CN102912894A - Sandwich wall with straw insulation boards - Google Patents

Sandwich wall with straw insulation boards Download PDF

Info

Publication number
CN102912894A
CN102912894A CN2012104257398A CN201210425739A CN102912894A CN 102912894 A CN102912894 A CN 102912894A CN 2012104257398 A CN2012104257398 A CN 2012104257398A CN 201210425739 A CN201210425739 A CN 201210425739A CN 102912894 A CN102912894 A CN 102912894A
Authority
CN
China
Prior art keywords
lobe wall
wall
warming plate
straw
collar tie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104257398A
Other languages
Chinese (zh)
Other versions
CN102912894B (en
Inventor
张延年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ma'anshan Feifan Machinery Co ltd
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201210425739.8A priority Critical patent/CN102912894B/en
Publication of CN102912894A publication Critical patent/CN102912894A/en
Application granted granted Critical
Publication of CN102912894B publication Critical patent/CN102912894B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

本项发明提供一种稻草保温板夹心墙,主要由内叶墙、外叶墙、稻草保温板、内叶墙圈梁、外叶墙圈梁、内叶墙与外叶墙连系梁、构造柱、拉结件、稻草保温板标准板、稻草保温板圈梁填充板和稻草保温板构造柱填充板等组成。其特征在于,在每一楼层内叶墙和外叶墙分别设置内叶墙圈梁和外叶墙圈梁;内叶墙圈梁和外叶墙圈梁之间设置内叶墙与外叶墙连系梁。本发明的效果和优点是造价低、节省大量施工时间及施工成本,材料损耗率极低,不产生建筑垃圾,施工场地整洁、文明、快捷、简便,并且具有良好的抗震性能和保温性能。

Figure 201210425739

This invention provides a sandwich wall of straw insulation board, which mainly consists of inner leaf wall, outer leaf wall, straw insulation board, inner leaf wall ring beam, outer leaf wall ring beam, inner leaf wall and outer leaf wall connecting beam, structure It is composed of columns, tie pieces, straw insulation board standard board, straw insulation board ring beam filling board and straw insulation board structure column filling board. It is characterized in that an inner leaf wall ring beam and an outer leaf wall ring beam are respectively arranged on the inner leaf wall and the outer leaf wall of each floor; the inner leaf wall and the outer leaf wall ring beam are arranged between the inner leaf wall ring beam and the outer leaf wall ring beam Connection beam. The effects and advantages of the invention are low cost, saving a lot of construction time and cost, extremely low material loss rate, no construction waste, clean, civilized, fast and convenient construction site, and good earthquake resistance and heat preservation performance.

Figure 201210425739

Description

稻草保温板夹心墙Straw insulation board sandwich wall

技术领域 technical field

本发明涉及一种新型外墙保温夹心墙,特别涉及一种稻草保温板夹心墙。 The invention relates to a novel exterior wall heat-insulating sandwich wall, in particular to a straw heat-insulating board sandwich wall.

背景技术 Background technique

据统计,我国建筑单位面积能耗仍是气候相近发达国家的3~5倍。建筑节能是各种节能途径中潜力最大、最为直接、有效的方式,是缓解能源紧张的最有效措施。建筑能耗中,通过外墙造成的能耗约占建筑总能耗的50%以上,因而墙体保温是实现建筑节能的关键。 According to statistics, the energy consumption per unit area of buildings in my country is still 3 to 5 times that of developed countries with similar climates. Building energy conservation is the most potential, most direct and effective way among various ways of energy conservation, and it is the most effective measure to alleviate energy shortage. Among the building energy consumption, the energy consumption caused by the external wall accounts for more than 50% of the total building energy consumption, so wall insulation is the key to realize building energy saving.

