- CN102953321A CN102953321A CN2011102424828A CN201110242482A CN102953321A CN 102953321 A CN102953321 A CN 102953321A CN 2011102424828 A CN2011102424828 A CN 2011102424828A CN 201110242482 A CN201110242482 A CN 201110242482A CN 102953321 A CN102953321 A CN 102953321A
- Authority
- CN
- China
- Prior art keywords
- bridge
- road
- rock flow
- mud
- folding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Road Paving Structures (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种能克服道路泥石流的桥梁,由折叠式桥脚系统和桥面板两部分组成。折叠式桥脚系统的内部连接件之间采用铰接的方式,可在水平面或纵垂面内相互转动,从而实现桥脚系统的伸缩和折叠。在运输时,该桥梁的桥脚系统是收缩折叠后放置在车厢内。在铺设桥梁时,可在受到泥石流影响路段的两端,沿路线方向摆设桥脚系统,对桥脚系统两端使用机械、车辆或人力进行拉伸展开后设置在路面上,并进行必要的锚固,然后在桥脚上面逐块铺设桥面板,即构成克服道路泥石流的桥梁。
Description
一、技术领域
本发明涉及一种能克服道路遭遇的泥石流的桥梁。
二、背景技术
泥石流是一种十分常见的自然灾害类型,当道路遭遇泥石流时,其危害主要体现在泥石流具有较大冲击力,能毁损路基、路面、道路构筑物以及行车,造成人员伤亡。尤其是因泥石流的作用而导致公路桥梁突然垮塌时,后果则是灾难性的。我国公路每年因泥石流造成的损失达数亿至数十亿,尤其在山区的道路,常常会遭受泥石流的破坏。目前,国内外克服道路泥石流的主要方法是尽量绕行(改路行进),无疑会影响道路运输的效率。而在克服道路泥石流的技术手段方面,一般是在泥石流停发后,采用工程机械推、挖、铲除道路上的泥石,而在泥石流的发生和持续过程中基本无有效手段来保障道路通行。另外的办法是切断道路以外的泥石流源头,但此法一般工程量巨大,费时很长,难以在短时间内恢复道路交通。
三、发明内容
1、发明目的:本发明的目的就是针对山区道路遭遇的泥石流问题,提出了可快速克服泥石流的桥脚折叠式桥梁器材,其作业方便、快速,灵活,能在道路原地快速构筑桥梁,以保障道路的正常通行。
2、技术方案:本发明所述的克服道路泥石流的桥梁,由折叠式桥脚系统和桥面板两部分组成。折叠式桥脚系统的内部连接件之间是采用铰接的方式,可在水平面或纵垂面内相互转动,从而实现桥脚系统的伸缩和折叠。桥脚的间距为1.5m左右,桥脚高度为1.5m左右。为了便于运输和灵活运用,可将整个桥梁分段设计。折叠式桥脚的分段长度在折叠状况下不超过4m(便于装车运输),展开后可达45m左右。同时,为便于车辆上下桥梁,还设计带有斜坡面的桥梁过渡段。桥面宽度为4m左右。
本发明的工作原理是:在运输时,该桥梁的桥脚系统是收缩折叠后放置在车厢内。在铺设桥梁时,可在受到泥石流影响路段的两端,沿路线方向摆设桥脚系统,对桥脚系统两端使用机械、车辆或人力进行拉伸展开后设置在路面上,并进行必要的锚固,然后在桥脚上面逐块铺设桥面板即构成桥梁。
3、有益效果:本发明与现有技术相比,其显著特点是:一是采用桥梁快速克服泥石流,不需要过多考虑在现场如何治理泥石流本身,尤其适合战时和平时突发事件下的应急交通保障需要;二是采用折叠式桥脚,便于储存和运输,使用时快速展开直接设置在路面上,作业速度快;三是这种折叠式桥脚因数量多,构成的桥梁不仅结构稳定,且泥石流可从桥脚的缝隙方便地通过,不至于对桥梁造成破坏性影响,即使在泥石流的持续过程中也可应用;四是具有桥脚多、间距小的桥梁结构,较易满足承载力要求,且桥面结构也相应轻便;五是该桥梁装备不仅可用于克服泥石流,也可用于其它场合的应急通道构筑。另外,所有的单根桥脚本身还可设计成可伸缩的。该桥梁更符合应急机动交通保障的实际需要。
四、附图说明
下面结合附图和实施例对本发明作进一步说明。
图1为本发明中的克服道路泥石流的桥梁标准段设计方案一图。
图2为本发明中的克服道路泥石流的桥梁过渡段设计图。
图3为本发明中的克服道路泥石流桥梁的固定方法示意图。
图4为本发明中的克服道路泥石流的桥梁标准段设计方案二图。
图5为本发明中的克服道路泥石流的桥梁标准段设计方案三图。
五、具体实施方式
在图1中,折叠式桥脚系统(2)沿路线方向经过拉伸展开后,设置在路面上;其上铺设桥面板(1)就可构成克服泥石流的桥梁。
在图2中,在带有斜坡式的折叠式桥脚系统(2)沿路线方向经过拉伸展开后,设置在路面上;其上铺设桥面板(1)就可构成克服泥石流桥梁的过渡段;该过渡段和桥梁标准段联合使用,以方便车辆上下桥梁。
