insulation with drill bushing cylinder with the form of draw-in groove.
5. the real-time detecting water by pilot hole device of constructing tunnel orientation with drilling induced polarization as claimed in claim 1, it is characterized in that, described high-strength insulation is with drill bushing cylinder, and adopt high-strength PVC insulating material, diameter is less than bore diameter.
6. the real-time detecting water by pilot hole device of constructing tunnel orientation with drilling induced polarization as claimed in claim 1, it is characterized in that, described observation electrode, elastic sheet outside surface, groove and ball surface all scribble solid electrolyte, are provided with cable tail in solid electrolyte.
7., based on the method for the real-time detecting water by pilot hole device according to any one of claim 1-6, it is characterized in that, comprise the steps:
(1) on the drill bit carrying out advanced levels probing, install connection bearing, connection bearing rear end connects high-strength insulation with drill bushing cylinder;
(2) lay directed transmitting electrode system and observation electrode system at high-strength insulation with drill bushing cylinder periphery, in described directed transmitting electrode system, two auxiliary power supply electrodes are separately fixed at transmitting electrode both sides, and plain metal electrode is positioned at tunnel; Described observation electrode system is between transmitting electrode and an auxiliary power supply electrode, and all electrodes of directed induced polarization exploration system are all connected with on-the-spot main frame by cable;
(3) carry out advanced levels probing, drill the certain depth that often advances, namely implement directed induced polarization forward probe;
When not stopping creeping into, feeding the same sex electric current of equal size to transmitting electrode, auxiliary power supply electrode, forming loop with plain metal electrode, simultaneously at observation electrode place collection signal;
(4) on-the-spot main frame carries out real-time detection decipher to observation electrode collection signal, obtains visual apparent resistivity and apparent chargeability result of detection; In conjunction with results of drilling, forecast is made to front, tunnel front water content situation.
8. the method for detecting water by pilot hole device in real time as claimed in claim 7, it is characterized in that, described two auxiliary power supply electrodes are equal with the distance of transmitting electrode.
9. the method for detecting water by pilot hole device in real time as claimed in claim 7, it is characterized in that, described observation electrode is equidistantly laid between transmitting electrode and an auxiliary power supply electrode.
CN201210583138.XA 2012-12-26 2012-12-26 The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization Active CN103076636B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210583138.XA CN103076636B (en) 2012-12-26 2012-12-26 The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210583138.XA CN103076636B (en) 2012-12-26 2012-12-26 The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization

Publications (2)

Publication Number Publication Date
CN103076636A CN103076636A (en) 2013-05-01
CN103076636B true CN103076636B (en) 2015-09-02

Family

ID=48153223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210583138.XA Active CN103076636B (en) 2012-12-26 2012-12-26 The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization

Country Status (1)

Country Link
CN (1) CN103076636B (en)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103278857B (en) * 2013-05-13 2015-11-04 江苏大学 A kind of arrangement of electrodes method of underground direct current forward probe
CN103967476B (en) * 2014-04-25 2016-08-17 武汉长盛煤安科技有限公司 With boring physical prospecting forward probe device and detection method
CN104007472A (en) * 2014-06-11 2014-08-27 中煤科工集团西安研究院有限公司 In-hole direct current electric method advanced detection method
CN103995295B (en) * 2014-06-11 2016-08-24 中煤科工集团西安研究院有限公司 DC electrical method ground hole detection method and device
CN104698501B (en) * 2015-02-15 2017-03-22 山东大学 Single-hole directional detection radar antenna for tunnel advanced geological prediction
CN104747184B (en) * 2015-03-11 2016-06-01 山东大学 Measurement-while-drilling method and device for three-dimensional wave velocity imaging of rock mass in front of tunnel face
CN105353413A (en) * 2015-12-11 2016-02-24 重庆地质仪器厂 Water seeking instrument
CN106089192B (en) * 2016-06-14 2019-04-05 王伟男 One kind is with brill induced polarization log instrument, system and method
CN106907145A (en) * 2017-02-09 2017-06-30 武汉地大华睿地学技术有限公司 A kind of apparent resistivity measuring system and method with brill advanced prediction
CN108957563B (en) * 2018-09-08 2020-10-23 聊城国奥信息技术有限公司 Advanced geological detection system and detection method for tunnel construction
CN111077583B (en) * 2019-12-31 2020-11-06 山东科技大学 Structure activation double-parameter monitoring system and monitoring method
CN111219183B (en) * 2020-01-21 2023-07-04 中国铁建重工集团股份有限公司 Water volume and water pressure detection device
CN111622700A (en) * 2020-06-19 2020-09-04 中国电建集团华东勘测设计研究院有限公司 Informatization drilling system and method suitable for advance prediction of unfavorable geological structural surface
CN112855261A (en) * 2020-12-30 2021-05-28 山东大学 Drainage device, system and method suitable for TBM tunnel induced polarization instrument
CN113216929B (en) * 2021-04-29 2023-12-22 中国科学院武汉岩土力学研究所 Method and equipment for measuring rock and soil parameters while drilling based on electromagnetic geophysical prospecting
CN113309506B (en) * 2021-05-18 2023-02-03 山东大学 Advanced observation method and device based on electric dipole emission in hole
CN113655541B (en) * 2021-08-11 2022-04-29 中国矿业大学 Underwater shield tunnel safety guarantee method based on directional drilling-detection integration