节能墙体有单一节能墙体和复合节能墙体两种形式。单一节能墙体以加气混凝土墙为代表,由于安全性、耐久性和使用功能等问题阻碍其使用和发展。复合节能墙体主要包括外墙内保温、外墙外保温和夹心墙技术。外墙内保温由于裂缝问题严重,难以避免热桥等缺点,所占比例逐年降低,已成为一种过渡的、落后的构造形式。目前,国内外应用最广的节能墙体是外墙外保温。我国外墙外保温工程的耐久性问题十分严重,无法保证在正确使用和正常维护条件下25年的使用年限,部分工程仅可使用3~5年。越来越多的专家认识到外墙外保温工程耐久性问题,担心在未来几年或十几年后外墙外保温工程出现全国性的大面积或整体破坏的灾难性后果。夹心墙是唯一能达到集承重、保温(隔声)和装饰于一体、适于不同地区的耐久性节能墙体。目前,夹心墙采用填充苯板等方式,施工复杂、工期长,在实际施工中容易出现质量问题,这已经影响了该技术的进一步推广应用。节能墙体保温层耐久性问题已成为中外建筑节能专家面临的主要问题,寻求一种经济、施工简单快捷、节能效果好、保温层与建筑同寿命的耐久性节能墙体技术刻不容缓。 There are two forms of energy-saving walls: single energy-saving walls and composite energy-saving walls. Single energy-saving walls are represented by aerated concrete walls, but their use and development are hindered by problems such as safety, durability, and use functions. Composite energy-saving walls mainly include external wall internal insulation, external wall external insulation and sandwich wall technology. Due to the serious problem of cracks and the difficulty of avoiding thermal bridges and other shortcomings, the proportion of thermal insulation in the external wall has been decreasing year by year, and it has become a transitional and backward structural form. At present, the most widely used energy-saving wall at home and abroad is external wall insulation. The durability of external wall insulation projects in China is very serious, and it cannot guarantee a 25-year service life under correct use and normal maintenance conditions, and some projects can only be used for 3 to 5 years. More and more experts are aware of the durability of external wall insulation projects, and worry about the catastrophic consequences of nationwide large-scale or overall damage to external wall insulation projects in the next few years or ten years. The sandwich wall is the only durable energy-saving wall that can integrate load-bearing, thermal insulation (sound insulation) and decoration, and is suitable for different regions. At present, sandwich walls are filled with benzene boards, etc. The construction is complicated, the construction period is long, and quality problems are prone to occur in actual construction, which has affected the further promotion and application of this technology. The durability of energy-saving wall insulation layer has become the main problem faced by Chinese and foreign building energy-saving experts. It is urgent to find a durable energy-saving wall technology that is economical, simple and fast in construction, good in energy saving effect, and the insulation layer has the same life as the building.

外墙夹心保温是一种能达到集承重、保温(隔声)和装饰于一体、适于不同地区的耐久性节能墙体,也是一种能解决保温层与建筑物同寿命问题的保温技术。填充式外墙夹心保温技术通常采用苯板作为夹心保温板,在实际施工中,在圈梁、窗口、阳台等保温薄弱部位,拉结件会造成苯板破坏。另外,聚苯板的造价较高。以上质量问题,使夹心保温墙体的夹层中间存在着较大的空隙,从而使冷热空气对流顺畅,热损失比设计的要大得多,保温性能大为降低,这已经影响了该技术的进一步推广应用。 External wall sandwich insulation is a durable and energy-saving wall that can integrate load-bearing, thermal insulation (sound insulation) and decoration, and is suitable for different regions. It is also a thermal insulation technology that can solve the problem of the same life span of the thermal insulation layer and the building. Filled exterior wall sandwich insulation technology usually uses benzene board as the sandwich insulation board. In actual construction, in the weak parts of insulation such as ring beams, windows, balconies, etc., the tie parts will cause damage to the benzene board. In addition, the cost of polystyrene board is relatively high. The above quality problems cause a large gap in the middle of the sandwich insulation wall, so that the hot and cold air convection is smooth, the heat loss is much larger than the design, and the insulation performance is greatly reduced, which has affected the technology. Promote the application further.

目前研究开发的夹心墙有中国专利号201110265208.2公开了一种名称为“一种自保温配筋砌块砌体夹心墙体 ”发明专利;中国专利号 201010194966.5公开了一种名称为“一种夹心墙板的制作工艺 ”的发明专利;中国专利号201010197901.6公开了一种名称为“一种建筑夹心墙保温材料的制备方法”发明专利;中国专利号 201010532212.6公开了一种名称为“一种无砂混凝土夹心墙的制作方法”的发明专利。 The sandwich wall currently researched and developed has Chinese Patent No. 201110265208.2, which discloses an invention patent named "A Self-insulating Reinforced Block Masonry Sandwich Wall"; The invention patent of "Manufacturing Process of Building Sandwich Wall"; Chinese Patent No. 201010197901.6 discloses an invention patent named "A Preparation Method of Building Sandwich Wall Insulation Material"; Chinese Patent No. 201010532212.6 discloses a patent named "A Sand-free Concrete The invention patent of the manufacturing method of the sandwich wall.