在图3中,对于已铺设好的一段泥石流桥梁,可采用横向固定桩(6)和纵向固定桩(7),并利用绳索(8)将该段桥梁进行固定,以防桥梁被泥石流冲移。
在图4中,折叠式桥脚系统(2)的内部连接件(3)可在水平面内相互转动,使得桥脚系统(2)可折叠和伸展,从而形成桥脚。
在图5中,折叠式桥脚系统(2)沿桥轴线可分两大列、每列的内部连接件(3)在水平面内相互转动,使得桥脚系统(2)可折叠和伸展,从而形成桥脚,更适用于路面不平整的情况。
Claims (3)
1.一种克服道路泥石流的桥梁,其特征在于该桥梁由折叠式桥脚系统(2)和桥面板(1)两部分组成。折叠式桥脚系统(2)的内部连接件(3)之间采用铰接的方式,可在水平面或纵垂面内相互转动,从而实现桥脚系统的伸缩和折叠。
2.根据权利要求1所述的克服道路泥石流的桥梁,其特征在于该桥梁包含有斜坡式的桥梁过渡段,该过渡段和桥梁标准段联合使用,可方便车辆上下。
3.根据权利要求1所述的克服道路泥石流的桥梁,其特征在于可采用机械、车辆或人力,对折叠式桥脚系统(2)进行拉伸展开作业,从而构成桥脚。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102424828A CN102953321A (zh) | 2011-08-23 | 2011-08-23 | 一种克服道路泥石流的桥梁 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102424828A CN102953321A (zh) | 2011-08-23 | 2011-08-23 | 一种克服道路泥石流的桥梁 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102953321A true CN102953321A (zh) | 2013-03-06 |
Family
ID=47762664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102424828A Pending CN102953321A (zh) | 2011-08-23 | 2011-08-23 | 一种克服道路泥石流的桥梁 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953321A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108009363A (zh) * | 2017-12-04 | 2018-05-08 | 中铁二院工程集团有限责任公司 | 一种泥石流冲刷桥墩的计算方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0290405A1 (en) * | 1987-05-08 | 1988-11-09 | Giuseppe Drago | Modular bridge structure |
CN2554222Y (zh) * | 2001-05-31 | 2003-06-04 | 张赤兵 | 快速伸展和收缩的链架结构桥 |
CN2682101Y (zh) * | 2004-03-22 | 2005-03-02 | 钟宝驹 | 可拆卸人车通道装置 |
CN100999895A (zh) * | 2006-10-24 | 2007-07-18 | 邹煜 | 一种大跨度桥梁架设装置及其架设方法 |
WO2007138100A1 (fr) * | 2006-05-31 | 2007-12-06 | Ets A. Deschamps Et Fils | Pont temporaire |
CN201695321U (zh) * | 2010-06-25 | 2011-01-05 | 中铁五局集团第一工程有限责任公司 | 多功能自行式隧道仰拱栈桥 |
-
2011
- 2011-08-23 CN CN2011102424828A patent/CN102953321A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0290405A1 (en) * | 1987-05-08 | 1988-11-09 | Giuseppe Drago | Modular bridge structure |
CN2554222Y (zh) * | 2001-05-31 | 2003-06-04 | 张赤兵 | 快速伸展和收缩的链架结构桥 |
CN2682101Y (zh) * | 2004-03-22 | 2005-03-02 | 钟宝驹 | 可拆卸人车通道装置 |
WO2007138100A1 (fr) * | 2006-05-31 | 2007-12-06 | Ets A. Deschamps Et Fils | Pont temporaire |
CN100999895A (zh) * | 2006-10-24 | 2007-07-18 | 邹煜 | 一种大跨度桥梁架设装置及其架设方法 |