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156301A (en) * 2011-03-23 2011-08-17 中南大学 Advanced-prediction observation system while drilling
CN102768369A (en) * 2012-06-05 2012-11-07 武汉长盛煤安科技有限公司 Roadway drivage drilling induced polarization advance water probing forecasting method, device and probe
CN203037865U (en) * 2012-12-26 2013-07-03 山东大学 Tunnel construction while drilling directional induced polarization real-time advance water probing device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156301A (en) * 2011-03-23 2011-08-17 中南大学 Advanced-prediction observation system while drilling
CN102768369A (en) * 2012-06-05 2012-11-07 武汉长盛煤安科技有限公司 Roadway drivage drilling induced polarization advance water probing forecasting method, device and probe
CN203037865U (en) * 2012-12-26 2013-07-03 山东大学 Tunnel construction while drilling directional induced polarization real-time advance water probing device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
TBM设备施工超前地质预报的技术措施;张利民;《甘肃水利水电技术》;20120925;第48卷(第9期);第57-63页 *
张维振,等.基于双频激电法的煤巷综掘超前探测系统研究.《煤炭科技·地质与勘探》.2012,第31页-32页右栏第1段. *

Also Published As

Publication number Publication date
CN103076636A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN103076636B (en) The real-time detecting water by pilot hole apparatus and method of constructing tunnel orientation with drilling induced polarization
US9817148B2 (en) Borehole while drilling electromagnetic tomography advanced detection apparatus and method
CN103713335B (en) Comprehensive advance geological detection system carried by tunnel boring machine
CN104018882B (en) A kind of distributed coal rock dynamic disaster current potential method of real-time and system
US20150233242A1 (en) Comprehensive advanced geological detection system carried on tunnel boring machine
CN203658603U (en) Comprehensive advanced geological detection system carried by tunnel boring machine
CN103278857B (en) A kind of arrangement of electrodes method of underground direct current forward probe
CN103967476A (en) Drilling geophysical prospecting advanced detecting device and method
CN107807395A (en) Three-dimensional double magnetic source detection method above and below Mine transient electromagnetic well
CN106707351B (en) A kind of TBM construction tunnel forward probe magnetic resonance device system
CN105589094A (en) Detection device and detection method for unidentified gob
US20230184983A1 (en) Vector-resistivity-based real-time advanced detection method for water-bearing hazard body
CN105604557A (en) Shield construction boulder detection method based on seismic CT
CN207249113U (en) A kind of Ground Penetrating Radar device of single hole detection boulder
CN102720484A (en) While-drilling acoustic well-logging apparatus and well-logging method
CN110821475B (en) Drilling resistivity monitoring method for coal mine working face bottom plate and cable pushing device
CN106368734A (en) Real-time monitoring and forecasting system for water bursting in ground-roadway TEM mine shaft
CN105301645A (en) Advanced geological forecasting method of shield construction
Jiang et al. Experiment in metal disturbance during advanced detection using a transient electromagnetic method in coal mines
CN203037865U (en) Tunnel construction while drilling directional induced polarization real-time advance water probing device
CN102692639B (en) Advanced geological forecast device utilizing vibration signals in construction with shield method and using method of advanced geological forecast device
CN203572970U (en) Overburden failure range detection system under impact of mining
CN204287508U (en) Between two lane, multicast radiowave cheats field strength measurement system
CN109738964A (en) Tunnel predictor, development machine and the method for seismic wave and electromagnetic wave joint inversion
CN112431586B (en) Method and device for acquiring data in cable transient electromagnetic probe drilling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220316

Address after: 250101 Room 601, 6 / F, building a7-5, Hanyu Golden Valley, No. 7000, Jingshi Road, Jinan area, China (Shandong) pilot Free Trade Zone, Jinan City, Shandong Province

Patentee after: Shandong bai20 Huitong Engineering Technology Co.,Ltd.

Address before: 250061, No. ten, No. 17923, Lixia District, Ji'nan City, Shandong Province

Patentee before: SHANDONG University

TR01 Transfer of patent right