然而,夹心墙的施工问题、夹心墙的保温问题仍需要进一步解决,稻草保温板夹心墙的开发将推动建筑节能、墙体保温的发展。 However, the construction problems of sandwich walls and the insulation problems of sandwich walls still need to be further resolved. The development of sandwich walls with straw insulation boards will promote the development of building energy conservation and wall insulation.

发明内容 Contents of the invention

    本发明目的目的是提供一种稻草保温板夹心墙,采用稻草作为夹心墙的保温板,可以大幅降低造价,并且可以通过板型设计解决在圈梁、窗口、阳台等保温薄弱部位,拉结件造成苯板破坏等问题。     The purpose of the present invention is to provide a sandwich wall with straw insulation boards. Using straw as the insulation board of the sandwich wall can greatly reduce the cost, and can solve the problem of tie parts in ring beams, windows, balconies and other weak parts of insulation through plate design. Cause problems such as benzene plate damage.

技术方案如下: The technical solution is as follows:

稻草保温板夹心墙主要由内叶墙(1)、外叶墙(2)、稻草保温板(3)、内叶墙圈梁(4)、外叶墙圈梁(5)、内叶墙与外叶墙连系梁(6)、构造柱(7)、拉结件(8)、稻草保温板标准板(9)、稻草保温板圈梁填充板(10)和稻草保温板构造柱填充板(11)等组成。其特征在于,内叶墙(1)厚度为外叶墙(2)厚度的2倍;在每一楼层内叶墙(1)和外叶墙(2)分别设置内叶墙圈梁(4)和外叶墙圈梁(5);内叶墙圈梁(4)和外叶墙圈梁(5)之间设置内叶墙与外叶墙连系梁(6),内叶墙与外叶墙连系梁(6)的间距留有艰巨,高度与内叶墙圈梁(4)和外叶墙圈梁(5)的高度相同。内叶墙与外叶墙连系梁(6)的间距为500毫米。 The straw insulation board sandwich wall is mainly composed of inner leaf wall (1), outer leaf wall (2), straw insulation board (3), inner leaf wall ring beam (4), outer leaf wall ring beam (5), inner leaf wall and Outer leaf wall connection beam (6), structural column (7), anchors (8), straw insulation board standard board (9), straw insulation board ring beam filling board (10) and straw insulation board structural column filling board (11) and so on. It is characterized in that the thickness of the inner leaf wall (1) is twice the thickness of the outer leaf wall (2); the inner leaf wall (1) and the outer leaf wall (2) of each floor are respectively provided with inner leaf wall ring beams (4) and the outer leaf wall ring beam (5); the inner leaf wall and outer leaf wall connecting beam (6) is set between the inner leaf wall ring beam (4) and the outer leaf wall ring beam (5), and the inner leaf wall and outer leaf wall The distance between the wall connecting beams (6) is difficult, and the height is the same as that of the inner leaf wall ring beam (4) and the outer leaf wall ring beam (5). The spacing between the inner leaf wall and the outer leaf wall connecting beam (6) is 500 millimeters.

在内叶墙(1)和外叶墙(2)之间除内叶墙与外叶墙连系梁(6)和拉结件(8),均应设置稻草保温板(3)。稻草保温板(3)包括稻草保温板标准板(9)、稻草保温板圈梁填充板(10)和稻草保温板构造柱填充板(11)。内叶墙圈梁(4)和外叶墙圈梁(5)之间设置稻草保温板圈梁填充板(10),构造柱(7)与外叶墙(2)之间设置稻草保温板构造柱填充板(11);稻草保温板圈梁填充板(10)和稻草保温板构造柱填充板(11)既作为保温板,也分别作为内叶墙圈梁(4)、外叶墙圈梁(5)和构造柱(7)的浇筑模板。其他部位采用稻草保温板标准板(9)。 Between the inner leaf wall (1) and the outer leaf wall (2), except for the connecting beam (6) and tie piece (8) between the inner leaf wall and the outer leaf wall, a straw insulation board (3) should be arranged. The straw insulation board (3) comprises a straw insulation board standard board (9), a straw insulation board ring beam filling board (10) and a straw insulation board construction column filling board (11). Set the straw insulation board ring beam filling plate (10) between the inner leaf wall ring beam (4) and the outer leaf wall ring beam (5), and set the straw insulation board structure between the structural column (7) and the outer leaf wall (2) The column filling board (11); the straw insulation board ring beam filling board (10) and the straw insulation board structure column filling board (11) are not only used as insulation boards, but also as inner leaf wall ring beams (4) and outer leaf wall ring beams respectively (5) and the pouring formwork of construction column (7). Other positions adopt straw insulation board standard plate (9).