CN201695321U (zh) * | 2010-06-25 | 2011-01-05 | 中铁五局集团第一工程有限责任公司 | 多功能自行式隧道仰拱栈桥 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108009363A (zh) * | 2017-12-04 | 2018-05-08 | 中铁二院工程集团有限责任公司 | 一种泥石流冲刷桥墩的计算方法 |
CN108009363B (zh) * | 2017-12-04 | 2021-02-02 | 中铁二院工程集团有限责任公司 | 一种泥石流冲刷桥墩的计算方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8973195B2 (en) | Pipeline crossing bridge | |
CN101935984B (zh) | 斜拉桥钢桁梁架梁吊机的走行装置及使用方法 | |
CN102644239A (zh) | 快速疏通堵车的应急装备 | |
KR101285089B1 (ko) | 승강이 가능한 조립식 하부구조물을 구비한 포장도로 | |
JP2003253623A (ja) | 橋桁の架替工法 | |
JP4134104B2 (ja) | 橋梁一括撤去工法 | |
CN110616658A (zh) | 道路临时分隔防撞护栏装置及防撞栏杆单元 | |
CN102953321A (zh) | 一种克服道路泥石流的桥梁 | |
CN204212046U (zh) | 一种伸缩式应急桥梁 | |
CN201439592U (zh) | 可折叠收放式公路防雪设施 | |
RU2476633C1 (ru) | Многоуровневая магистраль-эстакада для перемещения транспортных средств и передачи транспортируемых сред | |
KR20120047331A (ko) | 교량용 안전망 | |
CN102383369A (zh) | 单向拼组式轻型山谷桥 | |
KR101077092B1 (ko) | 기존 도로의 교통 원활을 위한 트롤리를 이용하여 거더를 시공하는 방법 | |
CN204589817U (zh) | 一种加强网架式防护操作一体化装置 | |
WO2012051616A2 (en) | Methods and systems for building by assembly structures and protection of structures against time, natural, and man-made elements | |
RU137558U1 (ru) | Сборно-разборный универсальный мост | |
CN111794079A (zh) | 一种基于桥梁施工的可通过车辆的临时架桥 | |
KR101757427B1 (ko) | 강관을 이용한 친환경 켄틸레버 인도교 및 그 인도교의 형성 방법 | |
CN211690078U (zh) | 道路临时分隔防撞护栏装置及防撞栏杆单元 | |
CN108909534B (zh) | 一种城市轨道交通客车接触网检修液压折叠型检修车 | |
CN211446567U (zh) | 一种用于桥梁建造的分段架桥支撑装置 | |
JP2005090108A (ja) | 橋梁の架設工法 | |
CN103241691A (zh) | 大跨度高空作业快速化施工特种车 | |
CN203211030U (zh) | 一种连接装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
DD01 | Delivery of document by public notice |
Addressee: Chen Yunhe Document name: Notification of Passing Preliminary Examination of the Application for Invention |
|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: Chen Yunhe Document name: Notification of Publication and of Entering the Substantive Examination Stage of the Application for Invention |
|
DD01 | Delivery of document by public notice |
Addressee: Chen Yunhe Document name: Notification that Application Deemed to be Withdrawn |
|
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130306 |