内叶墙(1)和外叶墙(2)之间设置拉结件(8),拉结件(8)设置在内叶墙(1)和外叶墙(2)的水平灰缝和稻草保温板(3)的接口处,拉结件(8)的竖向间距为400mm。板与板之间采用阶梯形接口,拉结件(8)穿过稻草保温板(3)的接口处,保证其中一个稻草保温板(3)的阶梯形接口的完好。 A tie member (8) is arranged between the inner leaf wall (1) and the outer leaf wall (2), and the tie member (8) is arranged on the horizontal mortar joints and straws of the inner leaf wall (1) and the outer leaf wall (2) At the interface of the insulation board (3), the vertical spacing of the anchors (8) is 400mm. Ladder-shaped interface is adopted between the board and the plate, and tie member (8) passes through the interface of straw insulation board (3) to ensure that the ladder-shaped interface of one of the straw insulation boards (3) is intact.

内叶墙(1)采用砌块或砖,外叶墙(2)采用砖。采用遮盖物挡住稻草保温板(3)的阶梯形接口,首先砌筑四行外叶墙(2)砖,然后设置稻草保温板(3),在砌筑两行砌块或四行砖,再布置拉结件,墙体砌筑依此进行。在内叶墙圈梁(4)、外叶墙圈梁(5)、内叶墙与外叶墙连系梁(6)和构造柱(7)等处的稻草保温板(3)不仅采用砖和砌块固定,且应采用其他辅助支护方式保证混凝土的浇筑和振捣。 Blocks or bricks are used for the inner leaf wall (1), and bricks are used for the outer leaf wall (2). Use a cover to block the stepped interface of the straw insulation board (3), first build four rows of outer leaf wall (2) bricks, then set the straw insulation board (3), and build two rows of blocks or four rows of bricks, and then Arrange the anchors, and the wall masonry proceeds accordingly. The straw insulation boards (3) at the inner leaf wall ring beam (4), the outer leaf wall ring beam (5), the inner leaf wall and outer leaf wall connecting beam (6) and the structural column (7) are not only made of bricks and blocks, and other auxiliary support methods shall be adopted to ensure the pouring and vibration of concrete.

本发明的优点与有益效果: Advantages and beneficial effects of the present invention:

本发明的效果和优点是造价低、节省大量施工时间及施工成本,材料损耗率极低,不产生建筑垃圾,施工场地整洁、文明、快捷、简便,并且具有良好的抗震性能和保温性能。 The effects and advantages of the invention are low cost, saving a lot of construction time and cost, extremely low material loss rate, no construction waste, clean, civilized, fast and convenient construction site, and good earthquake resistance and heat preservation performance.

附图说明 Description of drawings

图1为本发明稻草保温板夹心墙横断面1示意图; Fig. 1 is a schematic diagram of cross-section 1 of straw insulation board sandwich wall of the present invention;

图2为本发明稻草保温板夹心墙横断面2示意图; Fig. 2 is a schematic diagram of cross-section 2 of straw insulation board sandwich wall of the present invention;

图3为本发明稻草保温板夹心墙纵断面示意图; Fig. 3 is the schematic diagram of the longitudinal section of the sandwich wall of the straw insulation board of the present invention;

图4为本发明稻草保温板夹心墙水平断面示意图; Fig. 4 is the horizontal cross-section schematic diagram of the straw insulation board sandwich wall of the present invention;

图5为稻草保温板和拉结件布局示意图。 Fig. 5 is a schematic diagram of the layout of the straw insulation board and the anchors.

图中,1为内叶墙;2为外叶墙;3为稻草保温板;4为内叶墙圈梁;5为外叶墙圈梁;6为内叶墙与外叶墙连系梁;7为构造柱;8为拉结件;9为稻草保温板标准板;10为稻草保温板圈梁填充板;11为稻草保温板构造柱填充板。 In the figure, 1 is the inner leaf wall; 2 is the outer leaf wall; 3 is the straw insulation board; 4 is the ring beam of the inner leaf wall; 5 is the ring beam of the outer leaf wall; 6 is the connecting beam between the inner leaf wall and the outer leaf wall; 7 is a structural column; 8 is a tie piece; 9 is a standard board of a straw insulation board; 10 is a filling board of a ring beam of a straw insulation board; 11 is a filling board of a structural column of a straw insulation board.

具体实施方式 Detailed ways

下面结合技术方案和参照附图对本发明进行详细说明。 The present invention will be described in detail below in combination with technical solutions and with reference to the accompanying drawings.

本发明提出的稻草保温板夹心墙如图1~图5所示。主要由内叶墙1、外叶墙2、稻草保温板3、内叶墙圈梁4、外叶墙圈梁5、内叶墙与外叶墙连系梁6、构造柱7、拉结件8、稻草保温板标准板9、稻草保温板圈梁填充板10和稻草保温板构造柱填充板11等组成。 The straw insulation board sandwich wall proposed by the present invention is shown in Figures 1 to 5. It mainly consists of inner leaf wall 1, outer leaf wall 2, straw insulation board 3, inner leaf wall ring beam 4, outer leaf wall ring beam 5, inner leaf wall and outer leaf wall connecting beam 6, structural column 7, tie pieces 8. The straw insulation board standard board 9, the straw insulation board ring beam filling board 10 and the straw insulation board structural column filling board 11 are composed of.

内叶墙1采用砌块或砖,外叶墙2采用砖。采用遮盖物挡住稻草保温板3的阶梯形接口,首先砌筑四行外叶墙2砖,然后设置稻草保温板3,在砌筑两行砌块或四行砖,再布置拉结件,墙体砌筑依此进行。在内叶墙圈梁(4)、外叶墙圈梁5、内叶墙与外叶墙连系梁6和构造柱7等处的稻草保温板3不仅采用砖和砌块固定,且应采用其他辅助支护方式保证混凝土的浇筑和振捣。 The inner leaf wall 1 adopts blocks or bricks, and the outer leaf wall 2 adopts bricks. Use a covering to block the stepped interface of the straw insulation board 3, first build four rows of outer leaf wall 2 bricks, then set the straw insulation board 3, and then lay out the tie pieces after laying two rows of blocks or four rows of bricks. Body building proceeds in this way. The straw insulation boards 3 at the inner leaf wall ring beam (4), the outer leaf wall ring beam 5, the inner leaf wall and outer leaf wall connecting beam 6 and the structural column 7 are not only fixed by bricks and blocks, but also Other auxiliary support methods ensure the pouring and vibration of concrete.

Claims (5)

1. straw warming plate sandwich wall, formed by internal lobe wall (1), siphonal lobe wall (2), straw warming plate (3), internal lobe wall collar tie beam (4), siphonal lobe wall collar tie beam (5), internal lobe wall and siphonal lobe wall linking beam (6), constructional column (7), tension member (8), straw warming plate on-gauge plate (9), straw warming plate collar tie beam infill panel (10) and straw warming plate constructional column infill panel (11), it is characterized in that, internal lobe wall (1) thickness is 2 times of siphonal lobe wall (2) thickness; At each floor internal lobe wall (1) and siphonal lobe wall (2) internal lobe wall collar tie beam (4) and siphonal lobe wall collar tie beam (5) are set respectively; Internal lobe wall and siphonal lobe wall linking beam (6) are set between internal lobe wall collar tie beam (4) and the siphonal lobe wall collar tie beam (5), leave the spacing of spacing between internal lobe wall and the siphonal lobe wall linking beam (6), height is identical with the height of internal lobe wall collar tie beam (4) and siphonal lobe wall collar tie beam (5), between internal lobe wall (1) and siphonal lobe wall (2), remove internal lobe wall and siphonal lobe wall linking beam (6) and tension member (8), straw warming plate (3) all should be set, straw warming plate (3) comprises straw warming plate on-gauge plate (9), straw warming plate collar tie beam infill panel (10) and straw warming plate constructional column infill panel (11), between internal lobe wall collar tie beam (4) and the siphonal lobe wall collar tie beam (5) straw warming plate collar tie beam infill panel (10) is set, between constructional column (7) and the siphonal lobe wall (2) straw warming plate constructional column infill panel (11) is set; Straw warming plate collar tie beam infill panel (10) and straw warming plate constructional column infill panel (11) are both as warming plate, also respectively as the formwork for placing of internal lobe wall collar tie beam (4), siphonal lobe wall collar tie beam (5) and constructional column (7), straw warming plate on-gauge plate (9) is adopted at other positions.
2. straw warming plate sandwich wall according to claim 1, it is characterized in that: between internal lobe wall (1) and the siphonal lobe wall (2) tension member (8) is set, tension member (8) is arranged on the horizontal mortar joint of internal lobe wall (1) and siphonal lobe wall (2) and the interface of straw warming plate (3), tension member (8) vertically leave spacing, adopt the stairstepping interface between plate and the plate, tension member (8) passes the interface of straw warming plate (3), guarantees stairstepping interface intact of one of them straw warming plate (3).
3. straw warming plate sandwich wall according to claim 1, it is characterized in that: internal lobe wall (1) adopts building block or brick, siphonal lobe wall (2) adopts brick, adopt overcover to block the stairstepping interface of straw warming plate (3), at first build four lines siphonal lobe wall (2) brick by laying bricks or stones, straw warming plate (3) then is set, building two row building blocks or four lines brick by laying bricks or stones, arrange again tension member, building wall carries out according to this, at internal lobe wall collar tie beam (4), siphonal lobe wall collar tie beam (5), the straw warming plate (3) that internal lobe wall and siphonal lobe wall linking beam (6) and constructional column (7) etc. are located not only adopts brick and building block to fix, and should adopt other auxiliary shoring modes to guarantee concrete and vibrate.
4. straw warming plate sandwich wall according to claim 1, it is characterized in that: the spacing of internal lobe wall and siphonal lobe wall linking beam (6) is 500m.
5. straw warming plate sandwich wall according to claim 1, it is characterized in that: the vertical spacing of tension member (8) is 400mm.
CN201210425739.8A 2012-10-31 2012-10-31 Sandwich wall with straw insulation boards Expired - Fee Related CN102912894B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210425739.8A CN102912894B (en) 2012-10-31 2012-10-31 Sandwich wall with straw insulation boards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210425739.8A CN102912894B (en) 2012-10-31 2012-10-31 Sandwich wall with straw insulation boards

Publications (2)

Publication Number Publication Date
CN102912894A true CN102912894A (en) 2013-02-06
CN102912894B CN102912894B (en) 2014-09-10

Family

ID=47611442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210425739.8A Expired - Fee Related CN102912894B (en) 2012-10-31 2012-10-31 Sandwich wall with straw insulation boards

Country Status (1)

Country Link
CN (1) CN102912894B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122660A (en) * 2013-03-07 2013-05-29 沈阳建筑大学 Straw heat retaining plate used for waterproof type sandwich wall
CN103343572A (en) * 2013-07-19 2013-10-09 四川大学 Novel prefabricated composite wallboard anti-seismic energy-saving rural residence structural system
CN104514295A (en) * 2013-10-06 2015-04-15 廖树汉 85%-weight-reduced storey-multiplied heat-insulation using-area-increased straw environment-friendly wall for decreasing fire disasters
CN105178500A (en) * 2015-09-28 2015-12-23 沈阳建筑大学 Environmental-protection energy-saving wall plate of modular grass plate grass bundle wood structure
CN105256921A (en) * 2015-11-04 2016-01-20 沈阳建筑大学 Modularized light timberwork environment-friendly and energy-saving wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1804261A (en) * 2005-01-16 2006-07-19 许东奎 Thermal insulation wall assembled by block plate with rigid cover and polyphenyl sandwiched back
CN102002991A (en) * 2010-11-15 2011-04-06 李秋影 Light-weight thermal insulation wall board corner
CN102505763A (en) * 2011-10-21 2012-06-20 沈阳建筑大学 Externally laid masonry composite heat-insulating sintered building block exterior wall heat insulating system
CN202324258U (en) * 2011-08-26 2012-07-11 傅礼铭 Bidirectional multi-ribbed mortised wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1804261A (en) * 2005-01-16 2006-07-19 许东奎 Thermal insulation wall assembled by block plate with rigid cover and polyphenyl sandwiched back
CN102002991A (en) * 2010-11-15 2011-04-06 李秋影 Light-weight thermal insulation wall board corner
CN202324258U (en) * 2011-08-26 2012-07-11 傅礼铭 Bidirectional multi-ribbed mortised wall
CN102505763A (en) * 2011-10-21 2012-06-20 沈阳建筑大学 Externally laid masonry composite heat-insulating sintered building block exterior wall heat insulating system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103122660A (en) * 2013-03-07 2013-05-29 沈阳建筑大学 Straw heat retaining plate used for waterproof type sandwich wall
CN103122660B (en) * 2013-03-07 2016-04-20 沈阳建筑大学 Waterproof type sandwich wall straw insulation
CN103343572A (en) * 2013-07-19 2013-10-09 四川大学 Novel prefabricated composite wallboard anti-seismic energy-saving rural residence structural system
CN103343572B (en) * 2013-07-19 2016-04-27 四川大学 The agriculture of prefabricated combined wall board earthquake-proof energy-saving occupies structural system
CN104514295A (en) * 2013-10-06 2015-04-15 廖树汉 85%-weight-reduced storey-multiplied heat-insulation using-area-increased straw environment-friendly wall for decreasing fire disasters
CN105178500A (en) * 2015-09-28 2015-12-23 沈阳建筑大学 Environmental-protection energy-saving wall plate of modular grass plate grass bundle wood structure
CN105256921A (en) * 2015-11-04 2016-01-20 沈阳建筑大学 Modularized light timberwork environment-friendly and energy-saving wall

Also Published As

Publication number Publication date
CN102912894B (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN103174252B (en) A kind of self-insulation quake-proof building block and application process
CN102155059A (en) Multi-row hole thermal insulation building block reinforcing bar masonry wall system
CN103046665B (en) Insulating mortar strengthening layer rowlock wall with steel wire mesh for setting hose tooth constructional column and manufacturing method thereof
CN104594561A (en) Prefabricated reinforced concrete column with high-performance concrete frame and construction method
CN103603445B (en) A kind of power consumption steel frame building block infilled wall
CN102912894B (en) Sandwich wall with straw insulation boards
CN104975677A (en) Assembled sandwich thermal-insulation ribbed composite external wall plate and production method thereof
CN102912929A (en) Multi-ribbed insulation wallboard
CN201411775Y (en) An energy-saving building structure system suitable for industrial production
CN201874121U (en) Multi-row bore heat insulating building block reinforcing bar masonry wall system
CN102505800B (en) Combined type unreinforced thermal-insulating sandwich external wall slab and manufacturing method for inner laminate and outer laminate of same
CN202466964U (en) Composite cold bridge-free external wall panel with concrete close-column gypsum
CN101591943B (en) Energy-saving composite block with anti-condensation damage
CN103541485B (en) Dry construction is without heat bridge insulation blocks and building wall method
CN102535681A (en) Cast-in-place grid type gypsum sandwich thermal insulation wall and manufacturing method thereof
CN201746992U (en) Waterproof heat insulation roof with novel design
CN103790282A (en) Lattice type heatless bridge self-heat-insulation concrete sandwich wall panel
CN218758102U (en) Energy-conserving integration assembled shear force wall
CN201614676U (en) Energy-saving and thermal insulation double-lattice external wall without cold bridge
CN105804274A (en) Novel light connecting structure of block filling wall and frame structure and construction technique
CN207160359U (en) Prestressed concrete bidirectional laminated slab
CN201433484Y (en) Light steel truss cast-in-place lightweight solid composite wall
CN211691048U (en) Composite heat-bridge-free self-insulation building block
CN204826390U (en) Assembled presss from both sides compound side fascia of close rib of core heat preservation
CN108316531A (en) A kind of laminated floor slab heat insulation prefabricated bottom plate and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191218

Address after: In 243100 Anhui city of Ma'anshan Province Gansu Dangtu County Township

Patentee after: Ma'anshan Feifan Machinery Co.,Ltd.

Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9 Shenyang Construction University

Patentee before: SHENYANG JIANZHU University

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

CF01 Termination of patent right due to non-payment of annual fee